Contract Att09 - PSP Site Survey Template.xlsx
XLSX spreadsheet 173 KB Posted
- Solicitation number
- 70T04020R9AP4050
About this file
This document contains a site survey template for capturing key details regarding passenger screening checkpoint infrastructure and equipment at an airport in preparation for an upcoming security system deployment project. The template collects information on existing electrical systems, IT connectivity, equipment inventory, and other logistical requirements. Sections address badging, permitting, insurance needs, and contact lists to help plan the logistical aspects of the deployment. Spaces are provided to note infrastructure upgrade needs and attach relevant photos of existing conditions. The thorough site survey would inform bidding on the related Transportation Security Administration contract to provide Checkpoint Screening Equipment Deployment Services.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Sheet
| PSP Site Survey Report | |
| Site Survey Checklist Cover Page | |
| CDRL Purpose: | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Title | Name | Phone | |
| System Integrator (SI) Task Order Manager | |||
| SI Site Survey Lead | |||
| SI Electrical Engineer | |||
| TSA Federal Security Director (FSD) | |||
| TSA Assistant Federal Security Director (AFSD) | |||
| TSA Project Lead/Primary POC | |||
| TSA Project Assistant | |||
| IT POC | |||
| Airport Authority Representative | |||
| Airport Facilities | |||
| Airport Electrical | |||
| Law Enforcement |
| Checkpoints/Overview | |||||
| Terminal/Checkpoint Name or ID | Number of Lanes | Comments | |||
| 0 | |||||
| Shipping Address | |||||
| 0 | |||||
| Drawing Set Used for Validation | |||||
| Title and TSA Approval Status | Date | Source | |||
| 0 |
Passenger Screening Program
Sign-in Sheet
| PSP Site Survey Report | |
| Site Survey Attendees Sign-in Sheet | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
Name Organization Phone Number Email
Badging
| PSP Site Survey Report | |
| Badging Requirements | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| BADGING | ||||
| The following documents the badging requirements. | ||||
| Will local Airport Security Personnel provide escort? | 0 | |||
| Is contractor badging required? | 0 | |||
| Will the badging include escort privileges? | 0 | |||
| Is a badging class required? | 0 | |||
| What is the schedule for the badging class? | 0 | |||
| Badging Authority | POC | Contact Information | Hours of Operation |
Time To Obtain Cost Associated Valid For Escorting Privileges
| Documents Accepted | Notes: | |
| Driver's License | 0 | |
| Birth Certificate | 0 | |
| Social Security Card | 0 | |
| Passport | 0 | |
| # of Docs Required | 0 |
Office of Security Capabilities Passenger Screening Program Passenger Screening Program
YES
YES
YES
YES
NO
NO
NO
NO
Permitting
| PSP Site Survey Report | |||||
| Permitting Requirements | |||||
| System Integrator: | |||||
| System Integrator POC: | |||||
| Airport Name: | |||||
| Airport Code: | Survey Date: | ||||
| PERMIT GENERAL DOCUMENTATION REQUIREMENTS | |||||
| Permitting Authority and Address: | 0 | ||||
| Describe the Process Required by Permitting Agencies: | 0 | ||||
| Describe the Permitting Requirements: | 0 | ||||
| Describe Permitting Lead Time: | 0 | ||||
| # Raised/Signed & Sealed Drawings and Specifications Required: | 0 | ||||
| # D Sized Drawings Required: | 0 | ||||
| # of 11x17-Size Copies Req'd: | 0 | ||||
| Address to Send Signed & Sealed Copies: | 0 | ||||
| Cost of Obtaining Permits: | 0 | ||||
| FOR THIS SPECIFIC PROJECT | |||||
| Is permitting required? | 0 | ||||
| PERMIT TYPE APPLICABILITY FOR THIS PROJECT | 0 | ||||
| Type of Permit | Describe the Type of Work Effort that Requires Each Type of Permit | Airport POC and Contact Info (Phone, E-Mail) | |||
| Construction Permit | 0 | ||||
| Building Permit | 0 | 0 | |||
| Electrical Permit | 0 | 0 | |||
| Electrical Load Study | 0 | 0 | |||
| Seismic Analysis | 0 | 0 | |||
| Structural Analysis | 0 | 0 | |||
| HVAC Analysis | 0 | 0 | |||
| Asbestos Study | 0 | 0 | |||
| Waste Removal Plan | 0 | 0 | |||
| Spill Response Plan | 0 | 0 | |||
| Other (e.g., Tenant Improvement Plan): | 0 | 0 |
Passenger Screening Program
Cert of Insurance
| PSP Site Survey Report | |
| Certificate of Insurance Requirements | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Certificate of Insurance | |
| The following documents any Certificate of Insurance requirements. Include additional attachments or documentation as necessary. | |
| Is a Certificate of Insurance required? | Minimum Insurance Requirements |
| General Liability | |
| Additional Insured | Automobile Liability |
| Name | Umbrella Liability |
| Address | Worker's Compensation |
| Bodily Injury | |
| City, State, ZIP | Property Damage |
| Submit to | Notes |
| Name | |
| Fax |
Office of Security Capabilities Passenger Screening Program Passenger Screening Program
Vendors
| PSP Site Survey Report | |
| Current List of Permitted/Badged Airport Service Contractors | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? 0
| Type Contractor | Electrical/Data | Type Contractor | Electrical/Data |
| Name | Name | ||
| Address | Address | ||
| City | City | ||
| State | State | ||
| Zip Code | Zip Code | ||
| Point of Contact | Point of Contact | ||
| Phone Office | Phone Office | ||
| Phone Cell | Phone Cell | ||
| Fax | Fax | ||
| E-Mail Address | E-Mail Address | ||
| Badged? | Badged? |
Office of Security Capabilities Passenger Screening Program Passenger Screening Program
Hours of Operation
| PSP Site Survey Report | |
| Hours of Operation/Equipment Summary | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Checkpoint Operational Hours | |
| Weekdays | 0 |
| Weekends | 0 |
| Checkpoint must be turned over | 0 |
| Electrical room access | 0 |
| Basement access | 0 |
| Hours available for site survey | 0 |
| Hours available for site preparation | 0 |
| Notifications to be made when arriving on site | 0 |
Elec Panel
| PSP Site Survey Report | |
| Electrical Panel(s) | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Describe required procedure to obtain access to power panel | |
| 0 | |
| Describe required conduit route from electrical room to checkpoint; noting any restricted areas, space characteristics (public, utilities, etc.), special conditions, floor wall penetrations, or other potential cost considerations. | |
| 0 |
| Are panels located in locked rooms or areas? (Y/N) | 0 | Are panels located in locked rooms or areas? (Y/N) |
| Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet) | 0 | Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet) |
| Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.) | 0 | Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.) |
| Pictures of panels feeding Checkpoint equipment. Include panel ID/label, rating, main breaker, branch circuit breakers, schedule, etc. |
Pictures of appropriate sub-panel, if needed. Panel label, rating, panel capacity, and type of panel showing
**Pictures of conduit routes, if possible.**
Office of Security Capabilities
Passenger Screening Program
Elec Existing
| PSP Site Survey Report | |
| Existing Electrical | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Answer noted questions with relevant pictures and descriptions. |
| Describe mounting of existing electrical devices. |
Floor-mounted or power pole?
If floor, recessed (poke-thru) or surface?
| If floor, conduit entry core-drilled or surface run? | 0 | ||
| Other Notes: | 0 | ||
| Pictures of Electrical/Data Outlets - Labeled for Each TSE & Lane |
Passenger Screening Program
Elec Delta
| PSP Site Survey Report | |
| Electrical Changes | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| List tasks required to modify/upgrade infrastructure to accommodate required CAT units, starting from existing conditions. | |
| Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.) | Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.) |
| 0 | |
| 0 | |
| New Receptacles (quantity, location, etc.) | New Receptacles (quantity, location, etc.) |
| 0 | |
| 0 | |
| New Data Outlets | New Data Outlets |
| 0 | |
| 0 | |
| New Conduit (quantity, distance, location, routing, etc.) | New Conduit (quantity, distance, location, routing, etc.) |
| 0 | |
| 0 | |
| New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.) | New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.) |
| 0 | |
| 0 | |
| Panel Expansion/Extension, Sub-Panel (size, location, etc.) | Panel Expansion/Extension, Sub-Panel (size, location, etc.) |
| 0 | |
| 0 | |
| Other | Other |
| 0 | |
| 0 |
Office of Security Capabilities Passenger Screening Program Passenger Screening Program
Lane Summary
| PSP Site Survey Report | ||
| Lane Summary | ||
| System Integrator: | ||
| System Integrator POC: | ||
| Airport Name: | ||
| Airport Code: | Survey Date: |
| Checkpoint Name: | Main | Standard, PreCheck, or Flex? | |
| S/P/F | TDC Podium | ||
| Y/N | Power | ||
| Y/N | Dedicated Circuit | ||
| Y/N | # of Data Ports | Relocate Power Pole/Poke-thru | |
| Y/N | Cable to IT Cabinet More Than 295'? | ||
| Y/N | List average data cable length and describe any deficiencies. |
Pictures of Each TDC Location
IT
| PSP Site Survey Report | |
| Information Technology Connectivity | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
Make & Model of Switch(es) & Patch Panel(s) Total # of Ports # of Open Switch Ports or UnTerminated Patch Ports Location (room #) Is cable distance to TSE more than 295'? Category Cable
Is there room in existing rack for additional patch panels/switches? Is there space/power in existing room for an additional IT rack?
List any cables that exceed 295' or fail any test.
Describe required procedure to obtain access to IT rack(s).
Describe required routing for data cables and if conduit is required.
Any airport-provided IT connections? If yes, describe.
Pictures: Location/Patch Panel
Passenger Screening Program
Existing Equip Summary
| PSP Site Survey Report | |
| Existing Equipment Summary | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Existing Equipment Summary (TSA Standard Equipment Only) | ||
| TSE Type | TSE Number | TSE OEM |
Passenger Screening Program
Design Issues
| PSP Site Survey Report | |
| Design Issues | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
Terminal/Checkpoint Lane Drawing/Design Issue Additional Comments
Queue Area Validation
| PSP Site Survey Report | |
| Queue Area Validation | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Checkpoint/Terminal | Dimensions of Queue Area | Number of TDCs | Number of Stanchions | Additional Comments | |||||
| 0 | 0 | ||||||||
| Identify if an Employee/Known Crew Members (KCM) lane is being used? | |||||||||
| Is the Employee/KCM lane identified with signage? | Identify if an Employee/Known Crew Members (KCM) lane is being used? | ||||||||
| Is the Employee/KCM lane identified with signage? | 0 | ||||||||
| Identify if a PreCheck lane is being used? | |||||||||
| Is the PreCheck lane identified with signage? | Identify if a PreCheck lane is being used? | ||||||||
| Is the PreCheck lane identified with signage? | 0 | ||||||||
| How many lanes are established for passenger use? | How many lanes are established for passenger use? | 0 | |||||||
| Are there any other lanes/queues established for other use? If so, please identify their usage. | Are there any other lanes/queues established for other use? If so, please identify their usage. | 0 | |||||||
| Pictures of Queue Area Surveyed, Including Proposed CT Testing Area |
Alarms
| PSP Site Survey Report | |
| Duress/Covert Alarms | |
| System Integrator: | |
| System Integrator POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
Terminal/Checkpoint/Lane Type of Equipment Push-Button Needed? Additional Comments (Wireless, Hardwired, Integrated)
Total Number of Push Buttons to be Ordered/Sent to Local TSA
| Termination (location where monitored - NOT equipment end) | 0 |
| Owner | 0 |
| Maintenance/Contractor | 0 |
| Any New Circuits Required? | 0 |
| Identify Duress Alarm Type, Power, and Connectivity | 0 |
Passenger Screening Program
Decompress Pix Instruction
PSP Site Survey Report
Instructions to Compress Pictures
* Click on Picture within the file.
* Click on Picture Tools/Format Tab at top of file.
* Click on Compress Pictures.
* De-select "Apply only to this picture".
* Click on "Email" Circle.
* Select OK.
image1.png