M-Sheets.pdf

PDF 25 MB Posted

Attached to
WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2
Solicitation number
DTFH70-15-R-00015
Issued by

About this file

M

View the file

Other files

File Type Posted
Q A_4-11-2016.pdf PDF
A002_Norris.pdf PDF
Q A_4-8-2016.pdf PDF
A001.pdf PDF
YELL_spreadsheet.xlsx XLSX spreadsheet
K-Sheets.pdf PDF
C-Sheets.pdf PDF
Physical_Data_WY_PRA_YELL_10(19).pdf PDF
G-Sheets.pdf PDF
T-Sheets_-_Final.pdf PDF
D-Sheets.pdf PDF
P-sheets.pdf PDF
X-Sheets_-_Final.pdf PDF
S-Sheets_-_Final.pdf PDF
H-Sheets.pdf PDF
O-sheets.pdf PDF
Plan_Request_for_WY_PRA_YELL_10(19).pdf PDF
F-Sheets.pdf PDF
RFP_Norris_reduced.pdf PDF
V-Sheets_-_Final.pdf PDF
W-Sheets_-_Final.pdf PDF
E-Sheets.pdf PDF
L-sheets.pdf PDF
U-Sheets_-_Final.pdf PDF
B_-_SHEETS_-_Final.pdf PDF
N-sheets.pdf PDF
I-Sheets.pdf PDF
J-Sheets.pdf PDF
NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

FOOTNOTES:

5.

4.

3.

2.

1.

NORRIS ASPHALT

100 50 0 100 200

SCALE IN FEET

N

N o r r is C a n y o n R o a d

R o u te m i.

t o N o r r is J c t.

m i.

t o C a n y o n J c t.

A cc e ss

R o a d

(2)

(2)

(1)

YNP Maintenance Building

YNP Maintenance Building and other projects occuring within Yellowstone National Park.

Yellowstone National Park Service personnel and equipment, Sections 104 and 107 to permit concurrent operations with

Coordinate work areas and equipment activity according to

Maintain a clear access for the project duration.

Limit vehicular use to the access route shown on the map.

according to Section 104.

Establish and maintain processing areas, and manage stockpiles number, unless approved by the CO.

Do not use Stockpiles not identified with a stockpile legend utilizing materials at this site as indicated.

which includes: staging; stockpiling; processing materials; and

General use of the area shown is limited according to Section 107, Approximate site boundary approx. 200 CUYD's (30" to 60" typ.)

Rockery and masonry materials approx. 15 CUYD's (18" to 36" typ.)

Rockery and masonry materials separation and sorting required approx. 60 CUYD's (18" to 36" typ.)

Rockery and masonry materials separation and sorting required approx. 60 CUYD's (18" to 36" typ.)

Rockery and masonry materials area for Grand Loop Road

Approximate limit staging approved by the C.O.

Equipment, fuel storage, and office trailers, locations to be

NORRIS ASPHALT

M.1

STATE PROJECT

NUMBER

SHEET

WY

PRA YELL 10(19)

P

M

J a n u a r y

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d y e ll m a .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y quantity= approx. 2900 CUYD

Embankment INFO ONLY

W y o m in g W e s t S

P C S N

A D (2

O rth o m e tric E le v a tio n s b a s e d o n th e N

A V

D G

E O

ID

b

W y o m in g W e s t S

P C S N

A D (2

O rth o m e tric E le v a tio n s b a s e d o n th e N

A V

D G

E O

ID

b

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

51005

Access Ro ad

G r a n d L o o p R o a d

R o u te

)N o r r is J c t

.3 m il e s t o

N

SCALE IN FEET

1501005003050

GIBBON MEADOWS PIT

FOOTNOTE:

4.

3.

2.

1.

GIBBON MEADOW PIT

NOTE:

M.2

STATE PROJECT

A

D e c e m b e r

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m b .d g n

S J a c k s o

C

S m it h

C h e c k e d b y

D e s ig n e d b y

Use at locations and place as directed by the CO.

Process for use as stone curb, stone masonry, and rockeries.

disturbance limits. Obtain site limits from the CO.

Limit equipment activity and disturbance to be within the existing

Limit vehicular use to the access routes shown on the map.

Screening or crushing material is not allowed at this site.

by the CO.

and stone masonry; and utilizing material at this site as indicated which includes: staging; stockpiling; cutting stone for stone curbs

General use of the area shown is limited according to Section 107, (1)

(1)

(1)

(1) approx. 40 CUYD's (24" to 60" typ.)

Rockery and masonry materials approx. 30 CUYD's (18" to 48" typ.)

Rockery and masonry materials approx. 225 CUYD's 18" to 70", but typ. 18" to 48".

Rockery and masonry materials approx. 4000 CUYD's 18" to 70", but typically 18" to 48".

Rockery and masonry materials

Location

Photo

5 7

73507350

SCALE IN FEET

ROAD

SERVICE

GATE

45MPH

SPEED

GARDNER

R

IV

ER

NOTE:

FOOTNOTE:

4.

3.

2.

1.

.5 m il e t o M a m m o th

.5 m il e s t o N o r r is J c t.

Access Road

Access Road

N

SWAN LAKE PIT

100'50'0' 100' 200' 300'

EMUP

T

#45-1

UP

ELECTRIC

WATER

1 2 approx. 45 CUYD's (12" to 36" typ.)

(separation and sorting required)

Rockery and masonry materials approx. 10 CUYD's (19" to 30" typ.)

(separation and sorting required)

Masonry materials approx. 5 CUYD's (24" to 30" typ)

Masonry materials

(2)

(2)

(1) and other projects occuring within Yellowstone National Park.

Yellowstone National Park Service personnel and equipment

Sections 104 and 107 to permit concurrent operations with

Coordinate work areas and equipment activity according to access for the project duration.

Limit vehicular use to the access road shown. Maintain a clear unless approved by the CO.

Do not use stockpiles not identified with a stockpile legend number, as indicated.

in the designated area; cutting stone; and utilizing materials at this site which includes: staging; stockpiling; disposal of unsuitable materials

General use of the area shown is limited according to Section 107, Limits to be approved by CO.

low lying areas within the limits of the disposal area.

Maintain mounds of vegetation and fill in

(Separate boulders greater than 18")

Stockpile Area approx 25,000 CUYD's

Approx. limits of Excess Suitable Material

M.3

STATE PROJECT

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m d .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

(Separate boulders greater than 18")

Some tree removal required.

for unsuitable excavation.

Approx. limits of disposal area

Separate boulders greater than 18"

S E

R V I C

E R

O A

D

Wyoming West SPCS NAD 83 CORS96

Orthometric elevations based on the NAVD88 GEOID03

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

N

NOTE:

FOOTNOTE:

SCALE IN FEET

9.

8.

7.

6.

5.

4.

3.

2.

1.

100' 75' 50' 25 0' 100'

ICE LAKE PIT

Access road

R O

A D

L O

O P

G R

A N

D

.5 m il e s t o C a n y o n J c t.

.5 m il e s t o N o rr is J c t.

Material Unsuitable

Concrete disposal area 1

Unsuitable disposal area unsuitable material as directed by the CO.

Stockpiles not available for use. Additional area may be available for concrete on and adjacent to this stockpile as directed by the CO.

Existing stockpile of removed concrete structures. Place removed

ICE LAKE PIT DISPOSAL PLAN

Contour interval is 1 foot.

areas as directed by the CO.

Place waste material for disposal at this site within the designated according to Section 203.

Dispose of other deleterious substances remove from concrete concrete material at this site.

removed concrete material before stockpiling the removed

Remove deleterious substances except reinforcing steel from and other projects occuring within Yellowstone National Park.

Yellowstone National Park Service personnel and equipment, Sections 104 and 107 to permit concurrent operations with

Coordinate work areas and equipment activity according to for the project duration.

Do not block access in and out of pit. Maintain a clear access

Do not dispose of material beyond the pit limits shown.

according to Section 104.

Establish and maintain processing areas, and manage stockpiles materials.

Section 105, which includes: disposal;and processing

General use of the area shown is limited according to

M.4

STATE PROJECT

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m e .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

CAMP

CONTRACTOR

NOTE:

2.

1.

T o T o w e r

G R

A N

D L

O O

P R

O A

D

NO SCALE

.5 m ile s T o C a n y o n these sites or use of the area.

Do not interfere with the occupants' access to are currently occupied by concessionaire employees.

Spaces shown as not available to the contractor, Section 107.

Use of this facility is restricted according to

AT CANYON JUNCTION

CONTRACTOR CAMP

available for use

Trailer sites not

N

M.5

STATE PROJECT

D e c e m b e r

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m f.

d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

NOTE:

GREBE LAKE PITSCALE IN FEET

1501005003050

N

A C

C E S S R

O A

D

(1)

GREBE LAKE PIT AND STAGING AREA

Approx. 50 CUYD's (18" t0 36" typ.)

Rockery materials

M.6

STATE PROJECT

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m g .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

CANYON RIM

STAGING AREA FOR

APPROXIMATE LIMITS OF

(Other project)

SWPP protection

5.

4.

3.

2.

1.

operating at this site.

Install all temporary traffic control devices for this site before number, unless approved by the CO.

Do not use Stockpiles not identified with a stockpile legend in and out of pit. Maintain a clear access for the project duration.

Limit vehicular use to the access road shown. Do not block access

Park. See Subsection 104.06.

equipment and other projects occuring within Yellowstone National operations with Yellowstone National Park Service personnel and

Coordinate work areas and equipment activity to permit concurrent this site as indicated.

which includes staging, stone cutting, and utilizing materials at

General use of the area shown is limited according to Section 107

FOOTNOTE:

1 Place erosion control devices as directed by the CO.

C

C P

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

NOTE:

FOOTNOTE:

Water extraction area

Obsidian Cliffs Kiosk

OBSID

IAN

CREEK

O B S

ID

IA

N

C R E E K hto m ma M ot seli m 9.1

.t c J si r r o N ot s eli m

O B S

ID

IA

N C

R E E K K

IO

S K T

U R N

O U T

D A

O R

P O

O L

D N

A R

G obtaining water.

soil erosion control and temporary traffic control devices before least 15-feet of passing width within the pull through, and install

Park water truck completely outside the travelled way, provide at

N

SCALE IN FEET

25'50' 0' 50' 100'

WATER SOURCE

OBSIDIAN CREEK

5.

4.

3.

2.

1.

for quantities at this site.

See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.

Limit disturbances of existing topsoil and vegetation. Topsoil and

Subsection 105.02(d).

Pumping from this site is limited as described in resources.

Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.

the Obsidian Creek according to Section 105.02A. Do not extract

Submit an extraction plan for operating at, and drawing water from M.7

STATE PROJECT

D e c e m b e r

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m h .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y for quantities at this site.

See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.

Limit disturbances of existing topsoil and vegetation. Topsoil and resources.

Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.

the Obsidian Creek according to Section 105.02D. Do not extract

Submit an extraction plan for operating at, and drawing water from

4.

3.

2.

1.

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

N

M.8

STATE PROJECT

NUMBER

WY PRA YELL 10(19)

C h e c k e d b y

D e s ig n e d b y

NOTE:

FOOTNOTE:

GARDNER

RI

VER

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m i.

d g n

WATER SOURCE

GARDNER RIVER

J a n u a r y

SHEEPEATER ROAD

Water extraction area

G R

A N

D L

O O

P R

O A

STATE PROJECT

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m i.

d g

J a n u a r y

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y : obtaining water. Confirm water extraction area with C.O.

soil erosion control and temporary traffic control devices before least 15-feet of passing width within the pull through, and install

Park water truck completely outside the travelled way, provide at

4.

3.

2.

1.

for quantities at this site.

See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.

Limit disturbances of existing topsoil and vegetation. Topsoil and resources.

Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.

the Gardner River according to Section 105.02D. Do not extract

Submit an extraction plan for operating at, and drawing water from

0 7380

A27

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFF NATIONAL

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFF NATIONAL

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFF NATIONAL

HISTORICAL LANDMARK BOUNDARY

OBSIDIAN CLIFF NATIONAL B27

096S

096S

091D

096s

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

M.9

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m j.

d g n

WY PRA YELL 10(19)

J a n u a r y

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

NOTE:

430+00 to 450+00

OBSIDIAN ROCK SOURCE

Limits of rock source

LEGEND:

Approximate limits of rock source

N

Landmark Boundary

Obsidian Cliff National Historic

Obsidian Cliff parking area extraction as directed by the CO.

Surface stones will need to be saved to reclaim the areas of and the Parking Area.

Source to be used for rockery walls on Obsidian Cliff Trail

Contour interval is 5-foot.

at Gibbon Meadow Pit as directed by the CO.

Rock material not incorporated into the project is to be stockpiled

Do not use rock material obtained from this site as embankment.

4.

3.

2.

1.

GOLDEN GATE ROCK SOURCE

N

Glen Creek

Grand Loop Road

NOTE:

1.

scaling requirements for stone masonry material.

See SCR 105, 156, 623, & 651 for mechanical

LEGEND

Approximate limits of rock source

Rustic Falls

T ra il

M.10

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m k .d g n

WY PRA YELL 10(19)

D e c e m b e r

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

To Mammoth

Park ing

Are a, N orri s

To G len

Cre ek S tock

0 717

7275 7275

0 7300

7325 7325 7325

NO SCALE

YELL

OW

STONE

R

IV

E R

E A S T E

N T R A N C E R

O A D

Service Road

NOTE:

STORE

FOOTNOTE:

T o C o d y W

Y

T o Fish in g B rid g e

Limits of disturbance

BASKETBALL

COURT

CAM

P

GR

OU

N D

F

IS

H

IN

G B R

ID

GE

P A R

K

IN

G

P A R

K

IN

G

T R

A

IL

E R

P

A R

K

Crusher rejects rockery stone

Stockpiled

NPS Water Treatment Plant Area

ENTRANCE A

AREA

BRIDGE

FISHING

STATION

GAS

ENTRANCE B

within the area.

Do not interfere with public access to the store or other facilities

Operate only along the route shown in the map.

Ingress and egress at this site is restricted to Entrance A only.

2.

1.

Stay within limits of disturbance.

FISHING BRIDGE PIT

M.11

STATE PROJECT

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m l.

d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y within the area.

Do not interfere with public access to the store or other facilities

Operate only along the route shown in the map.

Ingress and egress at this site is restricted to Entrance A only.

M.12

STATE PROJECT

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m m .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

WATER SOURCE

YELLOWSTONE RIVER

Yellowstone River

Yello wsto ne Ri ver

Y e llo w s to n e R iv e r

Y e ll o w s to n e R iv e r

Cascade Cre ek

G ra n d L o o p R d

G ra n d L o o p R d

G ra nd Loop

Rd

Ot ter Creek

G ra n d L o o p R d

Crystal Falls

Lookout Point

Uncle Tom's Trail

Uncle Tom's Point

Artist Point

Brink of

Upper Falls

NOTE:

FOOTNOTE:

obtaining water. Confirm water extraction area with C.O.

soil erosion control and temporary traffic control devices before least 15-feet of passing width within the pull through, and install

Park water truck completely outside the travelled way, provide at

4.

3.

2.

1.

Water extraction area for quantities at this site.

See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.

Limit disturbances of existing topsoil and vegetation. Topsoil and resources.

Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.

the Yellowstone River according to Section 105.02D. Do not extract

Submit an extraction plan for operating at, and drawing water from

Pullout