Exhibit B - CDRLs.pdf
PDF 1021 KB Posted
- Attached to
- Cooperative Threat Reduction (CTR) Logistics Support (CLS) Federal contract opportunity
- Solicitation number
- CTI119925223
- Issued by
- Defense Threat Reduction Agency
About this file
Exhibit B - Contract Data Requirement List (CDRLs)
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit B - RFP Number HDTRA1-12-R-0011
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Shipping Standard Operating Procedures
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DTRA/BE-BC and DTRA/CTR-PM
7. DD 250 REQ
9.DIST STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE
CONTRACT
AWARD
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQUIRED
Draft
Fi na l Reg Repro
16. REMARKS:
THE CONTRACTOR SHALL PROVIDE, IN DETAIL, STANDARD
OPERATING PROCEDURES (SOP) AS RELATED TO THE EXECUTION
OF THE CONTRACT. THE SOPS SHALL BE SPECIFIC TO THE
COUNTRY, PROGRAM, AND TASK BEING EXECUTED. THESE SOPS
SHOULD CONTAIN THE FOLLOWING FOR ALL TASKS:
COUNTRY CLEARANCE PROCEDURES
REQUIRED CERTIFICATES, REGISTRATIONS, AND ANY OTHER
GOVERNMENT REQUIRED LICENSES
TAX EXEMPTION PROCEDURES
IMPORT/EXPORT REQUIREMENTS
TECHNICAL AID SHIPMENT PROCESSES
AS WELL AS ANY TASKS DEEMED REQUIRED BY THE
GOVERNMENT.
BLOCK 10: AS REQUIRED BASED ON POLICY CHANGES OR DIRECTED BY THE GOVERNMENT.
BLOCK 12: 30 DAYS AFTER KICKOFF MEETING.
DTRA/BE-BC
DTRA/OP-CTIS
DTRA/CT-PM
CTR A&AS
15. TOTAL 4
G. PREPARED BY
H. DATE
I. APPROVED BY
Nadine Rafaels, Contracting Officer
J. DATE
DD Form 1423-1, AUG96 (EG) PREVIOUS EDITION MAY BE USED. Page 1 of 1
(MicroSoft Word 97, DD Form 1423-1, AUG96 (EG) PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
(MicroSoft Word 97, DEC99)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
C. CATEGORY:
A002
2. TITLE OF DATA ITEM
Contract Performance Report (CPR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81466A
DTRA/BE-BC / DTRA/CTR-PM
7. DD 250 REQ
N/A
REQUIRED
MONTHLY
60 DAYS AFTER CONTRACT
SEE BLOCK 16
13. DATE OF SUBSEQUENT
Final
Reg Repro
16. REMARKS:
Tailor DI-MGMT 81466 A as follows:
Block 4:
Report data on Format 1 at WBS Level as specified for each Task Order. Default level is 5.
Format 5 variance analysis are required for the following variances in Format 1 (specify for each task order):
- Current period cost or schedule variances exceeding +/-10 %
- Cumulative cost or schedule variances exceeding +/- 10%
- Variances at completion exceeding +/-10 %
- Other significant variances that are causing or are likely to cause significant cost or schedule overruns (contractor determined)
The Government reserves the right to review and modify (through negotiations) the reporting levels for Formats 1 and variance thresholds for Format 5 during the performance of the contract.
Formats 3 reporting periods shall be monthly for at least six months, quarterly for at least two quarters, and then quarterly, semi-annually, or annually to completion.
Block 9: Information of Administrative or Operational Use.
Block 11: The CPR shall be prepared on a monthly basis, at the end of the contractor’s monthly accounting period. Formats 1, 3, 4, and 5 are required to be submitted monthly.
Block 13: Subsequent submissions shall be due NLT 12 working days after the close of the contractor’s monthly accounting period. Final submission is due when the last agreement/acknowledgement significant milestone/deliverable as defined by the contract has been achieved and remaining risk areas have been mitigated with Government concurrence.
Block 14: Electronic submission required in the form of an attachment to an e-mail. The format shall be appropriate to the nature of the document using Microsoft Office Suite (Word, Excel, Powerpoint and Project) 2003.
DTRA/BE-BC 1
DTRA/CTR-PM 1
DTRA/OP-CTIS 1
DTRA/BE-BLLS 1
CTR/A&AS 1
15. TOTAL 5
J. DATE
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Packaging, Marking and Documentation N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A DTRA/CTIS
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
N/A N/A SEE BLOCK 16 SEE BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
N/A SEE BLOCK 16 SEE BLOCK 16 Reg Repro
16. REMARKS: DTRA/CTI/PM 1
Block 10: Each new shipment delivery
Block 11: Award of first task order
Block 12: Day of shipment
Block 13: Day of each new shipment
Remarks: The contractor shall conform to Section J. The Master Inventory
List (MIL) shall be updated with the box/crate number and ISO container that the items are packed in. MSDS and IMO Declaration for Hazardous
Material Cargo shall be given to the freight carrier at pick up. See format requirements in CDRL A001. An “Intermodal Certification” shall be delivered as described in Section J, Attachment 2, Para 4.c.2. The freight carrier defined as the DTRA contracted carrier who picks up the cargo.
DTRA/CTI 1
DTRA/A&AS 1
H. DATE I. APPROVED BY
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
A006 Information System Interface Design Document N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-DI-IPSC-81436A DTRA/CTIS
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
N/A N/A QTRLY SEE BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
N/A CONTRACT
AWARD
SEE BLOCK 16 Reg Repro
16. REMARKS: DTRA/CTI/PM 1
The Information Interface Design Document will describe the agreed upon interface capabilities for the contractor’s Enterprise Management System
(EMS) to be used by the customer in the performance of the contract.
The IS Interface Design Document must be in Microsoft Word compatible and can be submitted in contractor’s format. The final document is subject to bilateral agreement between US Government and the contractor. The
CLS Team will discuss the IS Interface Design Document and DI-MGMT-
DI-IPSC-81436A at the Project Kick-Off meeting to finalize the Plan content.
Block 12: 30 Days after Project Kick-Off Meeting
Block 13: Updated Quarterly if required
DTRA/CTI 1
DTRA/A&AS 1
H. DATE I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
B. EXHIBIT C. CATEGORY:
A007
2. TITLE OF DATA ITEM
Communications Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80555A
5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
REQUIRED
QUARTERLY
30 DAYS AFTER KICK OFF MTG
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
AT QPMR
Reg Repro
16. REMARKS:
THIS DOCUMENT DELINEATES REQUIRED DELIVERABLES AND COMMUNICATIONS TOOLS,
THEIR FREQUENCY, AND THEIR METHOD OF DELIVERY. THE PURPOSE OF THIS PLAN IS TO
ENSURE CLEAR CHANNELS OF COMMUNICATION BETWEEN PERFORMING CONTRACTOR AND
THE DEFENSE THREAT REDUCTION AGENCY (DTRA). THERE ARE SIX MAJOR CATEGORIES
REQUIRED. THEY ARE AS FOLLOWS: MEETINGS, CONTRACT DATA REQUIREMENTS LIST
(CDRL), REPORTS, QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP), PMO FUNDING
DISTRIBUTION AND DOCUMENT RETENTION. THIS PLAN WILL BE UPDATED DURING THE
PROGRAM MANAGEMENT REVIEWS (PMR) OR AS DEEMED NECESSARY.
THE CIS TEAM WILL DISCUSS THE COMMUNICATION PLAN AND DI-MGMT-8055A AT THE
PROJECT KICK-OFF MEETING TO FINALIZE THE PLAN CONTENT.
DTRA/CT-PM 1
DTRA/OP-CTIS 1
CTR A&AS 1
15. Total 4
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching
Existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
C. CATEGORY:
TDP TM OTHER X
HDTRA1-12-R-0010 / HDTRA1-12-C-
1. DATA
ITEM NO.
A008
2. TITLE OF DATA ITEM
Lost, Stolen and Damaged Cargo Report
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.) DI-MGMT-80442
N/A
5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
DTRA/CTI
7. DD 250
REQ
REQUIRE
8. APP
CODE
UPON AWARD
13. DATE OF SUBSEQUENT
Reg Repro
THE CONTRACTOR SHALL PREPARE A LOSS AND DAMAGE REPORT TO INCLUDE THE FOLLOWING:
DESCRIPTION OF THE DAMAGE, DATE DISCOVERED, LOCATION, DESCRIPTION OF THE TYPE OF LOSS OR DAMAGE, VISIBLE AND NOTED (I.E. NOT APPARENT AT THE TIME OF DELIVERY AND RECORDED IN DETAIL ON THE PROOF OF DELIVERY) OR CONCEALED (I.E. NOT APPARENT AT THE TIME OF DELIVERY), FACTS KNOWN ABOUT THE INCIDENT, PERSONNEL INVOLVED, ITEMIZED LIST OF MATERIAL INVOLVED, PICTURES OF DAMAGE, NARRATIVE OF CORRECTION ACTION, COPY OF THE INSPECTION/DAMAGE REPORT, CLAIM FORM AND POINT OF CONTACT FOR THE REPORT. INVENTORY ITEMS REPORTED LOST, STOLEN, OR DAMAGED BEYOND ECONOMICAL REPORT SHALL BE REPORTED IAW BLOCKS 10-13 BELOW AND SHALL BE
ANNOTATED IN THE A002 MASTER GOVERNMENT PROPERTY-PHYSICAL INVENTORY REPORT. THE
CONTRACTOR SHALL POST THIS REPORT ON CTS EIDS, WHICH SHALL CONSTITUTE DELIVERY.
BLOCK 10: AS REQUIRED WHEN DAMAGE OR LOSS IS FOUND.
BLOCK 12: WHEN FIRST DAMAGE OR LOSS IS FOUND AND REPORTED AT THE NEXT WEEKLY SHIPPING
STATUS MEETING
BLOCK 13: WHENEVER DAMAGE OR LOSS IS FOUND
DTRA
DTRA/OP-CTIS 1
DTRA/CT-PM 1
DTRA/BE-BLLS 1
CTR A&AS 1
CIS Task Lead 1
Transportation
Analysts
Export Compliance
Advisor
15. TOTAL 8
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
C. CATEGORY:
A009
2. TITLE OF DATA ITEM
Environmental Health & Safety Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81626
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DTRA/BE-BC and DTRA/CTR-PM
7. DD 250 REQ 9.DIST STATEMENT
11. AS OF DATE 13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS:
THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A DEMONSTRABLE PROJECT
SAFETY PROGRAM TO PREVENT ACCIDENTS, PRESERVE THE LIFE AND HEALTH OF
PERSONNEL, AND MINIMIZE EQUIPMENT LOSS AND DOWNTIME. THIS PROGRAM WILL BE
BASED ON A SAFETY HAZARDS ASSESSMENT OF ALL OPERATIONS TO INCLUDE, BUT NOT
LIMITED TO: EQUIPMENT AND VEHICLE MAINTENANCE, EQUIPMENT AND VEHICLE
OPERATION, WAREHOUSE AND MATERIAL HANDLING PROCEDURES, AND HAZARDOUS
MATERIAL STORAGE, USE, AND DISPOSAL PROCEDURES. ACTIVITY ON THE PROGRAM
WILL BE DOCUMENTED AND REPORTED AS NECESSARY, BUT NOT LESS THAN EVERY
THREE MONTHS DURING THE CONTRACTOR’S QPMR.
THE FINAL DOCUMENT IS SUBJECT TO BILATERAL AGREEMENT BETWEEN US
GOVERNMENT AND THE CONTRACTOR. THE CIS TEAM WILL DISCUSS THE
ENVIRONMENTAL HEALTH AND SAFETY PLAN AND DI-SAFT-81626 AT THE PROJECT KICK-
OFF MEETING TO FINALIZE THE PLAN CONTENT.
BLOCK 12: 45 DAYS AFTER PROJECT KICK-OFF MEETING.
BLOCK 13: DURING QUARTERLY PMR.
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
A010
2. TITLE OF DATA ITEM
Significant Incidence Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DL-SAFT-81563
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DTRA/BE-BC and DTRA/CTR-PM
7. DD 250 REQ 9.DIST STATEMENT
AS NEEDED
WITHIN 24 HOURS OF INCIDENT
A DETAILED INCIDENT REPORT SHALL BE COMPLETED BY THE CONTRACTOR TO
IDENTIFY CRITICAL OR SENSITIVE INFORMATION REQUIRING THE IMMEDIATE
ATTENTION OF THE COR, AND/OR THE CONTRACTING OFFICER. THE SIR SHALL BE
PREPARED AND SUBMITTED IN A TIMELY MANNER, BY THE CONTRACTOR, FOR EACH
INCIDENT OR ACCIDENT. WHEN SUBMITTING A SIR, THE CONTRACTOR SHALL REPORT
THE FOLLOWING INFORMATION: TYPE OF INCIDENT, DATE AND TIME INCIDENT
OCCURRED, POSITION AND TITLE OF EMPLOYEE, LOCATION OF INCIDENT, INDIVIDUALS
INVOLVED AND A NARRATIVE SUMMARY OF THE INCIDENT, REMARKS, AND PUBLICITY
(DEGREE OF NEWS MEDIA COVERAGE). THE CONTRACTOR IS ENCOURAGED TO
PROVIDE DIGITAL PHOTOGRAPHS TO DOCUMENT/VISUALIZE THE SIR AS NEEDED.
THE FINAL DOCUMENT IS SUBJECT TO BILATERAL AGREEMENT BETWEEN US
GOVERNMENT AND THE CONTRACTOR. THE CIS TEAM WILL DISCUSS THE SIGNIFICANT
INCIDENT REPORT AND DI- SAFT-81563 AT THE PROJECT KICK-OFF MEETING TO
FINALIZE THE PLAN CONTENT.
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A011 Contract Transition Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A PWS CTIS
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
AS SCHEDULED 30 DAYS AFTER CONTRACT
AWARD
8. APP CODE N/A
a. ADDRESSEE
Draft
Final
6 MONTHS FROM CONTRACT END
3 MONTHS FROM CONTRACT END
Reg Repro
16. REMARKS: DTRA CTIS COR 1 1
Item 2. Plan to be in accordance with the commonly accepted transition plans. Data to include:
1. EXECUTIVE SUMMARY
Describe the transition plan at a high level and what the plan should accomplish. This section should include an overview and history of the contract, who the contract is currently with, who it is transitioning to, and the timeframe/period of transition.
2. TRANSITION APPROACH
Explain the overall approach to the transition. Discuss staffing during the transition – scale down or increase? Duration of transition. Document assumptions. Document interface with new contractor.
3. TRANSITION TEAM ORGANIZATION
Provide an organizational chart showing all resources and their roles in the transition. Key team members should be from both the incumbent and new contractors as well as the customer.
4. WORKFORCE TRANSITION
In order to set expectations and allow for adequate transition planning, the workforce must be determined and communicated ahead of time. Will workforce transition from one contractor to new contractor?
5. WORK EXECUTION DURING TRANSITION
Discuss the level of work to be performed during the transition period and the impact of the transition on that work (i.e. shipments in progress, inventory in warehouse, anticipated shipments, travel delegations, conference logistics, etc.).
6. SUBCONTRACTS
Document all the existing subcontracts and if/how they will be transitioned.
7. PROPERTY TRANSITION
7.1. Government Furnished Equipment (GFE)
Provide property disposition recommendations and schedule based on equipment condition and in accordance with FAR/DFARSS. Property may include but not limited to, Contractor Acquired Property
(GAP), hardware such as laptops/PCs, software bundles or add-ons, portable electronic devices (PEDs), and cell phones.
7.2. Incumbent Owned Equipment/Software
Equipment owned by the incumbent contractor will usually remain with incumbent. However, there may be instances where incumbent owned equipment supports customer services. This section should state that incumbent owned equipment will remain with the incumbent - and identify options where this equipment may be available for purchase by the new contractor or customer for their use.
7.3. Intellectual Property
Describe how intellectual property will be handled as part of the transfer process. Intellectual property may include various documentation, supplier and subcontractor information, service agreements, or original designs or plans.
8. KNOWLEDGE TRANSFER
Discuss what knowledge will be transferred from the incumbent staff to the staff of the new contractor and how that will be accomplished.
9. SCHEDULE
Provide a GANTT chart schedule of the transition. The complexity of the transition will dictate the level of detail required in the schedule. All major milestones, their dependencies, responsible party, as well as the transition start and completion dates should be included at a minimum.
10. TURNOVER AND ACCEPTANCE
Discuss how the new contractor will formally accept the turnover at the end of the transition. Checklist for acceptance or formal sign-off?
11. METRICS AND PROGRESS:
Describe how progress and metrics will be reported during the transition phase.
12. REQUIREMENTS:
List the contractor’s requirements and responsibilities during the transition phase.
New Contractor 1
CTSC 1
DTRA BCO 1
15. TOTAL 1 4
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, AUG96 (EG) PREVIOUS EDITION MAY BE USED. Page of Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
C. CATEGORY:
A013
2. TITLE OF DATA ITEM
DATA Accession List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453A
REQUIRED
90 DAYS AFTER PROJECT KICK
OFF MEETING
PROJECT
MEETING DATE
13. DATE OF SUBSEQUENT
THE PURPOSE OF THE DATA ACCESSION LIST (DAL) IS TO PROVIDE A MEDIUM FOR
IDENTIFYING CONTRACTOR INTERNAL DATA WHICH HAS BEEN GENERATED BY THE
CONTRACTOR IN COMPLIANCE WITH THE WORK EFFORT DESCRIBED IN THE
PERFORMANCE WORK STATEMENT (PWS). THE DAL IS AN INDEX OF THE GENERATED DATA.
THE FINAL DOCUMENT IS SUBJECT TO BILATERAL AGREEMENT BETWEEN US GOVERNMENT
AND THE CONTRACTOR. THE CIS TEAM WILL DISCUSS THE DATA ACCESSION LIST AND DI-
MGMT-81453A AT THE PROJECT KICK-OFF MEETING TO FINALIZE THE CONTENT.
DTRA/BE-BC
DTRA/OP-CTIS
DD Form 1423-1, AUG96 (EG) PREVIOUS EDITION MAY BE USED. Page of Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITE
C. CATEGORY:
A101
2. TITLE OF DATA ITEM
Master Government Property List
3. SUBTITLE
GFP, GFE, GFM, and Contractor Acquired Property
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80269
REQUIRED
MONTHLY
45th Calendar Day Following
Contract/Task Order Award
8. APP CODE 11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
BLOCK 4: THIS DID IS FOR REFERENCE ONLY. THE REPORT SHALL BE PREPARED
ACCORDING TO THE REMARKS BELOW.
BLOCK 11: AWARD OF CONTRACT/TASK ORDER.
BLOCK 13: 10TH CALENDAR DAY OF EACH MONTH (OR SUCCEEDING QUARTER)
REMARKS: DURING PERFORMANCE OF THE CONTRACT, THE CONTACTOR MAY
PURCHASE MATERIAL OR EQUIPMENT USING GOVERNMENT FUNDS {CONTRACTOR
ACQUIRED PROPERTY (CAP)} IF APPROVED BY THE CONTRACTING OFFICER. THE
CONTRACTOR SHALL PROVIDE A MASTER GOVERNMENT PROPERTY LIST (MPGL),
INCLUSIVE OF ALL CAP, ON THE 45TH CALENDAR DAY FOLLOWING CONTRACT/TASK
ORDER AWARD AND THE 10TH DAY OF EACH MONTH SUBSEQUENT MONTH.
THE MPGL SHALL INCLUDE ALL EQUIPMENT/PROPERTY PROVIDED TO THE CONTRACTOR,
INCLUDING EQUIPMENT TRANSFERRED BETWEEN PROJECTS, BROKEN AND OBSOLETE
EQUIPMENT, AND ITEMS PURCHASED OUTSIDE THE UNITED STATES. THE MPGL SHALL
CONSIST OF THE FOLLOWING DATA ELEMENTS AT A MINIMUM: ACCOUNTABLE
CONTRACT/TASK ORDER#, ORIGINAL MANUFACTURER’S NOUN NAME,
DESCRIPTION/COMMERCIAL USE, ORIGINAL MANUFACTURER’S PART#, MODEL#, SERIAL#,
DTRA ASSET ID#, EQUIPMENT IDENTIFICATION#, QUANTITY AND TASK/ORDER TO WHICH
THE EQUIPMENT IS ASSIGNED, WORK BREAK DOWN SCHEDULE (WBS) PROJECT#, ITEM
UNIQUE IDENTIFIER OR EQUIVALENT, PROJECT DESCRIPTOR, EQUIPMENT LOCATION,
DATE PLACED IN SERVICE, CONDITION OF PROPERTY, STATUS (ACTIVE, STORED, IN-
TRANSIT OR WAITING DISPOSAL). GOVERNMENT PROPERTY TYPE {GOVERNMENT
FURNISHED EQUIPMENT (GFE), GOVERNMENT FURNISHED MATERIAL (GFM),
GOVERNMENT FURNISHED PROPERTY (GFP), CAP}, UNIT ACQUISITION COST (FROM
ACCOUNTING SYSTEM) AND REMARKS..
THE MPGL SHALL BE DELIVERED ELECTRONICALLY IN A SPREADSHEET USING
MICROSOFT OFFICE EXCEL FORMAT. ABBREVIATIONS ARE PROHIBITED.
NINETY (90) DAYS PRIOR TO CONTRACT EXPIRATION, THE CONTRACTOR SHALL SUBMIT A
MGPL SUITABLE FOR CLOSE-OUT PURPOSES CONTAINING USE/DISPOSITION
RECOMMENDATIONS.
DTRA/BE-BLLS 1
DD FORM
1423-1, FEB
2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY:
TDP TM OTHER X
A102
2. TITLE OF DATA ITEM
MASTER GOVERNMENT PROPERTY LIST - PHYSICAL
INVENTORY
3. SUBTITLE
GOVERNMENT FURNISHED AND
CONTRACTOR ACQUIRED PROPERTY
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80441
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DTRA/BE-BC and DTRA/CTR-PM
7. DD 250 REQ
N/A
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ANNUALLY
12. DATE OF FIRST SUBMISSION
8. APP CODE 11. AS OF DATE
CONTINOUS
13. DATE IF SUBSEQUENT SUBM.
Reg Repro
16. REMARKS
BLOCK 4: THIS DID IS FOR REFERENCE ONLY. THE REPORT SHALL BE PREPARED ACCORDING TO THE
REMARKS BELOW
BLOCK 12: 30
TH
CALENDAR DAY FOLLOWING CONTRACT/TASK ORDER AWARD BLOCK 13:
ANNUALLY BY 1 SEPTEMBER EACH YEAR
REMARKS: THE CONTRACTOR SHALL ANNUALLY PERFORM, RECORD AND DISCLOSE PHYSICAL INVENTORY RESULTS OF ALL GOVERNMENT PROPERTY UNDER CONTRACTOR'S ACCOUNTABILITY, STEWARDSHIP, POSSESSION OR CONTROL.
THE PHYSICAL INVENTORY REPORT SHALL IDENTIFY THE CONTRACTOR'S POINT OF CONTACT WITH TELEPHONE NUMBER, SIGNATURE AND THE FOLLOWING DATA ELEMENTS AT A MINIMUM: ACCOUNTABLE CONTRACT AND TASK ORDER NUMBER TO WHICH PROPERTY IS ASSIGNED, ORIGINAL MANUFACTURER'S NOUN NAME, CESCRIPTION/COMMERCIAL USE , ORIGINAL MANUFACTURER'S PART NUMBER, MODEL NUMBER, SERIAL NUMBER, DTRA ASSET ID#, EQUIPMENT IDENTIFICATION NUMBER, QUANTITY COUNTED, ITEM UNIQUE IDENTIFIER OR EQUIVALENT, PROJECT DESCRIPTOR, PROPERTY LOCATION, DATE PLACED IN SERVICE, CONDITION OF PROPERTY, STATUS (ACTIVE, STORED, IN-TRANSIT OR WAITING DISPOSAL). GOVERNMENT
PROPERTY TYPE (GOVERNMENT FURNISHED EQUIPMENT, GOVERNMENT FURNISHED MATERIAL,
GOVERNMENT FURNISHED SPECIAL TOOLING, GOVERNMENT FURNISHED SPECIAL TEST EQUIPMENT, GOVERNMENT FURNISHED REAL PROPERTY, CONTRACTOR ACQUIRED EQUIPMENT, CONTRACTOR ACQUIRED MATERIAL, CONTRACTOR ACQUIRED SPECIAL TOOLING, CONTRACTOR ACQUIRED SPECIAL TEST EQUIPMENT, CONTRACTOR ACQUIRED REAL PROPERTY), UNIT ACQUISITION COST (FROM ACCOUNTING SYSTEM) AND
REMARKS.
THE PHYSICAL INVENTORY REPORT SHALL BE DOCUMENTED IN WRITING AND VALIDATED/CONFIRMED, VIA SIGNATURE BY BOTH THE CONTRACTOR’S PROPERTY ADMINSTRATOR AND THE DTRA’S
GOVERNMENT REPRESENTATIVE. INVENTORY DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO
THE CONTRACTING OFFICER, CONTRACTING OFFICER'S REPRESENTATIVE/PROGRAM MANAGER OR
DTRA ACCOUNTABLE PROPERTY OFFICER. THE REPORT SHALL CONTAIN ORIGINAL SIGNATURES WITH SPREADSHEET AND ATTACHMENTS AND BE DELIVERED ELECTRONICALLY IN A SPREADHSEET USING
MICROSOFT OFFICE EXCEL. ABBREVIATIONS ARE NOT ALLOWED.
NINETY (90) DAYS PRIOR TO CONTRACT EXPIRATION, THE CONTRACTOR SHALL SUBMIT A FINAL PROPERTY IDENTIFICATION LISTING SUITABLE FOR CLOSE-OUT PURPOSES CONTAINING USE/DISPOSITION RECOMMENDATIONS. THE REPORT MUST BE REVIEWED, APPROVED AND SIGNED BY THE DRTA ACCOUTABLE
PROPERTY OFFICER PRIOR TO CONTRACT CLOSE
DTRA/BE-BC
DTRA/CTR/PM
DTRA/BE-BLLS
DTRA/OP/CTIS 1
Nadine Rafaels, CONTRACTING OFFICER
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters
Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
C. CATEGORY:
A600
2. TITLE OF DATA ITEM
Transfer of Custody (TOC)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DTRA/BE-BC / DTRA/CTR-PM
7. DD 250 REQ
N/A
SEE BLOCK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS:
Block 10: TOCs will be conducted by the contractor whenever property is transferred to an agent of the host nation.
Block 11: As required.
Block 12: As required.
Block 13: As required.
Remarks: The Transfer of Custody is CTR’s primary tool for tracking property given to host nations as part of CTR programs. The TOC form is filled out and signed by the contractor and a host nation representative. This action should be accomplished when the item is physically handed over to the host nation representative, if this is not possible the TOC will be performed within 45 days of the physical transfer. When equipment is being purchased for integration into a larger assembly or structure, a TOC of the final assembly or structure may be appropriate. Please contact CTR-CTIS for special instruction in these situations. Several versions of the cover form are attached; however the contractor is free to make changes to this document to cover agreements and/or countries not currently included. Additionally, the TOC will be accompanied by an inventory of all property being transferred. Both documents should be completed in English and the host nation language.
After the forms are completed and signed, they will be posted to the CTRIC Business Hub, TOC
Docs folder. The TOC will be in PDF form, and the inventory will be an Excel file.
If for any reason a contractor cannot perform the TOC within the allotted time, or if there are questions regarding the completion of a TOC, then they are to contact the Contracting Officer’s
Representative (COR).
Attachments:
1. Transfer of Custody form (multiple translations)
2. Inventory Form
DTRA/OP-CTIS 1
DTRA/BE-BLLS 1