F-Sheets.pdf
PDF 4 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
F
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUANTITIES
EROSION CONTROL
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
WY
PRA YELL 10(19)
P
M
F e b r u a r y
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll d a .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522 item as staked
Erosion control wetland
Existing wetland
Existing item as staked
Erosion control
Wetland area mitigation 12" Approx.
6" Approx.
or Roadway obliteration
Roadway excavation wetland sod
Placed
4.
3.
2.
1.
204.05, 211.04, 623.02(c), & 627.06(d) wetland mitigation areas. See Sections
Conserve wetland sod for use in
0 7480
5 3 b s s s s s s s s d d s s b s s
8 1 s s s s s s s a s
2 1 s s s s s s s0 s s s s s
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
Fiber roll
Clearing limits
Slope stake limits
Silt fence
Clearing limits
Slope stake limits
W et la nd m iti ga tio n ar ea
W et la n d m it ig at io n a re a
Wetland or Stream Impact
LC
NOTE:
Wetland mitigation area
Eleocharis
Thermal boundary
Thermal boundary
O bs id ia n
Cr ee k
Obsidian
Creek
Wetland Mitigation area
Wetland impacts
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
Fiber roll
Silt fence
118 Wetland ID number
Rock cut
Protect trees
Protect trees FOOTNOTE:
Wetland mitigation area
Inlet Protection
Plastic Fence number (typ.)
YNP wetland identfication
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
See K.4 for Compound Cut Detail.
See L Sheets for Roadway Obliteration.
See K.4 for Compound Cut Detail.
See L Sheets for Roadway Obliteration.
306+75 TO 360+00
SOIL EROSION CONTROL
N
N
BEGIN PROJECT
TYPICAL DETAIL
F.2
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d b .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
306+75
WY PRA YELL 10(19)
WETLAND SOD CONSERVATION & PLACEMENT
(NTS)
a b d d b
004MIT
003MIT
ngg109001MIT
002MIT
ngg108
4.
3.
2.
1.
7520 752
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
360+00 TO 420+00
SOIL EROSION CONTROL
Thermal boundary
F.3
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d c .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Wetland or Stream Impact
Wetland Mitigation area
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
118 Wetland ID number
Inlet Protection
Plastic Fence
NOTE:
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
N
N
Fiber roll
Clearing limits
Clearing limits
Slope stake limits
Slope stake limits
Wetland mitigation area
Stream
NGG096s
Stream
NGG226S
Silt fence
Fiber roll
Fiber roll
Wetland mitigation area
Fiber roll
VEGETATION BUFFER
VEGETATION BUFFER
096S
6S
233S
233S 093
233S
233S ngg097
2.
1.
7400 7400
7420 7420
093D
096S
096S
091D
096s
096S
096S
096S
096S 096S
096S
096S
096S
096S
096S
096S
096S
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
Fiber roll
Clearing limits
Clearing limits
Slope stake limits
Slope stake limits
NGG096s
Obsidian Creek
Obsidian C reek
Culvert Headwall Repair
See G.5 for Obsidian Cliff
See Sheet F.7
Obsidian Cliff Trail and Parking
Wetland or Stream Impact
Wetland Mitigation area
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
118 Wetland ID number
Inlet Protection
Plastic Fence
NOTE:
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
420+00 TO 480+00
SOIL EROSION CONTROL
N N
Silt fence
Fiber roll
F.4
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d d .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
2.
1.
1S
S
221S
221S
1S
S
S
S
S
077083 083
221S 221S
212216
1S
S
S
S
078D
S
078D
1S
S
221S
S
221S
S
BM
C U
S C
G S
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
NGG076s
NGG221s
NGG077s
See Sheet F.7
Mt. Holmes Parking
Wetland or Stream Impact
Wetland Mitigation area
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
118 Wetland ID number
Inlet Protection
Plastic Fence
NOTE:
FOOTNOTE:
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
As approved by the C.O.
VEGETATION BUFFER
VEGETATION BUFFER
VEGETATION BUFFER
VEGETATION BUFFER
480+00 TO 540+00
SOIL EROSION CONTROL
N
N
Slope stake limits
Clearing limits
Clearing limits
Silt Fence
Wetland area mitigation
Ob s i d ian Creek
O b s id ia n C r e e k
511+50
WY PRA YELL 10(19)
SUSPEND SCHEDULE A
Silt fence
Silt fence
CULVERT WORK
AREA FOR APPOLINARIS
APPROXIMATE DISCHARGE
Fiber roll
F.5
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d e .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Stream Work G.6 & G.7
Apollinaris Box Culvert &
Plastic fence
2.
1.
73207320
7340 7340
0 7
72657265
07270
727072
757275
72857285
074D 065
065D
046B
046046
S
056056
S
096S
S
071S046
070070
068068
057S7
S
S
S
096s
06906906 S
074D074D
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
5 5
12000
NGG073s
NGG057s4
NGG069s
NGG096s
N
Silt fence
Silt fence
Silt fence
STOCK PARKING AREA
AND GLEN CREEK
540+00 TO 556+50
SOIL EROSION CONTROL
F.6
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d f.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Sheet G.8 & G.9
Glen Creek Culvert
See Sheet F.8
Moose Exhibit
Wetland or Stream Impact
Wetland Mitigation area
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
118 Wetland ID number
Inlet Protection
Plastic Fence
NOTE:
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
N
Silt fence
Clearing limits
Slope stake limits
Wetland mi tigation a rea 556+50
WY PRA YELL 10(19)
GLEN CREEK STOCK PARKING AREA
SUSPEND SCHEDULE B
8010+00
WY PRA YELL 10(19)
8000+00
WY PRA YELL 10(19)
RESUME SCHEDULES A & B
END SCHEDULES A & B
Silt fence
Silt fence
Fiber roll
G le n
C re e k
2.
1.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
096s
093D
Slope stake limits
Clearing limits
Slope stake limits
Silt fence
Inlet protection
Fiber roll
Wetland or Stream Impact
Wetland Mitigation area
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
118 Wetland ID number
Inlet Protection
Plastic Fence
NOTE:
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
PARKING AREA
MT. HOLMES
AND PARKING AREA
OBSIDIAN CLIFF TRAIL
ke er
C n ai di sb O
N N
F.7
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d g .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
AND MT. HOLMES
DETAIL OBSIDIAN CLIFF
SOIL EROSION CONTROL
2.
1.
7320 7320
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522 D I
D I
Fiber roll
Plastic fence
Protect wetland mound
NOTE:
See K.3 for Brush Blanket slope treatment.
Do not drive stakes.
Use sand bags to position fiber roll in thermal areas.
See Sheets F.12 for Fiber Roll Layout
Conserve wetland sod as directed by CO.
Wetland or Stream Impact
Wetland Mitigation area
Brush blanket Check dam
LEGEND
Fiber roll
Silt fence
118 Wetland ID number
Inlet Protection
Plastic Fence
N
DETAIL MOOSE EXHIBIT
SOIL EROSION CONTROL
F.8
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d h .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
NO SCALE
NOTE:
ELEVATION
PLAN
Flow
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Varies
Varies m in clearing
Limits of m in compacted soil
Backfilled and
(see Note 4)
Steel or wood post support mesh
Woven wire
Varies
Varies
Varies
Ditch line
Top of ditchslope
FlowFlow
F lo w
Centerline of road m in min. min.
Proposed culvert headwall
Proposed culvert
Plastic fencing support
Fence control, silt fence
Soil erosion
DETAILS
SOIL EROSION CONTROL
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
SOIL EROSION CONTROL, SILT FENCE AND
ASSEMBLY DETAILS FOR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
SOIL EROSION CONTROL, SILT FENCE AND
PLACEMENT DETAILS FOR
SOIL EROSION CONTROL AT CULVERTS
plastic fence traffic control, Temporary clearing
Limits of
(undisturbed)
Existing ground clearing
Limits of control, silt fence
Soil erosion plastic fence traffic control, Temporary
5' 5'
6" min. trench
4" min.
m in
4.
3.
2.
1.
fo r s p a c in g
S e e n o te
Geotextile devices in the field.
The CO may adjust the final location of all soil erosion control
6' (max.) spacing without woven wire support mesh.
10' (max.) spacing with woven wire support mesh.
upgrade to prevent water from running around the ends.
Install silt fence along ground contours. Curve ends of silt fence down, supporting posts.
ensure silt fence remains attached to, and does not slide recommendations for installation procedures. All types must long as specified dimensions are satisfied. Follow manufacturer's
Alternate preassembled silt fence options will be allowed as
To be determined by the CO in the field.
Fiber rolls Fiber rolls
Install soil erosion control, fiber rolls at outlet, (approximately 30')
F.9
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d i.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
DITCH GRADE (G)
Ponded water
6%
5%
4%
3%
2%
SPACING
CHECK DAM
SPACING TABLE
CHECK DAM
FOOTNOTE:
NO SCALE
or existing ground
Top of pavement or existing ground
Top of pavement
V-DITCH CROSS-SECTION DETAILS
TRAPEZOIDAL DITCH CROSS-SECTION DETAILS
(G)
GRADE
DITCH
Flow
DRAINAGE DITCH INSTALLATION
DITCHLINE PROFILEDITCHLINE PLAN
Check dam spacing
(S) (S)
Check dam spacing
Top of ditchslope
Top of ditchslope
Top of ditchslope
Top of ditchslope existing bank
Top of cut or existing bank
Top of cut or
Ditchline
Flat bottom ditch
Ditch centerline existing bank
Top of cut or ty p ty p
S (ft)
F.10
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll d j.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Fiber roll or wattle are acceptable.
Approximate length needed is 10 feet.
Approximate length needed is 7 feet.
Do not install check dams where grades are less than 2%.
CHECK DAM DETAILS
SOIL EROSION CONTROL,
Soil erosion control, check dam
Soil erosion control, check dam
Soil erosion control, check dam
Soil erosion control, check dam
NOTE:
1.
as directed by the CO.
Stabilize fiber roll with sand bags instead of stake in thermal areas
NO SCALE
SILT FENCE DROP INLET PROTECTION (TYPE A) GRAVEL AND WIRE MESH
DROP INLET PROTECTION (TYPE B)
BLOCK AND GRAVEL DROP INLET PROTECTION (TYPE C)
CURB INLET PROTECTION,
BLOCK AND GRAVEL (TYPE D)
CURB INLET PROTECTION,
WOODEN WEIR (TYPE E)
SECTION A-A
SECTION B-B
SECTION C-C
Filtered water
Use type A inlet protection in sump locations only.
Use type B inlet protection only in sump locations where heavy concentrated flows are not expected.
Do not use where ponding around the structure might cause inconvenience or damage.
Overflow
Filtered water Overflow
C
C
B
B
A A
Bury geotextile to a alternate weight
Sand bag or
Extend mesh
Wire mesh
Wire mesh Concrete block
Wire mesh
Wire mesh
Wire mesh
Drop inlet with grate
Accumulated sediment
Sediment laden runoff
Filtered water
Curb inlet
Concrete block
Gravel filter
Accumulated sediment
Sediment laden runoff
Filtered water
Curb inlet
Curb inlet
Sandbag (typ.)
Wire mesh entire opening length)
Gravel (extends across
Wire mesh
Gravel filter
Gravel filter below ground line to retain concrete blocks
Geotextile
Frame
Drop inlet with grate
Gather excess at corners
Gravel filter
Sediment laden runoff
Accumulated sediment
Emergency overflow
1.
2.
3.
4.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
157-2
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED:
INLET PROTECTION
TEMPORARY
For gravel filters use 2"- 3" diameter coarse aggregate.
" openings.2 1" x 2
1Use wire mesh with 12" (typ.)
min.
18" m in m a x depth of 8" (min.)
2" x 2" wood frame
12" 18"
2" x 4" anchor (typ.)
6'
2" x 4" weir
2" x 4" spacer (typ.)
2'-0"
2"
12" min.
2" x 4" wood frame
2" x 4" wood stud, used
STATE PROJECT
NUMBER
SHEET
F.11
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRA YELL 10(19) WY
A
J a n u a r y
U
S m y fi le s p w p r o d u c ti o n d y e ll d l.
d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
A
J a n u a r y
U
S m y fi le s p w p r o d u c ti o n d y e ll d m .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.12 PRA YELL 10(19) WY
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
File details come from the government source that posted it. Updated .