G-Sheets.pdf
PDF 20 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
G
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10.4 x 16 20301 -0300
20301 -1200
20301 -1400
20301 -1900
20426 -1000
20701 -0300
25101 -0100
25101 -0300
25801 -0000
55210 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60220 -3150
60220 -4200
60404 -1000
60501 -0000
62001 -0000
62002 -1000
62011 -0500
62011 -0600
62011 -0700
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
B O
X C
U
LV
ER
T
R
EM
O V A L
O F
H
EA
D W
A
LL
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
D
IT
C H
EX
C A V A
TI
O N
(A po lli na ri s ch an ne l)
S
EP
A R A
TI
O N
-S
TA
B
IL
IZ
A
TI
O N
G
EO
TE
X
TI
LE
C
LA
S S
TY
PE
C
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
EI
N
FO
R C
ED
C
O N
C R
ET
E R
ET
A
IN
IN
G
W A
LL
(P re ca st w in g w al l )
PR
EC
A S T
S
TR
U C
TU
R A L
C O
N C R
ET
E( Pr ec as t co nc re te fo ot in g)
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
F
EE
T
S
PA
N
FE
ET
R
IS
E
PR
EC
A S T
R
EI
N
FO
R C
ED
N C R
ET
E B O
X C
U
LV
ER
T
F
EE
T
S
PA
N
F
EE
T
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T ( ar ch
C A
TC
H B
A S
IN
FL
H T
YP
E
S
TA
N D
A R D
U N
D
ER
D R A
IN
S
YS
TE
M
S
TO
N E
M A S O
N R Y(
H ea dw al l re pa ir
C
LA
S S B
M A S O
N R Y, R O
C K F
A C E
FI
N
IS
H
S
TO
N E
M A S O
N R Y
H
EA
D W
LL
FO
R
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
6-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH EACH CUYD SQYD CUYD CUYD SQFT CUYD LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT CUYD SQYD EACH EACH EACH Lt Rt
309+00 2 45 15 5 59 2 CLAY [1] [4]
312+78 5 55 1 48 2 18 CLAY [1]
315+29 5 55 1 51 2 CLAY [1]
321+03 2 34 2 1 41 2 4 CLAY [2]
324+50 3 37 44 2 CLAY [1]
326+05 4 40 2 1 47 2 4 CMP [2] [7]
329+00 4 26 45 2 CMP [1]
331+70 1 CMP [1]
333+50 5 26 72 2 CMP [1]
334+06 2 1 CMP [2]
338+78 1 7 CMP [1]
341+17 1 1 CMP [1] [8]
342+00 10 94 15 5 86 1 1 CMP [1] [4]
344+06 11 44 1 1 15 5 71 1 1 7 CMP [2] [4] [7]
346+00 11 33 15 5 70 1 1 CMP [1] [4]
350+13 1 1 8 CMP [2] [7]
353+00 4 51 15 5 49 1 1 CMP [1] [4]
355+84 8 32 2 1 15 5 12 79 2 17 CMP [2] [4]
361+59 5 32 2 1 72 2 5 CMP [2]
366+50 1 16 40 2 CLAY [1]
371+13 2 1 5 [2]
372+50 4 17 59 2 CLAY [1]
378+25 1 22 41 2 CLAY [1]
384+50 7 73 2 1 67 2 9 CLAY [2]
387+50 9 45 15 5 70 2 CMP [1] [4]
394+00 5 38 15 5 50 2 CMP [1] [4]
397+51 4 45 2 1 54 2 16 CMP [2]
406+50 2 29 44 2 CMP [1]
410+90 1 53 1 1 15 5 49 2 5 CMP [2] [4] [7]
414+80 1 2 CMP [5] [6]
416+25 5 49 50 2 CMP [1]
417+63 1 1 10 CMP [2] [6]
420+50 5 52 50 2 CMP [1]
430+02 4 29 2 1 50 2 5 CMP [2]
432+50 1 32 39 2 CMP [1]
CUMULATIVE TOTAL 1104 0 22 1 19 0 135 45 12 0 0 0 1325 172 0 0 0 4 0 0 0 44 6 0
NOTE:
1. Steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table. FOOTNOTE: Allowable Pipe Material
2. Aluminized steel pipe culvert minimum wall thickness is the thickness required by the [1] No existing headwalls [6] Culvert length to be field verified CAP Corrugated Aluminized Std. 602-1 fill height table. [2] Existing headwall at inlet and/or outlet [7] Existing inlet treatment unknown CMP Corrugated Metal
3. Aluminum pipe culvert minimum wall thickness is the thickness required by the [3] Riprap energy dissipator at inlet [8] Existing drop inlet Clay Vitrified Clay Std. 602-1 fill height table. [4] Riprap energy dissipator at outlet [9] Schedule B only CONC Concrete
4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for [5] Ditch length to be field verified [10] Cut bevel to match face of wall all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. NPS PMIS No. 86308 & 2131522
5. See Std. 602-7 for acceptable concrete cell class. NPS Drwg. No. 101/130820
6. Project total is Schedule B total.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D ra in ag e_
S um m ar y_
FP
.x ls x]
Sh ee t 1-
Fe b-
1:
A
M C
S m it h
5/
D
S te el e
6/
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
PRA-YELL 10(19)WY
-0300
20301 -1200
20301 -1400
20301 -1900
20426 -1000
20701 -0300
25101 -0100
25101 -0300
25801 -0000
55210 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60220 -3150
60220 -4200
60404 -1000
60501 -0000
62001 -0000
62002 -1000
62011 -0500
62011 -0600
62011 -0700
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
B O
X C
U
LV
ER
T
R
EM
O V A L
O F
H
EA
D W
A
LL
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
D
IT
C H
EX
C A V A
TI
O N
(A po lli na ri s ch an ne l)
S
EP
A R A
TI
O N
-S
TA
B
IL
IZ
A
TI
TE
X
TI
LE
C
LA
S S
TY
PE
C
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
EI
N
FO
R C
ED
C
O N
C R
ET
E R
ET
A
IN
IN
G
W A
LL
(P re ca st w in g w al l )
PR
EC
A S T
S
TR
U C
TU
R A L
C O
N C R
ET
E( Pr ec as t co nc in g)
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
F
EE
T
S
PA
N
FE
ET
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T
F
EE
T
S
PA
N
F
EE
T
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T( ar ch
C A
TC
H B
A S
IN
FL
H T
YP
E
S
TA
N D
A R D
U N
D
ER
D R
TE
M
S
TO
N E
M A S O
N R Y(
H ea dw al l re pa ir
C
LA
S S B
M A S O
N R Y, R O
C K F
A C E
FI
N
IS
H
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
6-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH EACH CUYD SQYD CUYD CUYD SQFT CUYD LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT CUYD SQYD EACH EACH EACH Lt Rt
PREVIOUS SHEET: 1104 22 1 19 135 45 12 1325 172 4 44 6
435+28 4 44 2 1 15 5 42 2 1 CMP [2] [4] [5]
435+20 - 438+50, RT 55 330 Standard Underdrain System 437+30 15 5 444+50 - 445+50, RT 33 150 Standard Underdrain System
444+16 1 19 1 1 37 2 13 CMP [2]
446+11 173 11 7 CONC Obsidian Cliff Culvert 450+20 2 1 4 [2] 451+37 15 5 452+18 2 1 3 [2] 455+15 2 1 2 [2]
456+00 25 35 1 1 CMP [1] [4]
457+00 6 1 457+60 6 1 [10] 460+14 2 1 [2] 460+17 15 5
461+00 1 CMP [10] [1]
461+00 to 465+62 40 12 457 465+36 6 1
465+62 5 26 2 1 15 5 33 1 3 CLAY [2] [4]
469+07 2 1 1 6 CMP [2] [6] [7]
469+07 to 473+00 73 390 469+25 6 1 471+70 6 1
473+00 3 1 15 5 35 1 CMP [1] [4]
474+01 2 1 [2] 475+10 6 1 476+90 15 5
478+25 6 34 15 5 55 2 CMP [1] [4]
479+55 2 1
487+00 1 7 41 2 CMP [1]
490+90 5 47 2 1 54 2 1 CMP [2] [6]
498+02 2 29 2 1 59 1 1 1 CONC [2]
511+75 1 1 171 110 48 508 8 56 57 CONC [9] Apollinaris Box Culvert 515+40 15 5 [9]
CUMULATIVE TOTAL 1538 1 45 1 31 171 416 96 245 508 8 0 2563 172 0 56 0 10 480 11 57 56 6 0
NOTE:
1. Steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table. FOOTNOTE: Allowable Pipe Material
2. Aluminized steel pipe culvert minimum wall thickness is the thickness required by the [1] No existing headwalls [6] Culvert length to be field verified CAP Corrugated Aluminized Std. 602-1 fill height table. [2] Existing headwall at inlet and/or outlet [7] Existing inlet treatment unknown CMP Corrugated Metal
3. Aluminum pipe culvert minimum wall thickness is the thickness required by the [3] Riprap energy dissipator at inlet [8] Existing drop inlet Clay Vitrified Clay Std. 602-1 fill height table. [4] Riprap energy dissipator at outlet [9] Schedule B only CONC Concrete
4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for [5] Ditch length to be field verified [10] Cut bevel to match face of wall all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. NPS PMIS No. 86308 & 2131522
5. See Std. 602-7 for acceptable concrete cell class. NPS Drwg. No. 101/130820
6. Project total is Schedule B total.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.2 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D ra in ag e_
S um m ar y_
FP
.x ls x]
Sh ee t ( 2)
1- Fe b-
1:
A M
C
S m it h
5/
D
S te el e
6/
D es ig ne d by
C he ck ed b y:
SHEET
-0300
20301 -1200
20301 -1400
20301 -1900
20426 -1000
20701 -0300
25101 -0100
25101 -0300
25801 -0000
55210 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60220 -3150
60220 -4200
60404 -1000
60501 -0000
62001 -0000
62002 -1000
62011 -0500
62011 -0600
62011 -0700
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
B O
X C
U
LV
ER
T
R
EM
O V A L
O F
H
EA
D W
A
LL
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
D
IT
C H
EX
C A V A
TI
O N
(A po lli na ri s ch an ne l)
S
EP
A R A
TI
O N
-S
TA
B
IL
IZ
A
TI
TE
X
TI
LE
C
LA
S S
TY
PE
C
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
EI
N
FO
R C
ED
C
O N
C R
ET
E R
ET
A
IN
IN
G
W A
LL
(P re ca st w in g w al l )
PR
EC
A S T
S
TR
U C
TU
R A L
C O
N C R
ET
E( Pr ec as t co nc in g)
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
F
EE
T
S
PA
N
FE
ET
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T
F
EE
T
S
PA
N
F
EE
T
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T( ar ch
C A
TC
H B
A S
IN
FL
H T
YP
E
S
TA
N D
A R D
U N
D
ER
D R
TE
M
S
TO
N E
M A S O
N R Y(
H ea dw al l re pa ir
C
LA
S S B
M A S O
N R Y, R O
C K F
A C E
FI
N
IS
H
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
6-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH EACH CUYD SQYD CUYD CUYD SQFT CUYD LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT CUYD SQYD EACH EACH EACH Lt Rt PREVIOUS SHEET: 1538 1 45 1 31 171 416 96 245 508 8 2563 172 56 10 480 11 57 56 6
518+75 - 519+90, RT 1 115 [9] Standard Underdrain System
520+02 5 41 2 1 51 2 2 CAP [2] [9]
523+25 to 524+90, R 165 [9] Standard Underdrain System
525+01 29 2 1 58 2 2 CONC [2] [9]
530+01 2 1 [2] [9]
531+00 17 43 2 CONC [9]
533+00 3 21 43 2 CONC [6] [9]
538+34 3 41 2 1 46 2 13 CMP [2] [9]
541+42 1 62 1 1 42 2 2 CMP [2] [9]
544+75 - 548+25 350 [9] Standard Underdrain System
545+00 53 15 5 49 2 CMP [1] [4] [6] [9]
546+50 6 38 2 1 15 5 50 2 5 CMP [2] [4] [9]
548+31 1 36 2 1 42 2 1 CMP [2] [9]
551+01 2 17 2 1 42 2 CONC [2] [5] [9]
552+50 2 26 43 2 CONC [6] [9]
553+51 2 27 2 1 45 2 3 CMP [2] [9]
Obsidian Cliff Parking Area 12
2000+73 94 1 1 CMP [1]
2001+17 109 1 CMP [1]
2002+37 81 1 1 CMP [1]
Mt Holmes Trailhead 10000+00 5 1 10001+20 5 1 Moose Exhibit Parking Area
4000+30 1 42 2 1 42 2 CMP [2] [9]
4001+65 86 15 1 CMP [1] [4] [6] [9]
4001+77 15 5 [4] [9] Glen Creek Box Culve 8004+36 220 151 8 36 57
PROJECT TOTAL 1989 1 64 1 41 171 471 113 477 659 16 86 3107 259 264 56 36 14 1110 11 114 68 10 12
NOTE:
1. Steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table. FOOTNOTE: Allowable Pipe Material
2. Aluminized steel pipe culvert minimum wall thickness is the thickness required by the [1] No existing headwalls [6] Culvert length to be field verified CAP Corrugated Aluminized Std. 602-1 fill height table. [2] Existing headwall at inlet and/or outlet [7] Existing inlet treatment unknown CMP Corrugated Metal
3. Aluminum pipe culvert minimum wall thickness is the thickness required by the [3] Riprap energy dissipator at inlet [8] Existing drop inlet Clay Vitrified Clay Std. 602-1 fill height table. [4] Riprap energy dissipator at outlet [9] Schedule B only CONC Concrete
4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for [5] Ditch length to be field verified [10] Cut bevel to match face of wall all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. NPS PMIS No. 86308 & 2131522
5. See Std. 602-7 for acceptable concrete cell class. NPS Drwg. No. 101/130820
6. Project total is Schedule B total.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.3 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D ra in ag e_
S um m ar y_
FP
.x ls x]
Sh ee t ( 3)
1- Fe b-
1:
A M
C
S m it h
5/
D
S te el e
6/
D es ig ne d by
C he ck ed b y:
SHEET
DRAINAGE QUANTITIES
TABULATION OF
G.4
STATE PROJECT
SHEET
WY
PRA YELL 10(19)
P
M
F e b r u a r y
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll u c .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
1 See Sheet G.11 for design criteria.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
HEADWALL REPAIR
OBSIDIAN CLIFF CULVERT
ISOLATION OPTION
CULVERT HEADWALL REPAIR
OBSIDIAN CREEK
Headwall repair workHeadwall repair work
N approved by the CO
Dewater inlet to a location
Box Culvert
Flowline of
V a r ie s on solid ground bottom stones
Dig out base to set
V a r ie s
Class 3
Method A, Placed riprap, Varies
SECTION A-A
See C_Sheets section, Typical road
2' Depth
Method A, Class 3
Placed riprap, V a r ie s
A
A
Plastic Lining48-inch culvert pipe
60 lnft Temporary barrier, 40 LF
Sandbag flow diversion barrier, 40 LF
Sandbag flow diversion diversion barrier
Sandbag flow
NOTE:
5.
4.
3.
2.
1.
2-inch depth topsoil, Placed conserved
G.5
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u d .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
See Section 620.
to be emulated during the construction of stone masonry headwalls.
of the Grand Loop Road, that illustrates the stone masonry pattern constructed headwalls, along the Norris to Golden Gate segment set by the CO in the field. The CO will identify one, two, or three
Provide a variable rock face finish that emulates the stone pattern or as directed by the CO.
color and texture of conserved stones, the surrounding terrain, Produce additional stone as needed from rock material matching immediate area where the stones were conserved.
incorporate conserved stones at a headwall constructed in the of conserved stones are sufficient for reuse. Where applicable, Utilize stones conserved from existing headwalls where the size
Construct headwalls according to Section 620.
Obsidian Cliff Culvert is located at approximate Sta. 446+00.
5.
4.
3.
2.
1.
See Sheet C.8
Special rock embankment
446+25 to 447+75, Rt
See Section 620.
during the construction of stone masonry headwalls.
pattern, that illustrates the stone masonry pattern to be emulated set by the CO in the field. Match existing Obsidian Cliff masonry
Provide a variable rock face finish that emulates the stone pattern or as directed by the CO.
color and texture of conserved stones, the surrounding terrain, Produce additional stone as needed from rock material matching immediate area where the stones were conserved.
incorporate conserved stones at a headwall constructed in the of conserved stones are sufficient for reuse. Where applicable, Utilize stones conserved from existing headwalls where the size
Construct/reapair headwalls, in place, according to Section 620.
Obsidian Cliff Culvert is located at approximate Sta. 446+00.
stone masonry
Remove and reset
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
INLET OUTLET
and topsoil. Plantings by others
Placed riprap, Method A, Class 3, and topsoil. Plantings by others
Placed riprap, Method A, Class 3, (headwall repair)
Stone masonry
(headwall repair)
Stone masonry
(headwall repair)
Stone masonry
(headwall repair)
Stone masonry
73307330
N
Scale in feet
0 1010 20 30
A
A
LC
F lo w
LC
LC
HW = 4.7 FT
Q = 290 CFS
Q = 90 CFS
OHW = 2 FT
Hydraulic Information
G.6
STATE PROJECT
y e ll u e .d g n
U
S S u r ft
D
J a c k s o n h e c k e d b y
S m it e s ig n e d b y reinforced concrete box culvert
10' span, 8' rise precast
Removal of box culvert
Existing road bottom edge
New stream channel
Existing grade contour bank top
New stream
° ty p.
'-0
5' -0
5' -0
New road
Construction limit
20'
20'
Construction limit
'-0
Sta. 512+08.7
PLAN
BOX CULVERT & STREAM WORK
APOLLINARIS
'-0
5' -0
Toe of slope
2 5 wetland sod cover with conserved
Fill stream channel, New precast wingwalls obsidian creek channel
Existing stream
NOTE:
See F_Sheets for potential discharge areas.1.
Placed riprap, Method A, class 3 class 3
Method A, Placed riprap, E= 2456230.89 N= 1910777.98
E= 2456176.86 N= 1910792.72
E= 2456116.24 N= 1910810.28
E= 2456105.56 N= 1910844.19
E= 2456125.30 N= 1910884.38
See Profile Sheet G.6
New stream channel
Sandbag flow diversion
(t yp
0"
FOOTNOTE:
.5
IE 7323.0'
IE 7324.8'
Sta. 513+33.8
Sta. 513+26.8
4-sided with seal concrete
Construct coffer dam, See Sheet G.7 for details.
flow diversion channel, 10' x 56'.
Construct plastic-lined temporary
R=25'
LEGEND
Conserve and/or place wetland sod
Sandbag flow diversion
Flow
Flow
90 lnft each, slope 2% culvert pipe (2 total), SEC Temporary 48-inch installation.
Final location of cofferdam to be approved by CO prior to 1
Included in mainline embankment quantities.
2.See Sheet G.7 for Section AA.
Sandbag flow diversion
Mitigation, log weir
NOTE:
See Sheet G.12 for masonry facing detail.1.
70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
LC
NEW CULVERT & STREAM CHANNEL PROFILE
SECTION A-A
G.7
STATE PROJECT
y e ll u f.
d g n
U
S S u r ft
D
J a c k s e c k e d b y
S m s ig n e d b y
0 Ft/Ft 0.23% streambed material
Backfill with conserved
Riprap apron
FOOTNOTE:
Existing grade
MITIGATION, LOG WEIR DETAIL
New road embankment
SECTIONS & DETAILS
BOX CULVERT & STREAM WORK
APOLLINARIS
Wingwall
22'-0" 22'-0"45'-0"
New stream channel bottom
Mitigation, log weir
41'-0"
16'-2"
Existing ground surface channel bottom edge
New stream
10' channel bottom
New stream
5'-0" equal to stream bottom
Log weir, set top elev
5'10'5'
10' x 8' precast concrete box culvert
Existing road embankment
New road
Precast wingwall
New 10' x 8' precast concrete box culvert (L=54') streambed material
Backfill with conserved m in
Precast wingwalls footing Precast concrete
Existing grade
CULVERT INLET/OUTLET ELEVATION
NEW CULVERT PLAN
New road LC
New 10' x 8' precast concrete box culvert (L=54')
Precast wingwalls
LCNew culvert
Precast footing
5'-0" m in
Existing grade
DIVERSION CHANNEL
PLASTIC-LINED TEMPORARY FLOW
channelTemporary
Channel
Temporary 10' with plastic channel liner Cover entire excavation conserved wetland sod Conserve or place
5'-0" conserved wetland sod Conserve or place
LEGEND
(precast wing wall) pay limits
Reinforced concrete retaining wall
Elev 7330.2
2'-0"
Elev 7320.5
Elev 7317.5
Elev 7326.0
2.9 flow and field conditions.
Vary width and alignment as directed by the CO to accomodate for wetland sod conservation and placement detail.
as shown on the plan and as directed by the CO. See Sheet F.2 Conserve existing wetland sod, place conserved wetland sod
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
20'
"2
26'-7
"2
27'-4
12'-0"
135°
Sta. 512+08.7
Outlet
Inlet
Precast headwall
'-0
Skewed end section
SCALE IN FEET
0 55 10 15
N
PLAN & PROFILE
GLEN CREEK BOX CULVERT
LC
60 50 40 30 20 10 0 10 20 30 40 50 60 70
LC
LC
50HW = 4.5 FT
Q = 186 CFS
Q = 56 CFS
OHW = 1.5 FT
Hydraulic Information
Fl ow
New culvert
Remove existing bridge
Elev 7266.5'
New road edge
Existing top of bank grade contour
Existing
'-0
New road
New road embankment
New road
Elev 7274.3'
Elev 7261.6'
Elev 7272.6'
Elev 7265.5'
0.026 Ft/Ft
Match existing stream bottom Match existing stream bottom material
Conserved streambed
Flowline to existing stream channel shape and locate for smooth transition
New stream channel CL, 25 L.F., 5'-0"
Existing ground surface
Existing stream bottom embankment grade
New road min. new stream channel depth 18" to create smooth transition to existing grade, place conserved streambed material
Construct bank area, excavate or
New stream channel bottom edge
Existing trail transition to existing stream channel shape and locate for smooth
New stream channel CL, 30 L.F., (L=36') arch culvertconcrete
New 12' x 11' precast
(L-36') concrete arch culvert
New 12' x 11' precast
New precast wingwall
New precast wingwall
New precast concrete footing
Sta. 8004+35.6 locate as needed diversion barrier, Sandbag flow locate as needed diversion barrier, Sandbag flow locate as needed diversion barrier, Sandbag flow locate as needed diversion barrier, Sandbag flow class 3 Method A, Placed riprap, class 3 Method A, Placed riprap, Geotextile, Class 1, Type C
Separation-Stabilization
Geotextile, Class 1, Type C
Separation-Stabilization
Placed riprap, Method A, class 3
G.8
STATE PROJECT
NUMBER
SHEET
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u g .d g
WY PRA YELL 10(19)
J a c k s
S m
C h e c k e d b y
D e s ig n e d b y
4-sided with seal concrete
Construct coffer dam, FOOTNOTE:
installation.
Final location of cofferdam to be approved by CO prior to 1
90 lnft, slope 2%
48-inch culvert pipe, SEC Temporary
Flow
Existing ground surface
Existing stream bottom
Construct bank area, see note 1
New stream channel bottom edge
New grade
Existing streambed material
NOTE:
3.
2.
1.
2'-6"
New stream channel See Sheet G.12 for masonry facing detail.
Place conserved topsoil over constructed bank areas.
new stream channel depth 18-inches.
material to create smooth transition to existing grade, min.
Construct bank area, excavate or place conserved streambed
New stream channel
9'-0"
G.9
STATE PROJECT
y e ll u g b .d g n
U
S S u r ft
D
J a c k s e c k e d b y
S m s ig n e d b y
CULVERT INLET/OUTLET ELEVATION
with conserved streambed material
Backfill existing stream channel
TYPICAL BANK AREA CONSTRUCTION
Conserved topsoil, 6" min.
LC
LC
12'-0"
2'-6"
ELEVATIONS
GLEN CREEK BOX CULVERT
I n le t
2'-0"12'-0"
1.9
O u tl e t
Placed riprap, Class 3
Elev 7261.6' footing
Precast concrete
Precast concrete headwall
"2 118'-5 "2
117'-6
NEW CULVERT PLAN
LC
& channel
Culvert
LCNew road
New culvert LC
(L=36') concrete arch culvert
New 12' x 11' precast
Precast footing
Precast wingwalls
Precast headwall
Inlet
Outlet
Sta. 8004+35.6
'-0
Geotextile, Class 1, Type C
Separation-Stabilization
Measured along wing wall
2'-0" 2'-0"2'-6"
LEGEND
Reinforced concrete retaining wall (precast wing wall) pay limits streambed material
Backfill with conserved
Elev 7272.6'
Elev 7274.3'
(L=36') concrete arch culvert
New 12' x 11' precast Elev 7268.0' wingwalls @ 50° skew
Precast concrete
SECTION A-A
TYPICAL CULVERT & STREAM CHANNEL PROFILE
CULVERT INLET/OUTLET ELEVATION
Flow
TYPICAL CULVERT PLAN
5'-0"
5'-0"
'-0
'-0
Per plan
5'-0"
1 V a r ie s
ELEVATION
TYPICAL OUTSIDE WINGWALL FACE
ELEVATION
TYPICAL INSIDE WINGWALL FACE
5'-0"
5'-0"
Varies
Not to scale
Varies
5'-0"
Varies
Per plan
Per plan
Per plan
Varies
Per plan
5'-0"
Per plan
Varies
Placed riprap, class 3
CL culvert & stream
CL culvert & stream
CL culvert & stream
Existing stream bottom
Existing stream bottom bank top Stream bank top Stream bank top Stream bank top Stream
Proposed road grade
Proposed road grade bank top Stream
Box culvert headwall Box culvert headwall headwall Box culvert headwall Box culvert footing Wingwall
Wingwall footing
Wingwall footing
Wingwall footing
Wingwall footing footing Headwall
Wingwall
Wingwall
Wingwall
Wingwall top
A
A outside face Wingwall
Wingwall inside faceWingwall inside face
Stream bank toe
Stream bank toe wall Box culvert
NOTE:
for transition to existing bank top and toe.
1. Place conserved streambed material over riprap as neededGrade break
Grade break
G.10
STATE PROJECT
y e ll u g c .d g n
U
S S u r ft
D
J a c k s e c k e d b y
S m s ig n e d b y
Geotextile, Class 1, Type C Separation-Stabilization
Geotextile, Class 1, Type C Separation-Stabilization
Geotextile, Class 1, Type C Separation-Stabilization
Geotextile, Class 1, Type C Separation-Stabilization
Geotextile, Class 1, Type C Separation-Stabilization
Geotextile, Class 1, Type C Separation-StabilizationGeotextile, Class 1, Type C
Separation-Stabilization class 3 Method A, Placed riprap, class 3 Method A, Placed riprap, class 3 Method A, Placed riprap, class 3 Method A, Placed riprap, Method A, class 3 Placed riprap, class 3 Method A, Placed riprap, class 3 Method A, Placed riprap, Scaled graphics for riprap qty calcs
DETAILS
BOX CULVERT RIPRAP
plate assembly
Welded connection
GENERAL NOTES:Varies rope
1¼" mastic box culvert
Inside of box culvert
Outside of along slope both sides (typ.)
21#2" x 21#2" Bevel
(per manufacturer) wire mesh (typ.)
6"x6"xW1/4"2 connection plates (typ.)
Embedded Weep holes (typ.)
CONNECTION PLATE DETAIL
WATERTIGHT BOX JOINT SECTION
WINGWALL DETAIL
Bearing capacity: 2 ton/sq. ft.
Unit weight: 125 lbs/cu. ft.
SOIL:
Provide 2-inch minimum concrete cover to the face of any bar.
ASTM A1064.
(ASTM, A615) grade 60, or welded wire reinforcing conforming to
Furnish reinforcing steel bars conforming to AASHTO M31, deformed
REINFORCING STEEL:
Chamfer all exposed edges 3/4-inch.
compressive strength f'c=5000 psi.
Furnish structural concrete, class A(AE) with minimum 28-day design
CONCRETE:
HL-93.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
AASHTO LRFD Bridge Design Specifications, latest edition.
Design stem walls, headwalls, wingwalls, and footings in accordance with
Design precast culverts in accordance with Section 602.
DESIGN:
Install tie rods or connector plates per manufacturer between precast sections.
See section 104.
grades shown in the plans and provide shop drawings for review by the CO.
Provide precast concrete culverts conforming to the dimensions, lines, and of Roads and Bridges on Federal Highway Projects, FP-14 (U.S. Customary).
Federal Highway Administration Standard Specifications for Construction
Detail is for general information only.
CONSTRUCTION:
Precast footing
O Ring if required
1 1/4" dia. hole for 1" dia. joint tie over pipe joint
Do not install fastener 1'-3" min.
1'-5" max.
m a x ty p ic a l
2'-9 1/2" max.
2' -6 1/2" min.
precast permitted when
Tapered holes
SUPPLEMENTAL CONCRETE PIPE TIEHeaded Stud
4¼" Non-shrink grout
4½"
15° foam gasket
Closed cell
½" gap
V a r ie s
" ref.8 ref.
" 8 top and sides
(outside joint) on mastic joint wrap
Grout and 9" wide
G.11
STATE PROJECT
NUMBER
SHEET
WY PRA YELL 10(19)
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u g d .d g
J a c k s
S m
C h e c k e d b y
D e s ig n e d b y
TYPICAL STRUCTURAL DETAILS
AND WINGWALLS
PRECAST BOX CULVERT
(typ.)
(typ
NOTE:
4.
3.
2.
1.
DOVETAIL ANCHOR DETAIL
DOVETAIL ANCHOR AND SLOT DETAILS
Face of concrete across joint
Anchor center to the depth shown
Rake square and tool
"2
6" min.
"2
1" "8
1"
"4
Foam core
DOVETAIL ANCHOR DOVETAIL SLOT
(See Notes 4 and 5) see detail
Masonry support plate, MASONRY SUPPORT PLATE AND DETAILS
SECTION A-A
APOLLINARIS CULVERT
GLENN CREEK CULVERT
(See Note 4)
"Ø Threaded anchor bolt4
(See Note 4)
(typ.)
" Plate8
6"
A
R=30'-6" A
"8 712'-1
Plate and culvertLC
1'-8" 1'-8"
4"
Face of concrete
Precast concrete box culvert end section
8.
7.
6.
5.
rock face finish
Class B masonry, at 2'-0" max O.C., see detail
Precast masonry dovetail slots see detail at 2'-0" max O.C., dovetail slots
Precast masonry
Mortar steel dovetail slot Hot dipped galvanized
G.12
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u h .d g n
WY PRA YELL 10(19)
J a n u a r y
J a c k s
S m
C h e c k e d b y
D e s ig n e d b y
DETAILS
BOX CULVERT MASONRY
See Section 620.
be emulated during the construction of stone masonry headwalls.
masonry wing walls, that illustrates the stone masonry pattern to set by the CO in the field. Match pattern of the existing stone
Provide a variable rock face finish that emulates the stone pattern or as directed by the CO.
color and texture of conserved stones, the surrounding terrain, Produce additional stone as needed from rock material matching immediate area where the stones were conserved.
incorporate conserved stones at a headwall constructed in the of conserved stones are sufficient for reuse. Where applicable, Utilize stones conserved from existing headwalls where the size between edge of precast concrete and anchor bolt.
drilling into precast concrete. Provide 3" minimum clear distance manufacturer's recommendations. Verify hole locations before
Epoxy anchor threaded bolts into precast concrete. Follow
-inch threaded anchor bolt. 4 3-inch hole in plate for 16
13Drill
Provide steel plates conforming to ASTM A588, weathering steel.
Provide hot-dipped galvanized steel anchors.
Provide type D/A 101 dovetail anchors, or an approved equal.
concrete by providing a temporary foam core.
spacing no greater than 2-feet. Prevent slots from filling with
Set dovetail slots vertically into the concrete wall at a horizontal
Furnish 22 gage hot dipped galvanized steel dovetail slots.
Provide type D/A 100 dovetail slots, or an approved equal.
(Typ.)
MASONRY ANCHOR LAYOUT
(Glenn Creek Culvert layout shown, Apollinaris Culvert layout similar)
12" max 6" min to
Class B masonry, rock face finish pay limits
LEGEND
Plate and culvertLC
1'-8"1'-8"
A
A
(typ.)
4"
" 8 111'-5
"4 1R=32-3
NO SCALE
FOR PIPE CULVERT
STONE MASONRY HEADWALL
ROUND PIPE
(cuyd)
Stone(in)
D
(ft)
A
(ft)
B
(ft)
H
(ft)
L
0.37
0.61
0.72
1.41
2.52
4.35
12"
15"
18"
24"
30"
36" 2'-0"
1'-8"
1'-4"
1'-0"
1'-0"
1'-0" 1'-2"
1'-4"
1'-6"
1'-10"
2'-2"
2'-6"
3'-0"
3'-3"
3'-6"
4'-4"
5'-2"
6'-0"
3'-8"
4'-4"
5'-0"
6'-4"
7'-8"
9'-0"
SIDE ELEVATION
Concrete footing
L
D
B
Vari able
H
6"
B e lo w g r o u n d p o r ti o n o f h e a d w a ll
0.28
0.29
0.40
0.76
1.28
2.00
0.36
0.37
0.46
0.66
0.90
1.17
(cuyd)
Concrete
(cuyd)
Bed Course
SINGLE PIPE (INFORMATION ONLY)
7.
6.
5.
4.
3.
2.
1.
estimated quantities.
See Tabulation of Drainage Quantities Sheets for locations and
Modify headwalls as directed by the CO where pipes are skewed.
the headwall is less than 24-inches below shoulder grade.
Install headwalls parallel to the roadway line and grade where
See Section 620.
to be emulated during the construction of stone masonry headwalls.
of the Grand Loop Road, that illustrates the stone masonry pattern constructed headwalls, along the Norris to Golden Gate segment set by the CO in the field. The CO will identify one, two, or three
Provide a variable rock face finish that emulates the stone pattern or as directed by the CO.
color and texture of conserved stones, the surrounding terrain, Produce additional stone as needed from rock material matching immediate area where the stones were conserved.
incorporate conserved stones at a headwall constructed in the of conserved stones are sufficient for reuse. Where applicable, Utilize stones conserved from existing headwalls where the size
Construct headwalls according to Section 620.
7.9348" 2'-0" 3'-0" 7'-0" 12'-0" 2.50 1.90
Single Pipe
ROUND PIPE
FRONT ELEVATION
G.13
STATE PROJECT
y e ll u i.
d g n
U
S S u r ft
D
S J a c k s o n
C h e c k e d b y
C
S m it h
D e s ig n e d b y
M in
D A
CMP/PLASTIC CULVERT ISOMETRIC VIEW
6"
4-inch compacted depth
Bedding material, typ., pipe
Culvert pipe
Culvert
Culvert pi pe
Va ria bl e
SECTION A-A
SECTION B-B
B
B
AA
FOOTNOTE:
see Sheet G.5 for details
Stone masonry headwall, Stone masonry headwall
3'
10'
Depress flowline
Flowline
2' (typ.)
TYPICAL PLAN
CULVERT INLETS AND OUTLETS WITH HEADWALLS
ENERGY DISSIPATOR INSTALLATION AT
CULVERT INLETS & OUTLETS
ENERGY DISSIPATOR AT
G.14
STATE PROJECT
y e ll u j.
d g n
U
S S u r ft
D
S J a c k s o n
C h e c k e d b y
C
S m it h
D e s ig n e d b y
Class 1 or 2
Method A, Placed riprap, Class 1 or 2
Method A, Placed riprap, Class 1 or 2
Method A, Placed riprap, geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Separation-stabilization at various locations.
See Sheets G.1-2 for designated riprap classes to be installed of all pipe arch culverts.
D equals the diameter of all round pipe or the rise dimension
Dimensions not labeled are in feet.
2.
1.
FOOTNOTE:
Approximately 3 CUYD each.
than 1:2. Extend riprap from ditch bottom to subgrade shoulder.
Place riprap adjacent to headwall on all ditch side slopes steeper
Flat bottom ditch at culvert inle t
FLOW B
e r m slope
1:3 maximum4' (min.)
2D or
V a r ie s
FLOW
A
A
PLAN
Cut slope
Placed riprap, class 2
D
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
SECTION A-A
TYPE I
as staked
Slope at pipe cut slope
Normal
Original ground
Subgrade
Pipe culvertBerm subgrade elevation
Maximum 2D or
CUT SLOPES
INLET TREATMENT IN
NO SCALE
12"
D
10:1 in mountainous terrain or flat terrain. Taper at
Taper at 20:1 in rolling
Subgrade shoulder ditch line
Normal maximum slope
1:1.5
Stone masonry headwall
Pavement surface
3'
G.15
STATE PROJECT
y e ll u k .d g n
U
S S u r ft
D
S J a c k s o n
C h e c k e d b y
C
S m it h
D e s ig n e d b y
See Sheet G.13 Stone masonry headwall, 12"
12"
1:4, typ.
Var ies ove r d istu rbe d a rea s top soi l an d m ulc h
Pla ce con ser ved
DITCH LINING DETAIL
G.16
STATE PROJECT
D A
T E
P
A T
H
S J a c k s o n
C h e c k e d b y
C
S m it h
D e s ig n e d b y
Varies class 1
Method A, Riprap ditch, LC
NOTE:
FOOTNOTE:
2.
1.
Profile grade
Top of subgrade see Sheet C.1 for details
Pavement structure, Ditch lining
12', typ.
Shoulder subgrade
NO SCALE
staking report data listing and cross-sections for Grand Loop Road.
Minimum 6-foot width where cut slopes are 1V:1H or steeper. See
Construct slopes according to the staking report data listing.
shoulder subgrade.
Includes areas where the ditch lining does not connect to the
DETAIL
DITCH LINING
Place topsoil and mulch according to Sections 624 and 625.
See table on Sheet G.4 for ditch lining limits and quantities.
Asphalt pavement surface
FOOTNOTE:
NO SCALE
OR
applicable guardwall where
Stone masonry
PLAN
Log or stone curb
Turnout or Parking Area turnout or parking area
Finish grade of
Back edge of curb
PLAN
Paved Shoulder
Edge of pavement
Shoulder subgrade
4'
'0
Va rie s ground
Existing
Shoulder subgrade
Edge of pavement structure
Pavement wingwall where applicable
Curb, or Stone masonry
2'
4'
2' curb cut opening, min.
EDGES AND DITCH DROP-OFFS
AT CURB CUTS, PAVEMENT
ENERGY DISSIPATORS
See Section A for typical section
SECTION A
SECTION B
See Section B for typical section
LC
RIPRAP CLASS 1 OR 2, AT CURB CUTS)
DETAIL A (ENERGY DISSIPATOR,
AT PAVEMENT EDGES AND DITCH DROP-OFFS)
RIPRAP CLASS 1 OR 2,
DETAIL B (ENERGY DISSIPATOR,
6' where applicable
Stone masonry guardwall wingwall where applicable
Curb, or Stone masonry
A
A
B
B and riprap sizes.
See Energy Dissipator Quantities table for approximate locations excavation to embankment transitions.
shown centered within the ditchline where ditch drop-offs occur at
Installation shown at shoulder subgrade. Install at the dimensions such as rock outcroppings.
Adjust dimensions as needed to match existing natural features, listings.
Construct slopes according to the applicable staking report data stone curb
Top of log or class 1 or 2
Method A, Placed riprap, class 1 or 2
Method A, Placed riprap, class 1 or 2
Method A, Placed riprap, class 1 or 2
Method A, Placed riprap, geotextile, class 2, type D
Separation-stabilization geotextile, class 2, type D
Separation-stabilization
G.17
STATE PROJECT
WY PRA YELL 10(19)
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u m .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y resource impacts.
the field by the CO to maximize erosion protection and minimize approximate. Final locations and orientations are to be adjusted in
Locations shown in the Summary of Drainage Quantity Sheets are class(es), and approximate locations.
See Summary of Drainage Quantity Sheets for quantities, riprap, 2.
1.
FOOTNOTE:
UNDERDRAIN SYSTEM
STANDARD
Ditch center line
Profile grade
Ditch center line
Top of subgrade
Finished slope
Finished slope
V ar ie s
Varies
Va rie s
Outlet pipe
Hose clamp
Wire mesh
P r o p o s e d e d g e o f p a v e m e n t
SECTION VIEW
OUTLET CROSSING ROAD DETAIL
STANDARD UNDERDRAIN SYSTEM
1 2
PLAN VIEW
OUTLET DAYLIGHT TO DITCH DETAIL
STANDARD UNDERDRAIN SYSTEM
ELEVATION VIEW
UNDERDRAIN OUTLET DETAILS
7.
6.
5.
4.
3.
2.
1.
diameter and use stainless steel clamps.
Use galvanized steel, welded wire cloth, mesh count 4, 0.0625 wire listings.
Construct slopes according to the applicable staking report data ditch ahead or back on line where applicable.
Outlet crossing road shown. Outlet to catch basins, or daylight to
SECTION VIEW
STANDARD UNDERDRAIN SYSTEM TRENCH DETAIL
Cap beginning and end of each collector pipe run.
Mirror details to drain in opposite direction.
Extend outlet pipe to daylight as directed by the CO.
system.
Collector and outlet pipes are subsidiary to standard underdrain according to Sections 605 and 708.
Provide and install outlet pipes, and standard underdrain collectors approximate equal intervals based upon existing field conditions.
a minimum positive drainage slope of 1%. Space outlets at
Provide at least one outlet for every 200-feet of underdrain with
See Sheets G.1-3 for approximate locations and quantities.
G.18
STATE PROJECT
PRA YELL 10(17)
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u n .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NO SCALE
Granular backfill
8-inch outlet pipe
18" overlap
12"
Embankment
LC
LC
LC
(a pp ro x.)
2"
12" 12" h cti d f o e nil r et n e c r o e p ol s f o e o
T rodent guard, see detail this sheet
8-inch outlet pipe with
Placed riprap, class 1 or 2
Placed riprap, class 1 or 2 system, see detail this sheet
Standard underdrain see detail this sheet
Rodent guard, RODENT GUARD
8-inch collector pipe
12" min.
12" m in.
Rodent Guard, see detail this sheet
Perforated collector pipe geotextile, Class 1, Type C
Separation-stabilization
A
PLAN VIEW
Slope varies Grade to drain
SECTION A-A
INLET DETAILS
A
D ir e c ti o n o f fl o w m in
30"
12" spacing (typ.)
#5 bars @
GRATE DETAIL
ADA COMPLIANT
ty p
3"
GRATE SECTION
ADA COMPLIANT
GRATE SECTION
ADA COMPLIANT
of flow
Direction of flow
Direction
GRATE SECTION
VANE
GRATE SECTION
VANE
FOOTNOTE:
To be use for roadside application.
To be use at pedistrian facilities, turnouts and parking areas.
B B
C
C
SECTION B-B
SECTION C-C
INLET FRAME DETAILS
ADA COMPLIANT
Slope
INLET FRAME DETAILS
ROADSIDE VANE
GRATE DETAIL
ROADSIDE VANE
cement concrete
Portland
"4
"8
"4
"8
"8 31 "2
"4
"8
"2
"4
30"
" (typ.)2
"4
"4
"8
"4
33"
"2
"8
"8
"2
"4 31 "4
1"
4" m in
Pipe culvert
30"
6" (typ.)
12" (min.)pavement grade
Finished of concrete inlet
Outside edge
29"2" (typ.)
33" handling holes
(4) 1" dia
" min.2 1joint mortar bed 1
Set frame in a full reference point
Station and offset
Pipe culvert are permitted to allow manufacturers standards.
For frames and grates, minor variations in design and dimensions
For pipes on skew, adapt inlets as directed by the CO.
Construct inlets parallel to the roadway centerline and grade.
Cut ends of skewed culverts flush with inside face of inlet wall.
Chamfer all exposed edges and corners 3-inches.
Provide concrete that conforms to the requirements of Section 601.
Construct inlet to fit adjacent pavement slopes.
pouring the floor or placement of concrete inlet.
Foundation will be inspected and approved by the CO prior to
6.
5.
4.
3.
2.
1.
compacted depth
Bedding material, 6"
FLH TYPE 1
CATCH BASIN,
G.19
STATE PROJECT
J a n u a r y
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d y e ll u s .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
CLASS C TRENCH CLASS B TRENCH
CLASS CS TRENCH CLASS CLSM TRENCH
NOTE:
FOOTNOTE:
NO SCALE
TYPICAL PIPE PLACEMENT
Db d t
CLASS D TRENCH
b
TYPICAL TRENCH DIMENSIONS
LEGEND:
W
T
D b d t = Width of trench
= Trench depth
= Diameter pipe barrel m in
Db
Db
Db
Db
Db m in bb m in m in m in m in b b b b
CULVERT DETAILS
VITRIFIED CLAY PIPE
with embankment, or other suitable material approved by the CO.
When installing vitrified clay pipe under embankments, form trench according to Subsection 602.05A(a).
the proposed trench until the proposed trench is approved by the CO factor between 1 and 1.5 according to ASTM C12. Do not construct
At each culvert, excavate and backfill a trench that provides a safety project according to the dimensions defined in the Legend.
Compute trench loads for each vitrified clay pipe installed on the
3.
2.
1.
G.20
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll u o .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y occur, do not fill CLSM above top of pipe.
Class CLSM Trench where expansive soils exist. Where installations
Controlled low strength material (CLSM) 50-300 psi. Do not install
18" 18" top of bedding
Trench grade or
Bottom of pipe barrel at each bell/coupling, typ.
Provide bell/coupling hole
Flow direction bedding material
Suitable
18" 18" bedding material
Suitable
18" 18" bedding material
Suitable
18"18"
T
W
Finish grade (top of pavement)
Subgrade
18" 18"
Pipe bells or couplings
D material (see Note 1)
Initial backfill
D m in
CLSM
bedding material
Suitable
D m in material (see Note 1)
Initial backfill typical, both sides to OSHA standards, Slope trench walls material (see Note 1)
Initial backfill material (see Note 1)
Initial backfill
D m in
D m in
D m in
D m in .required to construct grade course material where
Provide suitable levelling material (see Note 1)
Initial backfill min. min.
min. min.
min.
min. min.
min. min. min.
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
G.21
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRA-YELL 10(19)WY
J a n u a r y
U m y fi le s p w p r o d u c ti o n d y e ll u r .d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
602-2
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
STATE PROJECT
NUMBER
SHEET
G.22
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRA-YELL 10(19)WY
J a n u a r y
U m y fi le s p w p r o d u c ti o n d y e ll u t.
d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
18" ±
18"± 18" ± not exceeding 6" compacted depth.
Embankment material placed in layers
2'-0" ±
1'-0" ±
PIPE CULVERT BEDDING
METAL AND PLASTIC
602-3 minimum
1'-0"
(min.)
6"
(min.)
6" trench excavations
Reduce to 18" for *
24"
36" whichever is less
OR
Half diameter or span
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48"
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)1 or 36" (max.) for embankment installations
Or lean concrete backfill in accordance with Section 614.
Soil classification: A-1, A-2-4, A-2-5, or A-3
"2 1 Plastic Pipe: Maximum particle size: 1
Soil classification: A-1, A-2, or A-3
Metal Pipe: Maximum particle size = 3" exceeding 6" compacted depth meeting the following:
Compacted backfill material placed in layers not
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
G.23
PROJECT
y e ll u p .d g n
U
S C u s to m a r y
Roadway embankment
Roadway embankment
ABOVE NATURAL GROUND
Roadway embankment
Natural ground
ON NATURAL GROUND
Roadway embankment
Natural ground
NATURAL GROUND
ABOVE AND BELOW
Bedding material (uncompacted)
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
Roadway excavation
ON UNSTABLE MATERIAL
Natural ground
Roadway embankment
ON UNYIELDING MATERIAL
Roadway embankment
Natural ground
H * H *
PIPE BEDDING
BEDDING DEPTH
PIPE SIZE (H) DEPTH
NOTE:
MULTIPLE PIPE INSTALLATION
MINIMUM SPACING
SPACING
or Span
Diameter
Toe plate
ELEVATION
or Span
Diameter
Toe plate
SECTION A-A
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
PIPING PLUG
H
A
A Width
(see table)
Minimum spacing dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
2.
1.
H H
H H
H H
H H
H
H
H H
H
H
H H or SPAN
DIAMETER
Natural ground
Finished subgrade
Metal end section section Metal end
Piping plug depth table
See bedding excavation in trench
18" (min.)
12" (min.), 24" (max.)
"/foot of cover,2
6" in uncompacted depth.
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material
Finished subgrade
Bedding
Finished subgrade
Bedding
Finished subgrade
Bedding treatment
Culvert end Bedding before trench excavation embankment height
Finished subgrade or
Original natural ground surface fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Finished subgrade
Pipe culvert
Embankment slope
High water elevation not exceeding 6" compacted depth.
1" dia. Joint tie
" dia. hole for4
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
72"
72"
2H
48"
0.5H
15"
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
CULVERT INSTALLATION
CONCRETE PIPE
602-7
INCHES
DIAMETER
INCHES
COVER
MINIMUM
1'-0"±
1'-0" (min.)
" min.2 12'-6 ty p ic a l m a x
1'-3" min.
1'-5" max.
" max.2 12'-9
Maximum particle size = 3" exceeding 6" compacted depth meeting the following:
Standard 602-3.
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
G.24
PROJECT
y e ll u q .d g n
U
S C u s to m a r y
STANDARD APPROVED FOR USE 12/1993
DRAFT: 9/2005
REVISED: 4/1994 6/2005
Impermeable backfill material.
LEGEND:
Roadway embankment
Limits of pipe compaction
Finished subgrade height before trench excavation
Finished subgrade or embankment springline backfill to
Compacted
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
(See table)
Minimum spacing
H
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
O Ring if required
° 60° holes (typ.)
Concrete pipe tie
PIPING PLUG
adjusted to tie into impervious material.
material is used for backfill. Width may be material at the pipe inlet where granular
Construct a piping plug of impermeable backfill
NOTE:
PIPE SIZE (H) DEPTH
BEDDING DEPTH
MINIMUM SPACING
DIAMETER EMBANKMENT TRENCH
CONCRETE ROUND PIPE CULVERT
FILL HEIGHT AND PIPE CLASS TABLE
EMBANKMENT TRENCH
CLASS III CLASS IV CLASS VCLASS II
Bedding material…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .