B_-_SHEETS_-_Final.pdf

PDF 170 KB Posted

Attached to
WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2
Solicitation number
DTFH70-15-R-00015
Issued by

About this file

B

View the file

Other files

File Type Posted
Q A_4-11-2016.pdf PDF
A002_Norris.pdf PDF
Q A_4-8-2016.pdf PDF
A001.pdf PDF
YELL_spreadsheet.xlsx XLSX spreadsheet
K-Sheets.pdf PDF
C-Sheets.pdf PDF
Physical_Data_WY_PRA_YELL_10(19).pdf PDF
G-Sheets.pdf PDF
T-Sheets_-_Final.pdf PDF
D-Sheets.pdf PDF
P-sheets.pdf PDF
X-Sheets_-_Final.pdf PDF
S-Sheets_-_Final.pdf PDF
H-Sheets.pdf PDF
O-sheets.pdf PDF
Plan_Request_for_WY_PRA_YELL_10(19).pdf PDF
F-Sheets.pdf PDF
RFP_Norris_reduced.pdf PDF
V-Sheets_-_Final.pdf PDF
W-Sheets_-_Final.pdf PDF
M-Sheets.pdf PDF
E-Sheets.pdf PDF
L-sheets.pdf PDF
U-Sheets_-_Final.pdf PDF
N-sheets.pdf PDF
I-Sheets.pdf PDF
J-Sheets.pdf PDF
NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet and Description

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15101-0000 MOBILIZATION (IP) LPSM ALL

A0060 15101-0000 MOBILIZATION (BUF) LPSM ALL

A0080 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (IP) LPSM ALL

A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING (BUF) LPSM ALL

A0140 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL

A0160 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (IP) LPSM ALL

A0180 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (BUF) LPSM ALL

A0200 15401-0000 CONTRACTOR TESTING LPSM ALL

A0220 15401-0000 CONTRACTOR TESTING (IP) LPSM ALL

A0240 15401-0000 CONTRACTOR TESTING (BUF) LPSM ALL

A0260 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0280 15501-0000 CONSTRUCTION SCHEDULE (IP) LPSM ALL

A0300 15501-0000 CONSTRUCTION SCHEDULE (BUF) LPSM ALL

A0320 15701-0000 SOIL EROSION CONTROL (IP) LPSM ALL

A0340 15701-0000 SOIL EROSION CONTROL (BUF) LPSM ALL

A0360 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING SQYD 160 160

A0380 15704-1100 SOIL EROSION CONTROL, BRUSH BLANKET SQYD 40,523 40,523

A0400 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 11,292 11,292

A0420 15705-1000 SOIL EROSION CONTROL, TEMPORARY 48-INCH

CULVERT PIPE LNFT 60 60

A0440 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 33,713 33,713

A0460 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (IP) LNFT 560 560

A0480 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (BUF) LNFT 1,935 1,935

A0500 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 72 72

A0520 15706-0300 SOIL EROSION CONTROL, SANDBAG EACH 100 400 500

A0540 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 13 13

A0560 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0580 20101-0000 CLEARING AND GRUBBING ACRE 32.0 3.0 35.0

A0600 20103-0000 CLEARING AND GRUBBING (IP) SQYD 530 530

A0620 20103-0000 CLEARING AND GRUBBING (BUF) SQYD 1,458 1,458

A0640 20301-0080 REMOVAL OF BENCH (IP) EACH 6 6

A0660 20301-0200 REMOVAL OF BOULDER, STOCKPILE EACH 82 29 111

A0680 20301-1100 REMOVAL OF GATE, double swing EACH 2 2

A0700 20301-1200 REMOVAL OF HEADWALL EACH 45 45

A0720 20301-1400 REMOVAL OF INLET EACH 1 1

A0740 20301-1900 REMOVAL OF PIPE CULVERT EACH 31 31

A0760 20301-2300 REMOVAL OF SIGN/MARKER EACH 25 25

A0780 20301-2300 REMOVAL OF SIGN/MARKER (IP) EACH 4 4

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U

LE

A pe rc en t Es tim at e-

.x ls x] Sh ee t

STATE PROJECT

B.1PRA YELL 10(19)WY

SHEET

NUMBER

NPS PMIS 86308

NPS Drawing # 101/130820

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A0800 20301-2300 REMOVAL OF SIGN/MARKER (BUF) EACH 4 4

A0820 20301-2700 REMOVAL OF STRUCTURE, DRY STACK WALL EACH 2 2

A0840 20301-3000 REMOVAL OF TRASH RECEPTACLE (BUF) EACH 4 4

A0860 20302-0700 REMOVAL OF FENCE (BUF) LNFT 130 130

A0880 20302-1000 REMOVAL OF FENCE, RAIL (IP) LNFT 55 55

A0900 20302-2500 REMOVAL OF HANDRAIL (IP) LNFT 275 275

A0920 20302-2500 REMOVAL OF HANDRAIL (BUF) LNFT 170 170

A0940 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CONC.

STAIRS (IP) SQYD 105 105

A0960 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS,

TIMBER STEPS (IP) SQYD 12 12

A0980 20303-0300 REMOVAL OF CONCRETE (IP) SQYD 25 25

A1000 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (BUF) SQYD 1,290 1,290

A1020 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (IP) SQYD 10 10

A1040 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (BUF) SQYD 938 938

A1060 20303-3200 REMOVAL OF SIDEWALK, CONCRETE (BUF) SQYD 66 66

A1080 20303-3500 REMOVAL OF STONE MASONRY SQYD 11 11

A1100 20401-0000 ROADWAY EXCAVATION CUYD 158,026 2,556 1,518 162,100

A1120 20401-0000 ROADWAY EXCAVATION (IP) CUYD 320 20 340

A1140 20401-0000 ROADWAY EXCAVATION (BUF) CUYD 57 3 60

A1160 20402-0000 SUBEXCAVATION CUYD 6,351 1,992 457 8,800

A1180 20402-0000 SUBEXCAVATION (IP) CUYD 300 50 350

A1200 20403-0000 UNCLASSIFIED BORROW CUYD 5,177 118 5,295

A1220 20411-0000 SELECT BORROW TON 15,996 5,439 1,565 23,000

A1240 20411-0000 SELECT BORROW (IP) TON 445 55 500

A1260 20411-0000 SELECT BORROW (BUF) TON 2,010 190 2,200

A1280 20421-0000 ROCK EXCAVATION (BUF) CUYD 10 1 11

A1300 20465-0000 CONSERVE AND PLACE BOULDER EACH 125 4 129

A1320 20466-0000 CONSERVE AND STOCKPILE TOPSOIL (IP) CUYD 3 3

A1340 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE A, WOVEN SQYD 2,352 148 2,500

A1360 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE B SQYD 230 20 250

A1380 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE C SQYD 8,196 301 503 9,000

A1400 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE C (Special Rock Embankment) SQYD 2,426 74 2,500

A1420 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE C, WOVEN SQYD 1,777 1,777

A1440 20703-0000 GEOGRID (Biaxial) SQYD 8,117 483 8,600

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(2

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.2PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A1460 20703-2000 GEOGRID, STABILIZATION SQYD 3,332 444 3,776

A1480 20704-0000 GEOMEMBRANE SQYD 2,041 159 2,200

A1500 20704-0000 GEOMEMBRANE (IP) SQYD 100 10 110

A1520 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM SQYD 2,041 159 2,200

A1540 20815-0000 COFFERDAMS (Glen Creek Box Culvert) LPSM ALL ALL

A1560 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 3,994 406 4,400

A1580 21101-1000 ROADWAY OBLITERATION, METHOD 1 (IP) SQYD 90 10 100

A1600 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 93 7 100

A1620 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (IP) CUYD 27 27

A1640 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (BUF) CUYD 26 4 30

A1660 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 429 71 500

A1680 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (IP) CUYD 5 5

A1700 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1 LNFT 1,750 150 1,900

A1720 25125-0000 BOULDER (IP) EACH 140 140

A1740 25125-0000 BOULDER (BUF) EACH 49 6 55

A1760 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 2) CUYD 329 21 350

A1780 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 3) CUYD 663 67 730

A1800 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 5) CUYD 316 34 350

A1820 25210-0000 ROCKERY SQFT 546 3,010 344 3,900

A1840 25210-0000 ROCKERY, SEAT WALL SQFT 18 18

A1860 25210-0000 ROCKERY, TYPE 1 (IP) SQFT 1,450 150 1,600

A1880 25210-0000 ROCKERY, TYPE 2 (IP) SQFT 200 20 220

A1900 25210-0000 ROCKERY, TYPE 2 (BUF) SQFT 560 40 600

A1920 25210-0000 ROCKERY, TYPE 2A (BUF) SQFT 520 80 600

A1940 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 13,903 97 14,000

A1960 25501-0000 MECHANICALLY STABILIZED EARTH WALL (IP) SQFT 400 400

A1980 25701-0400 CONTRACTOR FURNISHED REINFORCED CONCRETE

RETAINING WALL DESIGN LPSM ALL

A2000 25801-0000 REINFORCED CONCRETE RETAINING WALL (precast wing wall) SQFT 151 151

A2020 27301-0000 POLYURETHANE RESIN INJECTION (BUF) LB 7,600 7,600

A2040 27501-1000 GEOFOAM, LIGHTWEIGHT FILL MATERIAL (IP) CUYD 65 65

A2060 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 64 6 70

A2080 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,723 7 1,730

A2100 30202-2000 ROADWAY AGGREGATE, METHOD 2 (BUF) TON 445 445

A2120 30801-0000 RECYCLED AGGREGATE BASE SQYD 55,004 1,817 279 57,100

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(3

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.3PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A2140 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX,

1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE III TON 18,003 1,925 572 20,500

A2160 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 180 19 2 201

A2180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (BUF) TON 340 10 350

A2200 40601-0000 FOG SEAL TON 23 4 27

A2220 40605-0000 BLOTTER TON 450 52 502

A2240 40801-0000 COLD RECYCLED ASPHALT BASE COURSE TON 20,535 2,340 525 23,400

A2260 41201-0000 TACK COAT TON 31 3 1 35

A2280 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (IP) CUYD 38 38

A2300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (BUF) CUYD 8 8

A2320 55210-0000 PRECAST STRUCTURAL CONCRETE(precast concrete footing) CUYD 8 8

A2340 55401-1000 REINFORCING STEEL (IP) LB 11,500 11,500

A2360 55401-3000 REINFORCING STEEL, STAINLESS STEEL (BUF) LB 2,412 2,412

A2380 55501-0000 STRUCTURAL STEEL BOARDWALK (IP) LPSM ALL

A2400 56701-0000 MICROPILE , BOARDWALK (IP) LNFT 640 640

A2420 56701-0000 MICROPILE (IP) LNFT 160 160

A2440 56701-0000 MICROPILE (BUF) LNFT 64 64

A2460 57501-0000 MINOR BRIDGE WORK (BUF) LPSM ALL

A2480 60201-0400 12-INCH PIPE CULVERT (BUF) LNFT 8 8

A2500 60201-0600 18-INCH PIPE CULVERT (IP) LNFT 76 76

A2520 60201-0600 18-INCH PIPE CULVERT (BUF) LNFT 30 30

A2540 60201-0800 24-INCH PIPE CULVERT LNFT 2,847 2,847

A2560 60201-0900 30-INCH PIPE CULVERT LNFT 162 162

A2580 60220-4200 12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED

CONCRETE BOX CULVERT LNFT 36 36

A2600 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 13 13

A2620 60404-1000 CATCH BASIN, FLH TYPE 1 (IP) EACH 6 6

A2640 60404-1000 CATCH BASIN, FLH TYPE 1 (BUF) EACH 1 1

A2660 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 480 20 500

A2680 60510-0800 6-INCH OUTLET PIPE (BUF) LNFT 6 6

A2700 60510-0900 8-INCH COLLECTOR PIPE LNFT 750 50 800

A2720 60510-1000 8-INCH OUTLET PIPE LNFT 160 40 200

A2740 60522-0000 SAND CUYD 192 8 200

A2760 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 3,069 3,069

A2780 60901-2900 CURB, STONE, TYPE 1, 6-INCH DEPTH LNFT 699 699

A2800 60901-7000 CURB, LOG LNFT 3,109 481 3,590

A2820 61001-0000 HORIZONTAL DRAIN PIPE (BUF) LNFT 30 30

A2840 61501-0100 SIDEWALK, CONCRETE (IP) SQYD 185 185

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(4

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.4PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A2860 61501-1100 SIDEWALK, ASPHALT SQYD 102 102

A2880 61501-1100 SIDEWALK, ASPHALT (IP) SQYD 255 255

A2900 61501-1100 SIDEWALK, ASPHALT (BUF) SQYD 730 730

A2920 61503-5000 MEDIAN, STONE, Cobble SQYD 17 17

A2940 61504-3000 ACCESSIBILITY RAMP, ASPHALT SQYD 14 14

A2960 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD

POSTS LNFT 2,010 15 2,025

A2980 61702-1300 TERMINAL SECTION, TYPE MELT EACH 2 2

A3000 61901-1300 FENCE, CHAIN LINK, TEMPORARY (IP) LNFT 30 30

A3020 61901-1300 FENCE, CHAIN LINK, TEMPORARY (BUF) LNFT 50 50

A3040 61902-0900 GATE, METAL, 40 foot width (government furnished) EACH 2 2

A3060 62001-0000 STONE MASONRY(headwall repair) CUYD 11 11

A3080 62002-0000 STONE MASONRY(MSE Wall Facing) SQYD 1,267 33 1,300

A3100 62002-0000 STONE MASONRY, GUARDWALL (IP) SQYD 70 70

A3120 62002-0000 STONE MASONRY, WALL FACING (IP) SQYD 26 26

A3140 62002-0000 STONE MASONRY, PIPE COVER (IP) SQYD 6 6

A3160 62002-0000 STONE MASONRY, PAVING (BUF) SQYD 80 80

A3180 62002-0000 STONE MASONRY, WALL FACING (BUF) SQYD 45 45

A3200 62002-0000 STONE MASONRY, WALL ADJUSTMENTS (BUF) SQYD 35 35

A3220 62002-0000 STONE MASONRY, GUARDWALL (BUF) SQYD 17 17

A3240 62002-1000 CLASS B MASONRY, ROCK FACE FINISH SQYD 57 3 60

A3260 62005-0000 CONCRETE MASONRY UNITS CUYD 214 36 250

A3280 62010-0000 STONE MASONRY, EDGING (IP) LNFT 130 130

A3300 62010-0000 STONE MASONRY, SCUPPER (BUF) LNFT 4 4

A3320 62010-0000 STONE MASONRY, EDGING (BUF) LNFT 18 18

A3340 62010-0000 STONE MASONRY, SEAT WALL (BUF) LNFT 40 40

A3360 62010-0000 STONE MASONRY WALL (BUF) LNFT 215 215

A3380 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE

CULVERT (IP) EACH 2 2

A3400 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE

CULVERT (BUF) EACH 1 1

A3420 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE

CULVERT EACH 58 58

A3440 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE

CULVERT EACH 6 6

A3460 62026-1000 REMOVE AND RESET STONE MASONRY (FLAGSTONE) SQYD 16 4 20

A3480 62027-0000 REMOVE AND RESET STONE MASONRY(Curb) LNFT 335 15 350

A3500 62031-0000 REPOINT STONE MASONRY (BUF) SQFT 1,950 1,950

A3520 62201-0000 EQUIPMENT, JACKHAMMER HOUR 40 40

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(5

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Description Unit

STATE PROJECT

B.5PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A3540 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 400 400

A3560 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

(IP) HOUR 40 40

A3580 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

(BUF) HOUR 100 100

A3600 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED

CAPACITY BUCKET, 18-INCH WIDTH HOUR 50 50

A3620 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED

CAPACITY BUCKET, 18-INCH WIDTH (IP) HOUR 80 80

A3640 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED

CAPACITY BUCKET, 18-INCH WIDTH (BUF) HOUR 100 100

A3660 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED

CAPACITY HOUR 200 200

A3680 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED

CAPACITY (IP) HOUR 80 80

A3700 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED

CAPACITY (BUF) HOUR 100 100

A3720 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 200 200

A3740 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER (BUF) HOUR 40 40

A3760 62201-3000 HYDRAULIC EXCAVATOR (ROCK HAMMER) HOUR 200 200

A3780 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 3500

POUND MINIMUM HAMMER ATTACHMENT HOUR 100 100

A3800 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 50

FOOT MINIMUM REACH HOUR 40 40

A3820 62201-3000 HYDRAULIC EXCAVATOR, MINI EXCAVATOR, 69"

MINIMUM WIDTH, WITH THUMB ATTACHMENT HOUR 40 40

A3840 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0

CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT HOUR 500 500

A3860 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0

CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT (IP) HOUR 40 40

A3880 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0

CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT (BUF) HOUR 200 200

A3900 62201-3750 CHAIN SAW HOUR 40 40

A3920 62201-3750 CHAIN SAW (IP) HOUR 10 10

A3940 62201-3750 CHAIN SAW (BUF) HOUR 10 10

A3960 62301-0000 GENERAL LABOR HOUR 1,700 1,700

A3980 62301-0000 GENERAL LABOR (IP) HOUR 200 200

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(6

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.6PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A4000 62301-0000 GENERAL LABOR (BUF) HOUR 100 100

A4020 62302-0000 SPECIAL LABOR (WETLAND RESTORATION) HOUR 200 200

A4040 62302-0000 SPECIAL LABOR, Carpenter HOUR 200 200

A4060 62302-0000 SPECIAL LABOR, Stone Mason HOUR 200 200

A4080 62302-0000 SPECIAL LABOR CARPENTER (IP) HOUR 20 20

A4100 62302-0000 SPECIAL LABOR STONE MASON (IP) HOUR 40 40

A4120 62302-0000 SPECIAL LABOR, Carpenter (BUF) HOUR 20 20

A4140 62302-0000 SPECIAL LABOR, Stone Mason (BUF) HOUR 80 80

A4160 62302-0100 SPECIAL LABOR, SLOPE SCALING, Mechanical HOUR 16 16

A4180 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 50 50

A4200 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (IP) HOUR 25 25

A4220 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (BUF) HOUR 25 25

A4240 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (IP) SQYD 40 40

A4260 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (BUF) SQYD 950 950

A4280 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 27.3 1.1 1.6 30.0

A4300 62515-1000 MULCHING, DRY METHOD ACRE 25.6 1.1 3.3 30.0

A4320 62516-1000 MULCHING, DRY METHOD (IP) SQYD 40 40

A4340 62516-1000 MULCHING, DRY METHOD (BUF) SQYD 950 50 1,000

A4360 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (IP) EACH 9 9

A4380 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (BUF) EACH 19 19

A4400 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN Panel EACH 21 21

A4420 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (IP) EACH 10 10

A4440 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (BUF) EACH 10 10

A4460 63302-0000 SIGN SYSTEM SQFT 78 78

A4480 63306-0700 POST, STEEL, PIPE, Hitching Post EACH 1 1

A4500 63306-0700 POST, STEEL, PIPE, Hitching Post (REMOVE AND

RESET) EACH 2 2

A4520 63318-1000 SNOW POLE HOLDER EACH 152 152

A4540 63401-0000 PAVEMENT MARKINGS, Stop Line LNFT 170 170

A4560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 78,478 78,478

A4580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 76,702 76,702

A4600 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW LNFT 2,000 2,000

A4620 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED WHITE LNFT 8,550 8,550

A4640 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 3 3

A4660 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY

SYMBOL EACH 3 3

A4680 63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 EACH 100 100

A4700 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 30 30

A4720 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

(IP) EACH 3 3

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(7

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.7PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A4740 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

(BUF) EACH 3 3

A4760 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER,

TYPE 42-INCH EACH 230 230

A4780 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 200 200

A4800 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE

A EACH 65 65

A4820 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE

B EACH 95 95

A4840 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE

C EACH 100 100

A4860 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOW POLE EACH 80 80

A4880 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 1,750 1,750

A4900 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 80,650 80,650

A4920 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 1,603 1,603

A4940 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

(IP) SQFT 35 35

A4960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

(BUF) SQFT 65 65

A4980 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 4,500 4,500

A5000 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL

SUPERVISOR DAY 500 500

A5020 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 20,000 20,000

A5040 63701-0000 FIELD OFFICE (RELOCATION) EACH 1 1

A5060 64603-0100 FIXTURE, TRASH RECEPTACLE (IP) EACH 1 1

A5080 64603-0100 FIXTURE, TRASH RECEPTACLE (BUF) EACH 2 2

A5100 64603-0300 FIXTURE, BENCH MASONRY (IP) EACH 4 4

A5120 64603-0300 FIXTURE, BENCH WOOD (IP) EACH 4 4

A5140 64603-0300 FIXTURE, BENCH MASONRY (BUF) EACH 2 2

A5160 64603-0800 FIXTURE, KIOSK (BUF) EACH 1 1

A5180 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (IP) LNFT 154 154

A5200 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (IP) LNFT 60 60

A5220 64604-1000 FIXTURE, HANDRAIL, TYPE 3 (IP) LNFT 59 59

A5240 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (BUF) LNFT 205 205

A5260 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (BUF) LNFT 35 35

A5280 64604-3000 FIXTURE, PEDESTRIAN RAILING (BUF) LNFT 295 295

A5300 64605-1000 FIXTURE, KIOSK, repairs LPSM ALL ALL

A5320 64631-0000 ROADSIDE DEVELOPMENT, MASONRY STEPS AND EDGE

STONES (IP) LNFT 385 385

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(8

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.8PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

A5340 64632-0000 ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT

(IP) SQYD 155 155

A5360 64632-0000 ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT

(BUF) SQYD 16 16

A5380 64702-1000 MITIGATION, LANDSCAPING LOG LNFT 3,800 3,800

A5400 64703-1000 MITIGATION, LANDSCAPING LOG (IP) EACH 8 8

A5420 64703-1000 MITIGATION, LANDSCAPING LOG (BUF) EACH 15 15

A5440 64703-3000 MITIGATION, LOG WEIR EACH 2 2

A5460 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 81 81

A5480 65105-0000 TEMPORARY ROCKFALL PROTECTION LPSM ALL

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(9

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.9PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B0020 15101-0000 MOBILIZATION LPSM ALL

B0040 15101-0000 MOBILIZATION (IP) LPSM ALL

B0060 15101-0000 MOBILIZATION (BUF) LPSM ALL

B0080 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

B0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (IP) LPSM ALL

B0120 15201-0000 CONSTRUCTION SURVEY AND STAKING (BUF) LPSM ALL

B0140 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL

B0160 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (IP) LPSM ALL

B0180 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE (BUF) LPSM ALL

B0200 15401-0000 CONTRACTOR TESTING LPSM ALL

B0220 15401-0000 CONTRACTOR TESTING (IP) LPSM ALL

B0240 15401-0000 CONTRACTOR TESTING (BUF) LPSM ALL

B0260 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

B0280 15501-0000 CONSTRUCTION SCHEDULE (IP) LPSM ALL

B0300 15501-0000 CONSTRUCTION SCHEDULE (BUF) LPSM ALL

B0320 15701-0000 SOIL EROSION CONTROL (IP) LPSM ALL

B0340 15701-0000 SOIL EROSION CONTROL (BUF) LPSM ALL

B0360 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING SQYD 740 740

B0380 15704-1100 SOIL EROSION CONTROL, BRUSH BLANKET SQYD 40,523 40,523

B0400 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 14,298 14,298

B0420 15705-1000 SOIL EROSION CONTROL, TEMPORARY 48-INCH

CULVERT PIPE LNFT 338 338

B0440 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 36,799 36,799

B0460 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (IP) LNFT 560 560

B0480 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (BUF) LNFT 1,935 1,935

B0500 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 96 96

B0520 15706-0300 SOIL EROSION CONTROL, SANDBAG EACH 100 4,200 4,300

B0540 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 14 14

B0560 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

B0580 20101-0000 CLEARING AND GRUBBING ACRE 36.9 4.0 0.1 41.0

B0600 20103-0000 CLEARING AND GRUBBING (IP) SQYD 530 530

B0620 20103-0000 CLEARING AND GRUBBING (BUF) SQYD 1,458 1,458

B0640 20301-0080 REMOVAL OF BENCH (IP) EACH 6 6

B0660 20301-0200 REMOVAL OF BOULDER, STOCKPILE EACH 88 123 211

B0680 20301-0300 REMOVAL OF BOX CULVERT EACH 1 1

B0700 20301-1100 REMOVAL OF GATE, double swing EACH 2 2

B0720 20301-1200 REMOVAL OF HEADWALL EACH 64 64

B0740 20301-1400 REMOVAL OF INLET EACH 1 1

B0760 20301-1900 REMOVAL OF PIPE CULVERT EACH 41 41

B0780 20301-2300 REMOVAL OF SIGN/MARKER EACH 34 34

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U

B pe rc en t Es tim at e-

.x ls x] Sh ee t

STATE PROJECT

B.10PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B0800 20301-2300 REMOVAL OF SIGN/MARKER (IP) EACH 4 4

B0820 20301-2300 REMOVAL OF SIGN/MARKER (BUF) EACH 4 4

B0840 20301-2700 REMOVAL OF STRUCTURE, DRY STACK WALL EACH 2 2

B0860 20301-3000 REMOVAL OF TRASH RECEPTACLE (BUF) EACH 4 4

B0880 20302-0700 REMOVAL OF FENCE (BUF) LNFT 130 130

B0900 20302-1000 REMOVAL OF FENCE, RAIL (IP) LNFT 55 55

B0920 20302-2500 REMOVAL OF HANDRAIL (IP) LNFT 275 275

B0940 20302-2500 REMOVAL OF HANDRAIL (BUF) LNFT 170 170

B0960 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CONC.

STAIRS (IP) SQYD 105 105

B0980 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS,

TIMBER STEPS (IP) SQYD 12 12

B1000 20303-0300 REMOVAL OF CONCRETE (IP) SQYD 25 25

B1020 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (BUF) SQYD 1,290 1,290

B1040 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 71 71

B1060 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (IP) SQYD 10 10

B1080 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (BUF) SQYD 938 938

B1100 20303-3200 REMOVAL OF SIDEWALK, CONCRETE (BUF) SQYD 66 66

B1120 20303-3500 REMOVAL OF STONE MASONRY SQYD 91 91

B1140 20401-0000 ROADWAY EXCAVATION CUYD 162,463 2,781 2,356 167,600

B1160 20401-0000 ROADWAY EXCAVATION (IP) CUYD 320 20 340

B1180 20401-0000 ROADWAY EXCAVATION (BUF) CUYD 57 3 60

B1200 20402-0000 SUBEXCAVATION CUYD 9,792 1,992 1,216 13,000

B1220 20402-0000 SUBEXCAVATION (IP) CUYD 300 50 350

B1240 20403-0000 UNCLASSIFIED BORROW CUYD 5,177 618 5,795

B1260 20411-0000 SELECT BORROW TON 27,559 5,439 2,902 35,900

B1280 20411-0000 SELECT BORROW (IP) TON 445 55 500

B1300 20411-0000 SELECT BORROW (BUF) TON 2,010 190 2,200

B1320 20421-0000 ROCK EXCAVATION (BUF) CUYD 10 1 11

B1340 20426-1000 DITCH, EXCAVATION(Apollinaris channel) CUYD 171 171

B1360 20465-0000 CONSERVE AND PLACE BOULDER EACH 150 4 154

B1380 20466-0000 CONSERVE AND STOCKPILE TOPSOIL (IP) CUYD 3 3

B1400 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE A, WOVEN SQYD 2,352 148 2,500

B1420 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE B SQYD 230 20 250

B1440 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE C SQYD 16,830 471 799 18,100

B1460 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE C (Special Rock Embankment) SQYD 3,513 87 3,600

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(2

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.11PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B1480 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE C, WOVEN SQYD 1,777 1,777

B1500 20703-0000 GEOGRID (Biaxial) SQYD 8,117 483 8,600

B1520 20703-2000 GEOGRID, STABILIZATION SQYD 3,332 444 3,776

B1540 20704-0000 GEOMEMBRANE SQYD 2,041 159 2,200

B1560 20704-0000 GEOMEMBRANE (IP) SQYD 100 10 110

B1580 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM SQYD 2,041 159 2,200

B1600 20815-0000 COFFERDAMS (Apollinairis Box Culvert) LPSM ALL ALL

B1620 20815-0000 COFFERDAMS (Glen Creek Box Culvert) LPSM ALL ALL

B1640 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 3,994 406 4,400

B1660 21101-1000 ROADWAY OBLITERATION, METHOD 1 (IP) SQYD 90 10 100

B1680 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 113 7 120

B1700 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (IP) CUYD 27 27

B1720 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (BUF) CUYD 26 4 30

B1740 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 477 63 540

B1760 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (IP) CUYD 5 5

B1780 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1 LNFT 1,750 150 1,900

B1800 25125-0000 BOULDER (IP) EACH 140 140

B1820 25125-0000 BOULDER (BUF) EACH 49 6 55

B1840 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 2) CUYD 329 21 350

B1860 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 2, Landslide) CUYD 819 81 900

B1880 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 3) CUYD 756 69 825

B1900 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

(Class 5) CUYD 316 34 350

B1920 25210-0000 ROCKERY SQFT 546 3,816 438 4,800

B1940 25210-0000 ROCKERY, SEAT WALL SQFT 18 18

B1960 25210-0000 ROCKERY, TYPE 1 (IP) SQFT 1,450 150 1,600

B1980 25210-0000 ROCKERY, TYPE 2 (IP) SQFT 200 20 220

B2000 25210-0000 ROCKERY, TYPE 2 (BUF) SQFT 560 40 600

B2020 25210-0000 ROCKERY, TYPE 2A (BUF) SQFT 520 80 600

B2040 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 13,903 97 14,000

B2060 25501-0000 MECHANICALLY STABILIZED EARTH WALL (IP) SQFT 400 400

B2080 25701-0400 CONTRACTOR FURNISHED REINFORCED CONCRETE

RETAINING WALL DESIGN LPSM ALL

B2100 25801-0000 REINFORCED CONCRETE RETAINING WALL (precast wing wall) SQFT 659 659

B2120 27301-0000 POLYURETHANE RESIN INJECTION (BUF) LB 7,600 7,600

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(3

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.12PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B2140 27501-1000 GEOFOAM, LIGHTWEIGHT FILL MATERIAL (IP) CUYD 65 65

B2160 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 64 9 73

B2180 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,723 7 1,730

B2200 30202-2000 ROADWAY AGGREGATE, METHOD 2 (BUF) TON 445 445

B2220 30801-0000 RECYCLED AGGREGATE BASE SQYD 74,073 3,109 418 77,600

B2240 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX,

1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE III TON 21,858 2,246 2,196 26,300

B2260 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 219 22 3 244

B2280 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (BUF) TON 340 10 350

B2300 40601-0000 FOG SEAL TON 31 4 35

B2320 40605-0000 BLOTTER TON 547 60 607

B2340 40801-0000 COLD RECYCLED ASPHALT BASE COURSE TON 25,055 2,854 491 28,400

B2360 41201-0000 TACK COAT TON 38 4 1 43

B2380 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (IP) CUYD 38 38

B2400 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (BUF) CUYD 8 8

B2420 55210-0000 PRECAST STRUCTURAL CONCRETE(precast concrete footing) CUYD 16 16

B2440 55401-1000 REINFORCING STEEL (IP) LB 11,500 11,500

B2460 55401-3000 REINFORCING STEEL, STAINLESS STEEL (BUF) LB 2,412 2,412

B2480 55501-0000 STRUCTURAL STEEL BOARDWALK (IP) LPSM ALL

B2500 56701-0000 MICROPILE, BOARDWALK (IP) LNFT 640 640

B2520 56701-0000 MICROPILE (IP) LNFT 160 160

B2540 56701-0000 MICROPILE (BUF) LNFT 64 64

B2560 57501-0000 MINOR BRIDGE WORK (BUF) LPSM ALL

B2580 60201-0400 12-INCH PIPE CULVERT LNFT 86 86

B2600 60201-0400 12-INCH PIPE CULVERT (BUF) LNFT 8 8

B2620 60201-0600 18-INCH PIPE CULVERT (IP) LNFT 76 76

B2640 60201-0600 18-INCH PIPE CULVERT (BUF) LNFT 30 30

B2660 60201-0800 24-INCH PIPE CULVERT LNFT 3,107 3,107

B2680 60201-0900 30-INCH PIPE CULVERT LNFT 259 259

B2700 60201-1000 36-INCH PIPE CULVERT LNFT 264 264

B2720 60220-3150 10 FEET SPAN, 8 FEET RISE PRECAST REINFORCED

CONCRETE BOX CULVERT LNFT 56 56

B2740 60220-4200 12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED

CONCRETE BOX CULVERT LNFT 36 36

B2760 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 14 14

B2780 60404-1000 CATCH BASIN, FLH TYPE 1 (IP) EACH 6 6

B2800 60404-1000 CATCH BASIN, FLH TYPE 1 (BUF) EACH 1 1

B2820 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,110 40 1,150

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(4

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.13PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B2840 60510-0800 6-INCH OUTLET PIPE (BUF) LNFT 6 6

B2860 60510-0900 8-INCH COLLECTOR PIPE LNFT 2,420 80 2,500

B2880 60510-1000 8-INCH OUTLET PIPE LNFT 430 20 450

B2900 60522-0000 SAND CUYD 192 8 200

B2920 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 3,069 3,069

B2940 60901-2900 CURB, STONE, TYPE 1, 6-INCH DEPTH LNFT 839 839

B2960 60901-7000 CURB, LOG LNFT 3,843 481 4,324

B2980 61001-0000 HORIZONTAL DRAIN PIPE (BUF) LNFT 30 30

B3000 61501-0100 SIDEWALK, CONCRETE (IP) SQYD 185 185

B3020 61501-1100 SIDEWALK, ASPHALT SQYD 224 224

B3040 61501-1100 SIDEWALK, ASPHALT (IP) SQYD 255 255

B3060 61501-1100 SIDEWALK, ASPHALT (BUF) SQYD 730 730

B3080 61503-5000 MEDIAN, STONE, Cobble SQYD 17 17

B3100 61504-3000 ACCESSIBILITY RAMP, ASPHALT SQYD 21 21

B3120 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD

POSTS LNFT 2,010 15 2,025

B3140 61702-1300 TERMINAL SECTION, TYPE MELT EACH 2 2

B3160 61901-1300 FENCE, CHAIN LINK, TEMPORARY (IP) LNFT 30 30

B3180 61901-1300 FENCE, CHAIN LINK, TEMPORARY (BUF) LNFT 50 50

B3200 61902-0900 GATE, METAL, 40 foot width (government furnished) EACH 2 2

B3220 62001-0000 STONE MASONRY(headwall repair) CUYD 11 11

B3240 62002-0000 STONE MASONRY (MSE Wall Facing) SQYD 1,267 33 1,300

B3260 62002-0000 STONE MASONRY, WALL FACING (IP) SQYD 26 26

B3280 62002-0000 STONE MASONRY, PIPE COVER (IP) SQYD 6 6

B3300 62002-0000 STONE MASONRY, GUARDWALL (IP) SQYD 70 70

B3320 62002-0000 STONE MASONRY, PAVING (BUF) SQYD 80 80

B3340 62002-0000 STONE MASONRY, WALL FACING (BUF) SQYD 45 45

B3360 62002-0000 STONE MASONRY, WALL ADJUSTMENTS (BUF) SQYD 35 35

B3380 62002-0000 STONE MASONRY, GUARDWALL (BUF) SQYD 17 17

B3400 62002-1000 CLASS B MASONRY, ROCK FACE FINISH SQYD 114 6 120

B3420 62005-0000 CONCRETE MASONRY UNITS CUYD 214 36 250

B3440 62010-0000 STONE MASONRY, EDGING (IP) LNFT 130 130

B3460 62010-0000 STONE MASONRY, SCUPPER (BUF) LNFT 4 4

B3480 62010-0000 STONE MASONRY, EDGING (BUF) LNFT 18 18

B3500 62010-0000 STONE MASONRY, SEAT WALL (BUF) LNFT 40 40

B3520 62010-0000 STONE MASONRY WALL (BUF) LNFT 215 215

B3540 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE

CULVERT (IP) EACH 2 2

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(5

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.14PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B3560 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE

CULVERT (BUF) EACH 1 1

B3580 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE

CULVERT EACH 68 68

B3600 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE

CULVERT EACH 10 10

B3620 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE

CULVERT EACH 12 12

B3640 62026-1000 REMOVE AND RESET STONE MASONRY (FLAGSTONE) SQYD 16 4 20

B3660 62027-0000 REMOVE AND RESET STONE MASONRY (Curb) LNFT 467 33 500

B3680 62031-0000 REPOINT STONE MASONRY (BUF) SQFT 1,950 1,950

B3700 62201-0000 EQUIPMENT, JACKHAMMER HOUR 40 40

B3720 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 400 400

B3740 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

(IP) HOUR 40 40

B3760 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

(BUF) HOUR 100 100

B3780 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED

CAPACITY BUCKET, 18-INCH WIDTH HOUR 50 50

B3800 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED

CAPACITY BUCKET, 18-INCH WIDTH (IP) HOUR 80 80

B3820 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED

CAPACITY BUCKET, 18-INCH WIDTH (BUF) HOUR 100 100

B3840 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED

CAPACITY HOUR 200 200

B3860 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED

CAPACITY (IP) HOUR 80 80

B3880 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED

CAPACITY (BUF) HOUR 100 100

B3900 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 200 200

B3920 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER (BUF) HOUR 40 40

B3940 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 3500

POUND MINIMUM HAMMER ATTACHMENT HOUR 100 100

B3960 62201-3000 HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 50

FOOT MINIMUM REACH HOUR 40 40

B3980 62201-3000 HYDRAULIC EXCAVATOR, MINI EXCAVATOR, 69"

MINIMUM WIDTH, WITH THUMB ATTACHMENT HOUR 40 40

B4000 62201-3000 HYDRAULIC EXCAVATOR (ROCK HAMMER) HOUR 200 200

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(6

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.15PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B4020 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0

CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT HOUR 500 500

B4040 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0

CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT (IP) HOUR 40 40

B4060 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0

CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT (BUF) HOUR 200 200

B4080 62201-3750 CHAIN SAW HOUR 40 40

B4100 62201-3750 CHAIN SAW (IP) HOUR 10 10

B4120 62201-3750 CHAIN SAW (BUF) HOUR 10 10

B4140 62301-0000 GENERAL LABOR HOUR 1,700 1,700

B4160 62301-0000 GENERAL LABOR (IP) HOUR 200 200

B4180 62301-0000 GENERAL LABOR (BUF) HOUR 100 100

B4200 62302-0000 SPECIAL LABOR, Carpenter HOUR 200 200

B4220 62302-0000 SPECIAL LABOR, Stone Mason HOUR 200 200

B4240 62302-0000 SPECIAL LABOR (WETLAND RESTORATION) HOUR 200 200

B4260 62302-0000 SPECIAL LABOR CARPENTER (IP) HOUR 20 20

B4280 62302-0000 SPECIAL LABOR STONE MASON (IP) HOUR 40 40

B4300 62302-0000 SPECIAL LABOR, Carpenter (BUF) HOUR 20 20

B4320 62302-0000 SPECIAL LABOR, Stone Mason (BUF) HOUR 80 80

B4340 62302-0100 SPECIAL LABOR, SLOPE SCALING, Mechanical HOUR 16 16

B4360 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 50 50

B4380 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (IP) HOUR 25 25

B4400 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES (BUF) HOUR 25 25

B4420 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (IP) SQYD 40 40

B4440 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (BUF) SQYD 950 950

B4460 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 31.3 1.8 1.9 35.0

B4480 62515-1000 MULCHING, DRY METHOD ACRE 29.6 1.8 3.6 35.0

B4500 62516-1000 MULCHING, DRY METHOD (IP) SQYD 40 40

B4520 62516-1000 MULCHING, DRY METHOD (BUF) SQYD 950 50 1,000

B4540 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (IP) EACH 9 9

B4560 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (BUF) EACH 19 19

B4580 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN Panel EACH 27 27

B4600 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (IP) EACH 10 10

B4620 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (BUF) EACH 10 10

B4640 63302-0000 SIGN SYSTEM SQFT 118 118

B4660 63306-0700 POST, STEEL, PIPE, Hitching Post EACH 1 1

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(7

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.16PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B4680 63306-0700 POST, STEEL, PIPE, Hitching Post (REMOVE AND

RESET) EACH 2 2

B4700 63318-1000 SNOW POLE HOLDER EACH 196 196

B4720 63401-0000 PAVEMENT MARKINGS, Stop Line LNFT 227 227

B4740 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE LNFT 94,300 94,300

B4760 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW LNFT 90,542 90,542

B4780 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW LNFT 3,600 3,600

B4800 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED WHITE LNFT 10,600 10,600

B4820 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 3 3

B4840 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY

SYMBOL EACH 4 4

B4860 63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 EACH 100 100

B4880 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 30 30

B4900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

(IP) EACH 3 3

B4920 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

(BUF) EACH 3 3

B4940 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER,

TYPE 42-INCH EACH 230 230

B4960 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 200 200

B4980 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE

A EACH 65 65

B5000 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE

B EACH 95 95

B5020 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE

C EACH 100 100

B5040 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOW POLE EACH 80 80

B5060 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 1,750 1,750

B5080 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 80,650 80,650

B5100 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 159 159

B5120 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 1,603 1,603

B5140 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

(IP) SQFT 35 35

B5160 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

(BUF) SQFT 65 65

B5180 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 4,500 4,500

B5200 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL

SUPERVISOR DAY 500 500

B5220 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 20,000 20,000

B5240 63701-0000 FIELD OFFICE (RELOCATION) EACH 1 1

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(8

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.17PRA YELL 10(19)WY

SHEET

NUMBER

Section C Section D Section E Section F Section G Section H Section L & M Section N Section O Section P Section S Section T

Typical Section

Plan & Profile

Parking Areas and Approach

Roads

Erosion Control

Drainage & Culverts Walls

Roadway Oblit.

& Material

Source

Temporary Traffic Control

Staged & Surcharges

Permanent Traffic Control

Inspiration Point

Overlook

Brink of Upper Falls

Trails & Overlooks

ALLOWANCE Bid Schedule

B5260 64603-0100 FIXTURE, TRASH RECEPTACLE (IP) EACH 1 1

B5280 64603-0100 FIXTURE, TRASH RECEPTACLE (BUF) EACH 2 2

B5300 64603-0300 FIXTURE, BENCH MASONRY (IP) EACH 4 4

B5320 64603-0300 FIXTURE, BENCH WOOD (IP) EACH 4 4

B5340 64603-0300 FIXTURE, BENCH MASONRY (BUF) EACH 2 2

B5360 64603-0800 FIXTURE, KIOSK (BUF) EACH 1 1

B5380 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (IP) LNFT 154 154

B5400 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (IP) LNFT 60 60

B5420 64604-1000 FIXTURE, HANDRAIL, TYPE 3 (IP) LNFT 59 59

B5440 64604-1000 FIXTURE, HANDRAIL, TYPE 1 (BUF) LNFT 205 205

B5460 64604-1000 FIXTURE, HANDRAIL, TYPE 2 (BUF) LNFT 35 35

B5480 64604-3000 FIXTURE, PEDESTRIAN RAILING (BUF) LNFT 295 295

B5500 64605-1000 FIXTURE, KIOSK, repairs LPSM ALL ALL

B5520 64620-1100 REMOVE AND RESET KIOSK EACH 1 1

B5540 64631-0000 ROADSIDE DEVELOPMENT, MASONRY STEPS AND EDGE

STONES (IP) LNFT 385 385

B5560 64632-0000 ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT

(IP) SQYD 155 155

B5580 64632-0000 ROADSIDE DEVELOPMENT STABILIZED EMBANKMENT

(BUF) SQYD 16 16

B5600 64702-1000 MITIGATION, LANDSCAPING LOG LNFT 4,600 4,600

B5620 64703-1000 MITIGATION, LANDSCAPING LOG (IP) EACH 8 8

B5640 64703-1000 MITIGATION, LANDSCAPING LOG (BUF) EACH 15 15

B5660 64703-3000 MITIGATION, LOG WEIR EACH 6 6

B5680 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 138 138

B5700 65105-0000 TEMPORARY ROCKFALL PROTECTION LPSM ALL

Estimated Quantities

1- M ar -2

5:

P M c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s to

G ol de n

G at e Ph as e

S C H

ED

U pe rc en t Es tim at e-

.x ls x] Sh ee t

(9

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.18PRA YELL 10(19)WY

SHEET

NUMBER

Section U

Brink of the Upper Falls – Entry Drive and Parking Lot ALLOWANCE Bid

Schedule

W0020 15101-0000 MOBILIZATION LPSM ALL

W0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

W0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL

W0080 15401-0000 CONTRACTOR TESTING LPSM ALL

W0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

W0120 15701-0000 SOIL EROSION CONTROL LPSM ALL

W0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 2,090 2,090

W0160 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 3 3

W0180 20103-0000 CLEARING AND GRUBBING SQYD 1,520 1,520

W0200 20301-1400 REMOVAL OF INLET EACH 3 3

W0220 20301-2300 REMOVAL OF SIGN/MARKER EACH 1 1

W0240 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS, STAIRS AND

HANDRAILS EACH 2 2

W0260 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 2,090 2,090

W0280 20302-2100 REMOVAL OF PIPE CULVERT LNFT 100 100

W0300 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 309 309

W0320 20310-1000 PLUG, EXISTING PIPE EACH 1 1

W0340 20401-0000 ROADWAY EXCAVATION CUYD 1,420 180 1,600

W0360 20411-0000 SELECT BORROW TON 2,500 300 2,800

W0380 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 110 10 120

W0400 25110-0300 GROUTED RIPRAP, METHOD A, CLASS 3 CUYD 40 5 45

W0420 25125-0000 BOULDER EACH 20 2 22

W0440 25210-0000 ROCKERY, TYPE 1 SQFT 400 50 450

W0460 25501-0000 MECHANICALLY STABILIZED EARTH WALL, STONE MASONRY FACE SQFT 2,160 40 2,200

W0480 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,200 300 2,500

W0500 30801-0000 RECYCLED AGGREGATE BASE SQYD 7,825 75 7,900

W0520 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 2,020 10…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .