D-Sheets.pdf

PDF 8 MB Posted

Attached to
WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2
Solicitation number
DTFH70-15-R-00015
Issued by

About this file

D

View the file

Other files

File Type Posted
Q A_4-11-2016.pdf PDF
A002_Norris.pdf PDF
Q A_4-8-2016.pdf PDF
A001.pdf PDF
YELL_spreadsheet.xlsx XLSX spreadsheet
K-Sheets.pdf PDF
C-Sheets.pdf PDF
Physical_Data_WY_PRA_YELL_10(19).pdf PDF
G-Sheets.pdf PDF
T-Sheets_-_Final.pdf PDF
P-sheets.pdf PDF
X-Sheets_-_Final.pdf PDF
S-Sheets_-_Final.pdf PDF
H-Sheets.pdf PDF
O-sheets.pdf PDF
Plan_Request_for_WY_PRA_YELL_10(19).pdf PDF
F-Sheets.pdf PDF
RFP_Norris_reduced.pdf PDF
V-Sheets_-_Final.pdf PDF
W-Sheets_-_Final.pdf PDF
M-Sheets.pdf PDF
E-Sheets.pdf PDF
L-sheets.pdf PDF
U-Sheets_-_Final.pdf PDF
B_-_SHEETS_-_Final.pdf PDF
N-sheets.pdf PDF
I-Sheets.pdf PDF
J-Sheets.pdf PDF
NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROADWAY QUANTITIES

TABULATION OF

NOTE:

2.

1.

embankment construction.

See Sheet O.1 for additional quantities for staged and surcharged approach roads.

See Sheet E.1 for additional quantities at parking areas and

D.1

STATE PROJECT

NUMBER

SHEET

WY

PRA YELL 10(19)

P

M

F e b r u a r y

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d y e ll fa .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

FOOTNOTE:

See Sheet E.4 for Grizzly Lake Trail section.1

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

74807

750075

75107510

,5

.6

,5

.7

-0.7500%

-6.4150%

400' VC

K = 71

SSD = 390'

J H

J H

1 2 3 4 5 6 NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22649

BEGIN PROJECT

Slope stake limits

Eleocharis

Thermal boundary

PB 11

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

See Geotechnical Report No. 12-15.

UTILITY OWNER CONTACTS

888.467.2669

Thomas Stewart

Primary Contact:

NORTH WESTERN ENERGY

YELLOWSTONE NATIONAL PARK

307.344.2317

Dan Rhodes sewer, Gas, Etc:

Water, Power, Telecommunications, NTS and tack joint

Saw cut pavement structure details

See Sheet C.3 for

EXISTING PAVEMENT

CONNECTION TO

N

Line to be constructed

Profile grade Existing ground

Catch point right

Catch point left

Wetland boundary

R

T

L

T

See sheet E.3 Turnout, Soft ground

Soft ground

El=7512.87

E=2454621.65

N=1893188.08

306+75

SCHEDULES A & B

WY PRA YELL 10(19)

See Sheet O.2

Embankment construction

See Sheet O.2

Embankment construction

Riprap ditch, Method A, Class 1, RT

Class 1, LT

Riprap ditch, Method A, CUYD

EXC.

CUYD

EMB.

312+50 310+00307+50 305+00302+50300+00297+50

7485 7485

7490 7490

7495 7495

7500 7500

7505 7505

7510 7510

7515 7515

7520 7520

7525 7525

D.2

STATE PROJECT

A e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fb .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

5,639

,4

.9

,4

.0

-3.3509%

-1.4285%

570' VC

K = 297

,4

.0

+0.0681%

390' VC

K = 261

,4

.3

490' VC

K = 121

SSD = 512'

T S

.5

S C

.5

C S

.7

S T

.7

T S

.3

S C

.3

1 1

6 1 7 1

5 2

7 2

0 3

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

Slope stake limitsCP

22650

CP

22651 boundary

Thermal

Spiral= NG703002B

Ls= 150.00' f Spiral= NG703002A

Ls= 150.00' f

Curve= NG703002

D

D

R= 575.00'

Ts= 336.80'

L= 340.19'

Spiral= NG704013A f

Ls= 135.00'

D

D

Curve= NG704013

R= 500.00'

Ts= 333.98'

L= 353.47'

NGG096 Stream

ELO2014-01

BH

TB 37

TB

TB 38

TB

TB 39

TB

K = 124

380' VC

See sheet E.3

Turnout, See sheet E.3

Turnout, See sheet E.3

Turnout, See sheet E.3

Turnout, 321+00 to 330+50 Roadway excavation is unsuitable waste2.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

Eleocharis

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y c u lv e r t.

I n s ta ll in c h p ip e

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

N

Profile grade

Existing ground

Line to be constructed

Type 3

Subexcavation

Catch point right

Catch point left

Wetland boundary

R

T

L

T

Soft Ground

Soft Ground

Type 4

Subexcavation

See O_Sheets

Embankment construction

See Sheet O.2

Embankment construction

CUYD

EXC.

CUYD

EMB.

327+50 325+00322+50 320+00317+50315+00312+50

7445 7445

7450 7450

7455 7455

7460 7460

7465 7465

7470 7470

7475 7475

7480 7480

7485 7485

D.3

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fc .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

21,242

1,179

743074

74507450

-3.9660%

,4

.0

+2.9

630' VC

K = 91

,4

.8

610' VC

K = 80

SSD = 416'

S C 325+

92.38

C S

.8

S T

.8

P C

.0

P T

.4

P C

.6

C S

.1

S C

.1

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22651

CP

22053

CP

22054

Line to be constructed

Spiral= NG704013B f

Ls= 135.00'

D

D

Curve= NG704013

R= 500.00'

Ts= 333.98'

L= 353.47'

D

Curve= NG701003

R= 4,500.00'

T= 101.71'

L= 203.39'

D

R= 1,350.00'

T= 179.30'

L= 356.52'

Curve= NG701001 f

Spiral= NG701002B

Ls= 132.00'

PB 12

IP

GLR2014-01

GB-08

BH

YELL 05-31

GLR2014-02

GB-09

Slope stake limits

See sheet E.3 Turnout, See sheet E.4

Grizzly Lake Trail, See sheet E.3 Turnout, See sheet L.1, F.2 Roadway Obliteration, S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f in le t.

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s

I n s ta ll c a tc h b a s in

F L

H t y p e m a s o n r y h e a d w a ll

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

321+00 to 330+50 , Roadwasy excavation is unsuitable waste.

See F_Sheets for wetland impacts and mitigation areas.

2.

1.

S e e G

S h e e ts

R e m o v a l o f p ip e c u lv e r t.

R T

N

Subexcavation

Type 3

Catch point right Existing ground

Profile grade

Catch point left

CUYD

EXC.

CUYD

EMB.

342+50 340+00337+50 335+00332+50330+00327+50

7425 7425

7430 7430

7435 7435

7440 7440

7445 7445

7450 7450

7455 7455

7460 7460

7465 7465

D.4

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fd .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

21,906

13,250

107410

7420 74

507450

707570

-4.6990%

,4

.1

+1.3986

430' VC

K = 71

,4

.8

-4.9750%

510' VC

K = 80

SSD = 416'

,4

.9

350' VC

K = 86

S C

.1

P T

.7

P C

.8

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22055

CP

22655

Curve= NG701002

D

R= 1,000.00'

T= 680.14'

L= 1,194.55'

GB-09

GLR2014-03

GB-11

GB-10

GB-13

YELL 05-33

GB-14

GB-15

YELL 05-32

GB-12

Slope stake limits

57,899

21,111

See sheet E.3

Turnout, S e e G

S h e e ts

R e m o v a l o f h e a d w a ll

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s

I n s ta ll c a tc h b a s in

F L

H t y p e h e a d w a ll

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s

I n s ta ll c a tc h b a s in

F L

H t y p e m a s o n r y h e a d w a ll

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

I n s ta ll c a tc h b a s in

F L

H t y p e m a s o n r y h e a d w a ll

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1.

LEGEND

FOOTNOTE:

Drive probe location1

See Geotechnical Report No. 12-15.

reference number

Test boring location and boring mitigation areas.

See F_Sheets for wetland impacts and

NGG096 Stream

N

Line to be constructed

Slope stake limits

Thermal boundary

Profile grade

Existing ground

Catch point right

Catch point left

Wetland boundary

Riprap ditch, Method A, Class 1, RT

CUYD

EXC.

CUYD

EMB.

357+50 355+00352+50 350+00347+50345+00342+50

7405 7405

7410 7410

7415 7415

7420 7420

7425 7425

7430 7430

7435 7435

7440 7440

7445 7445

D.5

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fe .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

JH

JH

54628

-0.9088%

P C

.8

P T

.7

CP

22056

CP

22656

D

Curve= NG502002

R= 3,000.00'

T= 746.84'

L= 1,463.92'

PB 13

TB-40

TB 41

TB

NOTE:

2.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

1.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

will be wasted.

reused in this section. Excess roadway excavation material and in Solfatara Parking Area and Approach road needs to be

365+00 to 385+00 Roadway excavation on Grand Loop Road

See F Sheets for wetland impacts and mitigation areas.

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CUYD

EXC.

CUYD

EMB.

372+50370+00367+50365+00362+50360+00357+50

7385 7385

7390 7390

7395 7395

7400 7400

7405 7405

7410 7410

7415 7415

7420 7420

7425 7425

D.6

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll ff .d g n

WY PRA YELL 10(19)

e b r u a r y

C h e c k e d b y

D e s ig n e d b y

N

Line to be constructed

Profile grade

Existing ground

Slope stake limits

Slope stake limits

Wetland boundary

Catch point right

Catch point left

9,290

See sheet E.3 Turnout, See sheet E.3 Turnout, See sheet E.3 Turnout, 2.

1.

2,188

,4

.5

1,000' VC

K = 495

,4

.9

+1.1100%

-1.4607%

329' VC

K = 128

SSD = 584'

,4

.7

+2.9

400' VC

K = 91

P T

.7

0 P

C

.3

P T

.2

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22057

CP

22658

D

Curve= NG503035

R= 3,000.00'

T= 336.34'

L= 669.89'

NGG226 Stream

PB 14

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

8,422

See sheet E.5

Solfatara Parking Area, See sheet E.3

Turnout, See sheet E.3

Turnout, NOTE:

2.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number 1See Geotechnical Report No. 12-15.

will be wasted.

reused in this section. Excess roadway excavation material and in Solfatara Parking Area and Approach road needs to be

365+00 to 385+00 Roadway excavation on Grand Loop Road

N

Profile grade

Existing ground

Slope stake limits

Catch point left

Catch point right

Wetland boundary

Line to be constructed

Overhead power line

CUYD

EXC.

CUYD

EMB.

387+50 385+00382+50 380+00377+50375+00372+50

7385 7385

7390 7390

7395 7395

7400 7400

7405 7405

7410 7410

7415 7415

7420 7420

7425 7425

D.7

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fg .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

7410 7410

74307430

7450 7450

,4

.9

-3.3713%

760' VC

K = 120

SSD = 509'

,3

.3

+1.3528

580' VC

K = 123

,4

.3

400' VC

K = 137

SSD = 569'

P C

.1

P T

.1

P C

.8

5 P

T

.9

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22659 CP

22660

D

Curve= NG503032

R= 2,000.00'

T= 65.54'

L= 131.03'

D

Curve= NG503034

R= 2,300.00'

T= 192.99'

L= 385.08'

NGG232 Stream

PB 14

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

6,638

See sheet E.3

Turnout, See sheet E.3

Turnout, See sheet E.3

Turnout, S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1.See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

2,298

N

Existing ground

Profile grade

Line to be constructedSlope stake limits

Slope stake limits

Wetland boundary Thermal boundary

Catch point right

Catch point left

See sheet E.2 approach road, Beaver Lake Picnic Area

41.6' Paved apron

CUYD

EXC.

CUYD

EMB.

402+50 400+00397+50 395+00392+50390+00387+50

7385 7385

7390 7390

7395 7395

7400 7400

7405 7405

7410 7410

7415 7415

7420 7420

7425 7425

D.8

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fh .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

-1.5698%

,3

.3

1,200' VC

K = 506

T S

.5

S C

.5

C S

.0

S T

.0

P C

.3

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22661

Wetland boundary

Catch point right f

Spiral= NG708001B

Ls= 150.00' f

Spiral= NG708001A

Ls= 150.00'

D

D

Curve= NG708001

R= 850.00'

Ts= 267.15'

L= 227.52'

D

Curve= NG708002

R= 1,600.00'

T= 421.53'

L= 824.32'

GB-16

GB-17

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1.See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

See Geotechnical Report No. 12-15.

boring reference number

Test boring location and

S e e G

S h e e ts

R e m o v a l o f p ip e c u lv e r t.

Wetland boundary

Wetland boundary

N

Profile grade

Existing ground

Slope stake limits

Slope stake limits

Line to be constructed

Catch point left

15,995

1,835

See sheet E.3

Turnout, CUYD

EXC.

CUYD

EMB.

417+50 415+00412+50 410+00407+50405+00402+50

7370 7370

7375 7375

7380 7380

7385 7385

7390 7390

7395 7395

7400 7400

7405 7405

7410 7410

D.9

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fi .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

07450

74607460

,3

.5

+0.8018%

-1.2370%

400' VC

K = 196

SSD = 729'

,3

.7

630' VC

K = 313

HI

STORI

CAL L

ANDMARK

BOUNDARY

OBSI

DI

AN

CLI

FF

N

ATI

ONAL

HI

STORI

CAL L

ANDMARK

BOUNDARY

OBSI

DI

AN

CLI

FF

N

ATI

ONAL

P T

.6

P C

.6

P C

C

.8

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22058

CP

22059

CP

22060

D

R= 1,600.00'

Curve= NG708002

T= 421.53'

L= 824.32'

D

Curve= NG503026

R= 1,450.00'

T= 425.22'

L= 827.25'

GB-18

GB-19

OK 2013-01

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

N

Existing ground

Profile grade

Organic boundary

Catch point right

Line to be constructed

Slope stake limits

Remove existing drystack wall

Historical Landmark Boundary

Obsidian Cliff National

Catch point left

1,828

See sheet E.3

Turnout, See sheet E.3

Turnout, CUYD

EXC.

CUYD

EMB.

432+50 430+00427+50 425+00422+50420+00417+50

7370 7370

7375 7375

7380 7380

7385 7385

7390 7390

7395 7395

7400 7400

7405 7405

7410 7410

D.10

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fj .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

23,634

7410 7410

+0.7774%

,3

.5

80' VC

K = 107

,3

.6

+1.521 9%

-4.3010%

300' VC

K = 52

SSD = 335'

,3

.0

135' VC

K = 51

-1.6697%

A27

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFF NATIONAL

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFF NATIONAL

P C

C

.8

P T

.8

P C

.3

P T

.0

P C

.4

P T

.3

P C

.9

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

Standard

CP

22664

GPS

CP1015

Curve= NG503104

D

R= 1,690.00'

T= 267.71'

L= 531.02'

D

Curve= NG503102

R= 485.00'

T= 83.16'

L= 164.71'

L= 201.91'

T= 101.77'

R= 650.00'

D

Curve= NG503101

D

Curve= NOC701005

R= 535.00'

T= 213.46'

L= 406.21'

OK 2013-01

OK 2013-02

YELL04-5A

BH

YELL04-5

YELL04-6

OK 2013-03

OK 2013-04

OK2014-08

OK 2013-05

YELL04-31

OK2014-09

PB 15

OK 2013-06

OK 2013-06A

YELL04-7

YELL04-9

YELL04-10A

YELL04-10

Type 3

Subexcavation

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll

R e m o v a l o f p ip e c u lv e r t.

NOTE:

1.

LEGEND

FOOTNOTE:

1 1

Drive probe location1

See Geotechnical Report No. 12-15.

reference number

Test boring location and boring and mitigation areas.

See F_Sheets for wetland impacts S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

Ditch reconditioning, RT

See Sheet G.18 underdrain system, RT and Section 105.

Use Obsidian rock source. See Sheet M.9

Obsidian Creek

S to n e m a s o n r y h e a d w a ll r e p a ir

P la c e d r ip r a p m e th o d A c la s s

3,249

See sheet E.7

Obsidian Cliff Trail, See sheet E.3

Turnout, See sheet E.6

Parking Area

Obsidian Cliff

N

Profile grade

Slope stake limits

Slope stake limits

Line to be constructed

Historical Landmark Boundary

Obsidian Cliff NationalWetland boundary

Existing ground drystack wall existing

Remove

Catch point left

Catch point right

Organic boundary

Rockery wall

Rockery Wall

Class 2

Special Rock Embankment, LT

CUYD

EXC.

CUYD

EMB.

447+50 445+00442+50 440+00437+50435+00432+50

7365 7365

7370 7370

7375 7375

7380 7380

7385 7385

7390 7390

7395 7395

7400 7400

7405 7405

See sheet G.5

Culvert Headwall Repair, Obsidian Cliff

Rockery Wall

Class 5

Special Rock Embankment, RT

Removal of boulder, stockpile

Removal of boulder, stockpile

Riprap ditch, Method A, Class 1, RT

D.11

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fk .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

See Sheet G.18

Standard underdrain system, RT

73707370

7380 7380

7400 7400

7410 7410

74107420

7450 7450

7510 7510

75107520 7520

,3

.6

185' VC

K = 51

,3

.9

+1.98 13% -1.3876%

170' VC

K = 50

SSD = 405'

,3

.8

170' VC

K = 50

,3

.9

+2.03 00%

230' VC

K = 50

SSD = 350'

,3

.8

-2.5527%

+1.673 6%

B27

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFFS NATIONAL

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFFS NATIONAL

P T

.1

P C

.0

5 P

T

.7

P C

.1

8 3

9 5

2 5

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22061

CP

22062

Rockery Wall

MSE Wall Slope stake limits

YELL04-11

OK 2013-07

OK2014-10

OK2014-11

OK2014-12

BH

OK2014-13

230' VC

K = 54

7,577

See sheet E.3

Turnout, Terminal section type MELTM

M

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

RT, Class 2

Special Rock Embankment

S e e G

S h e e ts

I n s ta ll c a tc h b a s in F

L H t y p e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number 1See Geotechnical Report No. 12-15.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

C o n s tr u c t s to n e m a s o n r y h e a d w a ll

I n s ta ll c a tc h b a s in F

L H t y p e

I n s ta ll in c h p ip e c u lv e r t.

mitigation areas.

See F_Sheets for wetland impacts and

N

Historical Landmark Boundary

Obsidian Cliff National

Slope stake limits

Line to be constructed

Existing ground

Profile grade

Rockery Wall

Catch point left

Catch point right boundary

Wetland

CUYD

EXC.

CUYD

EMB.

462+50 460+00457+50 455+00452+50450+00447+50

7350 7350

7355 7355

7360 7360

7365 7365

7370 7370

7375 7375

7380 7380

7385 7385

7390 7390

Special Rock

Embankment, RT Class 5

Embankment, RT Class 3

Special Rock

Guardrail, RT

See sheet E.6

Obsidian Cliff Parking Area, Class 5

Special Rock Embankment, RT

See H.3 to H.7

MSE Wall

.9

D.12

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fl .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

Obsidian Creek

73507

7390 7390

7400 7400

7420 7420

207430

7430 7430 743

7440 7440 7440

07470

07480

,3

.1

-1.5608%

170' VC

K = 53

SSD = 419'

,3

.0

-0.9963%

,3

.3

240' VC

K = 93

,3

.6

+1.576 8%

290' VC

K = 122

SSD = 599'

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFFS NATIONAL

P C

C

.1

6 5

7 5

9 6

1 6

3 6 4 6

5 6 6 6

9 7 0 7

4 7

6 7

8 7

0 8 1 8

7 8

3 9

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

CP

22665

CP

22666

Historical Landmark Boundary

Obsidian Cliff National

Slope stake limits

Wetland Boundary

Line to be constructed

Profile grade

Existing ground

Rockery Wall Rockery Wall

Rockery Wall

Rockery Wall

Catch point left

Reinforced Soil Slope

Catch Point Right limits

Slope stake

Rockery wall

Rockery wall

Rockery wall

OK2014-14

OK2014-15

OK2014-16

OK2014-17

OK2014-18

PB 17

5,791

See H. 3 & H.4

MSE Wall

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts h e a d w a ll

C o n s tr u c t s to n e m a s o n r y

I n s ta ll c a tc h b a s in F

L H t y p e

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts h e a d w a ll

C o n s tr u c t s to n e m a s o n r y

I n s ta ll c a tc h b a s in F

L H t y p e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

I n s ta ll c a tc h b a s in F

L H t y p e

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

300' VC

K = 531

Obsidian Creek

Curve= NOC6103

R= 4,450.00'

T= 1,287.96'

L= 2,507.41'

D

N

CUYD

EXC.

CUYD

EMB.

477+50 475+00472+50 470+00467+50465+00462+50

7345 7345

7350 7350

7355 7355

7360 7360

7365 7365

7370 7370

7375 7375

7380 7380

7385 7385

Rockery Wall

Rockery Wall

5 Rockery Wall

0 Rockery Wall

MSE Wall

D.13

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fm .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

-0.7982%

,3

.5

+1.548 4%

220' VC

K = 94

,3

.0

-2.6339%

506' VC

K = 121

SSD = 511'

,3

.9

-0.8525%

300' VC

K = 168

P T

.6

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

Line to be constructed

Slope stake limits

Slope stake limits

Profile grade

Existing ground

CP

22667

Catch point left

Catch point right

Subexcavation

Type 5

LPL2014-01

BH

LPL2014-02

Subexcavation

Type 5

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

5,121

See sheet E.3

Turnout, See sheet E.3

Turnout, See sheet E.3

Turnout, Terminal section type MELTM

M

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s m a s o n r y h e a d w a ll to ta l)

C o n s tr u c t s to n e

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

Wetland boundary

1,502

N

CUYD

EXC.

CUYD

EMB.

492+50 490+00487+50 485+00482+50480+00477+50

7335 7335

7340 7340

7345 7345

7350 7350

7355 7355

7360 7360

7365 7365

7370 7370

7375 7375

D.14

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fn .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

,3

.4

-0.8525% +1.94

18%

255' VC

K = 91

,3

.1

800' VC

K = 161

SSD = 590'

P C

.5

P T

.8

P C

.2

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

Line to be constructed

Slope stake limits

Wetland boundary

GPS

22668

CP

22063

Profile grade

Existing ground

Catch point right

Catch point left

L= 520.26'

T= 264.28'

R= 1,200.00'

Curve= NOCW7002

D

PB 18

4,050

See sheet E.8

Mount Holmes Trailhead, Turnout, See Sheet E.3

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

tie-in alignment

Schedule A to existing

Transition

S e e G

S h e e ts h e a d w a ll

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll t o ta l)

R e m o v a l o f p ip e c u lv e r t

1,237

N

CUYD

EXC.

CUYD

EMB.

507+50 505+00502+50 500+00497+50495+00492+50

7325 7325

7330 7330

7335 7335

7340 7340

7345 7345

7350 7350

7355 7355

7360 7360

7365 7365

D.15

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fo .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

7340 7340

,3

.6

-3.0248%

436' VC

K = 71

,3

.6

+3.1

+1.85 60%

100' VC

K = 80

SSD = 914'

,3

.3

-2.6636%

365' VC

K = 81

SSD = 421'

,3

.4

-2.1003%

70' VC

K = 124

,3

.1

,3

.0

(Sch. A tie)

170' VC

,3

.0

S c h

A t ie

(Sch. A tie)

-3.0248%

(Sch. A tie)

-3.2460%

,3

.7

S c h

A t ie

(Sch. A tie)

-1.2880%

(Sch. A tie)

150' VC

S c h

A t ie

S c h

A t ie

0 5 5 P

T

.7

P C

.7

P T

.8

CP

22669

CP

22670

Line to be constructed Slope stake limits

Profile grade

Existing ground

Subexcavation

Type 1

Subexcavation

Type 3

N

Curve= NG706001

D

R= 2,400.00'

T= 456.65'

L= 902.51'

L= 308.08'

T= 154.09'

D

R= 5,000.00'

Curve= NG706002

Obsidian Creek

Subexcavation

Type 1

AS 2013-01

AS2014-03

YELL 04-17

PB 19

system, RT underdrain

Standard

SUSPEND SCHEDULE A

Removal of boulder, stockpile

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s r o c k f a c e f in is h

C o n tr u c t c la s s B m a s o n r y r e ta in in g w a ll w in g w a ll

I n s ta ll r e in fo r c e d c o n c r e te h e a d w a ll f o r b o x c u lv e r t.

C o n s tr u c t s to n e m a s o n r y

I n s ta ll c o n c r e te b o x c u lv e r t.

R e m o v a l o f b o x c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

NOTE:

1.LEGEND

FOOTNOTE:

Drive probe location1

See Geotechnical Report No. 12-15.

reference number

Test boring location and boring and mitigation areas.

See F_Sheets for wetland impacts tie-in alignment

Schedule A

Transition to existing tie-in alignment

Schedule A

SCHEDULE B ONLY

NPS Drwg. No. 101/130820

NPS PMIS No. 86308 & 2131522

SCHEDULE A & B

water line. (Do not disturb)

Existing underground

Catch point right

Catch point left

Wetland boundary

CUYD

EXC.

CUYD

EMB.

522+50 520+00517+50 515+00512+50510+00507+50

7315 7315

7320 7320

7325 7325

7330 7330

7335 7335

7340 7340

7345 7345

7350 7350

7355 7355

Special Rock

LT Class 3

Embankment, Type 3

Subexcavation

See Sheet G.18

(Do not disturb)

Apollinaris Spring

See Sheet E.3

Turnout, See sheet E.3

Turnout, 511+50

WY PRA YELL 10(19)

D.16

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fp .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

Transition to existing

See sheets G.6 to G.7

& stream work, Apollinaris box culvert

Apollinaris box culvert.

(Do not disturb)

Old growth trees.

1,166 3,285

W e tla n d B o u n d a r y

,3

.0

-0.5000%

333' VC

K = 208

,3

.4

+0.5413%

418' VC

K = 401

P C

.2

P T

.6

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

N

CP

22064

CP

22671

Line to be constructed

Slope stake limits

Profile grade

Existing ground

Catch point right

Catch point left

Wetland boundary

Curve= NG701007

D

R= 3,000.00'

T= 366.04'

L= 728.48'

I n s ta ll in c h p ip e c u lv e r t.

C o n s tr u c t s to n e m a s o n r y h e a d w a ll to ta l)

S e e G

S h e e ts

Type 3

Subexcavation

See sheet E.3

Turnout, Standard

See Sheet G.18

Turnout, See sheet E.3 replacement work at Obsidian Creek.

Area can be used for staging the culvert

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

Underdrain System, RT

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

See Sheet E.11

Apollinaris Picnic Area Approach Road

CUYD

EXC.

CUYD

EMB.

537+50 535+00532+50 530+00527+50525+00522+50

7305 7305

7310 7310

7315 7315

7320 7320

7325 7325

7330 7330

7335 7335

7340 7340

7345 7345

D.17

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fq .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

0 7320

73207320

,3

.0

-1.7414%

520' VC

K = 228

SSD = 733'

,3

.4

+0.1500%(Sch. B tie) +0.4435%

,3

.8

S c h

B t ie

P C

.3

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522N

Line to be constructed

Slope stake limits

Profile grade

Existing ground

Wetland boundary

5 Subexcavation

Type 3

CP

22065

GPS

22672

Catch point left

Catch point right

NGG069 Stream

NGG057s4 Stream

Subexcavation

Type 3

PB 20

AS 2013-02

580' VC

K = 307

Standard underdrain system

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

1,449

3,150

See sheet E.3

Turnout, See sheet E.3

Turnout, See sheet E.3

Turnout, See Sheet G.18

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number 1See Geotechnical Report No. 12-15.

tie-in alignment

Schedule B

Transition to existing tie-in alignment

Schedule B

Transition to existing

S e e G

S h e e ts

P la c e d r ip r a p m e th o d A c la s s h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

Organic Boundary

Class 2 (For Landslide)

Special Rock Embankment, LT

See sheet E.9

Parking Area, Moose Exhibit

(Do not disturb)

Mound wetland

CUYD

EXC.

CUYD

EMB.

552+50 550+00547+50 545+00542+50540+00537+50

7300 7300

7305 7305

7310 7310

7315 7315

7320 7320

7325 7325

7330 7330

7335 7335

7340 7340

D.18

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fr .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

,3

.9

400' VC

K = 348

SSD = 1138'

,3

.0

-1.0000%

250' VC

K = 192

,3

.7

+0.3000%

-1.0776%

250' VC

K = 181

SSD = 908'

,3

.5

(Sch. B tie)

500' VC

(Sch. B tie)

-0.4770%

S c h

B t ie

S c h

B t ie

,3

.3

P T

.6

P C

.1

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

N

CP

22066

CP

22067

Slope stake limits

Profile grade

Existing ground

Wetland boundary

Subexcavation

Type 3

Catch point left

Curve= NG707101

D

R= 4,700.00'

T= 516.74'

L= 1,029.35'

NGG073 Stream

Catch point right

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

R e m o v a l o f h e a d w a ll to ta l)

R e m o v a l o f p ip e c u lv e r t.

2,310

SCHEDULE B ONLY

SUSPEND SCHEDULE B

Transition to existing

Line to be constructed

S e e G

S h e e ts h e a d w a ll to ta l)

C o n s tr u c t s to n e m a s o n r y

I n s ta ll in c h p ip e c u lv e r t.

NOTE:

1. See F_Sheets for wetland impacts and mitigation areas.

LEGEND

FOOTNOTE:

Drive probe location1

Test boring location and boring reference number

See Geotechnical Report No. 12-15.

tie-in alignment

Schedule B

Transition to exis ting

(Do not disturb)

Parking area

FUTURE PROJECT (GRAND LOOP ROAD, NORRIS TO GOLDEN GATE, PHASE 3)

tie-in alignment

Schedule B

2,262

556+50

WY PRA YELL 10(19)

CUYD

EXC.

CUYD

EMB.

567+50 565+00562+50 560+00557+50555+00552+50

7295 7295

7300 7300

7305 7305

7310 7310

7315 7315

7320 7320

7325 7325

7330 7330

7335 7335

D.19

STATE PROJECT

e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fs .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

1013 1873196.422 2464721.476 7478.088 44°44'17.342135"N 110°41'55.966706"W 7450.1215 0.99961094 1/2" IR w/YPC 1.

1015 1903443.547 2457385.644 7379.800 44°49'15.444279"N 110°43'40.916299"W 7352.1088 0.99961836 1/2" IR w/YPC

22041 1873655.459 2464219.805 7496.565 44°44'21.837239"N 110°42'02.964966"W 7468.6005 0.99961024 1/2" IR w/YPC

22042 1876679.789 2460833.199 7552.499 44°44'51.443618"N 110°42'50.207665"W 7524.5479 0.99960882 1/2" IR w/YPC

22043 1877453.676 2460614.729 7519.725 44°44'59.068373"N 110°42'53.317979"W 7491.7798 0.99961047 1/2" IR w/YPC

22044 1877747.132 2460341.188 7513.647 44°45'01.945026"N 110°42'57.139896"W 7485.7035 0.99961086 1/2" IR w/YPC

22045 1879087.244 2457772.618 7537.091 44°45'14.978791"N 110°43'32.878235"W 7509.159 0.99961072 1/2" IR w/YPC

22046 1882498.556 2456342.712 7545.146 44°45'48.550499"N 110°43'53.069640"W 7517.2461 0.99961088 1/2" IR w/YPC

22047 1886568.123 2455475.780 7557.175 44°46'28.665377"N 110°44'05.536773"W 7529.3207 0.99961063 1/2" IR w/YPC

22048 1886950.545 2455091.992 7555.006 44°46'32.411051"N 110°44'10.899538"W 7527.1553 0.99961089 1/2" IR w/YPC

22049 1887537.769 2454036.992 7563.527 44°46'38.125447"N 110°44'25.590340"W 7535.6868 0.99961089 1/2" IR w/YPC

22050 1887900.041 2453885.393 7568.474 44°46'41.690442"N 110°44'27.732561"W 7540.6384 0.99961071 1/2" IR w/YPC

22051 1888631.352 2453893.833 7583.461 44°46'48.912119"N 110°44'27.697533"W 7555.634 0.99960999 1/2" IR w/YPC

22052 1890543.697 2454263.674 7542.055 44°47'07.824203"N 110°44'22.784112"W 7514.2483 0.99961182 1/2" IR w/YPC

22053 1895389.005 2452799.355 7430.405 44°47'55.549694"N 110°44'43.633794"W 7402.6544 0.99961772 1/2" IR w/YPC

22054 1896004.169 2452764.714 7426.662 44°48'01.621042"N 110°44'44.183686"W 7398.9153 0.99961791 1/2" IR w/YPC

22055 1896573.675 2452965.808 7415.919 44°48'07.260511"N 110°44'41.459071"W 7388.1756 0.99961835 1/2" IR w/YPC

22056 1897579.131 2454818.216 7400.660 44°48'17.336413"N 110°44'15.880437"W 7372.9301 0.99961835 1/2" IR w/YPC

22057 1898218.722 2455378.551 7404.529 44°48'23.696206"N 110°44'08.179992"W 7376.8043 0.99961795 1/2" IR w/YPC

22058 1901770.664 2456980.374 7389.270 44°48'58.894443"N 110°43'46.354289"W 7361.5712 0.99961806 1/2" IR w/YPC

22059 1902260.023 2457208.156 7392.909 44°49'03.744247"N 110°43'43.248309"W 7365.2119 0.9996178 1/2" IR w/YPC

22060 1902884.248 2457289.317 7375.571 44°49'09.914211"N 110°43'42.191109"W 7347.8772 0.9996186 1/2" IR w/YPC

22061 1904647.680 2457134.036 7375.808 44°49'27.314168"N 110°43'44.539693"W 7348.1237 0.99961865 1/2" IR w/YPC

22062 1905172.961 2457345.550 7372.246 44°49'32.517373"N 110°43'41.662921"W 7344.5607 0.99961874 1/2" IR w/YPC

22063 1908964.734 2456727.824 7349.820 44°50'09.908786"N 110°43'50.652743"W 7322.1481 0.99962004 1/2" IR w/YPC

22064 1911839.996 2455820.253 7328.213 44°50'38.227417"N 110°44'03.566870"W 7300.5526 0.99962142 1/2" IR w/YPC

22065 1913643.283 2455526.836 7324.204 44°50'56.009742"N 110°44'07.840107"W 7296.5466 0.99962173 1/2" IR w/YPC

22066 1915417.856 2455471.460 7319.239 44°51'13.527375"N 110°44'08.806562"W 7291.5806 0.99962198 1/2" IR w/YPC

22067 1916142.530 2455521.813 7313.110 44°51'20.686749"N 110°44'08.188371"W 7285.45 0.99962226 1/2" IR w/YPC

22068 1917681.576 2455431.703 7310.496 44°51'35.876028"N 110°44'09.610930"W 7282.8291 0.99962242 1/2" IR w/YPC

22069 1918299.825 2455293.229 7305.566 44°51'41.969577"N 110°44'11.602367"W 7277.8981 0.99962271 1/2" IR w/YPC

22070 1919309.022 2455153.571 7313.313 44°51'51.923207"N 110°44'13.654055"W 7285.6425 0.99962239 1/2" IR w/YPC

22071 1920959.381 2454938.660 7318.821 44°52'08.201604"N 110°44'16.822561"W 7291.1459 0.99962221 1/2" IR w/YPC

22072 1922530.342 2455085.768 7306.373 44°52'23.724820"N 110°44'14.955679"W 7278.6903 0.99962275 1/2" IR w/YPC

22073 1925203.796 2455995.806 7292.981 44°52'50.194418"N 110°44'02.616380"W 7265.276 0.99962304 1/2" IR w/YPC

22074 1927024.845 2456762.323 7277.207 44°53'08.235777"N 110°43'52.172943"W 7249.4869 0.9996235 1/2" IR w/YPC

22621 1874211.832 2463844.783 7514.939 44°44'27.302849"N 110°42'08.219146"W 7486.9781 0.9996095 1/2" IR w/YPC

22622 1874372.647 2463408.361 7537.499 44°44'28.857953"N 110°42'14.282494"W 7509.5374 0.99960859 1/2" IR w/YPC

22623 1874217.458 2462039.656 7583.554 44°44'27.222100"N 110°42'33.228657"W 7555.5862 0.99960689 1/2" IR w/YPC

PROJECT : Norris to Golden Gate Phase II DATE OF FIELD WORK : Multiple Entries

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM :Wyoming West SPCS NAD83 CORS96

VERTICAL DATUM : NAVD88 based on Geoid 03

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s-

G G

_c on tr ol sh ee t p ha se

II

.x ls x] Sh ee t

-J an -2

1:

P M

W

FL

H D

S ur ve y

G ob le

D es ig ne d by

C he ck ed b y:

STATE PROJECT

D.20

SHEET

NUMBER

PRA YELL 10(19)WY

NPS PMIS Nos. 86308 & 221090 NPS Drwg. No. 101/130820

SURVEY CONTROL

Sheet 1 of 3

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

22624 1874333.069 2461581.368 7573.773 44°44'28.328816"N 110°42'39.590298"W 7545.8042 0.99960753 1/2" IR w/YPC 1.

22625 1874723.199 2461152.437 7591.321 44°44'32.148324"N 110°42'45.574685"W 7563.3522 0.99960685 1/2" IR w/YPC

22626 1875320.405 2460964.288 7587.297 44°44'38.030863"N 110°42'48.245482"W 7559.3338 0.99960712 1/2" IR w/YPC

22627 1876038.807 2461057.211 7585.641 44°44'45.131585"N 110°42'47.035041"W 7557.685 0.99960716 1/2" IR w/YPC

22629 1877800.830 2459454.059 7528.834 44°45'02.406978"N 110°43'09.438344"W 7500.8888 0.99961047 1/2" IR w/YPC

22630 1877962.545 2459074.925 7543.918 44°45'03.974486"N 110°43'14.709432"W 7515.9732 0.9996099 1/2" IR w/YPC

22631 1878496.757 2458624.743 7516.354 44°45'09.214503"N 110°43'21.005642"W 7488.4131 0.99961138 1/2" IR w/YPC

22633 1879369.155 2457445.338 7526.112 44°45'17.736875"N 110°43'37.444418"W 7498.1829 0.99961136 1/2" IR w/YPC

22634 1880223.575 2457054.358 7518.503 44°45'26.142942"N 110°43'42.956381"W 7490.5825 0.99961188 1/2" IR w/YPC

22635 1880632.636 2456670.033 7520.852 44°45'30.151928"N 110°43'48.327501"W 7492.9324 0.99961191 1/2" IR w/YPC

22636 1881001.995 2456611.982 7523.012 44°45'33.794462"N 110°43'49.172701"W 7495.096 0.99961183 1/2" IR w/YPC

22637 1881503.580 2456664.033 7527.674 44°45'38.751252"N 110°43'48.506599"W 7499.7633 0.99961159 1/2" IR w/YPC

22638 1883513.945 2456083.923 7563.806 44°45'58.556176"N 110°43'56.768656"W 7535.9176 0.99961009 1/2" IR w/YPC

22639 1884602.128 2456231.296 7577.028 44°46'09.312598"N 110°43'54.846251"W 7549.1504 0.9996094 1/2" IR w/YPC

22640 1885948.391 2455727.227 7557.811 44°46'22.565968"N 110°44'01.982419"W 7529.9495 0.99961051 1/2" IR w/YPC

22641 1887093.866 2454682.113 7553.465 44°46'33.793682"N 110°44'16.597517"W 7525.6173 0.99961112 1/2" IR w/YPC

22642 1887303.386 2454200.409 7553.149 44°46'35.824164"N 110°44'23.298671"W 7525.3056 0.99961132 1/2" IR w/YPC

22645 1889697.007 2453986.447 7550.970 44°46'59.441841"N 110°44'26.532967"W 7523.1548 0.99961151 1/2" IR w/YPC

22646 1891293.209 2454458.281 7535.543 44°47'15.240415"N 110°44'20.169667"W 7507.7438 0.99961206 1/2" IR w/YPC

22647 1892065.985 2454757.406 7523.045 44°47'22.894627"N 110°44'16.108393"W 7495.2534 0.99961254 1/2" IR w/YPC

22648 1893076.743 2454655.220 7512.680 44°47'32.866766"N 110°44'17.638166"W 7484.9041 0.99961307 1/2" IR w/YPC

22649 1893603.167 2454442.010 7499.818 44°47'38.047729"N 110°44'20.653531"W 7472.049 0.99961377 1/2" IR w/YPC

22650 1894273.736 2453976.412 7459.317 44°47'44.631821"N 110°44'27.185153"W 7431.5569 0.99961588 1/2" IR w/YPC

22651 1894586.821 2453229.205 7453.552 44°47'47.663436"N 110°44'37.582227"W 7425.7945 0.99961645 1/2" IR w/YPC

22655 1896932.444 2453277.845 7412.157 44°48'10.828044"N 110°44'37.171873"W 7384.4156 0.99961841 1/2" IR w/YPC

22656 1897100.775 2454055.825 7413.573 44°48'12.552393"N 110°44'26.400836"W 7385.8395 0.99961803 1/2" IR w/YPC

22658 1898825.324 2455966.143 7405.553 44°48'29.732273"N 110°44'00.097353"W 7377.8326 0.99961768 1/2" IR w/YPC

22659 1899323.672 2456199.471 7409.543 44°48'34.671378"N 110°43'56.916190"W 7381.8282 0.9996174 1/2" IR w/YPC

22660 1900233.312 2456752.665 7408.603 44°48'43.696724"N 110°43'49.343397"W 7380.8941 0.99961723 1/2" IR w/YPC

22661 1900874.642 2456986.838 7394.961 44°48'50.047618"N 110°43'46.165812"W 7367.2557 0.99961779 1/2" IR w/YPC

22663 1903671.966 2457320.863 7388.649 44°49'17.694615"N 110°43'41.840182"W 7360.9591 0.99961796 1/2" IR w/YPC

22664 1904405.626 2457218.034 7381.152 44°49'24.930715"N 110°43'43.347615"W 7353.4664 0.99961836 1/2" IR w/YPC

22665 1906167.406 2457465.295 7365.336 44°49'42.345897"N 110°43'40.110919"W 7337.6533 0.99961902 1/2" IR w/YPC

22666 1907182.334 2457402.981 7355.997 44°49'52.362406"N 110°43'41.087268"W 7328.3179 0.99961949 1/2" IR w/YPC

22667 1908149.660 2457108.663 7361.072 44°50'01.890689"N 110°43'45.277894"W 7333.3965 0.99961936 1/2" IR w/YPC

22668 1909837.897 2456284.695 7346.167 44°50'18.495463"N 110°43'56.898887"W 7318.4984 0.99962039 1/2" IR w/YPC

22669 1910600.073 2456272.017 7332.020 44°50'26.020161"N 110°43'57.159340"W 7304.3531 0.99962107 1/2" IR w/YPC

22670 1911263.639 2456013.665 7339.771 44°50'32.551787"N 110°44'00.818490"W 7312.1087 0.9996208 1/2" IR w/YPC

22671 1912607.724 2455596.375 7324.561 44°50'45.790200"N 110°44'06.759561"W 7296.9029 0.99962168 1/2" IR w/YPC

PROJECT : Norris to Golden Gate Phase II DATE OF FIELD WORK : Multiple Entries

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM :Wyoming West SPCS NAD83 CORS96

VERTICAL DATUM : NAVD88 based on Geoid 03

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s-

G G

_c on tr ol sh ee t p ha se

II

.x ls x] Sh ee t (2

-J an

-2

1:

P

M W

FL

H

D S ur ve y

G ob le

D es ig ne d by

C he ck ed b y:

STATE PROJECT

D.21

SHEET

NUMBER

PRA YELL 10(19)WY

NPS PMIS Nos. 86308 & 221090 NPS Drwg. No. 101/130820

Sheet 2 of 3

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

22672 1914663.225 2455400.816 7318.626 44°51'06.070594"N 110°44'09.703028"W 7290.9692 0.99962204 1/2" IR w/YPC 1.

22673 1916685.582 2455584.166 7311.883 44°51'26.053749"N 110°44'07.383313"W 7284.2213 0.99962229 1/2" IR w/YPC

22675 1920384.276 2455043.177 7321.593 44°52'02.531389"N 110°44'15.307015"W 7293.9192 0.99962204 1/2" IR w/YPC

22676 1921653.030 2454810.321 7311.349 44°52'15.040406"N 110°44'18.682249"W 7283.6719 0.99962262 1/2" IR w/YPC

22677 1923368.088 2455328.853 7301.020 44°52'32.015958"N 110°44'11.673779"W 7273.3291 0.99962291 1/2" IR w/YPC

22678 1924182.130 2455285.213 7296.373 44°52'40.050253"N 110°44'12.370757"W 7268.6792 0.99962315 1/2" IR w/YPC

PROJECT : Norris to Golden Gate Phase II DATE OF FIELD WORK : Multiple Entries

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM :Wyoming West SPCS NAD83 CORS96

VERTICAL DATUM : NAVD88 based on Geoid 03

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

c:

\m yf ile s\ pw

_p ro du ct io n\ d0

N or ri s-

G G

_c on tr ol sh ee t p ha se

II

.x ls x] Sh ee t (3

-J an

-2

1:

P

M W

FL

H

D S ur ve y

G ob le

D es ig ne d by

C he ck ed b y:

STATE PROJECT

D.22

SHEET

NUMBER

PRA YELL 10(19)WY

NPS PMIS Nos. 86308 & 221090 NPS Drwg. No. 101/130820

Sheet 3 of 3

File details come from the government source that posted it. Updated .