This document is a decommissioning checklist for Transportation Security Administration (TSA) Advanced Imaging Technology (AIT) units. The checklist includes sections to document the condition and functionality of AIT system components such as software version, power supply, radiomes, warning lights, and operator cart. Photos must be taken of the AIT unit in operational and packaged states. A subcontractor must sign the checklist along with a federal employee witness to confirm on-site completion. Contact information is also required to be included for the subcontracting systems integrator and federal contracting officer.

View the file

Other files

File Type Posted
CP RFP_Amendment 04_revised.pdf PDF
CP RFP_Amendment 04.pdf PDF
CP RFP_Amendment 04_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 04.xlsx XLSX spreadsheet
Q_and_A amendment 4.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03 updated.xlsx XLSX spreadsheet
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03.xlsx XLSX spreadsheet
CP RFP_Amendment 03_SF30.pdf PDF
CP RFP_Amendment 02.pdf PDF
CP RFP_Amendment 02_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 02.xlsx XLSX spreadsheet
CP_SEDS QandA_Amendment 02.pdf PDF
CP RFP_Amendment 01.pdf PDF
CP RFP_Amendment 01_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 01.xlsx XLSX spreadsheet
Solicitation Attachment 04-DHS Subcontracting Plan Review Checklist.pdf PDF
CP RFP QA_Amendment 01.pdf PDF
CP RFP 70T040R9AP4050 SEDS.pdf PDF
Contract Att07 - ETD - 500DT De-Installation Checklist.pdf PDF
Contract Att02 - BLS - CEIA EMA-MS Decommission Checklist.pdf PDF
Contract Att05 - WTMD - CEIA Decommission Checklist.pdf PDF
Contract Att06 - ETD - QSB220 De-Instal - Instal Checklist.pdf PDF
Solicitation Att3-Checkpoint PM Task Order.pdf PDF
Contract Att11 - Weekly Status Report.xlsx XLSX spreadsheet
SEDS Q and A Template.xls XLS spreadsheet
Contract Att04 - BLS - Responder Decomm Checklist.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet .xlsx XLSX spreadsheet
Contract Att09 - PSP Site Survey Template.xlsx XLSX spreadsheet
Contract Att03 - AT Decommission Checklist.pdf PDF
Solicitation Att1-SF1449 Checkpoint.pdf PDF
Contract Att10 - PSP Site Survey Report Template.pdf PDF
Contract Att08 - Checkpoint IDIQ SIP Template.docx DOCX document
Contract Att12 - Daily Site Report.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Yes No

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition

Decommission Checklist For the L3

Advanced Imaging Technology (AIT) 1 & 2

Operation Test Kit (OTK)?

AIT S/N: TSA/FAA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

Software is up to date?

Passed SAT?

T es ti n g

ASCU: record SW version and scan count

Comments/ConcernsEvaluation Criteria

Operators Manual included?

System Keys?

Metal components free from rust/scratches?

Floor and ramps in good condition?

Foot prints clearly visible?

UPS present?

In v en to ry

L3 AIT Provision 2 System?

Power Supply?

Inner Radomes free from scratches?

Outer Radomes free from scratches?

FDRS Reports exported 30 days before decommission?

AC Power Cord in good condition?

BlueMan Panel in good condition?

OCP in good condition?

Skins free from scratches?

Warning lights illuminate?

E-stop functions correctly?

Ceiling lights all illuminate?

ASCU fans operate normally?

Motor/Gearbox operate normally?

Passed image quality test?

Motor Brake Release functional?

Last Updated May 2019

Yes No

Email Address Phone Number

Signature DateCompany Name

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

Operator Cart raises and lowers?

V is u a l V er if ic a ti o n U n it

C o n d it io n

Is the shipping label correct on the packaging?

Does the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers)

Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

Visible hardware tightened and secured?

Subcontractor Contact Information and Verification

Evaluation Criteria Comments/Concerns

System Integrator Section (This section should be filled in by the System Integrator ONLY)

Has all damage been documented? If NO, please specify in the comments section.

Printed Name

Sign and date this Decommission Checklist and leave a copy with the unit.

Systems Integrator Additional Comments

Performed By:

Are there any components missing? If YES, please specify in the comments section, to include those items in the above inventory section.

Is an Operational Test Kit (OTK) being returned with this unit?

If YES, please note it in the comments section.

U n it

P a ck a g in g

Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take photo of the unit PACKAGED and document any damage or concerns.

Panels are flush and fit satisfactorily?

Conveyor belts are free from tears?

Roller tables legs attached with all hardware?

DateSignature

Federal Employee Comments/Concerns

Federal Employee Verification

As a witness, sign and date this Decommission Checklist to confirm the document was completed on-site.

Confirmed By:

Printed Name

Systems Integrator Contact Information and Verification

Sign and date this Decommission Checklist and leave a copy with the unit.