DIVISIONAL COST BREAK-OUT.docx
DOCX document 16 KB Posted
- Solicitation number
- 36C26126R0036
About this file
This is a Divisional Cost Break-Out template for CLIN 0001 under solicitation 612A4-19-016 for the renovation of an Outpatient Pharmacy and HVAC system. The document is a pricing template that requires contractors to provide a complete cost breakdown organized by construction divisions and trade categories. The required divisions include General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastic, Thermal/Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, and Electronic Safety and Security. Contractors must also account for bonds and insurance, overhead, and profit margins, with a final line for the total project bid amount.
The project is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 and represents a capital improvement effort at a Veterans Affairs facility. Contractors responding to this solicitation must complete the cost break-out by populating each division line item with associated costs and providing subtotals before calculating final bid pricing. The template allows for additional line items under the "OTHER" category if project-specific divisions require separate cost accounting beyond the standard CSI (Construction Specifications Institute) format divisions listed.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISIONAL COST BREAK-OUT
CLIN 0001
612A4-19-016 | Renovate Outpatient Pharmacy and HVAC Provide complete Divisional Cost Break-Out for complete project. If necessary, add additional lines for each Division applicable to this project.
| REF |
| DESCRIPTION |
| TOTAL |
| 010000 |
| General Requirements |
| 020000 |
| Existing Conditions |
| 030000 |
| Concrete |
| 050000 |
| Metals |
| 060000 |
| Wood and Plastic |
| 070000 |
| Therm/Moisture Prot. |
| 080000 |
| Openings |
| 090000 |
| Finishes |
| 100000 |
| Specialties |
| 110000 |
| Equipment |
| 120000 |
| Furnishings |
| 130000 |
| Special Construction |
| 210000 |
| Fire Suppression |
| 220000 |
| Plumbing |
| 230000 |
| HVAC |
| 260000 |
| Electrical |
| 270000 |
| Communications |
| 280000 |
| Electronic Safety And Security |
OTHER
OTHER
| OTHER |
| OTHER |
SUB TOTAL:
BONDS & INSURANCE
OVERHEAD
PROFIT
TOTAL PROJECT BID AMOUNT:
File details come from the government source that posted it. Updated .