Contract Att06 - ETD - QSB220 De-Instal - Instal Checklist.pdf

PDF 246 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
70T04020R9AP4050
Issued by

About this file

This document is a checklist for de-installation, inspection, cleaning, testing, and re-installation of Quantum Sniffer QS-B220 explosive trace detection systems. The checklist outlines procedures for contractors to follow when removing a QS-B220 unit from its current location, conducting various tests to ensure proper functionality, cleaning both exterior and interior surfaces, taking photographs to document the unit's condition, repackaging the unit, and confirming all steps were completed. Contractors are required to sign and date the checklist upon finishing the de-installation, inspection, and repackaging processes. Both the contractor's system integrator and a federal employee must also sign and date the checklist to verify all procedures were performed correctly on site.

View the file

Other files

File Type Posted
CP RFP_Amendment 04_revised.pdf PDF
CP RFP_Amendment 04.pdf PDF
CP RFP_Amendment 04_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 04.xlsx XLSX spreadsheet
Q_and_A amendment 4.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03 updated.xlsx XLSX spreadsheet
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03.xlsx XLSX spreadsheet
CP RFP_Amendment 03_SF30.pdf PDF
CP RFP_Amendment 02.pdf PDF
CP RFP_Amendment 02_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 02.xlsx XLSX spreadsheet
CP_SEDS QandA_Amendment 02.pdf PDF
CP RFP_Amendment 01.pdf PDF
CP RFP_Amendment 01_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 01.xlsx XLSX spreadsheet
Solicitation Attachment 04-DHS Subcontracting Plan Review Checklist.pdf PDF
CP RFP QA_Amendment 01.pdf PDF
CP RFP 70T040R9AP4050 SEDS.pdf PDF
Contract Att07 - ETD - 500DT De-Installation Checklist.pdf PDF
Contract Att02 - BLS - CEIA EMA-MS Decommission Checklist.pdf PDF
Contract Att05 - WTMD - CEIA Decommission Checklist.pdf PDF
Solicitation Att3-Checkpoint PM Task Order.pdf PDF
Contract Att11 - Weekly Status Report.xlsx XLSX spreadsheet
SEDS Q and A Template.xls XLS spreadsheet
Contract Att04 - BLS - Responder Decomm Checklist.pdf PDF
Contract Att01 - AIT-1 and AIT-2 - L3 Decommission Checklist.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet .xlsx XLSX spreadsheet
Contract Att09 - PSP Site Survey Template.xlsx XLSX spreadsheet
Contract Att03 - AT Decommission Checklist.pdf PDF
Solicitation Att1-SF1449 Checkpoint.pdf PDF
Contract Att10 - PSP Site Survey Report Template.pdf PDF
Contract Att08 - Checkpoint IDIQ SIP Template.docx DOCX document
Contract Att12 - Daily Site Report.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Last Updated Jan. 2020

Quantum Sniffer QS-B220 System

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition Section Evaluation Criteria Yes No Comments/Concerns

In ve nt or y

L3 Implant Sciences QS-B220 System?

Power Supply?

Unit Hand Wand?

Unit Swabs?

Printer Paper?

Unit Filter?

Current Software Version Current Version

U ni t C on di tio n Does the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

T es tin g Did you SHUTDOWN the software and wait for the screen to turn black?

Did you turn off the power switch and disconnect power cords?

U ni t F un ct io na lit y

Does the System turn on?

Does the System become "Ready"?

Does the System allow Supervisor-level log on?

Is the System time correct?

Does the System pass the verification check?

Does the System alarm correctly?

Does the System clear alarms correctly?

Does the Printer function correctly?

C le an in g U ni t

Outer House Cleaning The Contractor shall use Isopropyl Alcohol Wipes to wipe down all surfaces of the system, including the touchscreen.

• Caution! The Contractor shall use care when wiping down the Desorber Cover as the Desorber is hot and may cause burns.

V is ua l

V er ifi ca tio n

Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

De-Installation / Installation Checklist

For the L3 Implant Sciences QS B220

ETD S/N: TSA/FAA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

Last Updated Jan. 2020

Take a photo of the POWER CORD and document any damage or concerns.

Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.

Performed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Subcontractor Contact Information and Verification

U ni t Pa ck ag in g Take photo of the unit PACKAGED in correct shipping box with foam inserts and document any damage or concerns.

Is the labeling correct on the packaging?

Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.

Performed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Subcontractor Contact Information and Verification

Systems Integrator Additional Comments

System Integrator Section (This section should be filled in by the System Integrator ONLY) Evaluation Criteria Yes No Comments/Concerns

Has all damage been documented? If NO, please specify in the comments section.

Are there any components missing? If YES, please specify in the comments section.

Is a Verification Kit being returned with this unit? If YES, please note it in the comments section.

Sign and date this De-installation / Installation Checklist and leave a copy with the unit.

Reviewed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Systems Integrator Contact Information and Verification

Federal Employee Comments/Concerns

As a witness, sign and date this De-Installation / Installation Checklist to confirm the document was completed on-site.

Confirmed By:

Printed Name Signature Date

Federal Employee Verification

Last Updated Nov. 2019

File details come from the government source that posted it. Updated .