4- Pre-Inspection Submittals Checklist to Bidders.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC
Solicitation number
36C26126R0036
Issued by

About this file

This file is a Pre-Final Inspection Checklist for bidders on a VA construction project, outlining all required pre-final submittal documentation and quality assurance deliverables across construction trades and building systems.

The checklist spans 28 specification sections covering structural, mechanical, electrical, plumbing, fire protection, and technology systems. For each trade or system, it identifies the specification section, paragraph reference, system description, and required pre-final inspection submittals. Key documentation requirements include: mill certificates and weld inspection reports for structural steel; concrete test reports, placement logs, and curing documentation; prism and mortar testing for masonry; NFPA acceptance tests and flushing reports for wet sprinkler systems; pressure test reports for plumbing; TAB certification for HVAC; cable megger testing and ground resistance reports for electrical; and functional performance test reports for HVAC, electrical, and building automation commissioning. Additional requirements include AWI certification for architectural woodwork, blower door testing for air barriers, roofing moisture scans, adhesion testing for sealants, and operational verification for doors, hardware, and equipment. The checklist designates each submittal as required (Y), not required (N), or not applicable (NA), serving as a comprehensive quality control and commissioning verification tool that bidders must satisfy prior to final project inspection for this VA outpatient pharmacy and HVAC renovation.

View the file

Other files

File Type Posted
36C26126C0064 Award Notice.docx DOCX document
36C26126R0036 0005.docx DOCX document
36C26126R0036 0004.docx DOCX document
1- RFI answers - 36C26126R0036 - Pharmacy - 612A4-19-016.xlsx XLSX spreadsheet
9- Site Visit log.jpeg JPEG file
8- VHA ICRA_612A4-19-016 Bid.pdf PDF
36C26126R0036 0003.docx DOCX document
7- B650 As builts 2014.pdf PDF
2- 087100 Door Hardware.docx DOCX document
3- 281300-Physical access control SYStem.doc DOC document
5- EQUIPMENT AND FURNITURE SCHEDULE_TEMPORARY TRAILER.xlsx XLSX spreadsheet
6- Utilty Map- Canteen Parking Lot.pdf PDF
36C26126R0036 0002.docx DOCX document
36C26126R0036 0001.docx DOCX document
8. Sheet G007_w Stamp.pdf PDF
Brand Name Justification.pdf PDF
S02 RFI FORM.docx DOCX document
3. 015000.01 Temporary Facilities and Controls - Pharmacy Trailer_CHANGES.docx DOCX document
DIVISIONAL COST BREAK-OUT.docx DOCX document
12. VA Provided Vault door cut sheet.pdf PDF
10. Spec Section 09 06 00 Schedof Finishes.docx DOCX document
4. 013216.15 Project Sched. Small - CA Edits.docx DOCX document
14. 087100 Door Hardware.docx DOCX document
1. 000110 TOC.docx DOCX document
19-103 DWGs 100 BD 20231012 .pdf PDF
19-103 Specs 100percent BD 20231108 .pdf PDF
11. Sheets I-001, I-101, and I-401.pdf PDF
SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx DOCX document
5. 013323 Shop Drawings-CA Edits.docx DOCX document
19-103 SubReg 100percent BD 20231013 .pdf PDF
36C26126R0036_2.docx DOCX document
7. Sheet G-006_-signed.pdf PDF
Past Performance Questionnaire.docx DOCX document
0. Adendum to 19-103 Specs 100percent BD 20231108 -sumary of changes-.doc DOC document
VAAR 852.219-75.docx DOCX document
9. NorCal Finish Standards 2025.pdf PDF
13. 070150.19 PrepReRoof.docx DOCX document
6. Sheet ES101 - ELECTRICAL SITE PLAN_SEALED_signed.pdf PDF
2. 010000 - General Requirements - CAEdits.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project Name:Project Name
VA Project Number:###-###
ACG Project Number:##-###
Pre-Final Inspection Checklist
Spec SectionPara.SystemRequired Pre-Final SubmittalY / N / NA
01 45 003.1Quality ControlFinal QC documentation + test reports
01 91 003.5General Cx ReqCommissioning completion + FPTs
03 30 001.4 / 3.5Cast-in-Place ConcreteConcrete test reports (breaks), placement logs, curing documentation
03 15 003.2WaterstopsInstallation verification
03 20 003.2Reinforcing SteelMill certs, inspection reports
03 35 003.3Concrete FinishingFloor flatness (FF/FL) reports
03 39 003.2CuringCuring verification records
04 20 001.4 / 3.5Unit MasonryPrism test reports, mortar/grout testing
04 05 133.2Mortar/GroutMix verification, lab reports
04 05 193.3ReinforcingInspection reports
04 05 233.2Masonry AccessoriesInstallation verification
05 12 001.4 / 3.2Structural SteelMill certs, weld inspection (UT/VT), bolt torque logs
05 21 003.2Steel JoistsManufacturer certification
05 50 003.2Metal FabricationsInstallation verification
05 51 003.2Metal StairsFabrication + installation certification
05 52 003.2RailingsLoad testing (if required), installation verification
06 10 003.2Rough CarpentryInstallation verification
06 20 003.2Finish CarpentryField quality inspection
06 40 003.3Architectural WoodworkAWI certification, installation verification
07 21 133.2InsulationInstallation inspection
07 25 003.3Air BarriersAir barrier testing (blower door if required)
07 27 263.3Fluid-Applied BarrierInspection reports
07 42 003.3Wall PanelsInstallation certification
07 54 003.6RoofingManufacturer warranty, inspection report, moisture scan
07 60 003.2FlashingInstallation verification
07 92 003.2Joint SealantsAdhesion testing (if required)
08 11 133.3Hollow Metal DoorsInstallation + operation verification
08 14 003.3Wood DoorsField inspection reports
08 33 233.3Overhead DoorsOperational testing
08 41 133.3Aluminum EntrancesInstallation verification
08 71 003.3Door HardwareFinal hardware schedule, operation testing
08 80 003.2GlazingGlass certification, safety compliance
09 22 163.2Metal FramingInstallation verification
09 29 003.3Gypsum BoardFinish level verification
09 30 003.3TilingInstallation inspection
09 51 003.2Acoustical CeilingsInstallation verification
09 65 003.3Resilient FlooringAdhesion / installation verification
09 68 003.3CarpetInstallation inspection
09 90 003.3PaintingCoating inspection reports
10 14 003.2SignageInstallation verification
10 21 133.2Toilet CompartmentsInstallation verification
10 28 003.2Toilet AccessoriesInstallation verification
10 44 163.2Fire ExtinguishersInspection + certification
11 xx xx3.2 / 3.3EquipmentStartup reports, installation certification, operational verification
12 24 003.2Window TreatmentsInstallation verification
12 36 003.3CountertopsInstallation inspection
12 48 003.2Entrance MatsInstallation verification
13 21 293.3Pre-Engineered StructuresManufacturer certification, installation verification
13 34 193.3Metal BuildingsErection certification, inspection reports
13 49 003.3Radiation ProtectionShielding certification, testing reports
21 05 003.2Common WorkHydrostatic testing reports
21 08 003.4CommissioningFunctional performance tests
21 13 133.5Wet SprinklerNFPA acceptance tests, flushing reports
21 30 003.3Fire PumpFlow test, controller test, certification
22 05 233.2ValvesInstallation verification
22 05 933.3TestingPressure test reports
22 07 xx3.2DisinfectionSterilization reports
22 08 003.4Plumbing CommissioningFunctional test reports
22 11 xx3.3Domestic WaterWater quality testing results
22 13 xx3.2SanitaryFlow verification
22 14 xx3.2StormDrainage verification
23 05 003.2Common WorkEquipment startup reports, installation verification
23 05 933.3 / 3.4TABFinal certified TAB report
23 07 xx3.2InsulationInspection reports
23 09 233.3 / 3.4DDC ControlsControls system report, point-to-point checkout, sequence validation
23 08 003.5HVAC CommissioningFunctional performance test reports, issue logs
23 21 xx3.2 / 3.3Hydronic SystemsPressure testing, flushing reports
23 31 xx3.2DuctworkLeakage test reports
23 34 xx3.2 / 3.3Fans/AHUStartup reports, vibration testing
23 64 xx3.3ChillersStartup certification, performance testing
23 65 xx3.3Cooling TowersStartup + water treatment verification
26 05 193.3 / 3.4Conductors & CablesCable testing (megger), continuity verification, installation certification
26 05 263.6Grounding & BondingGround resistance test reports, bonding verification
26 05 333.2Raceway & BoxesInstallation verification (QC/Cx sign-off)
26 05 731.4 / 3.2Power StudiesShort circuit, coordination, arc flash study (final stamped)
26 08 003.3 / 3.4Electrical CommissioningFunctional performance test reports, system verification
26 09 233.3 / 3.4Lighting ControlsControls calibration, sequence verification, functional testing
26 24 163.2 / 3.3PanelboardsManufacturer startup certification, torque logs, as-built schedules
26 27 263.3Wiring DevicesReceptacle testing (polarity/ground), GFCI/AFCI testing
26 28 163.2Safety SwitchesOperational testing verification
26 32 133.3 / 3.4GeneratorsLoad bank test, startup certification, fuel system testing
26 33 533.3UPSBattery testing, runtime verification, startup report
26 41 003.1 / 3.6Lightning ProtectionInstallation certification, ground testing, UL compliance
26 51 003.4Interior LightingFixture verification, controls integration testing
26 56 003.4Exterior LightingFunctional testing, photocell/timeclock verification
27 05 003.2Common WorkInstallation verification
27 15 xx3.3Structured CablingFluke test results, labeling verification
27 41 xx3.3AV SystemsFunctional testing reports
28 05 003.2Common WorkSystem verification
28 13 xx3.3Access ControlSystem testing + credential verification
28 23 xx3.3CCTVCamera testing, coverage verification
28 31 003.6Fire AlarmNFPA acceptance test, battery test, device verification

File details come from the government source that posted it. Updated .