13. 070150.19 PrepReRoof.docx
DOCX document 48 KB Posted
- Solicitation number
- 36C26126R0036
About this file
This is a specification template for roof preparation work prior to reroofing installation. The document provides standardized guidance for contractors preparing existing roof systems for new roofing applications, with extensive notes for specification writers to customize the requirements based on project-specific conditions.
The specification covers complete roof removal and installation of new roof systems, partial roof removal for new HVAC rooftop unit openings, and selective roofing membrane and component removal. It addresses various existing roofing system types including EPDM, built-up asphalt, coal tar, CSPE, PVC, TPO, and modified bituminous membranes. Key execution requirements include: infrared moisture surveys performed by NDT-certified technicians per ASTM C1153; removal of overburden materials (aggregate ballast, pavers, vegetation); complete or partial roofing system removal exposing structural deck; visual and moisture inspection of concrete decks per ASTM D4263; verification and potential reinforcement of steel deck fasteners; installation of temporary roofing to maintain building watertightness; removal and replacement of base flashings and counterflashings; and installation of recover boards with proper fastening to resist wind uplift. Pre-installation meetings are required minimum 30 days before work begins with key participants including the Contracting Officer's Representative, architect/engineer, contractor, and installer. The specification includes quality assurance requirements for installer qualifications, fastener pull-out testing per ANSI/SPRI FX1 (10 tests for the first 4,650 square meters, five tests for each additional 4,650 square meters), and certification by existing roof system warrantors. Work must proceed only during dry weather conditions, with no more roofing removal than can be made watertight the same day. This template is intended for application to VA renovation projects involving outpatient pharmacy and HVAC work.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02-01-16
SECTION 07 01 50.19
PREPARATION FOR RE‑ROOFING
SPEC WRITER NOTES:
1. Delete text between // ______ // not applicable to project. Edit remaining text to suit project.
2. Edit Summary article below after establishing re‑roofing scope and editing section to correspond to Project requirements.
GENERAL
SUMMARY
Section Includes:
Complete roof removal for new roof system installation.
Partial existing roof construction and roofing removal for new roof openings for HVAC rooftop unit system installation.
Roofing membrane and selective roofing system component removal for new roof membrane installation.
Existing roofing membrane preparation for new roofing // membrane // system // installation.
SPEC WRITER NOTE: Modify paragraph below to describe existing roofing system.
Existing Roofing System: // EPDM membrane roofingBuilt‑up asphalt // Built‑up coal tar // EPDM // CSPE // PVC // TPO // Modified bituminous /./. System components include:
SPEC WRITER NOTE: System components are listed in order from top down. Edit to suit existing roofing system.
Vegetation with growing media // water retention mat // and root barrier.
Pavers and paver supports.
Aggregate ballast.
Roof insulation // and drainage board //.
Aggregate surfacing.
Roofing membrane.
Cover board.
Roof insulation.
Vapor retarder.
Substrate board.
RELATED REQUIREMENTS
SPEC WRITER NOTE: Update and retain references only when specified elsewhere in this section.
Asbestos Removal: Section 02 82 13.21, ASBESTOS ROOFING ABATEMENT.
Replacement Roof Deck: Section 05 31 00, STEEL DECKING.
Replacement Roof Deck and Parapet Sheathing: Section 06 10 00, ROUGH CARPENTRY.
New Roofing System: // Section 07 51 00, BUILT‑UP BITUMINOUS ROOFING // Section 07 51 00.11, BUILT‑UP BITUMINOUS ROOFING, HOT‑APPLIED // Section 07 51 00.13, BUILT‑UP BITUMINOUS ROOFING, COLD‑APPLIED // Section 07 52 16, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE ROOFING, HOT APPLIED // Section 07 52 16.13, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE, ROOFING, COLD APPLIED // Section 07 53 23, ETHYLENE‑PROPYLENE‑DIENE‑MONOMER ROOFING // Section 07 54 16, ETHYLENE INTERPOLYMER (KEE) ROOFING // Section 07 54 19, POLYVINYL‑CHLORIDE (PVC) ROOFING // Section 07 54 23, THERMOPLASTIC POLYOLEFIN (TPO) ROOFING // Section 07 56 00, FLUID‑APPLIED ROOFING // Section 07 57 13, SPRAYED POLYURETHANE FOAM ROOFING //.
Sheet Metal Counterflashing: Section 07 60 00, SHEET METAL FLASHING AND TRIM.
APPLICABLE PUBLICATIONS
Comply with references to extent specified in this section.
American National Standards Institute/Single‑Ply Roofing Institute (ANSI/SPRI):
FX‑1‑01(R2006) Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners.
American Society for Nondestructive Testing (ASNT):
SNT‑TC‑1A - Personnel Qualification and Certification for Nondestructive Testing.
ASTM International (ASTM):
C208‑12 - Cellulosic Fiber Insulating Board.
C578‑15 - Rigid, Cellular Polystyrene Thermal Insulation.
C728‑15 - Perlite Thermal Insulation Board.
C1177/C1177M‑13 - Glass Mat Gypsum Substrate for Use as Sheathing.
C1153‑97(2003)e1 - Location of Wet Insulation in Roofing Systems Using Infrared Imaging.
C1278/C1278M‑07a(2015) - Fiber‑Reinforced Gypsum Panel.
D4263‑83(2012) - Indicating Moisture in Concrete by the Plastic Sheet Method.
U.S. Department of Commerce National Institute of Standards and Technology (NIST):
DOC PS 1‑09 - Structural Plywood.
DOC PS 2‑04 - Performance Standard for Wood‑Based Structural‑Use Panels.
PREINSTALLATION MEETINGS
Conduct pre-installation meeting minimum 30 days before beginning Work of this section.
SPEC WRITER NOTE: Edit participant list to ensure entities influencing outcome attend.
Required Participants:
Contracting Officer's Representative (COR).
// Architect/Engineer. // // Inspection and Testing Agency. // Contractor.
Installer.
SPEC WRITER NOTE: Include manufacturer's representative when work affects existing warranted roof.
// Manufacturer's field representative. // Other installers responsible for adjacent and intersecting work, including mechanical and electrical equipment installers.
SPEC WRITER NOTE: Edit meeting agenda to incorporate project specific topics.
Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
Removal and installation schedule.
Removal and installation sequence.
Preparatory work.
Protection before, during, and after installation.
Removal and installation.
Temporary roofing including daily terminations.
Transitions and connections to other work.
Inspecting and testing.
Other items affecting successful completion.
Document and distribute meeting minutes to participants to record decisions affecting installation.
SUBMITTALS
Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
Submittal Drawings:
Show size, configuration, and installation details.
Manufacturer's Literature and Data:
Description of each product.
Description of temporary roof system and components.
List of patching materials.
Recover board fastening requirements.
Temporary roofing installation instructions and // removal instructions. // preparation instructions to receive new roofing. // SPEC WRITER NOTE: Retain paragraph below when existing roof is under warranty.
Existing roofing warrantor's instructions provided by the COR.
Photographs: Document existing conditions potentially affected by roofing operations before work begins.
SPEC WRITER NOTE: Include field inspection report only when existing roof is under warranty.
Field Inspection Reports:
Certify warrantor inspected completed roofing and existing warranty remains in effect.
SPEC WRITER NOTE: Retain paragraph below if Infrared Roof Moisture Survey is conducted as specified in Part 3 for partial roof replacement.
Infrared Roof Moisture Survey Report.
QUALITY ASSURANCE
Installer Qualifications:
Same installer as // Section 07 51 00, BUILT‑UP BITUMINOUS ROOFING // Section 07 51 00.11, BUILT‑UP BITUMINOUS ROOFING, HOT‑APPLIED // Section 07 51 00.13, BUILT‑UP BITUMINOUS ROOFING, COLD‑APPLIED // Section 07 52 16, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE ROOFING, HOT APPLIED // Section 07 52 16.13, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE, ROOFING, COLD APPLIED // Section 07 53 23, ETHYLENE‑PROPYLENE‑DIENE‑MONOMER ROOFING // Section 07 54 16, ETHYLENE INTERPOLYMER (KEE) ROOFING // Section 07 54 19, POLYVINYL‑CHLORIDE (PVC) ROOFING // Section 07 54 23, THERMOPLASTIC POLYOLEFIN (TPO) ROOFING // Section 07 56 00, FLUID‑APPLIED ROOFING // 07 57 13, SPRAYED POLYURETHANE FOAM ROOFING //.
Licensed to perform asbestos abatement in Project jurisdiction when removal of asbestos‑containing material is required.
Approved by existing roofing system warrantor when work affects existing roofing system under warranty.
FIELD CONDITIONS
Building Occupancy: Perform work to minimize disruption to normal building operations.
SPEC WRITER NOTE: Retain subparagraph below only when impaired deck areas exist and building will be occupied during work.
Verify occupants are evacuated from affected building areas when working on structurally impaired roof decking above occupied areas.
Provide notice minimum 72 hours before beginning activities affecting normal building operations.
Existing Roofing Available Information:
The following are available for Contractor reference:
SPEC WRITER NOTES:
1. Retain three subparagraphs below if applicable.
2. If roof moisture survey results are not available, include testing specified in Part 3.
Roof moisture survey.
Test cores analysis.
Construction drawings and project manual.
Examine available information before beginning work of this section.
SPEC WRITER NOTE: Insert section number and title of Division 07 roofing section used for roof replacement.
Weather Limitations: Proceed with reroofing/roof patching preparation only during dry weather conditions as specified for new roofing installation in Section // Section 07 51 00, BUILT‑UP BITUMINOUS ROOFING // Section 07 51 00.11, BUILT‑UP BITUMINOUS ROOFING, HOT‑APPLIED // Section 07 51 00.13, BUILT‑UP BITUMINOUS ROOFING, COLD‑APPLIED // Section 07 52 16, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE ROOFING, HOT APPLIED // Section 07 52 16.13, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE, ROOFING, COLD APPLIED // Section 07 53 23, ETHYLENE‑PROPYLENE‑DIENE‑MONOMER ROOFING // Section 07 54 16, ETHYLENE INTERPOLYMER (KEE) ROOFING // Section 07 54 19, POLYVINYL‑CHLORIDE (PVC) ROOFING // Section 07 54 23, THERMOPLASTIC POLYOLEFIN (TPO) ROOFING // Section 07 56 00, FLUID‑APPLIED ROOFING // Section 07 57 13, SPRAYED POLYURETHANE FOAM ROOFING //.
Remove only as much roofing in one day as can be made watertight in same day.
SPEC WRITER NOTE: Retain paragraph below when no known hazardous materials exist.
Hazardous materials are not expected in existing roofing system.
Known hazardous materials were removed before start of work.
Do not disturb suspected hazardous materials. When discovered, notify Contracting Officer's Representativenotify the COR.
Hazardous materials discovered during execution of the work shawill be removed by Government as work of a separate contract.
SPEC WRITER NOTE: Retain paragraph below when hazardous materials exist.
Hazardous Materials are known to exist in existing roofing system.
See Section 02 82 13.21, ASBESTOS ROOFING ABATEMENT for hazardous material removal and disposal.
Coordinate reroofing preparation with asbestos roofing abatement to prevent water from entering existing roofing system and building.
SPEC WRITER NOTE: Ensure report of hazardous material is available or attached.
Hazardous material report is // attached at the end of this section // available in ______ // for review and use.
WARRANTY
SPEC WRITER NOTE: Always retain construction warranty. FAR includes Contractor's one year labor and material warranty.
Construction Warranty: FAR clause 52.246‑21, "Warranty of Construction."
SPEC WRITER NOTE: Retain this article if portions of existing roof still under warranty are to remain or if an adjoining existing roof is under warranty.
Existing Warranties: Perform work to maintain existing roofing warranty in effect.
Notify warrantor before beginning, and upon completion of reroofing.
Obtain warrantor's instructions for maintaining existing warranty.
PRODUCTS
MATERIALS
SPEC WRITER NOTE: Retain first paragraph below when patching and retaining portions of existing roofing system.
Patching Materials: Match existing roofing system materials.
Plywood Sheathing: See Section 06 10 00, ROUGH CARPENTRY.
Metal Flashing: See Section 07 60 00, SHEET METAL FLASHING AND TRIM.
Temporary Protection Materials:
Expanded Polystyrene (EPS) Insulation: ASTM C578.
Plywood: NIST DOC PS 1, Grade CD Exposure 1.
Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1.
Temporary Roofing System Materials: Contractor's option.
Recover Board: One of the following:
SPEC WRITER NOTE: Retain one of paragraphs below when new roofing is installed over existing roofing.
Insulation: See Section 07 22 00, ROOF AND DECK INSULATION.
Fiber Board: ASTM C208, Type II, fiber board; 13 mm (1/2 inch) thick.
Glass Mat Gypsum Board: ASTM C1177/C1177M, water‑resistant; // 6 mm (1/4 inch) // 13 mm (1/2 inch) // Type X, 16 mm (5/8 inch) // thick.
Fiber Reinforced Gypsum Board: ASTM C1278/C1278M, water‑resistant; // 6 mm (1/4 inch) // 10 mm (3/8 inch) // 13 mm (1/2 inch) // 16 mm (5/8 inch) // thick.
Perlite: ASTM C728; // 3 mm (1/2 inch) // 19 mm (3/4 inch) // 25 mm (1 inch) // thick.
Fasteners: Type and size required by roof membrane manufacturer to resist wind uplift.
EXECUTION
EXAMINATION
SPEC WRITER NOTE: Where partial removals are indicated, it is advisable to perform moisture testing to confirm extent.
Infrared Roof Moisture Survey: Ground‑based, walk‑over type performed according to ASTM C1153.
Record the entire survey on DVD and provide one copy to Contracting Officer's Representative the COR with report.
Include in report thermograms of suspect areas and corresponding daytime photos of same locations.
Conduct inspection by NDT test technician certified to at least Level 2 in Thermal/Infrared test method according to ASNT SNT‑TC‑1A.
Mark out roof areas determined to be wet to indicate // minimum // areas to be removed.
PREPARATION
Examine and verify substrate suitability for product installation.
SPEC WRITER NOTE: Retain first paragraph below when portions of existing roof will remain.
Protect existing roofing system indicated to remain.
Cover roof membrane with temporary protection materials without impeding drainage.
Limit traffic and material storage to protected areas.
Maintain temporary protection until replacement roofing is completed.
Protect existing construction and completed work from damage.
Protect landscaping from damage.
Maintain access to existing walkways and adjacent occupied facilities.
Coordinate use of rooftop fresh air intakes with Contracting Officer's Representative COR to minimize effect on indoor air quality.
Ensure temporary protection materials are available for immediate use in case of unexpected rain.
Ensure roof drainage remains functional.
Keep drainage systems clear of debris.
Prevent water from entering building and existing roofing system.
Coordinate rooftop utilities remaining active during roofing work with Contacting Officer's Representative.
RE‑ROOFING/PATCHING PREPARATION - GENERAL
Notify Contacting Officer's Representative of planned operations, daily.
Identify location and extent of roofing removal.
Request authorization to proceed.
OVERBURDEN REMOVAL
SPEC WRITER NOTE: Retain first paragraph below for loose laid roofing membrane and decorative ballast.
Remove aggregate ballast.
Store aggregate ballast for reuse.
Remove loose aggregate from bituminous membrane surface.
Remove pavers and paver support.
Store undamaged pavers and paver supports for reuse.
Dispose of damaged pavers.
Remove plants, planting medium, // water retention mat, // and root barrier from vegetated roof assembly.
Store materials and plants for reuse.
Protect plants from root exposure and drying.
SPEC WRITER NOTE: Retain first paragraph below for protected roofing membrane.
Remove insulation // and drainage board // from protected roofing membrane.
Store insulation and drainage board for reuse.
COMPLETE PARTIAL ROOFING SYSTEM REMOVAL
Remove existing roofing system for new work completely, exposing structural roof deck.
SPEC WRITER NOTE: Retain subparagraph below when roofing system components are known. Edit to suit existing conditions.
Remove // any cover board, // roof insulation, // vapor retarder, // and // substrate board //.
Remove or cut‑off roofing system fasteners.
PARTIAL ROOFING SYSTEM REMOVAL
Remove existing roofing completely, exposing structural roof deck at locations and to extent indicated on drawings.
Remove // cover board, // roof insulation, // vapor retarder, // and // substrate board //.
Remove or cut‑off roofing system fasteners.
SPEC WRITER NOTE: Retain article below if removal is limited to existing roofing membrane and selected components within roofing system identified for removal.
ROOFING MEMBRANE AND SELECTIVE ROOFING SYSTEM COMPONENT REMOVAL
Remove existing roofing membrane, only, in locations and to extent indicated on drawings.
Visually inspect and document // cover board, // roof insulation, // vapor retarder, // and // substrate board // ffor moisture immediately after roof membrane removal.
Coordinate with Contracting Officer's Representative COR to observe inspections.
Identify wet roofing system components required to be removed.
Mark roofing system removal locations and extents.
Remove wet roofing system components.
Remove or cut‑off roofing system fasteners when removals expose structural roof deck.
Patch selective roofing system removals immediately after inspection and repair.
Install patching materials to match existing roofing system.
Patch roofing membrane to maintain building watertight, unlesswatertight unless new roofing membrane is installed same day as removal and repair.
DECK PREPARATION
Inspect structural roof deck after roofing system removal.
SPEC WRITER NOTE: Retain first paragraph below for concrete deck.
Concrete Roof Decks:
Visually confirm concrete roof deck is dry.
Perform moisture test according to ASTM D4263 each day for each separate roof area.
Proceed with roofing work only when moisture is not observed.
SPEC WRITER NOTE: Retain first paragraph below for steel roof deck.
Steel Roof Decks-??:
Visually inspect structural roof deck installation and fasteners.
Notify Contracting Officer's Representative COR of unsuitable conditions and inadequate fastenings potentially affecting roof system performance.
SPEC WRITER NOTE: Retain first paragraph below and revise to add fastening requirements.
Secure roof deck with additional fastenings as // indicated on drawings. // determined by Contracting Officer's RepresentativeCOR. // SPEC WRITER NOTE: Retain paragraph below and revise to include replacement criteria. Coordinate specification of type of deck with "Related Requirements" Paragraph in Part 1 "Summary" Article.
Replace roof deck as // indicated on drawings. // determined by Contracting Officer's RepresentativeCOR. // Replacement Roof Deck: See // Section 05 31 00, STEEL DECKING. // Section 06 10 00, ROUGH CARPENTRY. //
TEMPORARY ROOFING
Install temporary roofing to maintain building watertight.
SPEC WRITER NOTE: Retain one of two paragraphs below.
Remove temporary roofing before installing new roofing.
Prepare temporary roofing to receive new roofing.
EXISTING MEMBRANE PREPARATION FOR NEW ROOFING
SPEC WRITER NOTE: Retain this article when new roof is installed over existing roofing membrane.
Remove existing roofing surface projections and irregularities. Produce smooth surface to receive recover boards.
Broom clean existing surface.
BASE FLASHING REMOVAL
Expose base flashings to permit removal.
Two‑Piece Counterflashings: Remove cap flashing and store for reuse.
Single Piece Counterflashings: Carefully bend counterflashing.
Metal Copings: Remove decorative cap and store for reuse.
Remove existing base flashings.
Clean substrates to receive new flashings.
Replace counterflashings damaged during removal.
Counterflashings: See Section 07 60 00 SHEET METAL FLASHING AND TRIM.
SPEC WRITER NOTES:
1. Retain paragraph below if replacing parapet sheathing.
2. Parapet sheathing is specified in Section 06 10 00, ROUGH CARPENTRY.
Remove existing parapet sheathing and inspect parapet framing.
Notify Contracting Officer's Representative of damaged framing.
Install // pressure‑preservative treated // exterior fire‑retardant‑treated // plywood sheathing, // 15 mm (19/32 inch) // thick.
RECOVER BOARD INSTALLATION
Install recover boards over existing // roof insulation, // roofing membrane // with butted joints. Stagger end joints in adjacent rows.
Fasten recover boards to resist wind‑uplift.
SPEC WRITER NOTES: Insert Division 07 roofing section number and title for new roofing membrane installation.
Fastening Requirements: See // Section 07 51 00, BUILT‑UP BITUMINOUS ROOFING // Section 07 51 00.11, BUILT‑UP BITUMINOUS ROOFING, HOT‑APPLIED // Section 07 51 00.13, BUILT‑UP BITUMINOUS ROOFING, COLD‑APPLIED // Section 07 52 16, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE ROOFING, HOT APPLIED // Section 07 52 16.13, STYRENE‑BUTADIENE‑STYRENE MODIFIED BITUMINOUS MEMBRANE, ROOFING, COLD APPLIED // Section 07 53 23, ETHYLENE‑PROPYLENE‑DIENE‑MONOMER ROOFING // Section 07 54 16, ETHYLENE INTERPOLYMER (KEE) ROOFING // Section 07 54 19, POLYVINYL‑CHLORIDE (PVC) ROOFING // Section 07 54 23, THERMOPLASTIC POLYOLEFIN (TPO) ROOFING // Section 07 56 00, FLUID‑APPLIED ROOFING // Section 07 57 13, SPRAYED POLYURETHANE FOAM ROOFING //.
Uplift Resistance: Base on pull out resistance determined by specified field testing.
FIELD QUALITY CONTROL
SPEC WRITER NOTE: Section 01 45 29, TESTING LABORATORY SERVICES includes VA provided testing for large projects and contractor provided testing for small projects. Coordinate testing responsibility.
Field Tests: Performed by testing laboratory specified in Section 01 45 2900, TESTING LABORATORY SERVICES.QUALITY CONTROL SPEC WRITER NOTE: ANSI/SPRI FX‑1 sets testing frequency as 10 tests for first 4,650 sq. m (50,000 sq. ft.) and five tests for each additional 4,650 sq. m (50,000 sq. ft.). Specify frequency to suit project conditions.
Fastener Pull Outout Tests: ANSI/SPRI FX‑1.
Existing Roofing System Warrantor Services:
Inspect reroofing preparation and roofing installation to verify compliance with existing warranty conditions.
Submit reports of field inspections, and supplemental instructions issued during inspections.
DISPOSAL
Collect waste materials in containers.
Remove waste materials from project site, regularly, to prevent accumulation.
Legally dispose of waste materials.
‑ - E N D - ‑