M-Sheets.pdf
PDF 25 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
M
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
FOOTNOTES:
5.
4.
3.
2.
1.
NORRIS ASPHALT
100 50 0 100 200
SCALE IN FEET
N
N o r r is C a n y o n R o a d
R o u te m i.
t o N o r r is J c t.
m i.
t o C a n y o n J c t.
A cc e ss
R o a d
(2)
(2)
(1)
YNP Maintenance Building
YNP Maintenance Building and other projects occuring within Yellowstone National Park.
Yellowstone National Park Service personnel and equipment, Sections 104 and 107 to permit concurrent operations with
Coordinate work areas and equipment activity according to
Maintain a clear access for the project duration.
Limit vehicular use to the access route shown on the map.
according to Section 104.
Establish and maintain processing areas, and manage stockpiles number, unless approved by the CO.
Do not use Stockpiles not identified with a stockpile legend utilizing materials at this site as indicated.
which includes: staging; stockpiling; processing materials; and
General use of the area shown is limited according to Section 107, Approximate site boundary approx. 200 CUYD's (30" to 60" typ.)
Rockery and masonry materials approx. 15 CUYD's (18" to 36" typ.)
Rockery and masonry materials separation and sorting required approx. 60 CUYD's (18" to 36" typ.)
Rockery and masonry materials separation and sorting required approx. 60 CUYD's (18" to 36" typ.)
Rockery and masonry materials area for Grand Loop Road
Approximate limit staging approved by the C.O.
Equipment, fuel storage, and office trailers, locations to be
NORRIS ASPHALT
M.1
STATE PROJECT
NUMBER
SHEET
WY
PRA YELL 10(19)
P
M
J a n u a r y
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll m a .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y quantity= approx. 2900 CUYD
Embankment INFO ONLY
W y o m in g W e s t S
P C S N
A D (2
O rth o m e tric E le v a tio n s b a s e d o n th e N
A V
D G
E O
ID
b
W y o m in g W e s t S
P C S N
A D (2
O rth o m e tric E le v a tio n s b a s e d o n th e N
A V
D G
E O
ID
b
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
51005
Access Ro ad
G r a n d L o o p R o a d
R o u te
)N o r r is J c t
.3 m il e s t o
N
SCALE IN FEET
1501005003050
GIBBON MEADOWS PIT
FOOTNOTE:
4.
3.
2.
1.
GIBBON MEADOW PIT
NOTE:
M.2
STATE PROJECT
A
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m b .d g n
S J a c k s o
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Use at locations and place as directed by the CO.
Process for use as stone curb, stone masonry, and rockeries.
disturbance limits. Obtain site limits from the CO.
Limit equipment activity and disturbance to be within the existing
Limit vehicular use to the access routes shown on the map.
Screening or crushing material is not allowed at this site.
by the CO.
and stone masonry; and utilizing material at this site as indicated which includes: staging; stockpiling; cutting stone for stone curbs
General use of the area shown is limited according to Section 107, (1)
(1)
(1)
(1) approx. 40 CUYD's (24" to 60" typ.)
Rockery and masonry materials approx. 30 CUYD's (18" to 48" typ.)
Rockery and masonry materials approx. 225 CUYD's 18" to 70", but typ. 18" to 48".
Rockery and masonry materials approx. 4000 CUYD's 18" to 70", but typically 18" to 48".
Rockery and masonry materials
Location
Photo
5 7
73507350
SCALE IN FEET
ROAD
SERVICE
GATE
45MPH
SPEED
GARDNER
R
IV
ER
NOTE:
FOOTNOTE:
4.
3.
2.
1.
.5 m il e t o M a m m o th
.5 m il e s t o N o r r is J c t.
Access Road
Access Road
N
SWAN LAKE PIT
100'50'0' 100' 200' 300'
EMUP
T
#45-1
UP
ELECTRIC
WATER
1 2 approx. 45 CUYD's (12" to 36" typ.)
(separation and sorting required)
Rockery and masonry materials approx. 10 CUYD's (19" to 30" typ.)
(separation and sorting required)
Masonry materials approx. 5 CUYD's (24" to 30" typ)
Masonry materials
(2)
(2)
(1) and other projects occuring within Yellowstone National Park.
Yellowstone National Park Service personnel and equipment
Sections 104 and 107 to permit concurrent operations with
Coordinate work areas and equipment activity according to access for the project duration.
Limit vehicular use to the access road shown. Maintain a clear unless approved by the CO.
Do not use stockpiles not identified with a stockpile legend number, as indicated.
in the designated area; cutting stone; and utilizing materials at this site which includes: staging; stockpiling; disposal of unsuitable materials
General use of the area shown is limited according to Section 107, Limits to be approved by CO.
low lying areas within the limits of the disposal area.
Maintain mounds of vegetation and fill in
(Separate boulders greater than 18")
Stockpile Area approx 25,000 CUYD's
Approx. limits of Excess Suitable Material
M.3
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m d .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
(Separate boulders greater than 18")
Some tree removal required.
for unsuitable excavation.
Approx. limits of disposal area
Separate boulders greater than 18"
S E
R V I C
E R
O A
D
Wyoming West SPCS NAD 83 CORS96
Orthometric elevations based on the NAVD88 GEOID03
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
N
NOTE:
FOOTNOTE:
SCALE IN FEET
9.
8.
7.
6.
5.
4.
3.
2.
1.
100' 75' 50' 25 0' 100'
ICE LAKE PIT
Access road
R O
A D
L O
O P
G R
A N
D
.5 m il e s t o C a n y o n J c t.
.5 m il e s t o N o rr is J c t.
Material Unsuitable
Concrete disposal area 1
Unsuitable disposal area unsuitable material as directed by the CO.
Stockpiles not available for use. Additional area may be available for concrete on and adjacent to this stockpile as directed by the CO.
Existing stockpile of removed concrete structures. Place removed
ICE LAKE PIT DISPOSAL PLAN
Contour interval is 1 foot.
areas as directed by the CO.
Place waste material for disposal at this site within the designated according to Section 203.
Dispose of other deleterious substances remove from concrete concrete material at this site.
removed concrete material before stockpiling the removed
Remove deleterious substances except reinforcing steel from and other projects occuring within Yellowstone National Park.
Yellowstone National Park Service personnel and equipment, Sections 104 and 107 to permit concurrent operations with
Coordinate work areas and equipment activity according to for the project duration.
Do not block access in and out of pit. Maintain a clear access
Do not dispose of material beyond the pit limits shown.
according to Section 104.
Establish and maintain processing areas, and manage stockpiles materials.
Section 105, which includes: disposal;and processing
General use of the area shown is limited according to
M.4
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m e .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
CAMP
CONTRACTOR
NOTE:
2.
1.
T o T o w e r
G R
A N
D L
O O
P R
O A
D
NO SCALE
.5 m ile s T o C a n y o n these sites or use of the area.
Do not interfere with the occupants' access to are currently occupied by concessionaire employees.
Spaces shown as not available to the contractor, Section 107.
Use of this facility is restricted according to
AT CANYON JUNCTION
CONTRACTOR CAMP
available for use
Trailer sites not
N
M.5
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m f.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NOTE:
GREBE LAKE PITSCALE IN FEET
1501005003050
N
A C
C E S S R
O A
D
(1)
GREBE LAKE PIT AND STAGING AREA
Approx. 50 CUYD's (18" t0 36" typ.)
Rockery materials
M.6
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m g .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
CANYON RIM
STAGING AREA FOR
APPROXIMATE LIMITS OF
(Other project)
SWPP protection
5.
4.
3.
2.
1.
operating at this site.
Install all temporary traffic control devices for this site before number, unless approved by the CO.
Do not use Stockpiles not identified with a stockpile legend in and out of pit. Maintain a clear access for the project duration.
Limit vehicular use to the access road shown. Do not block access
Park. See Subsection 104.06.
equipment and other projects occuring within Yellowstone National operations with Yellowstone National Park Service personnel and
Coordinate work areas and equipment activity to permit concurrent this site as indicated.
which includes staging, stone cutting, and utilizing materials at
General use of the area shown is limited according to Section 107
FOOTNOTE:
1 Place erosion control devices as directed by the CO.
C
C P
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
NOTE:
FOOTNOTE:
Water extraction area
Obsidian Cliffs Kiosk
OBSID
IAN
CREEK
O B S
ID
IA
N
C R E E K hto m ma M ot seli m 9.1
.t c J si r r o N ot s eli m
O B S
ID
IA
N C
R E E K K
IO
S K T
U R N
O U T
D A
O R
P O
O L
D N
A R
G obtaining water.
soil erosion control and temporary traffic control devices before least 15-feet of passing width within the pull through, and install
Park water truck completely outside the travelled way, provide at
N
SCALE IN FEET
25'50' 0' 50' 100'
WATER SOURCE
OBSIDIAN CREEK
5.
4.
3.
2.
1.
for quantities at this site.
See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.
Limit disturbances of existing topsoil and vegetation. Topsoil and
Subsection 105.02(d).
Pumping from this site is limited as described in resources.
Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.
the Obsidian Creek according to Section 105.02A. Do not extract
Submit an extraction plan for operating at, and drawing water from M.7
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m h .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y for quantities at this site.
See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.
Limit disturbances of existing topsoil and vegetation. Topsoil and resources.
Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.
the Obsidian Creek according to Section 105.02D. Do not extract
Submit an extraction plan for operating at, and drawing water from
4.
3.
2.
1.
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
N
M.8
STATE PROJECT
NUMBER
WY PRA YELL 10(19)
C h e c k e d b y
D e s ig n e d b y
NOTE:
FOOTNOTE:
GARDNER
RI
VER
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m i.
d g n
WATER SOURCE
GARDNER RIVER
J a n u a r y
SHEEPEATER ROAD
Water extraction area
G R
A N
D L
O O
P R
O A
STATE PROJECT
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m i.
d g
J a n u a r y
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y : obtaining water. Confirm water extraction area with C.O.
soil erosion control and temporary traffic control devices before least 15-feet of passing width within the pull through, and install
Park water truck completely outside the travelled way, provide at
4.
3.
2.
1.
for quantities at this site.
See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.
Limit disturbances of existing topsoil and vegetation. Topsoil and resources.
Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.
the Gardner River according to Section 105.02D. Do not extract
Submit an extraction plan for operating at, and drawing water from
0 7380
A27
HISTORICAL LANDMARK BOUNDARY
OBSIDIAN CLIFF NATIONAL
HISTORICAL LANDMARK BOUNDARY
OBSIDIAN CLIFF NATIONAL
HISTORICAL LANDMARK BOUNDARY
OBSIDIAN CLIFF NATIONAL
HISTORICAL LANDMARK BOUNDARY
OBSIDIAN CLIFF NATIONAL B27
096S
096S
091D
096s
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
M.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m j.
d g n
WY PRA YELL 10(19)
J a n u a r y
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NOTE:
430+00 to 450+00
OBSIDIAN ROCK SOURCE
Limits of rock source
LEGEND:
Approximate limits of rock source
N
Landmark Boundary
Obsidian Cliff National Historic
Obsidian Cliff parking area extraction as directed by the CO.
Surface stones will need to be saved to reclaim the areas of and the Parking Area.
Source to be used for rockery walls on Obsidian Cliff Trail
Contour interval is 5-foot.
at Gibbon Meadow Pit as directed by the CO.
Rock material not incorporated into the project is to be stockpiled
Do not use rock material obtained from this site as embankment.
4.
3.
2.
1.
GOLDEN GATE ROCK SOURCE
N
Glen Creek
Grand Loop Road
NOTE:
1.
scaling requirements for stone masonry material.
See SCR 105, 156, 623, & 651 for mechanical
LEGEND
Approximate limits of rock source
Rustic Falls
T ra il
M.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m k .d g n
WY PRA YELL 10(19)
D e c e m b e r
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
To Mammoth
Park ing
Are a, N orri s
To G len
Cre ek S tock
0 717
7275 7275
0 7300
7325 7325 7325
NO SCALE
YELL
OW
STONE
R
IV
E R
E A S T E
N T R A N C E R
O A D
Service Road
NOTE:
STORE
FOOTNOTE:
T o C o d y W
Y
T o Fish in g B rid g e
Limits of disturbance
BASKETBALL
COURT
CAM
P
GR
OU
N D
F
IS
H
IN
G B R
ID
GE
P A R
K
IN
G
P A R
K
IN
G
T R
A
IL
E R
P
A R
K
Crusher rejects rockery stone
Stockpiled
NPS Water Treatment Plant Area
ENTRANCE A
AREA
BRIDGE
FISHING
STATION
GAS
ENTRANCE B
within the area.
Do not interfere with public access to the store or other facilities
Operate only along the route shown in the map.
Ingress and egress at this site is restricted to Entrance A only.
2.
1.
Stay within limits of disturbance.
FISHING BRIDGE PIT
M.11
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m l.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y within the area.
Do not interfere with public access to the store or other facilities
Operate only along the route shown in the map.
Ingress and egress at this site is restricted to Entrance A only.
M.12
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll m m .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
WATER SOURCE
YELLOWSTONE RIVER
Yellowstone River
Yello wsto ne Ri ver
Y e llo w s to n e R iv e r
Y e ll o w s to n e R iv e r
Cascade Cre ek
G ra n d L o o p R d
G ra n d L o o p R d
G ra nd Loop
Rd
Ot ter Creek
G ra n d L o o p R d
Crystal Falls
Lookout Point
Uncle Tom's Trail
Uncle Tom's Point
Artist Point
Brink of
Upper Falls
NOTE:
FOOTNOTE:
obtaining water. Confirm water extraction area with C.O.
soil erosion control and temporary traffic control devices before least 15-feet of passing width within the pull through, and install
Park water truck completely outside the travelled way, provide at
4.
3.
2.
1.
Water extraction area for quantities at this site.
See Erosion Control Plans and Temporary Traffic Control Plans mulch any disturbed area(s) upon completion.
Limit disturbances of existing topsoil and vegetation. Topsoil and resources.
Do not impact the surrounding wetlands, rare plants, and cultural water at this site until the extraction plan is approved by the CO.
the Yellowstone River according to Section 105.02D. Do not extract
Submit an extraction plan for operating at, and drawing water from
Pullout
File details come from the government source that posted it. Updated .