L-sheets.pdf

PDF 1 MB Posted

Attached to
WY PRA YELL 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2
Solicitation number
DTFH70-15-R-00015
Issued by

About this file

L

View the file

Other files

File Type Posted
Q A_4-11-2016.pdf PDF
A002_Norris.pdf PDF
Q A_4-8-2016.pdf PDF
A001.pdf PDF
YELL_spreadsheet.xlsx XLSX spreadsheet
K-Sheets.pdf PDF
C-Sheets.pdf PDF
Physical_Data_WY_PRA_YELL_10(19).pdf PDF
G-Sheets.pdf PDF
T-Sheets_-_Final.pdf PDF
D-Sheets.pdf PDF
P-sheets.pdf PDF
X-Sheets_-_Final.pdf PDF
S-Sheets_-_Final.pdf PDF
H-Sheets.pdf PDF
O-sheets.pdf PDF
Plan_Request_for_WY_PRA_YELL_10(19).pdf PDF
F-Sheets.pdf PDF
RFP_Norris_reduced.pdf PDF
V-Sheets_-_Final.pdf PDF
W-Sheets_-_Final.pdf PDF
M-Sheets.pdf PDF
E-Sheets.pdf PDF
U-Sheets_-_Final.pdf PDF
B_-_SHEETS_-_Final.pdf PDF
N-sheets.pdf PDF
I-Sheets.pdf PDF
J-Sheets.pdf PDF
NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

74357435 7435 7435

74407440

657465

57485

0 3

C P

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

B M

B

C P

N

LEGEND:

Roadway obliteration

Wetland boundary

Line to be constructed

Slope stake limits

Roadway obliteration

NOTE:

according to Sheet K.2.

Place conserved boulders and landscape logs on finished slopes according to Sections 624 and 625.

Place conserved topsoil and mulch over all finished slopes are within wetland boundaries.

Sheet C.3. Do not round slopes where catch points are at or

Round slopes at hinge points and catch points according to

Conserve topsoil according to Section 204.

under Section 408.

asphalt concrete pavement according to Section 308 for use existing roadway; remove, process, and stockpile the existing

Before excavating and building embankment to obliterate the

5.

4.

3.

2.

1.

L.1

STATE PROJECT

NUMBER

SHEET

WY

PRA YELL 10(19)

P

F e b r u a r y

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d y e ll tb .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

330+79 to 334+21

PLAN

ROADWAY OBLITERATION

74607460

07480

D I

C P

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

N

LEGEND:

Roadway obliteration

Wetland boundary

Line to be constructed

Slope stake limits

Roadway obliteration

Slope stake limits

NOTE:

according to Sheet K.2.

Place conserved boulders and landscape logs on finished slopes according to Sections 624 and 625.

Place conserved topsoil and mulch over all finished slopes are within wetland boundaries.

Sheet C.3. Do not round slopes where catch points are at or

Round slopes at hinge points and catch points according to

Conserve topsoil according to Section 204.

under Section 408.

asphalt concrete pavement according to Section 308 for use existing roadway; remove, process, and stockpile the existing

Before excavating and building embankment to obliterate the

5.

4.

3.

2.

1.

Preserve adjacent trees with roadway excavation

Roadway prism removed with roadway excavation

Roadway prism removed

FOOTNOTE:

1 As shown in the Skating Report Data Listing.

L.2

STATE PROJECT

A

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll tc .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

339+61 to 341+12

74107410

57445

07450

357535

NPS Drwg. No. 101/130820

NPS PMIS Nos. 86308 & 2131522

N

LEGEND:

Roadway obliteration

Wetland boundary

Line to be constructed

Roadway obliteration

Slope stake limits

Slope stake limits

NOTE:

according to Sheet K.2.

Place conserved boulders and landscape logs on finished slopes according to Sections 624 and 625.

Place conserved topsoil and mulch over all finished slopes are within wetland boundaries.

Sheet C.3. Do not round slopes where catch points are at or

Round slopes at hinge points and catch points according to

Conserve topsoil according to Section 204.

under Section 408.

asphalt concrete pavement according to Section 308 for use existing roadway; remove, process, and stockpile the existing

Before excavating and building embankment to obliterate the

5.

4.

3.

2.

1.

Preserve adjacent trees with roadway excavation

Roadway prism removed

FOOTNOTE:

1 As shown in the Skating Report Data Listing.

with roadway excavation

Roadway prism removed

L.3

STATE PROJECT

A

J a n u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d y e ll td .d g n

S J a c k s o n

C

S m it h

C h e c k e d b y

D e s ig n e d b y

350+25 to 354+13

File details come from the government source that posted it. Updated .