O-sheets.pdf

PDF 523 KB Posted

Attached to
WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2
Solicitation number
DTFH70-15-R-00015
Issued by

About this file

O

View the file

Other files

File Type Posted
Q A_4-11-2016.pdf PDF
A002_Norris.pdf PDF
Q A_4-8-2016.pdf PDF
A001.pdf PDF
YELL_spreadsheet.xlsx XLSX spreadsheet
K-Sheets.pdf PDF
C-Sheets.pdf PDF
Physical_Data_WY_PRA_YELL_10(19).pdf PDF
G-Sheets.pdf PDF
T-Sheets_-_Final.pdf PDF
D-Sheets.pdf PDF
P-sheets.pdf PDF
X-Sheets_-_Final.pdf PDF
S-Sheets_-_Final.pdf PDF
H-Sheets.pdf PDF
Plan_Request_for_WY_PRA_YELL_10(19).pdf PDF
F-Sheets.pdf PDF
RFP_Norris_reduced.pdf PDF
V-Sheets_-_Final.pdf PDF
W-Sheets_-_Final.pdf PDF
M-Sheets.pdf PDF
E-Sheets.pdf PDF
L-sheets.pdf PDF
U-Sheets_-_Final.pdf PDF
B_-_SHEETS_-_Final.pdf PDF
N-sheets.pdf PDF
I-Sheets.pdf PDF
J-Sheets.pdf PDF
NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO SCALE

NOTE:

1.

QUANTITIES

TABULATION OF

See 204.11A - Soft Ground Embankment Construction.

O.1

STATE PROJECT

NUMBER

SHEET

WY

PRA YELL 10(19)

A

M

J a n u a r y

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d y e ll o a .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

311+25 TO 315+50 RT311+75 TO 315+50 LT

:1 .5

:1 .5

Existing ground

Existing ground

Pavement section

(See sheet C.3)

:1

:1

20'20'

Select borrow Select borrow

Existing roadway fill

18"

9"

(FINAL)

EMBANKMENT CONSTRUCTION

SOFT GROUND

NOTE:

1.

2.

EMBANKMENT CONSTRUCTION

SOFT GROUND

FOOTNOTE:

1 See sheet O.3 for Staged Construction

Listing.

Construct slopes and ditches as shown in the Staking Report Data

See 204.11A - Soft Ground Embankment Construction.

Top of subgrade

Geogrid, stabilization

Geogrid, stabilization class 1, type C, woven Separation-stabilization geotextile, O.2

STATE PROJECT

D e c e m b e r

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll o b .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

FOOTNOTE:

NOTE:

V a ri e s V a rie s

1' min. 1' min.

6' max 6' max

STAGE 1

V a ri e s

V a rie s

STAGE 2

2nd Stage

1st Stage 1st Stage

2nd Stage

:1 .5 traffic one-lane construction

12' min.

ground

Existing

Settles for 60 days min. at full surcharge height (3')

Settles for 60 days min.

(slope stake limits)

Edge of embankment widening(slope stake limits)

Edge of embankment widening

TRAFFIC STAGING DETAIL

Final configuration

Slope stake limits

CONSTRUCTION

STAGED

Construct final configuration one side at a time to maintain at least one lane of traffic

:1

Existing Roadway

Top of subgrade

Select borrow 9"

18" class 1, type C (woven)

Separation-stabilization geotextile, class 1, type C (woven)

Separation-stabilization geotextile, Geogrid, stabilization class 1, type C (woven)

Separation-stabilization geotextile, Unclassified borrow

Unclassified borrow

3' borrow accordance with 204.11.

Compact the second stage of the Unclassified Borrow material in

Do not compact first stage of the Unclassified Borrow material.

ground surface.

Do not remove topsoil, disturb the vegetation mat, or compact

Borrow

Unclassified

Staged 2.

1.

Removal of Unclassified Borrow is incidental to its placement.

See 204.10A - Soft Ground Embankment Construction.

O.3

STATE PROJECT

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll o c .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

File details come from the government source that posted it. Updated .