N-sheets.pdf
PDF 2 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
N
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
FOOTNOTE:
NOTE:
construction sign colors.
For all the MUTCD numbered construction signs, see MUTCD for personnel and the travelling public.
field as directed by the CO to ensure the safety of all construction plans are approximate, and are subject to adjustments in the
The location of temporary traffic control devices as shown on the
2.
1.
N.1
STATE PROJECT
NUMBER
SHEET
WY
PRA YELL 10(19)
P
M
J a n u a r y
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll n a .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
See Temporary Traffoc Control Plans for mileage.
Pit, Norris Asphalt, Gibbon Meadow Pit, Swan Lake Pit.
Install signs for the following locations: Grebe Lake Pit; Ice Lake
See Section 156 for applicable closure date information.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
NOTE:
To Bozeman
GARDINER
NORTH
ENTRANCE Gallatin
National
Forest
To Cooke City
NORTHEAST
ENTRANCEMAMMOTH
Shoshone
National
Forest
BRIDGE
FISHING
Gallatin
National
Forest
MADISON
PAINT POT
BASIN
BISCUIT
FAITHFUL
OLD
YELLOWSTONE
WEST
WEST
ENTRANCE
Targhee
National
Forest
SOUTH
ENTRANCE
LAKE
LEWIS
LAKE
HEART
VILLAGE
GRANT
LAKE
SHOSHONE
YELLOWSTONE
LAKE
CANYONNORRIS
EAST
ENTRANCE
CODY
89191
20191
To Jackson
Bridger - Teton National ForestJohn D. Rockefeller Jr.
Memorial Parkway
SCALE IN MILES
5 0 5 10 15
N
LEGEND:
10PM - 7PM
CLOSED
ROAD
MAMMOTH
NORRIS TO
Existing tee sign post
Existing portable variable message sign
Existing Tee-Post sign
TOWER
varies
Message
EXISTING TEE-POST SIGNS
2.
1.
Perimeter signing to be installed or adjusted
INFORMATIONAL SIGNING
supplied by Yellowstone National Park.
All signs (Tee-Post and Portable Variable Message) will be
Section 156. See map for all sign locations.
current construction operations on the project according to
Install or adjust the installation of perimeter signing to match
N.2
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n b .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
1 Place one portable variable message sign near the hotel/pagoda.
306+75
PRA-YELL 10(19)
GRAND LOOP ROAD
BEGIN WORK
Junction
Norris
W20-3
500 FT
CLOSED
ROAD
W20-3
AHEAD
CLOSED
ROAD
T o C a n y o n
T o M a d is o n
To Mammoth or
G20-1
1 FOOTNOTE:
NO SCALE
ROAD WORK
END
G20-2
Campgrounds
Norris
Lake
Nymph
Trail
Solfatara
Basin
Norris Gyser
Overlook
Norris
N
W20-3
AHEAD
CLOSED
ROAD
Ref-4 10 PM - 7 AM
7 MILES
(SHEET 1 OF 3)
CONTROL PLAN
TEMPORARY TRAFFIC
realignment at Grizzly Lake curves large cuts and roadway
Potential closure area, walls at Obsidian Cliff
Potential closure area, LEGEND:
walls north of Obsidian Cliff
Potential closure area, N.3
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n c .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
ROAD WORK
NEXT 5 MILES
10 PM - 7 AM
5" C
4'
1'
3 12"
3 12"
4"
4"
4" B1'
Ref-2
Ref-3
Ref-4
2'
5'
2'-6"
4 14"
4 58"
4 18"
5" C
6" C
Ref-1
2'
5'
4 18"
5" C
4 14"
6" C
4 58"
SEP 10 to OCT 6, 2017
FULL CLOSURE - SEP 11 to OCT 7, 2016
NIGHT CLOSURE - 10 pm -7 am
Parking Area
Roaring Mountain
GOVERNMENT FURNISHED GATE
GATE, METAL, 40-FOOT
Ref-1
Ref-3
Location determined by CO.
Install sign at Tower Junction and Canyon Junction.
immediately upon scheduled openings.
Install signs and barricades prior to scheduled closures. Remove
W16-3aP
G20-1
END
W20-3
W20-3
Ref-4 10 PM - 7 AM or
FOOTNOTE:
Ref-2
ROAD CLOSED
MAMMOTH to NORRIS
T o T o w e r
To Gardiner
To Norr is
Campground Indian Creek
Mammoth
500 FT
CLOSED
ROAD
W20-3
G20-2
N
AHEAD
CLOSED
ROAD
AHEAD
CLOSED
ROAD
(SHEET 2 OF 3)
CONTROL PLAN
TEMPORARY TRAFFIC
Sheepeater Cliff
Peak Bunsen
511+50
PRA YELL 10(19)
SCHEDULE A
END WORK
12 MILESW16-3aP
Parking Area Moose Exhibit
ROAD WORK
NEXT 4 MILES
N.4
STATE PROJECT
A
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n d .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
10 PM - 7 AM Ref-3
GOVERNMENT FURNISHED GATE
GATE, METAL, 40-FOOT
LEGEND:
SEP 10 to OCT 6, 2017
FULL CLOSURE - SEP 11 to OCT 7, 2016
NIGHT CLOSURE - 10 pm -7 am immediately upon scheduled openings.
Install signs and barricades prior to scheduled closures. Remove
Ref-2
ROAD CLOSED
MAMMOTH to NORRIS
10 PM - 7 AM Ref-3
SCHEDULE A
G20-1
END
W20-3
W20-3
Ref-4
10 PM - 7 AM
or
FOOTNOTE:
T o T o w e r
To Gardiner
To Norr is
Campground Indian Creek
Mammoth
500 FT
CLOSED
ROAD
W20-3
G20-2
N
AHEAD
CLOSED
ROAD
11 MILES
AHEAD
CLOSED
ROAD
(SHEET 3 OF 3)
CONTROL PLAN
TEMPORARY TRAFFIC
Sheepeater Cliff
Peak Bunsen
556+50
PRA YELL 10(19)
SCHEDULE B
END WORK
N.5
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n e .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Parking Area Willow Park
ROAD WORK
NEXT 5 MILES
immediately upon scheduled openings.
Install signs and barricades prior to scheduled closures. Remove
Ref-2
ROAD CLOSED
MAMMOTH to NORRIS
10 PM - 7 AM Ref-3
Ref-2
ROAD CLOSED
MAMMOTH to NORRIS
10 PM - 7 AM Ref-3
GOVERNMENT FURNISHED GATE
GATE, METAL, 40-FOOT
LEGEND:
SCHEDULE B
SEP 10 to OCT 6, 2017
FULL CLOSURE - SEP 11 to OCT 7, 2016
NIGHT CLOSURE - 10 pm -7 am
W16-3aP
WORK
SHOULDER
AHEAD
WORK
ROAD
AHEAD
ROAD
ONE LANE
AHEAD
WORK
ROAD
LANEONEROAD
WORK
1500 FT
ROAD
1000 FT
LANEONE
ROAD
1000 FT
ROAD
WORK
1500 FT
350'± 350'± 350'± 100' max.
W20-1 W20-4 W20-7
(PART-WIDTH CONSTRUCTION)
WORK ZONE CONTROL
Buffer space (B)
100' max.
350'± 350'± 350 ±
Work zone
W20-7 W20-4 W20-1
Work zone
(TURNOUT WORK)
WORK ZONE CONTROL
W21-1 W21-5 W20-1
BUFFER SPACE
(mph)
POSTED SPEED
LENGTH (B)
155'
200'
250'
305'
360'
Flagger location
Channelizing device
LEGEND:
Portable sign
W20-1 W20-4 W20-7
(PART-WIDTH CONSTRUCTION)
ADVANCED WORK ZONE CONTROL
Use as required.
FOOTNOTE:
NO SCALE
Limit Signing
See Project
Limits Signing
See Project
350'±350'±350'±
350'±350'±350'± along work zone = 90'
Maximum channelizing device spacing, along taper = 20'
Maximum channelizing device spacing, along work zone = 90'
Maximum channelizing device spacing, (SHEET 1 OF 4)
WORK ZONE CONTROL
TEMPORARY TRAFFIC CONTROL
N.6
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n f.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
ENGINE WHILE
Ref-5
TURN OFF
WAITING
250'±
250 ±
ENGINE WHILE
Ref-5
TURN OFF
WAITING
ROAD
ROUGH BUMP
BUMP
ROAD
ROUGH
ENDS
PAVEMENT
ENDS
PAVEMENT
W8-1 W8-3 W8-8
(NON-ASPHALT PAVEMENT SURFACES)
WORK ZONE CONTROL
C C A A
CCAA
W8-8 W8-3 W8-1
C
A
C
A C
A
C
A
(ASPHALT PAVEMENT SURFACES)
WORK ZONE CONTROL
BUMP
BUMP
(ASPHALT PAVEMENT JOINTS)
WORK ZONE CONTROL
W8-1
W8-1
LEGEND:
Portable sign
Channelizing device
Type 1 barricade
Type A warning light
Type C warning light
A
C permitted between shifts
No longitudinal joint
NO SCALE
LOW
SHOULDER
LOW
SHOULDER
W8-9
W8-9
200'±
200'± Work zone 100' 400'± 500' to 1500'
100'400'±500' to 1500'
500'±
Work zone 500'±
500'±
500'±
(SHEET 2 OF 4)
WORK ZONE CONTROL
TEMPORARY TRAFFIC CONTROL
N.7
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n g .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NPS PMIS No. 86308
NO SCALE
LEGEND:
Point slanted stripes in the direction shown.
Temporary traffic control, type 3 barricade.
ROAD
CLOSED
R11-2
Work Zone
DO NOT
BLOCK
INTERSECTION
R10-7
(WORK ZONE ACCESS LOCATIONS)
WORK ZONE CONTROL
travelled way
Edge of
Traffic flow
Traffic flow
(REALIGNMENT LOCATIONS)
WORK ZONE CONTROL
Realigned roadway
WORK ZONE
control, pavement markings
Temporary traffic
(WITHIN EXISTING ROADWAY)
Temporary traffic control, barricade, type 1, typ.
FOOTNOTE:
ROAD
CLOSED
R11-2
W1-6
ROAD
CLOSED
R11-2
W1-6
Temporary traffic control, barricade, type 1, typ.
(SHEET 3 OF 4)
WORK ZONE CONTROL
TEMPORARY TRAFFIC CONTROL
the traffic flow needs to follow.
with the slanted stripes pointed downward in the direction that
Place at 20-foot spacing to delineate new alignment. Install
N.8
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n h .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
(SHEET 4 OF 4)
WORK ZONE CONTROL
TEMPORARY TRAFFIC CONTROL
N.9
STATE PROJECT
A
F e b r u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n i.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
RATE
FLARE
BARRIER
CONCRETE
1:16
1:16
1:16
1:16
1:14
1:12
1:10
1:9
1:8
1:8
1:8
LENGTH
BUFFER SPACE
WIDTH
CLEAR ZONE
WORK ZONE
FEETSPACING IN FEETFEETMPH
NO SCALE
(USING CONCRETE BARRIER WITHIN DETOUR AREA)
WORK ZONE CONTROL
FOOTNOTE:
1 Install reflectors on concrete barriers at 25-foot intervals.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
Traffic flow
Traffic flow
NOTE:
spacing
Device pavement markings
Remove conflicting
Channelizing devices
See Note 2
Temporary concrete barrier.
See Note 4
TAPER AREA (
(optional)
BUFFER SPACE
VARIABLE WORK SPACE
(See Length and Spacing Table)
(optional)
BUFFER SPACE
TAPER AREA
50' - 100')
(50' - 100') with a crash cushion. Include reflectors on barrier at 25' intervals.
See Note 3
10' min.
may be changed to fit field conditions as approved by the CO.
Final location and spacing of temporary traffic control devices to provide access to work space.
Reduce or eliminate drums and barrier in downstream taper if necessary the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in when access is not needed.
Place channelizing devices at downstream taper during non-work hours or
Section 156.
For project specific minimum width, refer to Special Contract Requirements, barrier ends outside the work zone clear zone or protect the barrier ends
Place barrier according to the AASHTO Roadside Design Guide. Terminate
6.
5.
4.
3.
2.
1.
See Note 2
See Note 2
E d g e o f p a v e m e n t
Single
Double ty p
SIGN POST INSTALLATION
45°45°
PLAN
Single
Double
SIGN INSTALLATION ANGLE
Ø=90°
Ø=93°
200' ±
On tangent alignment Ø=93°
PROFILE
NOTE:
NO SCALE SIGN INSTALLATION DETAILS
TRAFFIC CONTROL
TEMPORARY
6' m in lag bolts with washers
" diameter galvanized 8
2.
1.
3.Paint the back of sign panels.
per post.
-inch diameter bolts8 3Attach sign panels with a minimum of 2-stained round posts.
Install signs in accordance with part VI of the MUTCD, using estimated length 13' post, treated timber
6" round
Local tangent
N.10
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll n j.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y for details
See Table on Sheet P.16
Drilled breakaway holes
File details come from the government source that posted it. Updated .