B_-_SHEETS_-_Final.pdf
PDF 170 KB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15101-0000 MOBILIZATION (IP) LPSM ALL
A0060 15101-0000 MOBILIZATION (BUF) LPSM ALL
A0080 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (IP) LPSM ALL
A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING (BUF) LPSM ALL
A0140 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0160 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (IP) LPSM ALL
A0180 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (BUF) LPSM ALL
A0200 15401-0000 CONTRACTOR TESTING LPSM ALL
A0220 15401-0000 CONTRACTOR TESTING (IP) LPSM ALL
A0240 15401-0000 CONTRACTOR TESTING (BUF) LPSM ALL
A0260 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0280 15501-0000 CONSTRUCTION SCHEDULE (IP) LPSM ALL
A0300 15501-0000 CONSTRUCTION SCHEDULE (BUF) LPSM ALL
A0320 15701-0000 SOIL EROSION CONTROL (IP) LPSM ALL
A0340 15701-0000 SOIL EROSION CONTROL (BUF) LPSM ALL
A0360 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING SQYD 160 160
A0380 15704-1100 SOIL EROSION CONTROL, BRUSH BLANKET SQYD 40,523 40,523
A0400 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 11,292 11,292
A0420 15705-1000 SOIL EROSION CONTROL, TEMPORARY 48-INCH
CULVERT PIPE LNFT 60 60
A0440 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 33,713 33,713
A0460 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (IP) LNFT 560 560
A0480 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (BUF) LNFT 1,935 1,935
A0500 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 72 72
A0520 15706-0300 SOIL EROSION CONTROL, SANDBAG EACH 100 400 500
A0540 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 13 13
A0560 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0580 20101-0000 CLEARING AND GRUBBING ACRE 32.0 3.0 35.0
A0600 20103-0000 CLEARING AND GRUBBING (IP) SQYD 530 530
A0620 20103-0000 CLEARING AND GRUBBING (BUF) SQYD 1,458 1,458
A0640 20301-0080 REMOVAL OF BENCH (IP) EACH 6 6
A0660 20301-0200 REMOVAL OF BOULDER, STOCKPILE EACH 82 29 111
A0680 20301-1100 REMOVAL OF GATE, double swing EACH 2 2
A0700 20301-1200 REMOVAL OF HEADWALL EACH 45 45
A0720 20301-1400 REMOVAL OF INLET EACH 1 1
A0740 20301-1900 REMOVAL OF PIPE CULVERT EACH 31 31
A0760 20301-2300 REMOVAL OF SIGN/MARKER EACH 25 25
A0780 20301-2300 REMOVAL OF SIGN/MARKER (IP) EACH 4 4
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U
LE
A pe rc en t Es tim at e-
.x ls x] Sh ee t
STATE PROJECT
B.1PRA YELL 10(19)WY
SHEET
NUMBER
NPS PMIS 86308
NPS Drawing # 101/130820
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A0800 20301-2300 REMOVAL OF SIGN/MARKER (BUF) EACH 4 4
A0820 20301-2700 REMOVAL OF STRUCTURE, DRY STACK WALL EACH 2 2
A0840 20301-3000 REMOVAL OF TRASH RECEPTACLE (BUF) EACH 4 4
A0860 20302-0700 REMOVAL OF FENCE (BUF) LNFT 130 130
A0880 20302-1000 REMOVAL OF FENCE, RAIL (IP) LNFT 55 55
A0900 20302-2500 REMOVAL OF HANDRAIL (IP) LNFT 275 275
A0920 20302-2500 REMOVAL OF HANDRAIL (BUF) LNFT 170 170
A0940 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CONC.
STAIRS (IP) SQYD 105 105
A0960 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS,
TIMBER STEPS (IP) SQYD 12 12
A0980 20303-0300 REMOVAL OF CONCRETE (IP) SQYD 25 25
A1000 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (BUF) SQYD 1,290 1,290
A1020 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (IP) SQYD 10 10
A1040 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (BUF) SQYD 938 938
A1060 20303-3200 REMOVAL OF SIDEWALK, CONCRETE (BUF) SQYD 66 66
A1080 20303-3500 REMOVAL OF STONE MASONRY SQYD 11 11
A1100 20401-0000 ROADWAY EXCAVATION CUYD 158,026 2,556 1,518 162,100
A1120 20401-0000 ROADWAY EXCAVATION (IP) CUYD 320 20 340
A1140 20401-0000 ROADWAY EXCAVATION (BUF) CUYD 57 3 60
A1160 20402-0000 SUBEXCAVATION CUYD 6,351 1,992 457 8,800
A1180 20402-0000 SUBEXCAVATION (IP) CUYD 300 50 350
A1200 20403-0000 UNCLASSIFIED BORROW CUYD 5,177 118 5,295
A1220 20411-0000 SELECT BORROW TON 15,996 5,439 1,565 23,000
A1240 20411-0000 SELECT BORROW (IP) TON 445 55 500
A1260 20411-0000 SELECT BORROW (BUF) TON 2,010 190 2,200
A1280 20421-0000 ROCK EXCAVATION (BUF) CUYD 10 1 11
A1300 20465-0000 CONSERVE AND PLACE BOULDER EACH 125 4 129
A1320 20466-0000 CONSERVE AND STOCKPILE TOPSOIL (IP) CUYD 3 3
A1340 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE A, WOVEN SQYD 2,352 148 2,500
A1360 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE B SQYD 230 20 250
A1380 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C SQYD 8,196 301 503 9,000
A1400 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C (Special Rock Embankment) SQYD 2,426 74 2,500
A1420 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C, WOVEN SQYD 1,777 1,777
A1440 20703-0000 GEOGRID (Biaxial) SQYD 8,117 483 8,600
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A1460 20703-2000 GEOGRID, STABILIZATION SQYD 3,332 444 3,776
A1480 20704-0000 GEOMEMBRANE SQYD 2,041 159 2,200
A1500 20704-0000 GEOMEMBRANE (IP) SQYD 100 10 110
A1520 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM SQYD 2,041 159 2,200
A1540 20815-0000 COFFERDAMS (Glen Creek Box Culvert) LPSM ALL ALL
A1560 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 3,994 406 4,400
A1580 21101-1000 ROADWAY OBLITERATION, METHOD 1 (IP) SQYD 90 10 100
A1600 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 93 7 100
A1620 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (IP) CUYD 27 27
A1640 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (BUF) CUYD 26 4 30
A1660 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 429 71 500
A1680 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (IP) CUYD 5 5
A1700 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1 LNFT 1,750 150 1,900
A1720 25125-0000 BOULDER (IP) EACH 140 140
A1740 25125-0000 BOULDER (BUF) EACH 49 6 55
A1760 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 2) CUYD 329 21 350
A1780 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 3) CUYD 663 67 730
A1800 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 5) CUYD 316 34 350
A1820 25210-0000 ROCKERY SQFT 546 3,010 344 3,900
A1840 25210-0000 ROCKERY, SEAT WALL SQFT 18 18
A1860 25210-0000 ROCKERY, TYPE 1 (IP) SQFT 1,450 150 1,600
A1880 25210-0000 ROCKERY, TYPE 2 (IP) SQFT 200 20 220
A1900 25210-0000 ROCKERY, TYPE 2 (BUF) SQFT 560 40 600
A1920 25210-0000 ROCKERY, TYPE 2A (BUF) SQFT 520 80 600
A1940 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 13,903 97 14,000
A1960 25501-0000 MECHANICALLY STABILIZED EARTH WALL (IP) SQFT 400 400
A1980 25701-0400 CONTRACTOR FURNISHED REINFORCED CONCRETE
RETAINING WALL DESIGN LPSM ALL
A2000 25801-0000 REINFORCED CONCRETE RETAINING WALL (precast wing wall) SQFT 151 151
A2020 27301-0000 POLYURETHANE RESIN INJECTION (BUF) LB 7,600 7,600
A2040 27501-1000 GEOFOAM, LIGHTWEIGHT FILL MATERIAL (IP) CUYD 65 65
A2060 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 64 6 70
A2080 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,723 7 1,730
A2100 30202-2000 ROADWAY AGGREGATE, METHOD 2 (BUF) TON 445 445
A2120 30801-0000 RECYCLED AGGREGATE BASE SQYD 55,004 1,817 279 57,100
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(3
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A2140 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX,
1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE III TON 18,003 1,925 572 20,500
A2160 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 180 19 2 201
A2180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (BUF) TON 340 10 350
A2200 40601-0000 FOG SEAL TON 23 4 27
A2220 40605-0000 BLOTTER TON 450 52 502
A2240 40801-0000 COLD RECYCLED ASPHALT BASE COURSE TON 20,535 2,340 525 23,400
A2260 41201-0000 TACK COAT TON 31 3 1 35
A2280 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (IP) CUYD 38 38
A2300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (BUF) CUYD 8 8
A2320 55210-0000 PRECAST STRUCTURAL CONCRETE(precast concrete footing) CUYD 8 8
A2340 55401-1000 REINFORCING STEEL (IP) LB 11,500 11,500
A2360 55401-3000 REINFORCING STEEL, STAINLESS STEEL (BUF) LB 2,412 2,412
A2380 55501-0000 STRUCTURAL STEEL BOARDWALK (IP) LPSM ALL
A2400 56701-0000 MICROPILE , BOARDWALK (IP) LNFT 640 640
A2420 56701-0000 MICROPILE (IP) LNFT 160 160
A2440 56701-0000 MICROPILE (BUF) LNFT 64 64
A2460 57501-0000 MINOR BRIDGE WORK (BUF) LPSM ALL
A2480 60201-0400 12-INCH PIPE CULVERT (BUF) LNFT 8 8
A2500 60201-0600 18-INCH PIPE CULVERT (IP) LNFT 76 76
A2520 60201-0600 18-INCH PIPE CULVERT (BUF) LNFT 30 30
A2540 60201-0800 24-INCH PIPE CULVERT LNFT 2,847 2,847
A2560 60201-0900 30-INCH PIPE CULVERT LNFT 162 162
A2580 60220-4200 12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED
CONCRETE BOX CULVERT LNFT 36 36
A2600 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 13 13
A2620 60404-1000 CATCH BASIN, FLH TYPE 1 (IP) EACH 6 6
A2640 60404-1000 CATCH BASIN, FLH TYPE 1 (BUF) EACH 1 1
A2660 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 480 20 500
A2680 60510-0800 6-INCH OUTLET PIPE (BUF) LNFT 6 6
A2700 60510-0900 8-INCH COLLECTOR PIPE LNFT 750 50 800
A2720 60510-1000 8-INCH OUTLET PIPE LNFT 160 40 200
A2740 60522-0000 SAND CUYD 192 8 200
A2760 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 3,069 3,069
A2780 60901-2900 CURB, STONE, TYPE 1, 6-INCH DEPTH LNFT 699 699
A2800 60901-7000 CURB, LOG LNFT 3,109 481 3,590
A2820 61001-0000 HORIZONTAL DRAIN PIPE (BUF) LNFT 30 30
A2840 61501-0100 SIDEWALK, CONCRETE (IP) SQYD 185 185
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(4
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.4PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A2860 61501-1100 SIDEWALK, ASPHALT SQYD 102 102
A2880 61501-1100 SIDEWALK, ASPHALT (IP) SQYD 255 255
A2900 61501-1100 SIDEWALK, ASPHALT (BUF) SQYD 730 730
A2920 61503-5000 MEDIAN, STONE, Cobble SQYD 17 17
A2940 61504-3000 ACCESSIBILITY RAMP, ASPHALT SQYD 14 14
A2960 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD
POSTS LNFT 2,010 15 2,025
A2980 61702-1300 TERMINAL SECTION, TYPE MELT EACH 2 2
A3000 61901-1300 FENCE, CHAIN LINK, TEMPORARY (IP) LNFT 30 30
A3020 61901-1300 FENCE, CHAIN LINK, TEMPORARY (BUF) LNFT 50 50
A3040 61902-0900 GATE, METAL, 40 foot width (government furnished) EACH 2 2
A3060 62001-0000 STONE MASONRY(headwall repair) CUYD 11 11
A3080 62002-0000 STONE MASONRY(MSE Wall Facing) SQYD 1,267 33 1,300
A3100 62002-0000 STONE MASONRY, GUARDWALL (IP) SQYD 70 70
A3120 62002-0000 STONE MASONRY, WALL FACING (IP) SQYD 26 26
A3140 62002-0000 STONE MASONRY, PIPE COVER (IP) SQYD 6 6
A3160 62002-0000 STONE MASONRY, PAVING (BUF) SQYD 80 80
A3180 62002-0000 STONE MASONRY, WALL FACING (BUF) SQYD 45 45
A3200 62002-0000 STONE MASONRY, WALL ADJUSTMENTS (BUF) SQYD 35 35
A3220 62002-0000 STONE MASONRY, GUARDWALL (BUF) SQYD 17 17
A3240 62002-1000 CLASS B MASONRY, ROCK FACE FINISH SQYD 57 3 60
A3260 62005-0000 CONCRETE MASONRY UNITS CUYD 214 36 250
A3280 62010-0000 STONE MASONRY, EDGING (IP) LNFT 130 130
A3300 62010-0000 STONE MASONRY, SCUPPER (BUF) LNFT 4 4
A3320 62010-0000 STONE MASONRY, EDGING (BUF) LNFT 18 18
A3340 62010-0000 STONE MASONRY, SEAT WALL (BUF) LNFT 40 40
A3360 62010-0000 STONE MASONRY WALL (BUF) LNFT 215 215
A3380 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE
CULVERT (IP) EACH 2 2
A3400 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE
CULVERT (BUF) EACH 1 1
A3420 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE
CULVERT EACH 58 58
A3440 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE
CULVERT EACH 6 6
A3460 62026-1000 REMOVE AND RESET STONE MASONRY (FLAGSTONE) SQYD 16 4 20
A3480 62027-0000 REMOVE AND RESET STONE MASONRY(Curb) LNFT 335 15 350
A3500 62031-0000 REPOINT STONE MASONRY (BUF) SQFT 1,950 1,950
A3520 62201-0000 EQUIPMENT, JACKHAMMER HOUR 40 40
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(5
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Description Unit
STATE PROJECT
B.5PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A3540 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 400 400
A3560 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
(IP) HOUR 40 40
A3580 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
(BUF) HOUR 100 100
A3600 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH HOUR 50 50
A3620 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH (IP) HOUR 80 80
A3640 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH (BUF) HOUR 100 100
A3660 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED
CAPACITY HOUR 200 200
A3680 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED
CAPACITY (IP) HOUR 80 80
A3700 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED
CAPACITY (BUF) HOUR 100 100
A3720 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 200 200
A3740 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER (BUF) HOUR 40 40
A3760 62201-3000 HYDRAULIC EXCAVATOR (ROCK HAMMER) HOUR 200 200
A3780 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 3500
POUND MINIMUM HAMMER ATTACHMENT HOUR 100 100
A3800 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 50
FOOT MINIMUM REACH HOUR 40 40
A3820 62201-3000 HYDRAULIC EXCAVATOR, MINI EXCAVATOR, 69"
MINIMUM WIDTH, WITH THUMB ATTACHMENT HOUR 40 40
A3840 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0
CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 500 500
A3860 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0
CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT (IP) HOUR 40 40
A3880 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0
CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT (BUF) HOUR 200 200
A3900 62201-3750 CHAIN SAW HOUR 40 40
A3920 62201-3750 CHAIN SAW (IP) HOUR 10 10
A3940 62201-3750 CHAIN SAW (BUF) HOUR 10 10
A3960 62301-0000 GENERAL LABOR HOUR 1,700 1,700
A3980 62301-0000 GENERAL LABOR (IP) HOUR 200 200
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(6
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.6PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A4000 62301-0000 GENERAL LABOR (BUF) HOUR 100 100
A4020 62302-0000 SPECIAL LABOR (WETLAND RESTORATION) HOUR 200 200
A4040 62302-0000 SPECIAL LABOR, Carpenter HOUR 200 200
A4060 62302-0000 SPECIAL LABOR, Stone Mason HOUR 200 200
A4080 62302-0000 SPECIAL LABOR CARPENTER (IP) HOUR 20 20
A4100 62302-0000 SPECIAL LABOR STONE MASON (IP) HOUR 40 40
A4120 62302-0000 SPECIAL LABOR, Carpenter (BUF) HOUR 20 20
A4140 62302-0000 SPECIAL LABOR, Stone Mason (BUF) HOUR 80 80
A4160 62302-0100 SPECIAL LABOR, SLOPE SCALING, Mechanical HOUR 16 16
A4180 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 50 50
A4200 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (IP) HOUR 25 25
A4220 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (BUF) HOUR 25 25
A4240 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (IP) SQYD 40 40
A4260 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (BUF) SQYD 950 950
A4280 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 27.3 1.1 1.6 30.0
A4300 62515-1000 MULCHING, DRY METHOD ACRE 25.6 1.1 3.3 30.0
A4320 62516-1000 MULCHING, DRY METHOD (IP) SQYD 40 40
A4340 62516-1000 MULCHING, DRY METHOD (BUF) SQYD 950 50 1,000
A4360 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (IP) EACH 9 9
A4380 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (BUF) EACH 19 19
A4400 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN Panel EACH 21 21
A4420 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (IP) EACH 10 10
A4440 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (BUF) EACH 10 10
A4460 63302-0000 SIGN SYSTEM SQFT 78 78
A4480 63306-0700 POST, STEEL, PIPE, Hitching Post EACH 1 1
A4500 63306-0700 POST, STEEL, PIPE, Hitching Post (REMOVE AND
RESET) EACH 2 2
A4520 63318-1000 SNOW POLE HOLDER EACH 152 152
A4540 63401-0000 PAVEMENT MARKINGS, Stop Line LNFT 170 170
A4560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 78,478 78,478
A4580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 76,702 76,702
A4600 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW LNFT 2,000 2,000
A4620 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED WHITE LNFT 8,550 8,550
A4640 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 3 3
A4660 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY
SYMBOL EACH 3 3
A4680 63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 EACH 100 100
A4700 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 30 30
A4720 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
(IP) EACH 3 3
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(7
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.7PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A4740 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
(BUF) EACH 3 3
A4760 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER,
TYPE 42-INCH EACH 230 230
A4780 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 200 200
A4800 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
A EACH 65 65
A4820 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
B EACH 95 95
A4840 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
C EACH 100 100
A4860 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOW POLE EACH 80 80
A4880 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 1,750 1,750
A4900 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 80,650 80,650
A4920 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 1,603 1,603
A4940 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
(IP) SQFT 35 35
A4960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
(BUF) SQFT 65 65
A4980 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 4,500 4,500
A5000 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 500 500
A5020 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 20,000 20,000
A5040 63701-0000 FIELD OFFICE (RELOCATION) EACH 1 1
A5060 64603-0100 FIXTURE, TRASH RECEPTACLE (IP) EACH 1 1
A5080 64603-0100 FIXTURE, TRASH RECEPTACLE (BUF) EACH 2 2
A5100 64603-0300 FIXTURE, BENCH MASONRY (IP) EACH 4 4
A5120 64603-0300 FIXTURE, BENCH WOOD (IP) EACH 4 4
A5140 64603-0300 FIXTURE, BENCH MASONRY (BUF) EACH 2 2
A5160 64603-0800 FIXTURE, KIOSK (BUF) EACH 1 1
A5180 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (IP) LNFT 154 154
A5200 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (IP) LNFT 60 60
A5220 64604-1000 FIXTURE, HANDRAIL, TYPE 3 (IP) LNFT 59 59
A5240 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (BUF) LNFT 205 205
A5260 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (BUF) LNFT 35 35
A5280 64604-3000 FIXTURE, PEDESTRIAN RAILING (BUF) LNFT 295 295
A5300 64605-1000 FIXTURE, KIOSK, repairs LPSM ALL ALL
A5320 64631-0000 ROADSIDE DEVELOPMENT, MASONRY STEPS AND EDGE
STONES (IP) LNFT 385 385
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(8
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.8PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
A5340 64632-0000 ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT
(IP) SQYD 155 155
A5360 64632-0000 ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT
(BUF) SQYD 16 16
A5380 64702-1000 MITIGATION, LANDSCAPING LOG LNFT 3,800 3,800
A5400 64703-1000 MITIGATION, LANDSCAPING LOG (IP) EACH 8 8
A5420 64703-1000 MITIGATION, LANDSCAPING LOG (BUF) EACH 15 15
A5440 64703-3000 MITIGATION, LOG WEIR EACH 2 2
A5460 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 81 81
A5480 65105-0000 TEMPORARY ROCKFALL PROTECTION LPSM ALL
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(9
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.9PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15101-0000 MOBILIZATION (IP) LPSM ALL
B0060 15101-0000 MOBILIZATION (BUF) LPSM ALL
B0080 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (IP) LPSM ALL
B0120 15201-0000 CONSTRUCTION SURVEY AND STAKING (BUF) LPSM ALL
B0140 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
B0160 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (IP) LPSM ALL
B0180 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (BUF) LPSM ALL
B0200 15401-0000 CONTRACTOR TESTING LPSM ALL
B0220 15401-0000 CONTRACTOR TESTING (IP) LPSM ALL
B0240 15401-0000 CONTRACTOR TESTING (BUF) LPSM ALL
B0260 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0280 15501-0000 CONSTRUCTION SCHEDULE (IP) LPSM ALL
B0300 15501-0000 CONSTRUCTION SCHEDULE (BUF) LPSM ALL
B0320 15701-0000 SOIL EROSION CONTROL (IP) LPSM ALL
B0340 15701-0000 SOIL EROSION CONTROL (BUF) LPSM ALL
B0360 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING SQYD 740 740
B0380 15704-1100 SOIL EROSION CONTROL, BRUSH BLANKET SQYD 40,523 40,523
B0400 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 14,298 14,298
B0420 15705-1000 SOIL EROSION CONTROL, TEMPORARY 48-INCH
CULVERT PIPE LNFT 338 338
B0440 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 36,799 36,799
B0460 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (IP) LNFT 560 560
B0480 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (BUF) LNFT 1,935 1,935
B0500 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 96 96
B0520 15706-0300 SOIL EROSION CONTROL, SANDBAG EACH 100 4,200 4,300
B0540 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 14 14
B0560 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
B0580 20101-0000 CLEARING AND GRUBBING ACRE 36.9 4.0 0.1 41.0
B0600 20103-0000 CLEARING AND GRUBBING (IP) SQYD 530 530
B0620 20103-0000 CLEARING AND GRUBBING (BUF) SQYD 1,458 1,458
B0640 20301-0080 REMOVAL OF BENCH (IP) EACH 6 6
B0660 20301-0200 REMOVAL OF BOULDER, STOCKPILE EACH 88 123 211
B0680 20301-0300 REMOVAL OF BOX CULVERT EACH 1 1
B0700 20301-1100 REMOVAL OF GATE, double swing EACH 2 2
B0720 20301-1200 REMOVAL OF HEADWALL EACH 64 64
B0740 20301-1400 REMOVAL OF INLET EACH 1 1
B0760 20301-1900 REMOVAL OF PIPE CULVERT EACH 41 41
B0780 20301-2300 REMOVAL OF SIGN/MARKER EACH 34 34
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U
B pe rc en t Es tim at e-
.x ls x] Sh ee t
STATE PROJECT
B.10PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B0800 20301-2300 REMOVAL OF SIGN/MARKER (IP) EACH 4 4
B0820 20301-2300 REMOVAL OF SIGN/MARKER (BUF) EACH 4 4
B0840 20301-2700 REMOVAL OF STRUCTURE, DRY STACK WALL EACH 2 2
B0860 20301-3000 REMOVAL OF TRASH RECEPTACLE (BUF) EACH 4 4
B0880 20302-0700 REMOVAL OF FENCE (BUF) LNFT 130 130
B0900 20302-1000 REMOVAL OF FENCE, RAIL (IP) LNFT 55 55
B0920 20302-2500 REMOVAL OF HANDRAIL (IP) LNFT 275 275
B0940 20302-2500 REMOVAL OF HANDRAIL (BUF) LNFT 170 170
B0960 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CONC.
STAIRS (IP) SQYD 105 105
B0980 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS,
TIMBER STEPS (IP) SQYD 12 12
B1000 20303-0300 REMOVAL OF CONCRETE (IP) SQYD 25 25
B1020 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (BUF) SQYD 1,290 1,290
B1040 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 71 71
B1060 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (IP) SQYD 10 10
B1080 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (BUF) SQYD 938 938
B1100 20303-3200 REMOVAL OF SIDEWALK, CONCRETE (BUF) SQYD 66 66
B1120 20303-3500 REMOVAL OF STONE MASONRY SQYD 91 91
B1140 20401-0000 ROADWAY EXCAVATION CUYD 162,463 2,781 2,356 167,600
B1160 20401-0000 ROADWAY EXCAVATION (IP) CUYD 320 20 340
B1180 20401-0000 ROADWAY EXCAVATION (BUF) CUYD 57 3 60
B1200 20402-0000 SUBEXCAVATION CUYD 9,792 1,992 1,216 13,000
B1220 20402-0000 SUBEXCAVATION (IP) CUYD 300 50 350
B1240 20403-0000 UNCLASSIFIED BORROW CUYD 5,177 618 5,795
B1260 20411-0000 SELECT BORROW TON 27,559 5,439 2,902 35,900
B1280 20411-0000 SELECT BORROW (IP) TON 445 55 500
B1300 20411-0000 SELECT BORROW (BUF) TON 2,010 190 2,200
B1320 20421-0000 ROCK EXCAVATION (BUF) CUYD 10 1 11
B1340 20426-1000 DITCH, EXCAVATION(Apollinaris channel) CUYD 171 171
B1360 20465-0000 CONSERVE AND PLACE BOULDER EACH 150 4 154
B1380 20466-0000 CONSERVE AND STOCKPILE TOPSOIL (IP) CUYD 3 3
B1400 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE A, WOVEN SQYD 2,352 148 2,500
B1420 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE B SQYD 230 20 250
B1440 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C SQYD 16,830 471 799 18,100
B1460 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C (Special Rock Embankment) SQYD 3,513 87 3,600
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.11PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B1480 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C, WOVEN SQYD 1,777 1,777
B1500 20703-0000 GEOGRID (Biaxial) SQYD 8,117 483 8,600
B1520 20703-2000 GEOGRID, STABILIZATION SQYD 3,332 444 3,776
B1540 20704-0000 GEOMEMBRANE SQYD 2,041 159 2,200
B1560 20704-0000 GEOMEMBRANE (IP) SQYD 100 10 110
B1580 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM SQYD 2,041 159 2,200
B1600 20815-0000 COFFERDAMS (Apollinairis Box Culvert) LPSM ALL ALL
B1620 20815-0000 COFFERDAMS (Glen Creek Box Culvert) LPSM ALL ALL
B1640 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 3,994 406 4,400
B1660 21101-1000 ROADWAY OBLITERATION, METHOD 1 (IP) SQYD 90 10 100
B1680 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 113 7 120
B1700 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (IP) CUYD 27 27
B1720 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (BUF) CUYD 26 4 30
B1740 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 477 63 540
B1760 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (IP) CUYD 5 5
B1780 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1 LNFT 1,750 150 1,900
B1800 25125-0000 BOULDER (IP) EACH 140 140
B1820 25125-0000 BOULDER (BUF) EACH 49 6 55
B1840 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 2) CUYD 329 21 350
B1860 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 2, Landslide) CUYD 819 81 900
B1880 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 3) CUYD 756 69 825
B1900 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
(Class 5) CUYD 316 34 350
B1920 25210-0000 ROCKERY SQFT 546 3,816 438 4,800
B1940 25210-0000 ROCKERY, SEAT WALL SQFT 18 18
B1960 25210-0000 ROCKERY, TYPE 1 (IP) SQFT 1,450 150 1,600
B1980 25210-0000 ROCKERY, TYPE 2 (IP) SQFT 200 20 220
B2000 25210-0000 ROCKERY, TYPE 2 (BUF) SQFT 560 40 600
B2020 25210-0000 ROCKERY, TYPE 2A (BUF) SQFT 520 80 600
B2040 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 13,903 97 14,000
B2060 25501-0000 MECHANICALLY STABILIZED EARTH WALL (IP) SQFT 400 400
B2080 25701-0400 CONTRACTOR FURNISHED REINFORCED CONCRETE
RETAINING WALL DESIGN LPSM ALL
B2100 25801-0000 REINFORCED CONCRETE RETAINING WALL (precast wing wall) SQFT 659 659
B2120 27301-0000 POLYURETHANE RESIN INJECTION (BUF) LB 7,600 7,600
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(3
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.12PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B2140 27501-1000 GEOFOAM, LIGHTWEIGHT FILL MATERIAL (IP) CUYD 65 65
B2160 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 64 9 73
B2180 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,723 7 1,730
B2200 30202-2000 ROADWAY AGGREGATE, METHOD 2 (BUF) TON 445 445
B2220 30801-0000 RECYCLED AGGREGATE BASE SQYD 74,073 3,109 418 77,600
B2240 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX,
1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE III TON 21,858 2,246 2,196 26,300
B2260 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 219 22 3 244
B2280 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (BUF) TON 340 10 350
B2300 40601-0000 FOG SEAL TON 31 4 35
B2320 40605-0000 BLOTTER TON 547 60 607
B2340 40801-0000 COLD RECYCLED ASPHALT BASE COURSE TON 25,055 2,854 491 28,400
B2360 41201-0000 TACK COAT TON 38 4 1 43
B2380 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (IP) CUYD 38 38
B2400 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (BUF) CUYD 8 8
B2420 55210-0000 PRECAST STRUCTURAL CONCRETE(precast concrete footing) CUYD 16 16
B2440 55401-1000 REINFORCING STEEL (IP) LB 11,500 11,500
B2460 55401-3000 REINFORCING STEEL, STAINLESS STEEL (BUF) LB 2,412 2,412
B2480 55501-0000 STRUCTURAL STEEL BOARDWALK (IP) LPSM ALL
B2500 56701-0000 MICROPILE, BOARDWALK (IP) LNFT 640 640
B2520 56701-0000 MICROPILE (IP) LNFT 160 160
B2540 56701-0000 MICROPILE (BUF) LNFT 64 64
B2560 57501-0000 MINOR BRIDGE WORK (BUF) LPSM ALL
B2580 60201-0400 12-INCH PIPE CULVERT LNFT 86 86
B2600 60201-0400 12-INCH PIPE CULVERT (BUF) LNFT 8 8
B2620 60201-0600 18-INCH PIPE CULVERT (IP) LNFT 76 76
B2640 60201-0600 18-INCH PIPE CULVERT (BUF) LNFT 30 30
B2660 60201-0800 24-INCH PIPE CULVERT LNFT 3,107 3,107
B2680 60201-0900 30-INCH PIPE CULVERT LNFT 259 259
B2700 60201-1000 36-INCH PIPE CULVERT LNFT 264 264
B2720 60220-3150 10 FEET SPAN, 8 FEET RISE PRECAST REINFORCED
CONCRETE BOX CULVERT LNFT 56 56
B2740 60220-4200 12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED
CONCRETE BOX CULVERT LNFT 36 36
B2760 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 14 14
B2780 60404-1000 CATCH BASIN, FLH TYPE 1 (IP) EACH 6 6
B2800 60404-1000 CATCH BASIN, FLH TYPE 1 (BUF) EACH 1 1
B2820 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,110 40 1,150
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(4
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.13PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B2840 60510-0800 6-INCH OUTLET PIPE (BUF) LNFT 6 6
B2860 60510-0900 8-INCH COLLECTOR PIPE LNFT 2,420 80 2,500
B2880 60510-1000 8-INCH OUTLET PIPE LNFT 430 20 450
B2900 60522-0000 SAND CUYD 192 8 200
B2920 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 3,069 3,069
B2940 60901-2900 CURB, STONE, TYPE 1, 6-INCH DEPTH LNFT 839 839
B2960 60901-7000 CURB, LOG LNFT 3,843 481 4,324
B2980 61001-0000 HORIZONTAL DRAIN PIPE (BUF) LNFT 30 30
B3000 61501-0100 SIDEWALK, CONCRETE (IP) SQYD 185 185
B3020 61501-1100 SIDEWALK, ASPHALT SQYD 224 224
B3040 61501-1100 SIDEWALK, ASPHALT (IP) SQYD 255 255
B3060 61501-1100 SIDEWALK, ASPHALT (BUF) SQYD 730 730
B3080 61503-5000 MEDIAN, STONE, Cobble SQYD 17 17
B3100 61504-3000 ACCESSIBILITY RAMP, ASPHALT SQYD 21 21
B3120 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD
POSTS LNFT 2,010 15 2,025
B3140 61702-1300 TERMINAL SECTION, TYPE MELT EACH 2 2
B3160 61901-1300 FENCE, CHAIN LINK, TEMPORARY (IP) LNFT 30 30
B3180 61901-1300 FENCE, CHAIN LINK, TEMPORARY (BUF) LNFT 50 50
B3200 61902-0900 GATE, METAL, 40 foot width (government furnished) EACH 2 2
B3220 62001-0000 STONE MASONRY(headwall repair) CUYD 11 11
B3240 62002-0000 STONE MASONRY (MSE Wall Facing) SQYD 1,267 33 1,300
B3260 62002-0000 STONE MASONRY, WALL FACING (IP) SQYD 26 26
B3280 62002-0000 STONE MASONRY, PIPE COVER (IP) SQYD 6 6
B3300 62002-0000 STONE MASONRY, GUARDWALL (IP) SQYD 70 70
B3320 62002-0000 STONE MASONRY, PAVING (BUF) SQYD 80 80
B3340 62002-0000 STONE MASONRY, WALL FACING (BUF) SQYD 45 45
B3360 62002-0000 STONE MASONRY, WALL ADJUSTMENTS (BUF) SQYD 35 35
B3380 62002-0000 STONE MASONRY, GUARDWALL (BUF) SQYD 17 17
B3400 62002-1000 CLASS B MASONRY, ROCK FACE FINISH SQYD 114 6 120
B3420 62005-0000 CONCRETE MASONRY UNITS CUYD 214 36 250
B3440 62010-0000 STONE MASONRY, EDGING (IP) LNFT 130 130
B3460 62010-0000 STONE MASONRY, SCUPPER (BUF) LNFT 4 4
B3480 62010-0000 STONE MASONRY, EDGING (BUF) LNFT 18 18
B3500 62010-0000 STONE MASONRY, SEAT WALL (BUF) LNFT 40 40
B3520 62010-0000 STONE MASONRY WALL (BUF) LNFT 215 215
B3540 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE
CULVERT (IP) EACH 2 2
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(5
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.14PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B3560 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE
CULVERT (BUF) EACH 1 1
B3580 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE
CULVERT EACH 68 68
B3600 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE
CULVERT EACH 10 10
B3620 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE
CULVERT EACH 12 12
B3640 62026-1000 REMOVE AND RESET STONE MASONRY (FLAGSTONE) SQYD 16 4 20
B3660 62027-0000 REMOVE AND RESET STONE MASONRY (Curb) LNFT 467 33 500
B3680 62031-0000 REPOINT STONE MASONRY (BUF) SQFT 1,950 1,950
B3700 62201-0000 EQUIPMENT, JACKHAMMER HOUR 40 40
B3720 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 400 400
B3740 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
(IP) HOUR 40 40
B3760 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
(BUF) HOUR 100 100
B3780 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH HOUR 50 50
B3800 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH (IP) HOUR 80 80
B3820 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH (BUF) HOUR 100 100
B3840 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED
CAPACITY HOUR 200 200
B3860 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED
CAPACITY (IP) HOUR 80 80
B3880 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED
CAPACITY (BUF) HOUR 100 100
B3900 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 200 200
B3920 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER (BUF) HOUR 40 40
B3940 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 3500
POUND MINIMUM HAMMER ATTACHMENT HOUR 100 100
B3960 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 50
FOOT MINIMUM REACH HOUR 40 40
B3980 62201-3000 HYDRAULIC EXCAVATOR, MINI EXCAVATOR, 69"
MINIMUM WIDTH, WITH THUMB ATTACHMENT HOUR 40 40
B4000 62201-3000 HYDRAULIC EXCAVATOR (ROCK HAMMER) HOUR 200 200
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(6
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.15PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B4020 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0
CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 500 500
B4040 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0
CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT (IP) HOUR 40 40
B4060 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0
CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT (BUF) HOUR 200 200
B4080 62201-3750 CHAIN SAW HOUR 40 40
B4100 62201-3750 CHAIN SAW (IP) HOUR 10 10
B4120 62201-3750 CHAIN SAW (BUF) HOUR 10 10
B4140 62301-0000 GENERAL LABOR HOUR 1,700 1,700
B4160 62301-0000 GENERAL LABOR (IP) HOUR 200 200
B4180 62301-0000 GENERAL LABOR (BUF) HOUR 100 100
B4200 62302-0000 SPECIAL LABOR, Carpenter HOUR 200 200
B4220 62302-0000 SPECIAL LABOR, Stone Mason HOUR 200 200
B4240 62302-0000 SPECIAL LABOR (WETLAND RESTORATION) HOUR 200 200
B4260 62302-0000 SPECIAL LABOR CARPENTER (IP) HOUR 20 20
B4280 62302-0000 SPECIAL LABOR STONE MASON (IP) HOUR 40 40
B4300 62302-0000 SPECIAL LABOR, Carpenter (BUF) HOUR 20 20
B4320 62302-0000 SPECIAL LABOR, Stone Mason (BUF) HOUR 80 80
B4340 62302-0100 SPECIAL LABOR, SLOPE SCALING, Mechanical HOUR 16 16
B4360 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 50 50
B4380 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (IP) HOUR 25 25
B4400 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (BUF) HOUR 25 25
B4420 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (IP) SQYD 40 40
B4440 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (BUF) SQYD 950 950
B4460 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 31.3 1.8 1.9 35.0
B4480 62515-1000 MULCHING, DRY METHOD ACRE 29.6 1.8 3.6 35.0
B4500 62516-1000 MULCHING, DRY METHOD (IP) SQYD 40 40
B4520 62516-1000 MULCHING, DRY METHOD (BUF) SQYD 950 50 1,000
B4540 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (IP) EACH 9 9
B4560 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (BUF) EACH 19 19
B4580 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN Panel EACH 27 27
B4600 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (IP) EACH 10 10
B4620 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (BUF) EACH 10 10
B4640 63302-0000 SIGN SYSTEM SQFT 118 118
B4660 63306-0700 POST, STEEL, PIPE, Hitching Post EACH 1 1
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(7
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.16PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B4680 63306-0700 POST, STEEL, PIPE, Hitching Post (REMOVE AND
RESET) EACH 2 2
B4700 63318-1000 SNOW POLE HOLDER EACH 196 196
B4720 63401-0000 PAVEMENT MARKINGS, Stop Line LNFT 227 227
B4740 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 94,300 94,300
B4760 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 90,542 90,542
B4780 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW LNFT 3,600 3,600
B4800 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED WHITE LNFT 10,600 10,600
B4820 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 3 3
B4840 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY
SYMBOL EACH 4 4
B4860 63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 EACH 100 100
B4880 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 30 30
B4900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
(IP) EACH 3 3
B4920 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
(BUF) EACH 3 3
B4940 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER,
TYPE 42-INCH EACH 230 230
B4960 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 200 200
B4980 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
A EACH 65 65
B5000 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
B EACH 95 95
B5020 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
C EACH 100 100
B5040 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOW POLE EACH 80 80
B5060 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 1,750 1,750
B5080 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 80,650 80,650
B5100 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 159 159
B5120 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 1,603 1,603
B5140 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
(IP) SQFT 35 35
B5160 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
(BUF) SQFT 65 65
B5180 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 4,500 4,500
B5200 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 500 500
B5220 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 20,000 20,000
B5240 63701-0000 FIELD OFFICE (RELOCATION) EACH 1 1
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(8
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.17PRA YELL 10(19)WY
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T
Typical Section
Plan & Profile
Parking Areas and Approach
Roads
Erosion Control
Drainage & Culverts Walls
Roadway Oblit.
& Material
Source
Temporary Traffic Control
Staged & Surcharges
Permanent Traffic Control
Inspiration Point
Overlook
Brink of Upper Falls
Trails & Overlooks
ALLOWANCE Bid Schedule
B5260 64603-0100 FIXTURE, TRASH RECEPTACLE (IP) EACH 1 1
B5280 64603-0100 FIXTURE, TRASH RECEPTACLE (BUF) EACH 2 2
B5300 64603-0300 FIXTURE, BENCH MASONRY (IP) EACH 4 4
B5320 64603-0300 FIXTURE, BENCH WOOD (IP) EACH 4 4
B5340 64603-0300 FIXTURE, BENCH MASONRY (BUF) EACH 2 2
B5360 64603-0800 FIXTURE, KIOSK (BUF) EACH 1 1
B5380 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (IP) LNFT 154 154
B5400 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (IP) LNFT 60 60
B5420 64604-1000 FIXTURE, HANDRAIL, TYPE 3 (IP) LNFT 59 59
B5440 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (BUF) LNFT 205 205
B5460 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (BUF) LNFT 35 35
B5480 64604-3000 FIXTURE, PEDESTRIAN RAILING (BUF) LNFT 295 295
B5500 64605-1000 FIXTURE, KIOSK, repairs LPSM ALL ALL
B5520 64620-1100 REMOVE AND RESET KIOSK EACH 1 1
B5540 64631-0000 ROADSIDE DEVELOPMENT, MASONRY STEPS AND EDGE
STONES (IP) LNFT 385 385
B5560 64632-0000 ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT
(IP) SQYD 155 155
B5580 64632-0000 ROADSIDE DEVELOPMENT STABILIZED EMBANKMENT
(BUF) SQYD 16 16
B5600 64702-1000 MITIGATION, LANDSCAPING LOG LNFT 4,600 4,600
B5620 64703-1000 MITIGATION, LANDSCAPING LOG (IP) EACH 8 8
B5640 64703-1000 MITIGATION, LANDSCAPING LOG (BUF) EACH 15 15
B5660 64703-3000 MITIGATION, LOG WEIR EACH 6 6
B5680 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 138 138
B5700 65105-0000 TEMPORARY ROCKFALL PROTECTION LPSM ALL
Estimated Quantities
1- M ar -2
5:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or ri s to
G ol de n
G at e Ph as e
S C H
ED
U pe rc en t Es tim at e-
.x ls x] Sh ee t
(9
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.18PRA YELL 10(19)WY
SHEET
NUMBER
Section U
Brink of the Upper Falls – Entry Drive and Parking Lot ALLOWANCE Bid
Schedule
W0020 15101-0000 MOBILIZATION LPSM ALL
W0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
W0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
W0080 15401-0000 CONTRACTOR TESTING LPSM ALL
W0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
W0120 15701-0000 SOIL EROSION CONTROL LPSM ALL
W0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 2,090 2,090
W0160 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 3 3
W0180 20103-0000 CLEARING AND GRUBBING SQYD 1,520 1,520
W0200 20301-1400 REMOVAL OF INLET EACH 3 3
W0220 20301-2300 REMOVAL OF SIGN/MARKER EACH 1 1
W0240 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, STAIRS AND
HANDRAILS EACH 2 2
W0260 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 2,090 2,090
W0280 20302-2100 REMOVAL OF PIPE CULVERT LNFT 100 100
W0300 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 309 309
W0320 20310-1000 PLUG, EXISTING PIPE EACH 1 1
W0340 20401-0000 ROADWAY EXCAVATION CUYD 1,420 180 1,600
W0360 20411-0000 SELECT BORROW TON 2,500 300 2,800
W0380 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 110 10 120
W0400 25110-0300 GROUTED RIPRAP, METHOD A, CLASS 3 CUYD 40 5 45
W0420 25125-0000 BOULDER EACH 20 2 22
W0440 25210-0000 ROCKERY, TYPE 1 SQFT 400 50 450
W0460 25501-0000 MECHANICALLY STABILIZED EARTH WALL, STONE MASONRY FACE SQFT 2,160 40 2,200
W0480 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,200 300 2,500
W0500 30801-0000 RECYCLED AGGREGATE BASE SQYD 7,825 75 7,900
W0520 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 2,020 10…