WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2
Solicitation number
DTFH70-15-R-00015
Issued by

About this file

Amendment A002

View the file

Other files

File Type Posted
Q A_4-11-2016.pdf PDF
Q A_4-8-2016.pdf PDF
A001.pdf PDF
YELL_spreadsheet.xlsx XLSX spreadsheet
K-Sheets.pdf PDF
C-Sheets.pdf PDF
Physical_Data_WY_PRA_YELL_10(19).pdf PDF
G-Sheets.pdf PDF
T-Sheets_-_Final.pdf PDF
D-Sheets.pdf PDF
P-sheets.pdf PDF
X-Sheets_-_Final.pdf PDF
S-Sheets_-_Final.pdf PDF
H-Sheets.pdf PDF
O-sheets.pdf PDF
Plan_Request_for_WY_PRA_YELL_10(19).pdf PDF
F-Sheets.pdf PDF
RFP_Norris_reduced.pdf PDF
V-Sheets_-_Final.pdf PDF
W-Sheets_-_Final.pdf PDF
M-Sheets.pdf PDF
E-Sheets.pdf PDF
L-sheets.pdf PDF
U-Sheets_-_Final.pdf PDF
B_-_SHEETS_-_Final.pdf PDF
N-sheets.pdf PDF
I-Sheets.pdf PDF
J-Sheets.pdf PDF
NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 04/08/2016 N/A WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-R-00015

9B. DATED (SEE ITEM 11)

03/15/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 04/08/2016 WY PRA YELL 10(19), Solicitation No. DTFH70-15-R-00015 Norris to Golden Gate, Ph 2

REVISIONS ARE AS FOLLOWS:

BID SCHEDULE

Page A-15. Revises Bid Item 60901-2900 Curb, Stone, Type 1, 6-inch depth to 60901-

3500 Curb, Stone, Type 1, 12-inch depth

Page A-30. Revises Bid Item 60901-2900 Curb, Stone, Type 1, 6-inch depth to 60901- 3500 Curb, Stone, Type 1, 12-inch depth

PLANS

See Bid Schedule above See Bid Schedule above See Bid Schedule above

Plan sheet #B.4 Plan sheet #B.14 Plan sheet #E.1 Plan sheet #G.18 Revises quantities

ENCLOSURES

Pages:

A.7 through A-52

Plan Sheets B.4

B.14 E.1 G.18

Notice to Bidders: Please submit revised pages A-7 through A-52 with your bid.

A - 7

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

WY PRA YELL 10(19)

Grand Loop Road, Norris to Golden Gate, Phase 2

A-8

B I D S C H E D U L E Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

15101-0000 Line A0020 ALL LPSM $

15101-0000 Line A0040 ALL LPSM $

15101-0000 Line A0060 ALL LPSM $

15201-0000 Line A0080 ALL LPSM $

15201-0000 Line A0100 ALL LPSM $

15201-0000 Line A0120 ALL LPSM $

15301-0010 Line A0140 ALL LPSM $

15301-0010 Line A0160 ALL LPSM $

15301-0010 Line A0180 ALL LPSM $

15401-0000 Line A0200 ALL LPSM $

15401-0000 Line A0220 ALL LPSM $

15401-0000 Line A0240 ALL LPSM $

15501-0000 Line A0260 ALL LPSM $

15501-0000 Line A0280 ALL LPSM $

15501-0000 Line A0300 ALL LPSM $

15701-0000 Line A0320 ALL LPSM $

15701-0000 Line A0340 ALL LPSM $

15704-1000 Line A0360 160 SQYD $ $

15704-1100 Line A0380 40,523 SQYD $ $

Schedule Total: ________________________

Submitted by: _________________________

SOIL EROSION CONTROL (IP)

SOIL EROSION CONTROL (BUF)

SOIL EROSION CONTROL, PLASTIC LINING

MOBILIZATION

MOBILIZATION (IP)

MOBILIZATION (BUF)

CONSTRUCTION SURVEY AND STAKING

CONSTRUCTION SURVEY AND STAKING (IP)

CONSTRUCTION SURVEY AND STAKING (BUF)

SOIL EROSION CONTROL, BRUSH BLANKET

CONSTRUCTION SCHEDULE

CONSTRUCTION SCHEDULE (IP)

CONSTRUCTION SCHEDULE (BUF)

CONTRACTOR QUALITY CONTROL AND ASSURANCE

CONTRACTOR QUALITY CONTROL AND ASSURANCE (IP)

CONTRACTOR QUALITY CONTROL AND ASSURANCE (BUF)

CONTRACTOR TESTING

CONTRACTOR TESTING (IP)

CONTRACTOR TESTING (BUF)

A-9

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

15705-0100 Line A0400 11,292 LNFT $ $

15705-1000 Line A0420 60 LNFT $ $

15705-1400 Line A0440 33,713 LNFT $ $

15705-1400 Line A0460 560 LNFT $ $

15705-1400 Line A0480 1,935 LNFT $ $

15706-0200 Line A0500 72 EACH $ $

15706-0300 Line A0520 500 EACH $ $

15706-1000 Line A0540 13 EACH $ $

15802-0000 Line A0560 ALL LPSM $

20101-0000 Line A0580 35.0 ACRE $ $

20103-0000 Line A0600 530 SQYD $ $

20103-0000 Line A0620 1,458 SQYD $ $

20301-0080 Line A0640 6 EACH $ $

20301-0200 Line A0660 111 EACH $ $

20301-1100 Line A0680 2 EACH $ $

20301-1200 Line A0700 45 EACH $ $

20301-1400 Line A0720 1 EACH $ $

20301-1900 Line A0740 31 EACH $ $

20301-2300 Line A0760 25 EACH $ $

REMOVAL OF PIPE CULVERT

REMOVAL OF SIGN/MARKER

REMOVAL OF GATE, double swing

REMOVAL OF HEADWALL

REMOVAL OF INLET

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

CLEARING AND GRUBBING (IP)

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, FIBER ROLL (IP)

SOIL EROSION CONTROL, FIBER ROLL (BUF)

CLEARING AND GRUBBING (BUF)

REMOVAL OF BENCH (IP)

REMOVAL OF BOULDER, STOCKPILE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, TEMPORARY 48-INCH CULVERT PIPE

SOIL EROSION CONTROL, CHECK DAM

SOIL EROSION CONTROL, SANDBAG

SOIL EROSION CONTROL, INLET PROTECTION

A-10

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

20301-2300 Line A0780 4 EACH $ $

20301-2300 Line A0800 4 EACH $ $

20301-2700 Line A0820 2 EACH $ $

20301-3000 Line A0840 4 EACH $ $

20302-0700 Line A0860 130 LNFT $ $

20302-1000 Line A0880 55 LNFT $ $

20302-2500 Line A0900 275 LNFT $ $

20302-2500 Line A0920 170 LNFT $ $

20303-0000 Line A0940 105 SQYD $ $

20303-0000 Line A0960 12 SQYD $ $

20303-0300 Line A0980 25 SQYD $ $

20303-1600 Line A1000 1,290 SQYD $ $

20303-3000 Line A1020 10 SQYD $ $

20303-3000 Line A1040 938 SQYD $ $

20303-3200 Line A1060 66 SQYD $ $

20303-3500 Line A1080 11 SQYD $ $

20401-0000 Line A1100 162,100 CUYD $ $

20401-0000 Line A1120 340 CUYD $ $

20401-0000 Line A1140 60 CUYD $ $

ROADWAY EXCAVATION

ROADWAY EXCAVATION (IP)

ROADWAY EXCAVATION (BUF)

REMOVAL OF CONCRETE (IP)

REMOVAL OF PAVEMENT, ASPHALT (BUF)

REMOVAL OF SIDEWALK, ASPHALT (IP)

REMOVAL OF SIDEWALK, ASPHALT (BUF)

REMOVAL OF SIDEWALK, CONCRETE (BUF)

REMOVAL OF STONE MASONRY

REMOVAL OF FENCE (BUF)

REMOVAL OF FENCE, RAIL (IP)

REMOVAL OF HANDRAIL (IP)

REMOVAL OF HANDRAIL (BUF)

REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CONC. STAIRS (IP)

REMOVAL OF STRUCTURES AND OBSTRUCTIONS, TIMBER STEPS (IP)

REMOVAL OF SIGN/MARKER (IP)

REMOVAL OF SIGN/MARKER (BUF)

REMOVAL OF STRUCTURE, DRY STACK WALL

REMOVAL OF TRASH RECEPTACLE (BUF)

A-11

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

20402-0000 Line A1160 8,800 CUYD $ $

20402-0000 Line A1180 350 CUYD $ $

20403-0000 Line A1200 5,295 CUYD $ $

20411-0000 Line A1220 23,000 TON $ $

20411-0000 Line A1240 500 TON $ $

20411-0000 Line A1260 2,200 TON $ $

20421-0000 Line A1280 11 CUYD $ $

20465-0000 Line A1300 129 EACH $ $

20466-0000 Line A1320 3 CUYD $ $

20701-0100 Line A1340 2,500 SQYD $ $

20701-0200 Line A1360 250 SQYD $ $

20701-0300 Line A1380 9,000 SQYD $ $

20701-0300 Line A1400 2,500 SQYD $ $

20701-0300 Line A1420 1,777 SQYD $ $

20703-0000 Line A1440 8,600 SQYD $ $

20703-2000 Line A1460 3,776 SQYD $ $

20704-0000 Line A1480 2,200 SQYD $ $

20704-0000 Line A1500 110 SQYD $ $

20705-1000 Line A1520 2,200 SQYD $ $

GEOGRID, STABILIZATION

GEOMEMBRANE

GEOMEMBRANE (IP)

INSULATION BOARD, POLYSTYRENE FOAM

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A, WOVEN

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (Special Rock Embankment)

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C, WOVEN

GEOGRID (Biaxial)

SELECT BORROW

SELECT BORROW (IP)

SELECT BORROW (BUF)

ROCK EXCAVATION (BUF)

CONSERVE AND PLACE BOULDER

CONSERVE AND STOCKPILE TOPSOIL (IP)

SUBEXCAVATION

SUBEXCAVATION (IP)

UNCLASSIFIED BORROW

A-12

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

20815-0000 Line A1540 ALL LPSM $

21101-1000 Line A1560 4,400 SQYD $ $

21101-1000 Line A1580 100 SQYD $ $

25101-0100 Line A1600 100 CUYD $ $

25101-0200 Line A1620 27 CUYD $ $

25101-0200 Line A1640 30 CUYD $ $

25101-0300 Line A1660 500 CUYD $ $

25101-0300 Line A1680 5 CUYD $ $

25120-0100 Line A1700 1,900 LNFT $ $

25125-0000 Line A1720 140 EACH $ $

25125-0000 Line A1740 55 EACH $ $

25201-1000 Line A1760 350 CUYD $ $

25201-1000 Line A1780 730 CUYD $ $

25201-1000 Line A1800 350 CUYD $ $

25210-0000 Line A1820 3,900 SQFT $ $

25210-0000 Line A1840 18 SQFT $ $

25210-0000 Line A1860 1,600 SQFT $ $

25210-0000 Line A1880 220 SQFT $ $

25210-0000 Line A1900 600 SQFT $ $

ROCKERY

ROCKERY, SEAT WALL

ROCKERY, TYPE 1 (IP)

ROCKERY, TYPE 2 (IP)

ROCKERY, TYPE 2 (BUF)

RIPRAP DITCH, METHOD A, CLASS 1

BOULDER (IP)

BOULDER (BUF)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 2)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 3)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 5)

ROADWAY OBLITERATION, METHOD 1 (IP)

PLACED RIPRAP, METHOD A, CLASS 1

PLACED RIPRAP, METHOD A, CLASS 2 (IP)

PLACED RIPRAP, METHOD A, CLASS 2 (BUF)

PLACED RIPRAP, METHOD A, CLASS 3

PLACED RIPRAP, METHOD A, CLASS 3 (IP)

COFFERDAMS (Glen Creek Box Culvert)

ROADWAY OBLITERATION, METHOD 1

A-13

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

25210-0000 Line A1920 600 SQFT $ $

25501-0000 Line A1940 14,000 SQFT $ $

25501-0000 Line A1960 400 SQFT $ $

25701-0400 Line A1980 ALL LPSM $

25801-0000 Line A2000 151 SQFT $ $

27301-0000 Line A2020 7,600 LB $ $

27501-1000 Line A2040 65 CUYD $ $

30202-1000 Line A2060 70 TON $ $

30202-2000 Line A2080 1,730 TON $ $

30202-2000 Line A2100 445 TON $ $

30801-0000 Line A2120 57,100 SQYD $ $

40101-5600 Line A2140 20,500 TON $ $

40105-3000 Line A2160 201 TON $ $

40301-0100 Line A2180 350 TON $ $

40601-0000 Line A2200 27 TON $ $

40605-0000 Line A2220 502 TON $ $

40801-0000 Line A2240 23,400 TON $ $

41201-0000 Line A2260 35 TON $ $

55201-0200 Line A2280 38 CUYD $ $

ASPHALT CONCRETE PAVEMENT, TYPE 1 (BUF)

FOG SEAL

BLOTTER

COLD RECYCLED ASPHALT BASE COURSE

TACK COAT

STRUCTURAL CONCRETE, CLASS A (AE) (IP)

ROADWAY AGGREGATE, METHOD 1

ROADWAY AGGREGATE, METHOD 2

ROADWAY AGGREGATE, METHOD 2 (BUF)

RECYCLED AGGREGATE BASE

ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE III

ANTISTRIP ADDITIVE, TYPE 3

MECHANICALLY STABILIZED EARTH WALL

MECHANICALLY STABILIZED EARTH WALL (IP)

CONTRACTOR FURNISHED REINFORCED CONCRETE RETAINING WALL DESIGN

REINFORCED CONCRETE RETAINING WALL (precast wing wall)

POLYURETHANE RESIN INJECTION (BUF)

GEOFOAM, LIGHTWEIGHT FILL MATERIAL (IP)

ROCKERY, TYPE 2A (BUF)

A-14

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

55201-0200 Line A2300 8 CUYD $ $

55210-0000 Line A2320 8 CUYD $ $

55401-1000 Line A2340 11,500 LB $ $

55401-3000 Line A2360 2,412 LB $ $

55501-0000 Line A2380 ALL LPSM $

56701-0000 Line A2400 640 LNFT $ $

56701-0000 Line A2420 160 LNFT $ $

56701-0000 Line A2440 64 LNFT $ $

57501-0000 Line A2460 ALL LPSM $

60201-0400 Line A2480 8 LNFT $ $

60201-0600 Line A2500 76 LNFT $ $

60201-0600 Line A2520 30 LNFT $ $

60201-0800 Line A2540 2,847 LNFT $ $

60201-0900 Line A2560 162 LNFT $ $

60220-4200 Line A2580 36 LNFT $ $

60404-1000 Line A2600 13 EACH $ $

60404-1000 Line A2620 6 EACH $ $

60404-1000 Line A2640 1 EACH $ $

60501-0000 Line A2660 500 LNFT $ $

STANDARD UNDERDRAIN SYSTEM

24-INCH PIPE CULVERT

30-INCH PIPE CULVERT

12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

CATCH BASIN, FLH TYPE 1

CATCH BASIN, FLH TYPE 1 (IP)

CATCH BASIN, FLH TYPE 1 (BUF)

MICROPILE (IP)

MICROPILE (BUF)

MINOR BRIDGE WORK (BUF)

12-INCH PIPE CULVERT (BUF)

18-INCH PIPE CULVERT (IP)

18-INCH PIPE CULVERT (BUF)

STRUCTURAL CONCRETE, CLASS A (AE) (BUF)

PRECAST STRUCTURAL CONCRETE(precast concrete footing)

REINFORCING STEEL (IP)

REINFORCING STEEL, STAINLESS STEEL (BUF)

STRUCTURAL STEEL BOARDWALK (IP)

MICROPILE , BOARDWALK (IP)

A-15

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

60510-0800 Line A2680 6 LNFT $ $

60510-0900 Line A2700 800 LNFT $ $

60510-1000 Line A2720 200 LNFT $ $

60522-0000 Line A2740 200 CUYD $ $

60901-1700 Line A2760 3,069 LNFT $ $

60901-3500 Line A2780 699 LNFT $ $

60901-7000 Line A2800 3,590 LNFT $ $

61001-0000 Line A2820 30 LNFT $ $

61501-0100 Line A2840 185 SQYD $ $

61501-1100 Line A2860 102 SQYD $ $

61501-1100 Line A2880 255 SQYD $ $

61501-1100 Line A2900 730 SQYD $ $

61503-5000 Line A2920 17 SQYD $ $

61504-3000 Line A2940 14 SQYD $ $

61701-2000 Line A2960 2,025 LNFT $ $

61702-1300 Line A2980 2 EACH $ $

61901-1300 Line A3000 30 LNFT $ $

61901-1300 Line A3020 50 LNFT $ $

61902-0900 Line A3040 2 EACH $ $

6-INCH OUTLET PIPE (BUF)

8-INCH COLLECTOR PIPE

8-INCH OUTLET PIPE

SAND

CURB, CONCRETE, 18-INCH DEPTH

SIDEWALK, ASPHALT (BUF)

MEDIAN, STONE, Cobble

ACCESSIBILITY RAMP, ASPHALT

GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS

TERMINAL SECTION, TYPE MELT

FENCE, CHAIN LINK, TEMPORARY (IP)

CURB, STONE, TYPE 1, 12-INCH DEPTH

CURB, LOG

HORIZONTAL DRAIN PIPE (BUF)

SIDEWALK, CONCRETE (IP)

SIDEWALK, ASPHALT

SIDEWALK, ASPHALT (IP)

FENCE, CHAIN LINK, TEMPORARY (BUF)

GATE, METAL, 40 foot width (government furnished)

A002

A-16

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62001-0000 Line A3060 11 CUYD $ $

62002-0000 Line A3080 1,300 SQYD $ $

62002-0000 Line A3100 70 SQYD $ $

62002-0000 Line A3120 26 SQYD $ $

62002-0000 Line A3140 6 SQYD $ $

62002-0000 Line A3160 80 SQYD $ $

62002-0000 Line A3180 45 SQYD $ $

62002-0000 Line A3200 35 SQYD $ $

62002-0000 Line A3220 17 SQYD $ $

62002-1000 Line A3240 60 SQYD $ $

62005-0000 Line A3260 250 CUYD $ $

62010-0000 Line A3280 130 LNFT $ $

62010-0000 Line A3300 4 LNFT $ $

62010-0000 Line A3320 18 LNFT $ $

62010-0000 Line A3340 40 LNFT $ $

62010-0000 Line A3360 215 LNFT $ $

62011-0300 Line A3380 2 EACH $ $

62011-0300 Line A3400 1 EACH $ $

62011-0500 Line A3420 58 EACH $ $

STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT (IP)

STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT (BUF)

STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

CONCRETE MASONRY UNITS

STONE MASONRY, EDGING (IP)

STONE MASONRY, SCUPPER (BUF)

STONE MASONRY, EDGING (BUF)

STONE MASONRY, SEAT WALL (BUF)

STONE MASONRY WALL (BUF)

STONE MASONRY, PIPE COVER (IP)

STONE MASONRY, PAVING (BUF)

STONE MASONRY, WALL FACING (BUF)

STONE MASONRY, WALL ADJUSTMENTS (BUF)

STONE MASONRY, GUARDWALL (BUF)

CLASS B MASONRY, ROCK FACE FINISH

STONE MASONRY(headwall repair)

STONE MASONRY(MSE Wall Facing)

STONE MASONRY, GUARDWALL (IP)

STONE MASONRY, WALL FACING (IP)

A-17

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62011-0600 Line A3440 6 EACH $ $

62026-1000 Line A3460 20 SQYD $ $

62027-0000 Line A3480 350 LNFT $ $

62031-0000 Line A3500 1,950 SQFT $ $

62201-0000 Line A3520 40 HOUR $ $

62201-0300 Line A3540 400 HOUR $ $

62201-0300 Line A3560 40 HOUR $ $

62201-0300 Line A3580 100 HOUR $ $

62201-0450 Line A3600 50 HOUR $ $

62201-0450 Line A3620 80 HOUR $ $

62201-0450 Line A3640 100 HOUR $ $

62201-1000 Line A3660 200 HOUR $ $

62201-1000 Line A3680 80 HOUR $ $

62201-1000 Line A3700 100 HOUR $ $

62201-1350 Line A3720 200 HOUR $ $

62201-1350 Line A3740 40 HOUR $ $

62201-3000 Line A3760 200 HOUR $ $

62201-3000 Line A3780 100 HOUR $ $

62201-3000 Line A3800 40 HOUR $ $

BULLDOZER, 200HP MINIMUM FLYWHEEL POWER (BUF)

HYDRAULIC EXCAVATOR (ROCK HAMMER)

HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 3500 POUND MINIMUM HAMMER ATTACHMENT

HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 50 FOOT MINIMUM REACH

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH (IP)

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH (BUF)

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY (IP)

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY (BUF)

BULLDOZER, 200HP MINIMUM FLYWHEEL POWER

REPOINT STONE MASONRY (BUF)

EQUIPMENT, JACKHAMMER

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY (IP)

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY (BUF)

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT

REMOVE AND RESET STONE MASONRY (FLAGSTONE)

REMOVE AND RESET STONE MASONRY(Curb)

A-18

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62201-3000 Line A3820 40 HOUR $ $

62201-3150 Line A3840 500 HOUR $ $

62201-3150 Line A3860 40 HOUR $ $

62201-3150 Line A3880 200 HOUR $ $

62201-3750 Line A3900 40 HOUR $ $

62201-3750 Line A3920 10 HOUR $ $

62201-3750 Line A3940 10 HOUR $ $

62301-0000 Line A3960 1,700 HOUR $ $

62301-0000 Line A3980 200 HOUR $ $

62301-0000 Line A4000 100 HOUR $ $

62302-0000 Line A4020 200 HOUR $ $

62302-0000 Line A4040 200 HOUR $ $

62302-0000 Line A4060 200 HOUR $ $

62302-0000 Line A4080 20 HOUR $ $

62302-0000 Line A4100 40 HOUR $ $

62302-0000 Line A4120 20 HOUR $ $

62302-0000 Line A4140 80 HOUR $ $

62302-0100 Line A4160 16 HOUR $ $

62302-1100 Line A4180 50 HOUR $ $

SPECIAL LABOR STONE MASON (IP)

SPECIAL LABOR, Carpenter (BUF)

SPECIAL LABOR, Stone Mason (BUF)

SPECIAL LABOR, SLOPE SCALING, Mechanical

SPECIAL LABOR, HIRED SURVEY SERVICES

GENERAL LABOR (IP)

GENERAL LABOR (BUF)

SPECIAL LABOR (WETLAND RESTORATION)

SPECIAL LABOR, Carpenter

SPECIAL LABOR, Stone Mason

SPECIAL LABOR CARPENTER (IP)

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT (IP)

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT (BUF)

CHAIN SAW

CHAIN SAW (IP)

CHAIN SAW (BUF)

GENERAL LABOR

HYDRAULIC EXCAVATOR, MINI EXCAVATOR, 69" MINIMUM WIDTH, WITH THUMB ATTACHMENT

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

A-19

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62302-1100 Line A4200 25 HOUR $ $

62302-1100 Line A4220 25 HOUR $ $

62405-0200 Line A4240 40 SQYD $ $

62405-0200 Line A4260 950 SQYD $ $

62406-0100 Line A4280 30.0 ACRE $ $

62515-1000 Line A4300 30.0 ACRE $ $

62516-1000 Line A4320 40 SQYD $ $

62516-1000 Line A4340 1,000 SQYD $ $

62650-1000 Line A4360 9 EACH $ $

62650-1000 Line A4380 19 EACH $ $

63301-1000 Line A4400 21 EACH $ $

63301-1000 Line A4420 10 EACH $ $

63301-1000 Line A4440 10 EACH $ $

63302-0000 Line A4460 78 SQFT $ $

63306-0700 Line A4480 1 EACH $ $

63306-0700 Line A4500 2 EACH $ $

63318-1000 Line A4520 152 EACH $ $

63401-0000 Line A4540 170 LNFT $ $

63401-0300 Line A4560 78,478 LNFT $ $

SIGN SYSTEM

POST, STEEL, PIPE, Hitching Post

POST, STEEL, PIPE, Hitching Post (REMOVE AND RESET)

SNOW POLE HOLDER

PAVEMENT MARKINGS, Stop Line

PAVEMENT MARKINGS, TYPE B, SOLID WHITE

MULCHING, DRY METHOD (BUF)

REMOVE AND REPLANT TREE AND SHRUB (IP)

REMOVE AND REPLANT TREE AND SHRUB (BUF)

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN Panel

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (IP)

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (BUF)

SPECIAL LABOR, HIRED SURVEY SERVICES (BUF)

PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (IP)

PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (BUF)

PLACING CONSERVED TOPSOIL, 2-INCH DEPTH

MULCHING, DRY METHOD

MULCHING, DRY METHOD (IP)

SPECIAL LABOR, HIRED SURVEY SERVICES (IP)

A-20

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

63401-0300 Line A4580 76,702 LNFT $ $

63401-0400 Line A4600 2,000 LNFT $ $

63401-0450 Line A4620 8,550 LNFT $ $

63405-0550 Line A4640 3 EACH $ $

63405-0850 Line A4660 3 EACH $ $

63502-0400 Line A4680 100 EACH $ $

63502-0600 Line A4700 30 EACH $ $

63502-0600 Line A4720 3 EACH $ $

63502-0600 Line A4740 3 EACH $ $

63502-1250 Line A4760 230 EACH $ $

63502-1300 Line A4780 200 EACH $ $

63502-1500 Line A4800 65 EACH $ $

63502-1600 Line A4820 95 EACH $ $

63502-1700 Line A4840 100 EACH $ $

63502-3700 Line A4860 80 EACH $ $

63503-0400 Line A4880 1,750 LNFT $ $

63503-0700 Line A4900 80,650 LNFT $ $

63504-1000 Line A4920 1,603 SQFT $ $

63504-1000 Line A4940 35 SQFT $ $

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (IP)

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (IP)

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (BUF)

TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

PAVEMENT MARKINGS, TYPE B, SOLID YELLOW

PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW

PAVEMENT MARKINGS, TYPE B, DOTTED WHITE

PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW

PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

TEMPORARY TRAFFIC CONTROL, SNOW POLE

TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

A-21

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

63504-1000 Line A4960 65 SQFT $ $

63506-0600 Line A4980 4,500 HOUR $ $

63507-0700 Line A5000 500 DAY $ $

63509-1000 Line A5020 20,000 FXHR $ $

63701-0000 Line A5040 1 EACH $ $

64603-0100 Line A5060 1 EACH $ $

64603-0100 Line A5080 2 EACH $ $

64603-0300 Line A5100 4 EACH $ $

64603-0300 Line A5120 4 EACH $ $

64603-0300 Line A5140 2 EACH $ $

64603-0800 Line A5160 1 EACH $ $

64604-1000 Line A5180 154 LNFT $ $

64604-1000 Line A5200 60 LNFT $ $

64604-1000 Line A5220 59 LNFT $ $

64604-1000 Line A5240 205 LNFT $ $

64604-1000 Line A5260 35 LNFT $ $

64604-3000 Line A5280 295 LNFT $ $

64605-1000 Line A5300 ALL LPSM $

64631-0000 Line A5320 385 LNFT $ $

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (BUF)

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

TEMPORARY TRAFFIC CONTROL, PILOT CAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

FIELD OFFICE (RELOCATION)

FIXTURE, TRASH RECEPTACLE (IP)

FIXTURE, TRASH RECEPTACLE (BUF)

FIXTURE, BENCH MASONRY (IP)

FIXTURE, BENCH WOOD (IP)

FIXTURE, BENCH MASONRY (BUF)

FIXTURE, KIOSK (BUF)

FIXTURE, HANDRAIL, TYPE 1 (IP)

FIXTURE, HANDRAIL, TYPE 2 (IP)

FIXTURE, HANDRAIL, TYPE 3 (IP)

FIXTURE, HANDRAIL, TYPE 1 (BUF)

FIXTURE, HANDRAIL, TYPE 2 (BUF)

FIXTURE, PEDESTRIAN RAILING (BUF)

FIXTURE, KIOSK, repairs

ROADSIDE DEVELOPMENT, MASONRY STEPS AND EDGE STONES (IP)

38.00 760,000.00

A-22

Schedule A Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

64632-0000 Line A5340 155 SQYD $ $

64632-0000 Line A5360 16 SQYD $ $

64702-1000 Line A5380 3,800 LNFT $ $

64703-1000 Line A5400 8 EACH $ $

64703-1000 Line A5420 15 EACH $ $

64703-3000 Line A5440 2 EACH $ $

64704-1000 Line A5460 81 CUYD $ $

65105-0000 Line A5480 ALL LPSM $

ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT (IP)

ROADSIDE DEVELOPMENT, STABILIZED EMBANKMENT (BUF)

MITIGATION, LANDSCAPING LOG

MITIGATION, LANDSCAPING LOG (IP)

MITIGATION, LANDSCAPING LOG (BUF)

MITIGATION, LOG WEIR

MITIGATION, STREAMBED MATERIAL

TEMPORARY ROCKFALL PROTECTION

A-23

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

15101-0000 Line B0020 ALL LPSM $

15101-0000 Line B0040 ALL LPSM $

15101-0000 Line B0060 ALL LPSM $

15201-0000 Line B0080 ALL LPSM $

15201-0000 Line B0100 ALL LPSM $

15201-0000 Line B0120 ALL LPSM $

15301-0010 Line B0140 ALL LPSM $

15301-0010 Line B0160 ALL LPSM $

15301-0010 Line B0180 ALL LPSM $

15401-0000 Line B0200 ALL LPSM $

15401-0000 Line B0220 ALL LPSM $

15401-0000 Line B0240 ALL LPSM $

15501-0000 Line B0260 ALL LPSM $

15501-0000 Line B0280 ALL LPSM $

15501-0000 Line B0300 ALL LPSM $

15701-0000 Line B0320 ALL LPSM $

15701-0000 Line B0340 ALL LPSM $

15704-1000 Line B0360 740 SQYD $ $

15704-1100 Line B0380 40,523 SQYD $ $

Schedule Total: ________________________

Submitted by: _________________________

SOIL EROSION CONTROL (IP)

SOIL EROSION CONTROL (BUF)

SOIL EROSION CONTROL, PLASTIC LINING

MOBILIZATION

MOBILIZATION (IP)

MOBILIZATION (BUF)

CONSTRUCTION SURVEY AND STAKING

CONSTRUCTION SURVEY AND STAKING (IP)

CONSTRUCTION SURVEY AND STAKING (BUF)

SOIL EROSION CONTROL, BRUSH BLANKET

CONSTRUCTION SCHEDULE

CONSTRUCTION SCHEDULE (IP)

CONSTRUCTION SCHEDULE (BUF)

CONTRACTOR QUALITY CONTROL AND ASSURANCE

CONTRACTOR QUALITY CONTROL AND ASSURANCE (IP)

CONTRACTOR QUALITY CONTROL AND ASSURANCE (BUF)

CONTRACTOR TESTING

CONTRACTOR TESTING (IP)

CONTRACTOR TESTING (BUF)

A-24

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

15705-0100 Line B0400 14,298 LNFT $ $

15705-1000 Line B0420 338 LNFT $ $

15705-1400 Line B0440 36,799 LNFT $ $

15705-1400 Line B0460 560 LNFT $ $

15705-1400 Line B0480 1,935 LNFT $ $

15706-0200 Line B0500 96 EACH $ $

15706-0300 Line B0520 4,300 EACH $ $

15706-1000 Line B0540 14 EACH $ $

15802-0000 Line B0560 ALL LPSM $

20101-0000 Line B0580 41.0 ACRE $ $

20103-0000 Line B0600 530 SQYD $ $

20103-0000 Line B0620 1,458 SQYD $ $

20301-0080 Line B0640 6 EACH $ $

20301-0200 Line B0660 211 EACH $ $

20301-0300 Line B0680 1 EACH $ $

20301-1100 Line B0700 2 EACH $ $

20301-1200 Line B0720 64 EACH $ $

20301-1400 Line B0740 1 EACH $ $

20301-1900 Line B0760 41 EACH $ $

REMOVAL OF INLET

REMOVAL OF PIPE CULVERT

REMOVAL OF BOX CULVERT

REMOVAL OF GATE, double swing

REMOVAL OF HEADWALL

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

CLEARING AND GRUBBING (IP)

SOIL EROSION CONTROL, FIBER ROLL

SOIL EROSION CONTROL, FIBER ROLL (IP)

SOIL EROSION CONTROL, FIBER ROLL (BUF)

CLEARING AND GRUBBING (BUF)

REMOVAL OF BENCH (IP)

REMOVAL OF BOULDER, STOCKPILE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, TEMPORARY 48-INCH CULVERT PIPE

SOIL EROSION CONTROL, CHECK DAM

SOIL EROSION CONTROL, SANDBAG

SOIL EROSION CONTROL, INLET PROTECTION

A-25

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

20301-2300 Line B0780 34 EACH $ $

20301-2300 Line B0800 4 EACH $ $

20301-2300 Line B0820 4 EACH $ $

20301-2700 Line B0840 2 EACH $ $

20301-3000 Line B0860 4 EACH $ $

20302-0700 Line B0880 130 LNFT $ $

20302-1000 Line B0900 55 LNFT $ $

20302-2500 Line B0920 275 LNFT $ $

20302-2500 Line B0940 170 LNFT $ $

20303-0000 Line B0960 105 SQYD $ $

20303-0000 Line B0980 12 SQYD $ $

20303-0300 Line B1000 25 SQYD $ $

20303-1600 Line B1020 1,290 SQYD $ $

20303-3000 Line B1040 71 SQYD $ $

20303-3000 Line B1060 10 SQYD $ $

20303-3000 Line B1080 938 SQYD $ $

20303-3200 Line B1100 66 SQYD $ $

20303-3500 Line B1120 91 SQYD $ $

20401-0000 Line B1140 167,600 CUYD $ $

REMOVAL OF SIDEWALK, CONCRETE (BUF)

REMOVAL OF STONE MASONRY

ROADWAY EXCAVATION

REMOVAL OF STRUCTURES AND OBSTRUCTIONS, TIMBER STEPS (IP)

REMOVAL OF CONCRETE (IP)

REMOVAL OF PAVEMENT, ASPHALT (BUF)

REMOVAL OF SIDEWALK, ASPHALT

REMOVAL OF SIDEWALK, ASPHALT (IP)

REMOVAL OF SIDEWALK, ASPHALT (BUF)

REMOVAL OF TRASH RECEPTACLE (BUF)

REMOVAL OF FENCE (BUF)

REMOVAL OF FENCE, RAIL (IP)

REMOVAL OF HANDRAIL (IP)

REMOVAL OF HANDRAIL (BUF)

REMOVAL OF STRUCTURES AND OBSTRUCTIONS, CONC. STAIRS (IP)

REMOVAL OF SIGN/MARKER

REMOVAL OF SIGN/MARKER (IP)

REMOVAL OF SIGN/MARKER (BUF)

REMOVAL OF STRUCTURE, DRY STACK WALL

A-26

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

20401-0000 Line B1160 340 CUYD $ $

20401-0000 Line B1180 60 CUYD $ $

20402-0000 Line B1200 13,000 CUYD $ $

20402-0000 Line B1220 350 CUYD $ $

20403-0000 Line B1240 5,795 CUYD $ $

20411-0000 Line B1260 35,900 TON $ $

20411-0000 Line B1280 500 TON $ $

20411-0000 Line B1300 2,200 TON $ $

20421-0000 Line B1320 11 CUYD $ $

20426-1000 Line B1340 171 CUYD $ $

20465-0000 Line B1360 154 EACH $ $

20466-0000 Line B1380 3 CUYD $ $

20701-0100 Line B1400 2,500 SQYD $ $

20701-0200 Line B1420 250 SQYD $ $

20701-0300 Line B1440 18,100 SQYD $ $

20701-0300 Line B1460 3,600 SQYD $ $

20701-0300 Line B1480 1,777 SQYD $ $

20703-0000 Line B1500 8,600 SQYD $ $

20703-2000 Line B1520 3,776 SQYD $ $

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (Special Rock Embankment)

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C, WOVEN

GEOGRID (Biaxial)

GEOGRID, STABILIZATION

DITCH, EXCAVATION(Apollinaris channel)

CONSERVE AND PLACE BOULDER

CONSERVE AND STOCKPILE TOPSOIL (IP)

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A, WOVEN

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B

SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C

SUBEXCAVATION (IP)

UNCLASSIFIED BORROW

SELECT BORROW

SELECT BORROW (IP)

SELECT BORROW (BUF)

ROCK EXCAVATION (BUF)

ROADWAY EXCAVATION (IP)

ROADWAY EXCAVATION (BUF)

SUBEXCAVATION

A-27

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

20704-0000 Line B1540 2,200 SQYD $ $

20704-0000 Line B1560 110 SQYD $ $

20705-1000 Line B1580 2,200 SQYD $ $

20815-0000 Line B1600 ALL LPSM $

20815-0000 Line B1620 ALL LPSM $

21101-1000 Line B1640 4,400 SQYD $ $

21101-1000 Line B1660 100 SQYD $ $

25101-0100 Line B1680 120 CUYD $ $

25101-0200 Line B1700 27 CUYD $ $

25101-0200 Line B1720 30 CUYD $ $

25101-0300 Line B1740 540 CUYD $ $

25101-0300 Line B1760 5 CUYD $ $

25120-0100 Line B1780 1,900 LNFT $ $

25125-0000 Line B1800 140 EACH $ $

25125-0000 Line B1820 55 EACH $ $

25201-1000 Line B1840 350 CUYD $ $

25201-1000 Line B1860 900 CUYD $ $

25201-1000 Line B1880 825 CUYD $ $

25201-1000 Line B1900 350 CUYD $ $

BOULDER (BUF)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 2)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 2, Landslide)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 3)

SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED (Class 5)

PLACED RIPRAP, METHOD A, CLASS 2 (IP)

PLACED RIPRAP, METHOD A, CLASS 2 (BUF)

PLACED RIPRAP, METHOD A, CLASS 3

PLACED RIPRAP, METHOD A, CLASS 3 (IP)

RIPRAP DITCH, METHOD A, CLASS 1

BOULDER (IP)

INSULATION BOARD, POLYSTYRENE FOAM

COFFERDAMS (Apollinairis Box Culvert)

COFFERDAMS (Glen Creek Box Culvert)

ROADWAY OBLITERATION, METHOD 1

ROADWAY OBLITERATION, METHOD 1 (IP)

PLACED RIPRAP, METHOD A, CLASS 1

GEOMEMBRANE

GEOMEMBRANE (IP)

A-28

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

25210-0000 Line B1920 4,800 SQFT $ $

25210-0000 Line B1940 18 SQFT $ $

25210-0000 Line B1960 1,600 SQFT $ $

25210-0000 Line B1980 220 SQFT $ $

25210-0000 Line B2000 600 SQFT $ $

25210-0000 Line B2020 600 SQFT $ $

25501-0000 Line B2040 14,000 SQFT $ $

25501-0000 Line B2060 400 SQFT $ $

25701-0400 Line B2080 ALL LPSM $

25801-0000 Line B2100 659 SQFT $ $

27301-0000 Line B2120 7,600 LB $ $

27501-1000 Line B2140 65 CUYD $ $

30202-1000 Line B2160 73 TON $ $

30202-2000 Line B2180 1,730 TON $ $

30202-2000 Line B2200 445 TON $ $

30801-0000 Line B2220 77,600 SQYD $ $

40101-5600 Line B2240 26,300 TON $ $

40105-3000 Line B2260 244 TON $ $

40301-0100 Line B2280 350 TON $ $

ROADWAY AGGREGATE, METHOD 2

ROADWAY AGGREGATE, METHOD 2 (BUF)

RECYCLED AGGREGATE BASE

ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL, TYPE III

ANTISTRIP ADDITIVE, TYPE 3

ASPHALT CONCRETE PAVEMENT, TYPE 1 (BUF)

MECHANICALLY STABILIZED EARTH WALL (IP)

CONTRACTOR FURNISHED REINFORCED CONCRETE RETAINING WALL DESIGN

REINFORCED CONCRETE RETAINING WALL (precast wing wall)

POLYURETHANE RESIN INJECTION (BUF)

GEOFOAM, LIGHTWEIGHT FILL MATERIAL (IP)

ROADWAY AGGREGATE, METHOD 1

ROCKERY, SEAT WALL

ROCKERY, TYPE 1 (IP)

ROCKERY, TYPE 2 (IP)

ROCKERY, TYPE 2 (BUF)

ROCKERY, TYPE 2A (BUF)

MECHANICALLY STABILIZED EARTH WALL

ROCKERY

A-29

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

40601-0000 Line B2300 35 TON $ $

40605-0000 Line B2320 607 TON $ $

40801-0000 Line B2340 28,400 TON $ $

41201-0000 Line B2360 43 TON $ $

55201-0200 Line B2380 38 CUYD $ $

55201-0200 Line B2400 8 CUYD $ $

55210-0000 Line B2420 16 CUYD $ $

55401-1000 Line B2440 11,500 LB $ $

55401-3000 Line B2460 2,412 LB $ $

55501-0000 Line B2480 ALL LPSM $

56701-0000 Line B2500 640 LNFT $ $

56701-0000 Line B2520 160 LNFT $ $

56701-0000 Line B2540 64 LNFT $ $

57501-0000 Line B2560 ALL LPSM $

60201-0400 Line B2580 86 LNFT $ $

60201-0400 Line B2600 8 LNFT $ $

60201-0600 Line B2620 76 LNFT $ $

60201-0600 Line B2640 30 LNFT $ $

60201-0800 Line B2660 3,107 LNFT $ $

24-INCH PIPE CULVERT

MICROPILE (BUF)

MINOR BRIDGE WORK (BUF)

12-INCH PIPE CULVERT

12-INCH PIPE CULVERT (BUF)

18-INCH PIPE CULVERT (IP)

18-INCH PIPE CULVERT (BUF)

PRECAST STRUCTURAL CONCRETE(precast concrete footing)

REINFORCING STEEL (IP)

REINFORCING STEEL, STAINLESS STEEL (BUF)

STRUCTURAL STEEL BOARDWALK (IP)

MICROPILE, BOARDWALK (IP)

MICROPILE (IP)

FOG SEAL

BLOTTER

COLD RECYCLED ASPHALT BASE COURSE

TACK COAT

STRUCTURAL CONCRETE, CLASS A (AE) (IP)

STRUCTURAL CONCRETE, CLASS A (AE) (BUF)

A-30

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

60201-0900 Line B2680 259 LNFT $ $

60201-1000 Line B2700 264 LNFT $ $

60220-3150 Line B2720 56 LNFT $ $

60220-4200 Line B2740 36 LNFT $ $

60404-1000 Line B2760 14 EACH $ $

60404-1000 Line B2780 6 EACH $ $

60404-1000 Line B2800 1 EACH $ $

60501-0000 Line B2820 1,150 LNFT $ $

60510-0800 Line B2840 6 LNFT $ $

60510-0900 Line B2860 2,500 LNFT $ $

60510-1000 Line B2880 450 LNFT $ $

60522-0000 Line B2900 200 CUYD $ $

60901-1700 Line B2920 3,069 LNFT $ $

60901-3500 Line B2940 839 LNFT $ $

60901-7000 Line B2960 4,324 LNFT $ $

61001-0000 Line B2980 30 LNFT $ $

61501-0100 Line B3000 185 SQYD $ $

61501-1100 Line B3020 224 SQYD $ $

61501-1100 Line B3040 255 SQYD $ $

30-INCH PIPE CULVERT

36-INCH PIPE CULVERT

10 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

CATCH BASIN, FLH TYPE 1

SAND

CURB, CONCRETE, 18-INCH DEPTH

CURB, STONE, TYPE 1, 12-INCH DEPTH

CURB, LOG

HORIZONTAL DRAIN PIPE (BUF)

SIDEWALK, CONCRETE (IP)

CATCH BASIN, FLH TYPE 1 (IP)

CATCH BASIN, FLH TYPE 1 (BUF)

STANDARD UNDERDRAIN SYSTEM

6-INCH OUTLET PIPE (BUF)

8-INCH COLLECTOR PIPE

8-INCH OUTLET PIPE

SIDEWALK, ASPHALT

SIDEWALK, ASPHALT (IP)

A002

A-31

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

61501-1100 Line B3060 730 SQYD $ $

61503-5000 Line B3080 17 SQYD $ $

61504-3000 Line B3100 21 SQYD $ $

61701-2000 Line B3120 2,025 LNFT $ $

61702-1300 Line B3140 2 EACH $ $

61901-1300 Line B3160 30 LNFT $ $

61901-1300 Line B3180 50 LNFT $ $

61902-0900 Line B3200 2 EACH $ $

62001-0000 Line B3220 11 CUYD $ $

62002-0000 Line B3240 1,300 SQYD $ $

62002-0000 Line B3260 26 SQYD $ $

62002-0000 Line B3280 6 SQYD $ $

62002-0000 Line B3300 70 SQYD $ $

62002-0000 Line B3320 80 SQYD $ $

62002-0000 Line B3340 45 SQYD $ $

62002-0000 Line B3360 35 SQYD $ $

62002-0000 Line B3380 17 SQYD $ $

62002-1000 Line B3400 120 SQYD $ $

62005-0000 Line B3420 250 CUYD $ $

STONE MASONRY, GUARDWALL (BUF)

CLASS B MASONRY, ROCK FACE FINISH

CONCRETE MASONRY UNITS

STONE MASONRY, WALL FACING (IP)

STONE MASONRY, PIPE COVER (IP)

STONE MASONRY, GUARDWALL (IP)

STONE MASONRY, PAVING (BUF)

STONE MASONRY, WALL FACING (BUF)

STONE MASONRY, WALL ADJUSTMENTS (BUF)

TERMINAL SECTION, TYPE MELT

FENCE, CHAIN LINK, TEMPORARY (IP)

FENCE, CHAIN LINK, TEMPORARY (BUF)

GATE, METAL, 40 foot width (government furnished)

STONE MASONRY(headwall repair)

STONE MASONRY (MSE Wall Facing)

SIDEWALK, ASPHALT (BUF)

MEDIAN, STONE, Cobble

ACCESSIBILITY RAMP, ASPHALT

GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS

A-32

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62010-0000 Line B3440 130 LNFT $ $

62010-0000 Line B3460 4 LNFT $ $

62010-0000 Line B3480 18 LNFT $ $

62010-0000 Line B3500 40 LNFT $ $

62010-0000 Line B3520 215 LNFT $ $

62011-0300 Line B3540 2 EACH $ $

62011-0300 Line B3560 1 EACH $ $

62011-0500 Line B3580 68 EACH $ $

62011-0600 Line B3600 10 EACH $ $

62011-0700 Line B3620 12 EACH $ $

62026-1000 Line B3640 20 SQYD $ $

62027-0000 Line B3660 500 LNFT $ $

62031-0000 Line B3680 1,950 SQFT $ $

62201-0000 Line B3700 40 HOUR $ $

62201-0300 Line B3720 400 HOUR $ $

62201-0300 Line B3740 40 HOUR $ $

62201-0300 Line B3760 100 HOUR $ $

62201-0450 Line B3780 50 HOUR $ $

62201-0450 Line B3800 80 HOUR $ $

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY (IP)

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY (BUF)

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH (IP)

STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT

REMOVE AND RESET STONE MASONRY (FLAGSTONE)

REMOVE AND RESET STONE MASONRY (Curb)

REPOINT STONE MASONRY (BUF)

EQUIPMENT, JACKHAMMER

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

STONE MASONRY, SEAT WALL (BUF)

STONE MASONRY WALL (BUF)

STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT (IP)

STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT (BUF)

STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT

STONE MASONRY, EDGING (IP)

STONE MASONRY, SCUPPER (BUF)

STONE MASONRY, EDGING (BUF)

A-33

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62201-0450 Line B3820 100 HOUR $ $

62201-1000 Line B3840 200 HOUR $ $

62201-1000 Line B3860 80 HOUR $ $

62201-1000 Line B3880 100 HOUR $ $

62201-1350 Line B3900 200 HOUR $ $

62201-1350 Line B3920 40 HOUR $ $

62201-3000 Line B3940 100 HOUR $ $

62201-3000 Line B3960 40 HOUR $ $

62201-3000 Line B3980 40 HOUR $ $

62201-3000 Line B4000 200 HOUR $ $

62201-3150 Line B4020 500 HOUR $ $

62201-3150 Line B4040 40 HOUR $ $

62201-3150 Line B4060 200 HOUR $ $

62201-3750 Line B4080 40 HOUR $ $

62201-3750 Line B4100 10 HOUR $ $

62201-3750 Line B4120 10 HOUR $ $

62301-0000 Line B4140 1,700 HOUR $ $

62301-0000 Line B4160 200 HOUR $ $

62301-0000 Line B4180 100 HOUR $ $

CHAIN SAW (IP)

CHAIN SAW (BUF)

GENERAL LABOR

GENERAL LABOR (IP)

GENERAL LABOR (BUF)

HYDRAULIC EXCAVATOR, MINI EXCAVATOR, 69" MINIMUM WIDTH, WITH THUMB ATTACHMENT

HYDRAULIC EXCAVATOR (ROCK HAMMER)

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT (IP)

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT (BUF)

CHAIN SAW

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY (IP)

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY (BUF)

BULLDOZER, 200HP MINIMUM FLYWHEEL POWER

BULLDOZER, 200HP MINIMUM FLYWHEEL POWER (BUF)

HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 3500 POUND MINIMUM HAMMER ATTACHMENT

HYDRAULIC EXCAVATOR, 140HP MINIMUM WITH 50 FOOT MINIMUM REACH

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH (BUF)

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

A-34

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62302-0000 Line B4200 200 HOUR $ $

62302-0000 Line B4220 200 HOUR $ $

62302-0000 Line B4240 200 HOUR $ $

62302-0000 Line B4260 20 HOUR $ $

62302-0000 Line B4280 40 HOUR $ $

62302-0000 Line B4300 20 HOUR $ $

62302-0000 Line B4320 80 HOUR $ $

62302-0100 Line B4340 16 HOUR $ $

62302-1100 Line B4360 50 HOUR $ $

62302-1100 Line B4380 25 HOUR $ $

62302-1100 Line B4400 25 HOUR $ $

62405-0200 Line B4420 40 SQYD $ $

62405-0200 Line B4440 950 SQYD $ $

62406-0100 Line B4460 35.0 ACRE $ $

62515-1000 Line B4480 35.0 ACRE $ $

62516-1000 Line B4500 40 SQYD $ $

62516-1000 Line B4520 1,000 SQYD $ $

62650-1000 Line B4540 9 EACH $ $

62650-1000 Line B4560 19 EACH $ $

PLACING CONSERVED TOPSOIL, 2-INCH DEPTH

MULCHING, DRY METHOD

MULCHING, DRY METHOD (IP)

MULCHING, DRY METHOD (BUF)

REMOVE AND REPLANT TREE AND SHRUB (IP)

REMOVE AND REPLANT TREE AND SHRUB (BUF)

SPECIAL LABOR, SLOPE SCALING, Mechanical

SPECIAL LABOR, HIRED SURVEY SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES (IP)

SPECIAL LABOR, HIRED SURVEY SERVICES (BUF)

PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (IP)

PLACING CONSERVED TOPSOIL, 3-INCH DEPTH (BUF)

SPECIAL LABOR, Stone Mason

SPECIAL LABOR (WETLAND RESTORATION)

SPECIAL LABOR CARPENTER (IP)

SPECIAL LABOR STONE MASON (IP)

SPECIAL LABOR, Carpenter (BUF)

SPECIAL LABOR, Stone Mason (BUF)

SPECIAL LABOR, Carpenter

A-35

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

63301-1000 Line B4580 27 EACH $ $

63301-1000 Line B4600 10 EACH $ $

63301-1000 Line B4620 10 EACH $ $

63302-0000 Line B4640 118 SQFT $ $

63306-0700 Line B4660 1 EACH $ $

63306-0700 Line B4680 2 EACH $ $

63318-1000 Line B4700 196 EACH $ $

63401-0000 Line B4720 227 LNFT $ $

63401-0300 Line B4740 94,300 LNFT $ $

63401-0300 Line B4760 90,542 LNFT $ $

63401-0400 Line B4780 3,600 LNFT $ $

63401-0450 Line B4800 10,600 LNFT $ $

63405-0550 Line B4820 3 EACH $ $

63405-0850 Line B4840 4 EACH $ $

63502-0400 Line B4860 100 EACH $ $

63502-0600 Line B4880 30 EACH $ $

63502-0600 Line B4900 3 EACH $ $

63502-0600 Line B4920 3 EACH $ $

63502-1250 Line B4940 230 EACH $ $

PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (BUF)

TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

SNOW POLE HOLDER

PAVEMENT MARKINGS, Stop Line

PAVEMENT MARKINGS, TYPE B, SOLID WHITE

PAVEMENT MARKINGS, TYPE B, SOLID YELLOW

PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW

PAVEMENT MARKINGS, TYPE B, DOTTED WHITE

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN Panel

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (IP)

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (BUF)

SIGN SYSTEM

POST, STEEL, PIPE, Hitching Post

POST, STEEL, PIPE, Hitching Post (REMOVE AND RESET)

PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (IP)

A-36

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

63502-1300 Line B4960 200 EACH $ $

63502-1500 Line B4980 65 EACH $ $

63502-1600 Line B5000 95 EACH $ $

63502-1700 Line B5020 100 EACH $ $

63502-3700 Line B5040 80 EACH $ $

63503-0400 Line B5060 1,750 LNFT $ $

63503-0700 Line B5080 80,650 LNFT $ $

63503-1000 Line B5100 159 LNFT $ $

63504-1000 Line B5120 1,603 SQFT $ $

63504-1000 Line B5140 35 SQFT $ $

63504-1000 Line B5160 65 SQFT $ $

63506-0600 Line B5180 4,500 HOUR $ $

63507-0700 Line B5200 500 DAY $ $

63509-1000 Line B5220 20,000 FXHR $ $

63701-0000 Line B5240 1 EACH $ $

64603-0100 Line B5260 1 EACH $ $

64603-0100 Line B5280 2 EACH $ $

64603-0300 Line B5300 4 EACH $ $

64603-0300 Line B5320 4 EACH $ $

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

TEMPORARY TRAFFIC CONTROL, SNOW POLE

TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (IP)

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (BUF)

TEMPORARY TRAFFIC CONTROL, PILOT CAR

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

TEMPORARY TRAFFIC CONTROL, FLAGGER

FIELD OFFICE (RELOCATION)

FIXTURE, TRASH RECEPTACLE (IP)

FIXTURE, TRASH RECEPTACLE (BUF)

FIXTURE, BENCH MASONRY (IP)

FIXTURE, BENCH WOOD (IP)

38.00 760,000.00

A-37

Schedule B Account: ALL

Project No: WY PRA YELL 10(19)

Name: Grand Loop Road Norris to Golden Gate, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

64603-0300 Line B5340 2 EACH $ $

64603-0800 Line B5360 1 EACH $ $

64604-1000 Line B5380 154 LNFT $ $

64604-1000 Line B5400 60 LNFT $ $

64604-1000 Line B5420 59 LNFT $ $

64604-1000 Line B5440 205 LNFT $ $

64604-1000 Line B5460 35 LNFT $ $

64604-3000 Line B5480 295 LNFT $ $

64605-1000 Line B5500 ALL LPSM $

64620-1100 Line B5520 1 EACH $ $

64631-0000 Line B5540 385 LNFT $ $

64632-0000 Line B5560 155 SQYD $ $

64632-0000 Line B5580 16 SQYD $ $

64702-1000 Line B5600 4,600 LNFT $ $

64703-1000 Line B5620 8 EACH $ $

64703-1000 Line B5640 15 EACH $ $

64703-3000 Line B5660 6 EACH $ $

64704-1000 Line B5680 138 CUYD $ $

65105-0000 Line B5700 ALL LPSM $

FIXTURE, BENCH MASONRY (BUF)

FIXTURE, KIOSK (BUF)

FIXTURE, HANDRAIL, TYPE 1 (IP)

FIXTURE, HANDRAIL, TYPE 2 (IP)

FIXTURE, HANDRAIL, TYPE 3 (IP)

FIXTURE, HANDRAIL, TYPE 1 (BUF)

FIXTURE, HANDRAIL, TYPE 2 (BUF)

FIXTURE, PEDESTRIAN RAILING (BUF)

FIXTURE, KIOSK, repairs

REMOVE AND RESET KIOSK

ROADSIDE DEVELOPMENT,…