This document is a Data Item Description (DID) for a Counterfeit Prevention Plan. The plan outlines the contractor's procedures for procuring parts and materials from original equipment manufacturers (OEMs) or their authorized distributors, as well as processes for identifying, storing, and reporting counterfeit parts. Key requirements include monitoring the supply chain, verifying the authenticity of parts, training receiving inspectors, and ensuring subcontractors adhere to similar requirements. The plan must be updated as counterfeiting methods evolve. The Counterfeit Prevention Plan is related to the Parts, Materials and Processes Selection List (PMPSL) and the "As Designed" and "As Built" Parts List.

The related federal contract opportunity is for the remanufacture of the F110 LVDT (Motional Transducer), which is a sole source to Ametek (CAGE Code: 97424). This opportunity is being solicited by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other versions and copies of DI-MISC-81832

File Revision Posted Attached to
Counterfeit Prevention Plan (DI-MISC-81832).pdf Revision not stated F108 Compressor Inlet Temperature (CIT) Sensor
DI-MISC-81832.pdf Revision not stated Amendment-01 FD20302600598_FA811826R0033- Overhaul of B1 Torque tube assembly
DiD-DI-MISC-81832-Counterfeit Prevention Plan.pdf Revision not stated Repair of B-2 Transponder Set (KU Band)
DI-MISC-81832.pdf Revision not stated Remanufacture of C-5 Dual Boost Fuel Pump; NSN: 2915-00-489-9215RK
DI-MISC-81832.pdf Same revision and size as this file Revision not stated F101 DEC Repair
DI-MISC-81832.pdf Same revision and size as this file Revision not stated REMANUFACTURE OF THE C-5 DUAL FUEL BOOST PUMP
DI-MISC-81832.pdf Same revision and size as this file Revision not stated F110 LVDT (Motional Transducer) Remanufacture
DI-MISC-81832.pdf Same revision and size as this file Revision not stated Repair of Valves, Linear Direct, NSN 4810-01-326-0862, P/N 1886-280 and NSN 4810-01-326-0863, P/N 1886-290
DI-MISC-81832.pdf Same revision and size as this file Revision not stated Remanufacture of Air Launched Cruise Missile (ALCM) Air Cycle Machine (ACM)
3667479_CPP DI-MISC-81832.pdf Same revision and size as this file Revision not stated Repair of B-52 YECU/PECU Circuit Card & Power Supply
DI-MISC-81832 COUNTERFEIT PREVENTION PLAN.pdf Revision not stated Remanufacture of B-1 Flap Slat Power Drive Unit (POU) NSN: 1650-01-152-7304, P/N NF53100-03B
DI-MISC-81832.pdf Revision not stated Repair J85-21 T5 Digital Temperature Control Amplifier
Data Item Description - COUNTERFEIT PREVENTION PLAN - DI - MISC - 81832.pdf Same revision and size as this file Revision not stated TF 33 2nd Stage Turbine Blade Sets
DI-MISC-81832 - Counterfeit Prevention Plan.pdf Same revision and size as this file Revision not stated Repair of KC-135 Attitude Indicator
DI-MISC-81832 Counterfeit Prevention Program.pdf Revision not stated Remanufacture of Oxygen Items, Regulators, Manifolds, and Valves on the F015E (multi NSN's)
Exhibit 5 DI-MISC-81832.pdf Same revision and size as this file Revision not stated Repair Inertial Measurement Unit & Attitude Motion Sensor Set for the B-2
A026 DI-MISC-81832 Counterfeit Prevention Plan.pdf Revision not stated System Security Engineering Services for Electronic Propeller Control System and NP2000 8-Bladed Propeller
A002 DI-MISC-81832 Conterfeit Protection Plan.pdf Revision not stated NP2000-EPCS Propeller Repair
2702775_ATTACH DID DI-MISC-81832.pdf Revision not stated Repair of B-2 Transponder Set
A002 DI-MISC-81832 Conterfeit Protection Plan FD2060-20-30513.pdf Revision not stated DRAFT RFP* NP2000 Propeller Component Repair *DRAFT RFP*
Show all 20

Who attaches DI-MISC-81832

Other files

File Type Posted
DI-PSSS-81995A.pdf PDF
DI-MGMT-80441D.pdf PDF
FA812224R0023 Updated.pdf PDF
DI-MGMT-81838.pdf PDF
CAVAF_REPORT_REQ.pdf PDF
DI-PSSS-81534B.pdf PDF
DI-MGMT-80503.pdf PDF
CDRL1_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

TITLE: COUNTERFEIT PREVENTION PLAN

Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A

Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.

b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).

c. This DID is related to “As Designed” and “As Built” Parts List.

d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).

Requirements:

1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:

a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.

b. Procurement practices and internal processes used for exceptions to buying from

OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.

c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.

d. Training/certification program for receiving inspectors.

e. Process to verify counterfeit.

DI-MISC-81832

- 2 -

f. Processes to identify, store, and report counterfeit parts.

g. Process to ensure subcontracts contain the following requirements (As a minimum):

(1) Requirements to procure only from Original Equipment Manufacturer

(OEM) or OEM franchised distributors

(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained

(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain

(4) Training/certification program for receiving inspectors

(5) Process to verify counterfeit

(6) Processes to identify, store, and report counterfeit parts.

(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)

h. Self-audit of internal processes.

i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.

j. Notification Procedure:

(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.

(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.

Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.

DI-MISC-81832

- 3 -

(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:

a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information

b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence

c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)

d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests

e. List of company products affected

(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)

(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.

(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team