K-Sheets.pdf
PDF 3 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
K
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO SCALE
NOTE:
1.
(Sheet 3 of 3)
SLOPE TREATMENT DETAILS
Brush Blanket
BRUSH BLANKET TREATMENT PLAN
K.3
STATE PROJECT
NUMBER
SHEET
WY
PRA YELL 10(19)
P
M
D e c e m b e r
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll s d .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
See 157.11(g) for brush blanket requirements.
Top of soil cut
Top of rock cut
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
EXCAVATION PRACTICES TO AVOID
and exposed presplit holes
Avoid shear cut rock faces
EARTH CUT SLOPE TREATMENT
(TYPICAL)
ROCK CUT SLOPE TREATMENT
(TYPICAL)
Benching
Normal ditch line
NOTE:
NO SCALE
ground, emphasizing ridges and draws
Undulate cut line to match original
Planting pockets
(5' to 8') rounding
Side slope
(5' to 8') rounding
Top of cut rock slope cuts with ledges and pockets to promote revegetation
Excavate by mechanical methods or controlled blasting to produce
FOOTNOTE:
6.
5.
4.
3.
2.
1.
within cuts
Avoid long, linear benches
Remove half cast lines and equipment marks on the final cut face.
equipment and fly rock damage where applicable.
Protect the natural environment, outside the clearing limits, from
When blasting, perform work according to Section 205.
lines, emphasizing rock outcrops, draws and ridges.
Shape the cut slope to blend with surrounding natural ground length of 30 feet (typical).
Construct benches and planting pocket to a depth of 5 feet and a promoting revegetation.
texture, blending with the natural rock outcroppings and
Preserve or create irregularities in the slope to create a rough by the CO.
Vary neatline slopes shown in the cross-sections as directed
Treatment of cut slopes are subsidiary to roadway excavation.
(Sheet 1 of 3)
SLOPE TREATMENT DETAILS
ROCK CUT SLOPE TREATMENT (EXAMPLE)
K.1
STATE PROJECT
A
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll s a .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
Landscape logs for log placement
Depress ground log on the slope as needed to retain
Berm soil material
Small trees and seedlings (to be planted by others)
CUT SLOPE TREATMENT PLAN
FILL SLOPE TREATMENT PLAN
LOG PLACEMENT DETAIL
Place boulder
BOULDER DETAIL
FOOTNOTE:
Material surrounding rock
Finished cut or fill slope secure placed boulders into finished slopes.
slope; and adjust cuts and fills around boulder placements to and natural rock outcrops are encountered within finished cut
Remove surrounding surface material where in-slope boulders
Place conserved boulders
1.
as directed by the CO.
Place conserved boulders and landscape logs on finish slopes
Place landscape logs
(Sheet 2 of 3)
SLOPE TREATMENT DETAILS
Natural rock outcroppings
Existing in-slope boulder
Place boulder
Place boulder or placed boulder natural rock outcropping, Existing in-slope boulder, K.2
STATE PROJECT
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll s c .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
COMPOUND CUT DETAIL
FOOTNOTE:
1 Varies. See Staking Data.
Ditch
Final slope staking for soil portion of cut
Temporary slope
Initial slope staking
Original ground
Anticipated hinge point
Final slope staking for soil portion of cut
Temporary slope
Initial slope staking
Original ground
Anticipated hinge point
Ditch
1.25
1.5
412+25 to 422+75
LC
NO SCALE
347+75 to 352+50
338+50 to 341+25
LC
Pavement Section
15'
Pavement section
15'
1.25 - 1.5
Soil
Rock
Soil
Rock
DETAIL
COMPOUND CUT
SOUTH OBSIDIAN
DETAIL
COMPOUND CUT
GRIZZLY LAKE
K.4
STATE PROJECT
NUMBER
SHEET
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll s e .d g n
WY PRA YELL10(19)
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
File details come from the government source that posted it. Updated .