The file's text, extracted by GovTribe without its formatting.
07-01-14
| VA Northern California Health Care System | October 13, 2023 |
| Renovation of Outpatient Pharmacy and HVAC | 100% Bid Documents |
| Mather, CA | Project No. 612A4-19-016 |
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
DIVISION 00 ‑ SPECIAL SECTIONS
| 00 01 15 |
| List of Drawing Sheets |
| 07-15 |
DIVISION 01 ‑ GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 03-19 |
| 01 32 16 |
| Project Schedules |
| 03-18 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 12-18 |
| 01 35 26 |
| Safety Requirements |
| 03-18 |
| 01 42 19 |
| Reference Standards |
| 09-19 |
| 01 45 00 |
| Quality Control |
| 03-18 |
| 01 50 00.01 |
| Temporary Facilities and Controls |
| N/A |
| 01 45 29 |
| Testing Laboratory Services |
| 11-18 |
| 01 74 19 |
| Construction Waste Management |
| 12-18 |
| 01 91 00 |
| General Commissioning Requirements |
| 10-15 |
DIVISION 02 – EXISTING CONDITIONS
| 02 41 00 |
| Demolition |
| 08-17 |
DIVISION 03 – CONCRETE
| 03 30 00 |
| Cast-in-Place Concrete |
| 07-19 |
| 03 41 13 |
| Precast Concrete Hollow Core Planks |
| 07-11 |
DIVISION 05 – METALS
| 05 12 00 |
| Structural Steel Framing |
| 11-18 |
| 05 31 00 |
| Steel Decking |
| 02-16 |
| 05 40 00 |
| Cold-Formed Metal Framing |
| 05-16 |
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
| 06 83 10 |
| Composite Column Enclosures |
DIVISION 07 ‑ THERMAL AND MOISTURE PROTECTION
| 07 01 50.19 |
| Preparation for Re-Roofing |
| 02-16 |
| 07 21 13 |
| Thermal Insulation |
| 10-17 |
| 07 22 00 |
| Roof and Deck Insulation |
| 02-16 |
| 07 24 00 |
| Exterior Insulation and Finish Systems |
| 02-16 |
| 07 53 23 |
| Ethylene-Propylene-Diene-Monomer Roofing |
| 01-21 |
| 07 84 00 |
| Firestopping |
| 02-16 |
| 07 92 00 |
| Joint Sealants |
| 10-17 |
| 07 95 13 |
| Expansion Joint Cover Assemblies |
| 02-16 |
DIVISION 08 ‑ OPENINGS
| 08 11 13 |
| Hollow Metal Doors and Frames |
| 08-16 |
| 08 14 00 |
| Interior Wood Doors |
| 02-16 |
| 08 31 13 |
| Access Doors and Frames |
| 02-16 |
| 08 34 53 |
| Security Doors and Frames |
| 05-15 |
| 08 34 59 |
| Vault Doors and Day Gates |
| 02-16 |
| 08 41 13 |
| Aluminum-Framed Entrances and Storefronts |
| 08-16 |
| 08 56 19 |
| Pass Windows |
| 02-16 |
| 08 56 59 |
| Service and Teller Window Units |
| 02-16 |
| 08 71 00 |
| Door Hardware |
| 01-20 |
| 08 71 13 |
| Automatic Door Operators |
| 02-16 |
| 08 71 13.11 |
| Low Energy Power Assist Door Operators |
| 08-16 |
DIVISION 09 – FINISHES
| 09 05 16 |
| Subsurface Preparation for Floor Finishes |
| 02-15 |
| 09 06 00 |
| Schedule for Finishes |
| 04-15 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 06-18 |
| 09 29 00 |
| Gypsum Board |
| 06-18 |
| 09 30 13 |
| Ceramic/Porcelain Tiling |
| 09-15 |
| 09 51 00 |
| Acoustical Ceilings |
| 12-18 |
| 09 65 13 |
| Resilient Base and Accessories |
| 02-16 |
| 09 65 16 |
| Resilient Sheet Flooring |
| 05-18 |
| 09 65 19 |
| Resilient Tile Flooring |
| 05-18 |
DIVISION 10 – SPECIALTIES
| 10 26 00 |
| Wall and Door Protection |
| 10-15 |
| 10 28 00 |
| Toilet, Bath, and Laundry Accessories |
| 02-16 |
| 10 44 13 |
| Fire Extinguisher Cabinets |
| 08-18 |
| 10 56 13 |
| Metal Storage Shelving (FrameWRX) |
| N/A |
DIVISION 11 – EQUIPMENT
| 11 17 36 |
| Package Transfer Units |
| 01-21 |
DIVISION 12 – FURNISHINGS
| 12 32 00 |
| Manufactured Wood Casework |
| 09-15 |
| 12 36 00 |
| Countertops |
| 12-18 |
DIVISION 13 – SPECIAL CONSTRUCTION
| 13 05 41 |
| Seismic Restraint Requirements for Non-Structural Components |
| 01-14 |
DIVISION 21- FIRE SUPPRESSION
| 21 13 13 |
| Wet-Pipe Sprinkler Systems |
| 06-15 |
DIVISION 22 – PLUMBING
| 22 05 11 |
| Common Work Results for Plumbing |
| 07-16 |
| 22 05 23 |
| General-Duty Valves for Plumbing Piping |
| 09-15 |
| 22 05 33 |
| Heat Tracing for Plumbing Piping |
| 09-15 |
| 22 07 11 |
| Plumbing Insulation |
| 09-19 |
| 22 11 00 |
| Facility Water Distribution |
| 11-19 |
| 22 13 00 |
| Facility Sanitary and Vent Piping |
| 09-15 |
| 22 40 00 |
| Plumbing Fixtures |
| 09-15 |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
| 23 05 11 |
| Common Work Results for HVAC |
| 02-20 |
| 23 05 12 |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| 02-20 |
| 23 05 41 |
| Noise and Vibration Control for HVAC Piping and Equipment |
| 02-20 |
| 23 05 93 |
| Testing, Adjusting, and Balancing for HVAC |
| 02-20 |
| 23 07 11 |
| HVAC and Boiler Plant Insulation |
| 02-20 |
| 23 08 00 |
| Commissioning of HVAC Systems |
| 02-20 |
| 23 09 23 |
| Direct-Digital Control System for HVAC |
| 09-11 |
| 23 21 13 |
| Hydronic Piping |
| 02-20 |
| 23 22 13 |
| Steam and Condensate Heating Piping |
| 02-20 |
| 23 31 00 |
| HVAC Ducts and Casings |
| 02-20 |
| 23 36 00 |
| Air Terminal Units |
| 02-20 |
| 23 37 00 |
| Air Outlets and Inlets |
| 02-20 |
| 23 40 00 |
| HVAC Air Cleaning Devices |
| 02-12 |
| 23 74 13 |
| Packaged, Outdoor, Central-Station Air-Handling Units |
| 04-11 |
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 01-18 |
| 26 05 73 |
| Overcurrent Protective Device Coordination Study |
| 01-18 |
| 26 09 23 |
| Lighting Controls |
| 01-18 |
| 26 24 13 |
| Distribution Switchboards |
| 01-18 |
| 26 24 16 |
| Panelboards |
| 01-18 |
| 26 27 26 |
| Wiring Devices |
| 01-18 |
| 26 29 11 |
| Motor Controllers |
| 01-18 |
| 26 29 21 |
| Enclosed Switches and Circuit Breakers |
| 01-17 |
| 26 43 13 |
| Surge Protective Devices |
| 01-17 |
| 26 51 00 |
| Interior Lighting |
| 01-18 |
DIVISION 27 – COMMUNICATIONS
| 27 05 11 |
| Requirements for Communications Installations |
| 09-19 |
| 27 05 26 |
| Grounding and Bonding for Communications Systems |
| 06-15 |
| 27 05 33 |
| Raceways and Boxes for Communications Systems |
| 10-18 |
| 27 10 00 |
| Control, Communication and Signal Wiring |
| 06-15 |
| 27 11 00 |
| Telecommunications Room Fittings |
| 06-15 |
| 27 15 00 |
| Communications Structured Cabling |
| 01-16 |
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
| 28 05 00 |
| Common Work Results for Electronic Safety and Security |
| 04-18 |
| 28 05 13 |
| Conductors and Cables for Electronic Safety and Security |
| 10-18 |
| 28 05 26 |
| Grounding and Bonding for Electronic Safety and Security |
| 09-11 |
| 28 05 28.33 |
| Conduits and Backboxes for Electronic Safety and Security |
| 09-11 |
| 28 13 00 |
| Physical Access Control System |
| 10-11 |
| 28 16 00 |
| Intrusion Detection System |
| 10-11 |
| 28 31 00 |
| Fire Detection and Alarm |
| 10-11 |
---END---
00 01 10 - 1