PROJECT_DESCRIPTION.pdf
PDF 34 KB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
Project Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WY PRA 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2, Park County, Wyoming
The work consists of:
Norris to Golden Gate corridor reconstruction is between 6 and 14 mile north of the Norris Junction along the Grand Loop Road. This project also includes construction of a new Stock Parking Area near Bunsen Peak parking area. Work consists of 150,000 to 200,000 CY roadway excavation (gross) grading, drainage, compaction, MSE walls, Reinforced Slope Stabilization, base, paving, pavement obliteration, and stone masonry.
Three Canyon Rims Overlook and Parking Areas: The parking areas are approximately 1 mile south of the Canyon Junction along South Rim Road and North Rim Road.
Inspiration Point (Included in base bid): construction of trails and the overlook. Work consists of grading; paving, drainage; MSE, CIP and rockery walls; bench, handrail and vault toilet fixtures; and stone work.
Brink of Upper Falls: (potential Option area) construction of trails, overlooks, access road and parking lot. Work consists of grading; paving; curb and sidewalk; drainage;
MSE and rockery walls; bench, handrail, and orientation pavilion fixtures; and stone work.
Uncle Tom’s Point: (potential Option area) construction of trails, overlooks, and parking lot. Work consists of grading; paving; curb and sidewalk; drainage; MSE and rockery walls; bench, kiosk and vault toilet fixtures; steel boardwalk; and stone work.
Project length: 7 miles
Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Over $20,000,000
Location: This project is located within Yellowstone National Park. The Norris to Golden Gate corridor is between 6 and 14 miles north of Norris Junction along the Grand Loop Road. The Canyon Rims Overlook and Parking Areas is approximately 1 mile south of the Canyon Junction along South Rim Road and North Rim Road.
DESCRIPTION OF WORK IN
US CUSTOMARY UNITS
FP-14
Grand Loop Corridor (Base)
Inspiration Point (Base)
Brink of Upper Falls (Potential Option)
Uncle Tom’s Point (Potential Option)
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes
Inspiration Point (Base)
Brink of Upper
Option)
157 Soil Erosion & Sediment Control (erosion control devices) Yes Yes Yes Yes 158 Watering for Dust Control Yes Yes No Yes
DIVISION 200 – Earthwork 201 Clearing & Grubbing 50 ACRE 0.1 AC 1.3 AC .6 ACRE 202 Additional Clearing & Grubbing (clearing & grubbing) INDIVIDUAL TREES AT CANYON
RIMS NA 27 TREES 159 TREES 85 TREES
203 Removal of Structures & Obstructions (structures, demolition) Box Culvert 2 EA NA NA NA 203 Removal of Structures & Obstructions (structures, demolition) CURB & GUTTER 0 LF 0 LF 3000 LF 3,000 LF 203 Removal of Structures & Obstructions (structures, demolition) FENCE & RAILING 0 LF 300 LF 0 LF 350 LF 203 Removal of Structures & Obstructions (structures, demolition) PAV’T & TRAIL 1000 SY 10 SY 9,600 SY 14,400 SY 203 Removal of Structures & Obstructions (structures, demolition) STONE MASONRY
59 head walls 0 SY 10 SY 20 SY
204 Excavation & Embankment 200,000 CY 335 CY 3,347 CY 1,440 CY 205 Rock Blasting: Controlled Blast Hole (rock blasting) Yes No No No 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) Yes No No No 211 Roadway Obliteration 31,500 SY 0 SY 0 SY 0 SY 213 Subgrade stabilization 33,000 T 260 T 1,733 T 1,000 T
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 780 CY 25 CY 105 CY 0 CY 252 Rockery, Special Rock Embankment, and Rock Buttress 4,700 SF 2,790 SF 2,520 SF 5,500 SF 255 Mechanically Stabilized Earth Walls (retaining walls) 600 SF 3,750 SF 1,210 SF 2,015 SF 258 Reinforced Concrete Retaining Walls (retaining walls) 0 SF 1,050 SF 0 SF 0 SF 261 Reinforced Soil Slopes 9,100 SF 0 SF 0 SF 0 SF
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) NA 0 T 2,901 T 3430 T 302 Minor Crushed Aggregate NA 120 T 612 T 1030 T
Inspiration Point (Base)
Brink of Upper
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 34,500 T 0 T 2,145 T 2540 T 408 Cold Recycled Asphalt Base Course 44,000 T NA NA NA 412 Asphalt Tack Coat (asphalt surface treatment) 67 T 0 T 0 T 0 T
DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) STEEL BOARDWALK NA NA NA 1 EA 604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) CULVERT 2,700 LF 60 LF 275 LF 405 LF 604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) CONCRETE BOX
CULVERT 10’ SPAN, 8’ RISE 56 LF NA NA NA
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) CONCRETE ARCH
CULVERT 12’ SPAN, 7’ RISE 38 LF NA NA NA
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) CATCH BASINS 0 EA 0 EA 4 EA 6 EA 605 Underdrains, Sheet Drains & Pavement Edge Drains Underdrains 1,000 LF NA NA NA 608 Paved Waterways (culverts & drains) 0 SY 0 SY 15 SY 10 SY 609 Curb & Gutter (concrete – minor structures) (indicate which) CURB 0 LF 0 LF 2,345 LF 3160 LF 615 Sidewalks, Pads & Paved Medians (concrete – minor structures) ASPHALT 1,800 SY 550 SY 2,980 SY 5010 SY 617 Guardrail 2,080 LF 0 LF 0 LF 0 LF 620 Stone Masonry EDGING 0 SF 290 SF 100 SF 1385 SF 620 Stone Masonry HEADWALLS 100 EA 2 EA 0 EA 0 EA 620 Stone Masonry BOX & ARCH CULVERT 70 CY NA NA NA 621 Monuments & Markers (construction survey & staking) (yes/no) Yes Yes Yes Yes 622 Rental Equipment (yes/no) Yes Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes Yes 624 Topsoil PLACE CONSERVED 45 ACRE 0 ACRE 0 ACRE 0 ACRE 625 Turf Establishment
DRY MULCH 41 ACRE 0 ACRE 0 ACRE 0 ACRE
626 Plants, Trees, Shrubs, Vines & Groundcovers LS LS LS LS 633 Permanent Traffic Control (traffic control devices) Yes No Yes Yes 634 Permanent Pavement Markings (traffic pavement markings) 300,000 LF 125 LF 1,440 LF 5,000 LF
Inspiration Point (Base)
Brink of Upper
Option)
635 Temporary Traffic Control – Flagger YES No YES YES 635 Temporary Traffic Control – Pilot Car YES No No No 637 Facilities & Services (field offices, laboratories, & housing) YES No No No 646 Roadside Development (use pay item description) FIXTURE BENCH 0 EA 1 EA 4 EA 7 EA 646 Roadside Development (use pay item description) FIXTURE KIOSK 1 EA 0 EA 0 EA 3 EA 646 Roadside Development (use pay item description) FIXTURE VAULT TOILET 0 EA 1 EA 0 EA 2 EA 646 Roadside Development (use pay item description) ORIENTATION PAVILION 0 EA 0 EA 1EA 1 EA 650 Temporary Diversions FLOW DIVERSION
BARRIER 200 LF NA NA NA
File details come from the government source that posted it. Updated .