Attachment L-6 - PWS Framework Sample Task 2.pdf

PDF 328 KB Posted

Attached to
Cooperative Threat Reduction (CTR) Logistics Support (CLS) Federal contract opportunity
Solicitation number
CTI119925223
Issued by
Defense Threat Reduction Agency

About this file

Attachment L-6 - PWS Framework Sample Task 2

View the file

Other files for this federal contract opportunity

Other files attached to Cooperative Threat Reduction (CTR) Logistics Support (CLS), newest first.
File Type Posted
HDTRA1-12-R-0011-0008.pdf PDF
Amendment_0007.zip ZIP file
Amendment_0006_to_HDTRA1-12-R-0011.zip ZIP file
HDTRA1-12-R-0011-0005.pdf PDF
Amendment_0004_to_HDTRA1-12-R-0011.zip ZIP file
Amendment_0003.ZIP ZIP file
Amendment_0002.zip ZIP file
QA 09 13 2012.xlsx XLSX spreadsheet
QA_Amendment 0001.pdf PDF
Amendment 0001 to HDTRA1-12-R-0011.zip ZIP file
Reference_Library_5.7_Posted_to_FBO.zip ZIP file
Reference_Library_5.6_Posted_to_FBO.zip ZIP file
Final Solicitation HDTRA1-12-R-0011.zip ZIP file
Draft HDTRA1-12-R-0011 Q As.pdf PDF
DD254 07202012.pdf PDF
CBEP Program Overview Slides.pdf PDF
CTR Trifold.pdf PDF
Shipping Process Charts Mar - May 2012_CLS.pdf PDF
Attachment 2 - Performance Assessment Report.pdf PDF
Attachment S-1 - Socio Economic Commitment Template.xlsx XLSX spreadsheet
Exhibit B - CDRLs.pdf PDF
Attachment L-2 - Past Performance Questionare.pdf PDF
Exhibit A - DD254.pdf PDF
Attachment L-4 - Sample Task 2 Estimating Assumptions.pdf PDF
DRAFT_HDTRA1-12-R-0011.pdf PDF
Attachment L-7 - QASP Framework.pdf PDF
Attachment 1 - Statement of Objectives.pdf PDF
Attachment L-1 - Past Performance Information Form.pdf PDF
Attachment 3 - Customer Complaint Record.pdf PDF
Attachment L-3 - Sample Task 1 Estimating Assumptions.pdf PDF
Attachment L-5 - PWS Framework Sample Task 1.pdf PDF
CTR Industry Day QA Final_05-17-12.pdf PDF
7 May 2012 CLS SOO.docx DOCX document
Reference Library 3.3 Posted to FBO.zip ZIP file
Reference Library 2.1 Posted to FBO.zip ZIP file
Reference Library 1.11 Posted to FBO.zip ZIP file
CTR Logistics Support Industry Day Attendance List 03.29.12.xlsx XLSX spreadsheet
Slides Approved for Public Release.docx DOCX document
CTR Logistics Support Industry Day Slides - 20 March 2012 - FINAL.pptx PPTX presentation
CTR Logistics Support SOO - 14 March 2012 - DRAFT.docx DOCX document
Industry Day Announcement final 03.12.12.docx DOCX document
Industry Day Final.pdf PDF
CILS_scenarios_Final.doc DOC document
CILS_Glossary of terms.doc DOC document
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L-6

THE DEFENSE THREAT REDUCTION AGENCY

COOPERATIVE THREAT REDUCTION

LOGISTICS SUPPORT (CLS)

HDTRA1-12-R-0011

PERFORMANCE WORK STATEMENT (PWS)

SAMPLE TASK 2

1. PURPOSE. The purpose of this contract is to facilitate mission support for Defense Threat

Reduction Agency’s (DTRA) J-3C Operations/Exercise & Readiness, CTR Program

Integration, Program Support (CTIS) through a worldwide logistics program.

2. SCOPE/MISSION: The primary mission of the Cooperative Threat Reduction Logistics

Support (CLS) program is to manage and execute flexible, efficient, and effective core logistics services including global supply chain management and personnel logistics support throughout all areas of responsibility (AOR), and in all operational and physical environments. From time to time, other on-demand logistics support services (emerging requirements) may be required for worldwide operations that are seamlessly integrated across all programs.

3. PERIOD AND PLACE OF PERFORMANCE: The period of performance of this task order is ____________ (to be determined by the offeror). The period of performance does not fall within the transition period of the ID/IQ contract/Sample Task 1. The place of performance is worldwide.

4. BACKGROUND: With the passage of the Soviet Nuclear Threat Reduction Act of 1991, Senators Sam Nunn and Richard Lugar enabled a far reaching program that responds to the threat of proliferation of WMD and related expertise and knowledge. Since 1992, the CTR

Program has focused its efforts on reducing the risks associated with WMD. Originally, that focus was geographically limited to the states of the former Soviet Union (FSU). The FY

2008 National Defense Authorization Act removed this limitation and authorized the CTR

Program, contingent upon a determination by the Secretary of Defense and in coordination with the Secretary of State, to conduct projects and activities with partners outside the FSU.

The CTR Program directly supports broader U.S. national security objectives and initiatives by:

dismantling strategic weapons delivery systems and infrastructure;

enhancing security and safety of WMD and fissile material, during transportation and storage, through physical upgrades and training;

consolidating and secures dangerous pathogens at risk for theft, diversion, accidental release, or use by terrorists;

enhancing partner states’ capacity to detect, diagnose, and report bio-terror attacks and potential pandemics, in compliance with international health reporting requirements;

facilitating biological research partnerships;

helping prevent proliferation of WMD and related materials, through the establishment of land and maritime surveillance systems; and supporting security cooperation, with the objective of reducing WMD threats

As the CTR program matures and expands its scope of preventing the proliferation of WMD, its logistics support requirements are increasing. While still conducting operations in the

FSU, the emphasis has shifted to infrastructure and other support services beyond the FSU.

5. PERFORMANCE OBJECTIVES. The objective of this contract is to provide efficient and effective sustainment support to all program areas under the CTR Program, throughout all

AORs and in all operational and physical environments. This includes the seamless integration of other USG partners’ efforts; other contractor, collaborator and stakeholder requirements; and recipient state efforts.

5.1 Description of Services: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform CLS as defined in this Performance

Work Statement except for those items specified as government furnished property and services. The contracting officer will notify the contractor of acceptance or required modifications to the PWS before the contract start date. The contractor shall perform to the standards in this contract. To accomplish this effort, the contractor shall provide the following:

5.1.1 On-Demand Logistics Services

5.1.1.1 The Offeror shall procure sustainment items as identified to support CTR

Program needs.

5.1.1.2 Provide end-to-end shipping, clearing items as technical aid to achieve duty and tax free clearance, preparing all documentation, while providing economic pass-through warehousing solutions, and materiel for in-country sustainment and maintenance support services, as required.

5.2 Performance Requirements/Tasks

OFFEROR SHALL IDENTIFY SPECIFIC WORK TASKS

5.3 Quality Assurance Surveillance

5.3.1 The contractor shall establish and maintain a complete Quality Assurance

Surveillance Plan (QASP) to ensure services are performed in accordance with this PWS. The contractor’s QASP is the means by which the contractor ensures that the work complies with the requirements of the contract.

5.3.2 The contracting officer will notify the contractor of acceptance or required modifications to the plan before the contract start date.

5.3.3 The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

5.3.4 Contracting Officer Representatives (CORs): The government will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the Contractor’s performance through inspections and the completion of a

Performance Assessment Report. The government may inspect quarterly or increase the number of quality assurance inspections if deemed appropriate because of repeated failures discovered during quality assurance inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality control inspections if merited by performance. The government will also complete a Customer Complaint Report and investigate complaints received from various customers in the CTR program.

5.3.5 The COR will inform the contractor’s representative when discrepancies occur and shall request corrective action through a Customer Complaint Report. The COR will make a notation of the discrepancy on their Customer Complaint Report with the date and time the discrepancy was noted and shall request the contractor’s representative to initial the entry on the report.

5.3.6 The services to be performed by the Contractor during the period of this contract shall at all times and place be subject to review by the Contracting Officer (CO) or authorized representative.

Offerors shall NOT complete a QASP for Sample Task 2

5.4 Security Requirements

5.4.1 Contractor personnel performing work under this contract must have the required security clearance at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254.

5.5 Contract Line Item Structure (CLIN) – The offeror shall identify the specific services that are firm fixed price

CLIN 0001 On-Demand Logistics Services – Cost Plus Fixed Fee

CLIN 0002 On-Demand Logistics Services – Firm Fixed Price

CLIN 0003 CDRLs – NSP

5.6 Deliverables

CDRL

REF

Paragraph

Title

Due

A001 5.1.1.1 Shipping Standard Operating

Procedures

30 days after kick-off meeting

A002 Cost and Funding Report 120 days after contract award

A004 5.1.1 Packaging, Marking and

Documentation

Day of shipment

A008 5.1.1 Lost, Stolen and Damaged Cargo

Report

As required

A009 Environmental Health & Safety Plan 45 days after kick-off meeting

A101 5.6 Master Government Property List 45 calendar days after contract award

A102 5.6 Master Government Property List -

Physical Inventory

30 calendar day after contract award

A600 5.6 Transfer of Custody As required

File details come from the government source that posted it. Updated .