1. 000110 TOC.docx

DOCX document 43 KB Posted

Attached to
Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC
Solicitation number
36C26126R0036
Issued by

About this file

This is a Table of Contents document for the VHA Master Specifications related to the renovation of the Outpatient Pharmacy and HVAC systems at the VA Northern California Health Care System in Mather, California (Project No. 612A4-19-016). The document outlines the organizational structure for 100% bid documents dated October 13, 2023, and serves as an index to the technical specifications that will govern the construction project.

The specifications are organized across 28 divisions covering the full scope of renovation work, including general requirements, demolition of existing conditions, concrete, structural steel, thermal and moisture protection, doors and openings, finishes, plumbing, heating/ventilating/air conditioning (HVAC) systems, electrical, communications, and electronic safety and security systems. Key HVAC-related sections include common work results, motor requirements, noise and vibration control, testing and balancing, insulation, ductwork, fans, air terminal units, air cleaning devices, and packaged air-handling units. Other significant divisions address fire suppression, plumbing fixtures and distribution, interior finishes including flooring and painting, lighting, and physical access control systems. Each specification section is identified by its CSI division number, section number, and most recent revision date, with dates ranging from 2011 to 2021.

View the file

Other files

File Type Posted
36C26126C0064 Award Notice.docx DOCX document
36C26126R0036 0005.docx DOCX document
36C26126R0036 0004.docx DOCX document
7- B650 As builts 2014.pdf PDF
3- 281300-Physical access control SYStem.doc DOC document
36C26126R0036 0003.docx DOCX document
9- Site Visit log.jpeg JPEG file
8- VHA ICRA_612A4-19-016 Bid.pdf PDF
5- EQUIPMENT AND FURNITURE SCHEDULE_TEMPORARY TRAILER.xlsx XLSX spreadsheet
2- 087100 Door Hardware.docx DOCX document
1- RFI answers - 36C26126R0036 - Pharmacy - 612A4-19-016.xlsx XLSX spreadsheet
6- Utilty Map- Canteen Parking Lot.pdf PDF
4- Pre-Inspection Submittals Checklist to Bidders.xlsx XLSX spreadsheet
36C26126R0036 0002.docx DOCX document
36C26126R0036 0001.docx DOCX document
12. VA Provided Vault door cut sheet.pdf PDF
10. Spec Section 09 06 00 Schedof Finishes.docx DOCX document
8. Sheet G007_w Stamp.pdf PDF
36C26126R0036_2.docx DOCX document
11. Sheets I-001, I-101, and I-401.pdf PDF
Brand Name Justification.pdf PDF
Past Performance Questionnaire.docx DOCX document
13. 070150.19 PrepReRoof.docx DOCX document
9. NorCal Finish Standards 2025.pdf PDF
6. Sheet ES101 - ELECTRICAL SITE PLAN_SEALED_signed.pdf PDF
2. 010000 - General Requirements - CAEdits.docx DOCX document
0. Adendum to 19-103 Specs 100percent BD 20231108 -sumary of changes-.doc DOC document
S02 RFI FORM.docx DOCX document
VAAR 852.219-75.docx DOCX document
14. 087100 Door Hardware.docx DOCX document
7. Sheet G-006_-signed.pdf PDF
5. 013323 Shop Drawings-CA Edits.docx DOCX document
4. 013216.15 Project Sched. Small - CA Edits.docx DOCX document
3. 015000.01 Temporary Facilities and Controls - Pharmacy Trailer_CHANGES.docx DOCX document
SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx DOCX document
DIVISIONAL COST BREAK-OUT.docx DOCX document
19-103 SubReg 100percent BD 20231013 .pdf PDF
19-103 Specs 100percent BD 20231108 .pdf PDF
19-103 DWGs 100 BD 20231012 .pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14

VA Northern California Health Care SystemOctober 13, 2023
Renovation of Outpatient Pharmacy and HVAC100% Bid Documents
Mather, CAProject No. 612A4-19-016

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO.
DIVISION AND SECTION TITLES
DATE

DIVISION 00 ‑ SPECIAL SECTIONS

00 01 15
List of Drawing Sheets
07-15

DIVISION 01 ‑ GENERAL REQUIREMENTS

01 00 00
General Requirements
03-19
01 32 16
Project Schedules
03-18
01 33 23
Shop Drawings, Product Data, and Samples
12-18
01 35 26
Safety Requirements
03-18
01 42 19
Reference Standards
09-19
01 45 00
Quality Control
03-18
01 50 00.01
Temporary Facilities and Controls
N/A
01 45 29
Testing Laboratory Services
11-18
01 74 19
Construction Waste Management
12-18
01 91 00
General Commissioning Requirements
10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00
Demolition
08-17

DIVISION 03 – CONCRETE

03 30 00
Cast-in-Place Concrete
07-19
03 41 13
Precast Concrete Hollow Core Planks
07-11

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-18
05 31 00
Steel Decking
02-16
05 40 00
Cold-Formed Metal Framing
05-16

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 83 10
Composite Column Enclosures

DIVISION 07 ‑ THERMAL AND MOISTURE PROTECTION

07 01 50.19
Preparation for Re-Roofing
02-16
07 21 13
Thermal Insulation
10-17
07 22 00
Roof and Deck Insulation
02-16
07 24 00
Exterior Insulation and Finish Systems
02-16
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
01-21
07 84 00
Firestopping
02-16
07 92 00
Joint Sealants
10-17
07 95 13
Expansion Joint Cover Assemblies
02-16

DIVISION 08 ‑ OPENINGS

08 11 13
Hollow Metal Doors and Frames
08-16
08 14 00
Interior Wood Doors
02-16
08 31 13
Access Doors and Frames
02-16
08 34 53
Security Doors and Frames
05-15
08 34 59
Vault Doors and Day Gates
02-16
08 41 13
Aluminum-Framed Entrances and Storefronts
08-16
08 56 19
Pass Windows
02-16
08 56 59
Service and Teller Window Units
02-16
08 71 00
Door Hardware
01-20
08 71 13
Automatic Door Operators
02-16
08 71 13.11
Low Energy Power Assist Door Operators
08-16
08 80 00
Glazing
10-15

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
02-15
09 06 00
Schedule for Finishes
04-15
09 22 16
Non-Structural Metal Framing
06-18
09 29 00
Gypsum Board
06-18
09 30 13
Ceramic/Porcelain Tiling
09-15
09 51 00
Acoustical Ceilings
12-18
09 65 13
Resilient Base and Accessories
02-16
09 65 16
Resilient Sheet Flooring
05-18
09 65 19
Resilient Tile Flooring
05-18
09 91 00
Painting
01-16

DIVISION 10 – SPECIALTIES

10 14 00
Signage
01-21
10 26 00
Wall and Door Protection
10-15
10 28 00
Toilet, Bath, and Laundry Accessories
02-16
10 44 13
Fire Extinguisher Cabinets
08-18
10 56 13
Metal Storage Shelving (FrameWRX)
N/A

DIVISION 11 – EQUIPMENT

11 17 36
Package Transfer Units
01-21

DIVISION 12 – FURNISHINGS

12 32 00
Manufactured Wood Casework
09-15
12 36 00
Countertops
12-18

DIVISION 13 – SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-14

DIVISION 21- FIRE SUPPRESSION

21 13 13
Wet-Pipe Sprinkler Systems
06-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
07-16
22 05 23
General-Duty Valves for Plumbing Piping
09-15
22 05 33
Heat Tracing for Plumbing Piping
09-15
22 07 11
Plumbing Insulation
09-19
22 11 00
Facility Water Distribution
11-19
22 13 00
Facility Sanitary and Vent Piping
09-15
22 40 00
Plumbing Fixtures
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11
Common Work Results for HVAC
02-20
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
02-20
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 93
Testing, Adjusting, and Balancing for HVAC
02-20
23 07 11
HVAC and Boiler Plant Insulation
02-20
23 08 00
Commissioning of HVAC Systems
02-20
23 09 23
Direct-Digital Control System for HVAC
09-11
23 21 13
Hydronic Piping
02-20
23 22 13
Steam and Condensate Heating Piping
02-20
23 31 00
HVAC Ducts and Casings
02-20
23 34 00
HVAC Fans
02-20
23 36 00
Air Terminal Units
02-20
23 37 00
Air Outlets and Inlets
02-20
23 40 00
HVAC Air Cleaning Devices
02-12
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
04-11
23 82 16
Air Coils
04-11

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceway and Boxes for Electrical Systems
01-18
26 05 73
Overcurrent Protective Device Coordination Study
01-18
26 09 23
Lighting Controls
01-18
26 24 13
Distribution Switchboards
01-18
26 24 16
Panelboards
01-18
26 27 26
Wiring Devices
01-18
26 29 11
Motor Controllers
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 43 13
Surge Protective Devices
01-17
26 51 00
Interior Lighting
01-18

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
09-19
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 10 00
Control, Communication and Signal Wiring
06-15
27 11 00
Telecommunications Room Fittings
06-15
27 15 00
Communications Structured Cabling
01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and Security
10-18
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 13 00
Physical Access Control System
10-11
28 16 00
Intrusion Detection System
10-11
28 31 00
Fire Detection and Alarm
10-11

---END---

00 01 10 - 1

File details come from the government source that posted it. Updated .