Standard Form (SF) 25A, Payment Bond.SF

Standard Form 19 KB Posted

Attached to
SIR/RFO DTFAAC-17-R-02323 Miscellaneous Mechanical Construction Services
Solicitation number
DTFAAC-17-R-02323
Issued by

About this file

Standard Form (SF) 25A, Payment Bond (pdf)

Text of this file

OMB Control No. 2120-0595 (SF-25A) FAA Template No. 15 (8/97)

PAYMENT BOND 1. DATE BOND EXECUTED (MUST NOT BE LATER THAN DATE OF CONTRACT.)

(See Instructions on Reverse)

2. PRINCIPAL (LEGAL NAME AND BUSINESS ADDRESS) 3. TYPE OF ORGANIZATION (“X” ONE)

Individual Partnership

Joint Venture Corporation

4. STATE OF INCORPORATION

5. SURETY(IES) (NAME AND BUSINESS ADDRESS)

a. Penal Sum of Bond b. Bid Identification Percent of Amount not to exceed Bid Date Invitation No.

of Bid Million(s) Thousand(s) Hundred(s) Cents

Price For (Construction , Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The above obligation is void if the Principal promptly makes payment to al persons having a direct relationship with the Principal or a subcontractor of the principal for furnishing labor, material or both in the prosecution of the work provided for in the contract identified above, and any authorized modifications of the contract that subsequently are made. Notice of those modifications to the Surety(ies) are waived.

WITNESS:

The Principal and surety(ies) executed this bid bond and affixes their seals on the above date.

6. PRINCIPAL

a. Signature(s) (1) (2) (3)

(seal) (seal) (seal) Corporate

b. Name(s) & (1) (2) (3) Seal

Titles (Typed)

7. INDIVIDUAL SURETY(IES)

a. Signature(s) (1) (2)

(Seal)

(Seal)

b. Name(s) (1) (2)

(Typed)

8. CORPORATE SURETY(IES)

S u

a. Name & Address

b. State of Inc.

a. Liability Limit r e

d. Signatures (1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

A (Typed)

OMB Control No. 2120-0595 (SF-25A) FAA Template No. 15 (Reverse) (8/97)

8. CORPORATE SURETY(IES) (Continued)

S u

d. Signatures (1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

B (Typed)

S u

d. Signatures (1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

C (Typed)

S u e d. Signatures

(1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

D (Typed)

S u

d. Signatures (1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

E (Typed)

S u

d. Signatures (1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

F (Typed)

S u

d. Signatures (1) (2) Corporate t y

e. Name(s) & Title(s)

(1) (2) Seal

G (Typed)

Instructions

1. This form, for the protection of persons supplying labor and material is used when a payment bond is required under the Act of August 24, 1935, 49 Stat. 793 (40 USC 270a-270e).

2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury’s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the space (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).”

In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

4. Corporations executing the bond shall affix their corporate seals.

Individuals shall execute the bond opposite the word “Corporate Seal;” and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

5. Type the name and title of each person signing this bond in the space provided.

Other versions and copies of SF 25A

File Revision Posted Attached to
Payment Bond SF25A-23a.pdf Revision not stated RF Roof Replacement Project
SF-25A_Payment_Bond_Form.pdf Revision not stated IE181 - WHS Greenhouse Construction
Attachment_6__-_SF25A_0002.pdf Revision not stated SLV-CB PUMPING PLANT ROOF
B08_Attachment_7_Payment_Bond_SF25A-23a_upon_award.pdf Revision not stated EROS Removal and replacement of chilled and conden
B08_Attachment_4_Payment_Bond_SF25A-23a_upon_award.pdf Revision not stated DREDGING OF SEDIMENT POND & CONTACT POOL
Attachment VI - SF25A Payment Bond.pdf Revision not stated USCG Base Portsmouth C5I Trailer Roof Replacement
SF25A-23a.pdf Revision not stated Demolition of exisiting and Installation of new Handicap Ramps and Steps with Landings at USCG Base Portsmouth
Standard Form 25A - Payment Bond.pdf Revision not stated Provide range thermal evaporator installation for USCG Base Portsmouth
SF-25A_Payment_Bond_Form.pdf Revision not stated STOPLOG LIFTING BEAM MODIFICATION PROJECT - Colora
SF25A-23a.pdf Revision not stated Replace HVAC Units, USCG Station Hatteras Inlet, NC
Attachment_9_-_SF25A_Payment_Bond.pdf Revision not stated 2026 MARCOTT COULEE PIPELINE
SF25A-23a.pdf Revision not stated Z2GC--Repair Above Ground Storage Tanks, USCG Base Elizabeth City
SF25A-23a.pdf Revision not stated Z2JZ--Replace HVAC Units at Building 7 and 97, USCG Base Elizabeth CIty
Attachment VI - SF25A.pdf Revision not stated USCG Station Cape Charles Sewage Lift Station Repairs
Attachment IV- SF25A Payment Bond.pdf Revision not stated USCG Base Portsmouth Chief's Mess Roof Repair
SF25A-23a.pdf Revision not stated Z2FA--USCG Outer Banks Housing Deck and Stair Replacement
B08_Attachment_5_Payment_Bond_SF25A-23a_upon_award.pdf Revision not stated REPLACEMENT OF 2 ROOF SYSTEMS
SF25A-23a.pdf Revision not stated Z2EB--Vehicle Maintenance Shop Roof Insulation, USCG Base Elizabeth City, NC
Standard Form 25A - Payment Bond.pdf Revision not stated Monument Sign - Natick Soldiers Systems Center
SF25A-23a.pdf Revision not stated Z1GC--Replace HVAC Units, Building 366, USCG Base Elizabeth City, NC
Show all 20

Who attaches SF 25A

State Files
Montana 1

Other files

File Type Posted
Standard Form (SF) 25A, Payment Bond.SF —
Contractor's Release.pdf PDF
Past Performance Information Form.pdf PDF
Standard Form (SF) 25, Performance Bond.SF —
Chapter 33 Construction Safety Chapter.pdf PDF
Statement of Work (SOW) 06.01.2016.SOW —
Table of Contents 06.01.2016.pdf PDF
Q&A DTFAAC-17-R-02323.pdf PDF
Business Declaration.pdf PDF
Amendment 2 documents.pdf PDF
Wage Rate Decision OK160049 09.02.2016.pdf PDF
Screening Information Request (SIR).SIR —
Proposal Form CAI Replace AHU2-5.doc DOC document
Specifications: 12-018539 CAI Replace AHU2-5.pdf PDF
Past Performance Survey.pdf PDF
Drawing: 12-018539 CAI Replace AHU2-5.pdf PDF
Operational Control Documents Combined.pdf PDF
Client Authorization Letter.pdf PDF
Amendment A001 complete.pdf PDF
Pre Bid Site Visit Attendee List.pdf PDF
Contractor's Release.pdf PDF
Screening Information Request (SIR).SIR —
Wage Rate Decision OK160049 09.02.2016.pdf PDF
Standard Form (SF) 25, Performance Bond.SF —
Table of Contents 06.01.2016.pdf PDF
Client Authorization Letter.pdf PDF
Drawing: 12-018539 CAI Replace AHU2-5.pdf PDF
Pre Bid Site Visit Attendee List.pdf PDF
Past Performance Information Form.pdf PDF
Operational Control Documents Combined.pdf PDF
Business Declaration.pdf PDF
Q&A DTFAAC-17-R-02323.pdf PDF
Specifications: 12-018539 CAI Replace AHU2-5.pdf PDF
Chapter 33 Construction Safety Chapter.pdf PDF
Past Performance Survey.pdf PDF
Statement of Work (SOW) 06.01.2016.SOW —
Proposal Form CAI Replace AHU2-5.doc DOC document
Past Performance Survey.pdf PDF
Business Declaration.pdf PDF
Contractor's Release.pdf PDF
Past Performance Information Form.pdf PDF
Specifications: 12-018539 CAI Replace AHU2-5.pdf PDF
Proposal Form CAI Replace AHU2-5.doc DOC document
Operational Control Documents Combined.pdf PDF
Standard Form (SF) 25A, Payment Bond.SF —
Pre Bid Site Visit Attendee List.pdf PDF
Chapter 33 Construction Safety Chapter.pdf PDF
Screening Information Request (SIR).SIR —
Drawing: 12-018539 CAI Replace AHU2-5.pdf PDF
Statement of Work (SOW) 06.01.2016.SOW —
Show 40 more

Latest 50 of 101 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .