L-sheets.pdf
PDF 1 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
L
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
74357435 7435 7435
74407440
657465
57485
0 3
C P
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
B M
B
C P
N
LEGEND:
Roadway obliteration
Wetland boundary
Line to be constructed
Slope stake limits
Roadway obliteration
NOTE:
according to Sheet K.2.
Place conserved boulders and landscape logs on finished slopes according to Sections 624 and 625.
Place conserved topsoil and mulch over all finished slopes are within wetland boundaries.
Sheet C.3. Do not round slopes where catch points are at or
Round slopes at hinge points and catch points according to
Conserve topsoil according to Section 204.
under Section 408.
asphalt concrete pavement according to Section 308 for use existing roadway; remove, process, and stockpile the existing
Before excavating and building embankment to obliterate the
5.
4.
3.
2.
1.
L.1
STATE PROJECT
NUMBER
SHEET
WY
PRA YELL 10(19)
P
F e b r u a r y
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll tb .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
330+79 to 334+21
PLAN
ROADWAY OBLITERATION
74607460
07480
D I
C P
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
N
LEGEND:
Roadway obliteration
Wetland boundary
Line to be constructed
Slope stake limits
Roadway obliteration
Slope stake limits
NOTE:
according to Sheet K.2.
Place conserved boulders and landscape logs on finished slopes according to Sections 624 and 625.
Place conserved topsoil and mulch over all finished slopes are within wetland boundaries.
Sheet C.3. Do not round slopes where catch points are at or
Round slopes at hinge points and catch points according to
Conserve topsoil according to Section 204.
under Section 408.
asphalt concrete pavement according to Section 308 for use existing roadway; remove, process, and stockpile the existing
Before excavating and building embankment to obliterate the
5.
4.
3.
2.
1.
Preserve adjacent trees with roadway excavation
Roadway prism removed with roadway excavation
Roadway prism removed
FOOTNOTE:
1 As shown in the Skating Report Data Listing.
L.2
STATE PROJECT
A
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll tc .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
339+61 to 341+12
74107410
57445
07450
357535
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
N
LEGEND:
Roadway obliteration
Wetland boundary
Line to be constructed
Roadway obliteration
Slope stake limits
Slope stake limits
NOTE:
according to Sheet K.2.
Place conserved boulders and landscape logs on finished slopes according to Sections 624 and 625.
Place conserved topsoil and mulch over all finished slopes are within wetland boundaries.
Sheet C.3. Do not round slopes where catch points are at or
Round slopes at hinge points and catch points according to
Conserve topsoil according to Section 204.
under Section 408.
asphalt concrete pavement according to Section 308 for use existing roadway; remove, process, and stockpile the existing
Before excavating and building embankment to obliterate the
5.
4.
3.
2.
1.
Preserve adjacent trees with roadway excavation
Roadway prism removed
FOOTNOTE:
1 As shown in the Skating Report Data Listing.
with roadway excavation
Roadway prism removed
L.3
STATE PROJECT
A
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll td .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
350+25 to 354+13