Contract Att07 - ETD - 500DT De-Installation Checklist.pdf

PDF 272 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
70T04020R9AP4050
Issued by

About this file

This document is a de-installation checklist for removing an Ionscan 500DT explosive trace detection system. The checklist outlines procedures for inventory, unit condition checks, functionality testing, visual verification through photography, cleaning, packaging, and sign-offs by the contractor and integrating system provider. Key parties involved are the transportation security administration and airports. The detailed form ensures thorough documentation and accountability during removal and return of this sensitive screening equipment.

View the file

Other files

File Type Posted
CP RFP_Amendment 04_revised.pdf PDF
CP RFP_Amendment 04.pdf PDF
CP RFP_Amendment 04_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 04.xlsx XLSX spreadsheet
Q_and_A amendment 4.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03 updated.xlsx XLSX spreadsheet
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03.xlsx XLSX spreadsheet
CP RFP_Amendment 03_SF30.pdf PDF
CP RFP_Amendment 02.pdf PDF
CP RFP_Amendment 02_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 02.xlsx XLSX spreadsheet
CP_SEDS QandA_Amendment 02.pdf PDF
CP RFP_Amendment 01.pdf PDF
CP RFP_Amendment 01_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 01.xlsx XLSX spreadsheet
Solicitation Attachment 04-DHS Subcontracting Plan Review Checklist.pdf PDF
CP RFP QA_Amendment 01.pdf PDF
CP RFP 70T040R9AP4050 SEDS.pdf PDF
Contract Att02 - BLS - CEIA EMA-MS Decommission Checklist.pdf PDF
Contract Att05 - WTMD - CEIA Decommission Checklist.pdf PDF
Contract Att06 - ETD - QSB220 De-Instal - Instal Checklist.pdf PDF
Solicitation Att3-Checkpoint PM Task Order.pdf PDF
Contract Att11 - Weekly Status Report.xlsx XLSX spreadsheet
SEDS Q and A Template.xls XLS spreadsheet
Contract Att04 - BLS - Responder Decomm Checklist.pdf PDF
Contract Att01 - AIT-1 and AIT-2 - L3 Decommission Checklist.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet .xlsx XLSX spreadsheet
Contract Att09 - PSP Site Survey Template.xlsx XLSX spreadsheet
Contract Att03 - AT Decommission Checklist.pdf PDF
Solicitation Att1-SF1449 Checkpoint.pdf PDF
Contract Att10 - PSP Site Survey Report Template.pdf PDF
Contract Att08 - Checkpoint IDIQ SIP Template.docx DOCX document
Contract Att12 - Daily Site Report.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Last Updated Jan. 2020

ETD S/N:

osives Trace Detection (ETD)

TSA/FAA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition Section Evaluation Criteria Yes No Comments/Concerns

In ve nt or y

Ionscan 500DT System?

(P/N: 4816800-201-A)

Power Cord?

(P/N: 15145) 500DT Sampler Kit?

(P/N: 6820512-B) Operators Manual?

(P/N: 6817558TSA)

Maintenance Manual?

(P/N: 6821635) Standard Maintenance Kit?

(P/N: 6817660-D)

Calibration Data Package?

Metal Inlet Gasket Kit?

(P/N: 1818933-A) Condenser Tube Assembly Kit?

(P/N: 6817658-B) Printer Paper Kit?

(Impact or Thermal)?

500DT Swabs?

(P/N: 6818055-A)

Unit Hand Wand?

Unit Filter?

Date of Last Radiation Leak Test Date

Current Software Version Current Version

U ni t C on di tio n Does the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

U ni t F un ct io na lit y

Does the System turn on?

Does the System become "Ready"?

Does the System allow Supervisor-level log on?

Is the System time correct?

Does the System pass the verification check?

Does the System alarm correctly?

Does the System clear alarms correctly?

Does the Printer function correctly?

De-Installation / Installation Checklist

For the Smiths Detection 500 DT

V is ua l V er ifi ca tio n Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

C le an in g U ni t

The Contractor shall use a clean, chemical and dust free cloth to wipe down the outside of the IONSCAN 500DT to remove excess dust, dirt, and moisture that may have accumulated. Smiths Detection recommends the use of clean, dry Kimwipes® to remove excess dust, dirt and moisture.

The Contractor shall not use commercial cleaners to clean the IONSCAN 500DT as it is a highly sensitive detection system.

U ni t Pa ck ag in g Take photo of the unit PACKAGED and document any damage or concerns.

Correct package labeling?

Subcontractor Contact Information and Verification Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.

Performed By:

Printed Name Email Address Phone Number

Company Name Signature Date

System Integrator Section (This section should be filled in by the System Integrator ONLY) Evaluation Criteria Yes No Comments/Concerns

Has all damage been documented? If NO, please specify in the comments section.

Are there any components missing? If YES, please specify in the comments section.

Is a Verification Kit being returned with this unit? If YES, please note it in the comments section.

Systems Integrator Additional Comments

Systems Integrator Contact Information and Verification Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.

Reviewed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Federal Employee Comments/Concerns

Printed Name Signature Date

Federal Employee Verification As a witness, sign and date this De-Installation / Installation Checklist to confirm the document was completed on-site.

Confirmed By:

File details come from the government source that posted it. Updated .