Contract Att03 - AT Decommission Checklist.pdf

PDF 132 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
70T04020R9AP4050
Issued by

About this file

This document contains a decommissioning checklist template for security screening equipment. The checklist is to be used by the system integrator and federal employees to document the condition of screening equipment being removed from airports. It includes sections to record details on equipment components and functionality, take photos of the equipment, and note any damage or missing parts. Federal employees must sign the checklist to verify the information before it is left with the decommissioned unit. The related federal contract opportunity is a solicitation from the Transportation Security Administration for Checkpoint Screening Equipment Deployment Services. Offerors are to provide services for the deployment of security screening equipment at airports, as further detailed in the attached RFP package. Questions should be submitted using the provided template.

View the file

Other files

File Type Posted
CP RFP_Amendment 04_revised.pdf PDF
CP RFP_Amendment 04.pdf PDF
CP RFP_Amendment 04_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 04.xlsx XLSX spreadsheet
Q_and_A amendment 4.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03 updated.xlsx XLSX spreadsheet
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 03.xlsx XLSX spreadsheet
CP RFP_Amendment 03_SF30.pdf PDF
CP RFP_Amendment 02.pdf PDF
CP RFP_Amendment 02_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 02.xlsx XLSX spreadsheet
CP_SEDS QandA_Amendment 02.pdf PDF
CP RFP_Amendment 01.pdf PDF
CP RFP_Amendment 01_SF30.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet_Amendment 01.xlsx XLSX spreadsheet
Solicitation Attachment 04-DHS Subcontracting Plan Review Checklist.pdf PDF
CP RFP QA_Amendment 01.pdf PDF
CP RFP 70T040R9AP4050 SEDS.pdf PDF
Contract Att07 - ETD - 500DT De-Installation Checklist.pdf PDF
Contract Att02 - BLS - CEIA EMA-MS Decommission Checklist.pdf PDF
Contract Att05 - WTMD - CEIA Decommission Checklist.pdf PDF
Contract Att06 - ETD - QSB220 De-Instal - Instal Checklist.pdf PDF
Solicitation Att3-Checkpoint PM Task Order.pdf PDF
Contract Att11 - Weekly Status Report.xlsx XLSX spreadsheet
SEDS Q and A Template.xls XLS spreadsheet
Contract Att04 - BLS - Responder Decomm Checklist.pdf PDF
Contract Att01 - AIT-1 and AIT-2 - L3 Decommission Checklist.pdf PDF
Solicitation Att2-Checkpoint Pricing Worksheet .xlsx XLSX spreadsheet
Contract Att09 - PSP Site Survey Template.xlsx XLSX spreadsheet
Solicitation Att1-SF1449 Checkpoint.pdf PDF
Contract Att10 - PSP Site Survey Report Template.pdf PDF
Contract Att08 - Checkpoint IDIQ SIP Template.docx DOCX document
Contract Att12 - Daily Site Report.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Yes NoEvaluation Criteria

Conveyor belt stops

Conveyor belt reverses

Operator/Maintenance Manual

AVS Monitors

AVS Computer, Keyboard, Mouse

AT System

Power Supply

Keys (Keyboard/Computer Door)

Operator Cart (Rapiscan only - 2 Monitors/Keyboard)

Queing Conveyor (Rapiscan only)

Infeed Conveyor

High Speed Conveyor belt moves at correct speed (Rapiscan -44cm/s; Smiths - 54cm/s)

Queing Conveyor belt moves at correct speed (Rapiscan - 16cm/s)

Infeed Conveyor belt moves at correct speed (Rapiscan - 22cm/s; Smiths - 24cm/s)

UPS

In ve n to ry

Conveyor belt moves forward

Comments/Concerns

AVS Keys (Cabinet/Computer)

System Keys

High Speed Conveyor

Entry Roller Table

Exit Roller Table

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition

Decommission Checklist Advanced Technology

Operation Test Kit (remove if directed by TSA)

AT S/N: TSA/FAA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

Software Version

Extension Roller Table Quantity

List any missing parts

Yes No

Take photo of the unit PACKAGED and document any damage or concerns.

Panels are flush and fit satisfactorily

Conveyor belts are free from tears

Roller tables in good condition

Conveyor belt stops

Warning lights illuminate

Unit scans when belt moves forward

U n it

P ac k ag in g

Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

AVS Photos (Operational, front, sides, back, serial number, barcode)

E-stop performs as expected

Scanned image transmitted to AVS

Date of last radiation survey (in comments)

Passed image quality test

Roller tables legs attached with all hardware

Subcontractor Contact Information and Verification

Evaluation Criteria Comments/Concerns System Integrator Section (This section should be filled in by the System Integrator ONLY)

Has all damage been documented? If NO please specify in the

Printed Name

Sign and date this Decommission Checklist and leave a copy with the unit.

Performed By:

Operator Cart/Work Station raises and lowers

V is u al

V er if ic at io n U n it

C on d it io n

Copy of shipping Label Attached

Does the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers)

Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

Visible hardware tightened and secured

T es ti n g

Operator Cart Photos (Rapiscan Only)

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

Is the labeling correct on the packaging

Email Address Phone Number

Signature DateCompany Name

Are there any components missing? If YES, please specify in the comments section.

Is a Verification Kit being returned with this unit? If YES, please note it in the COMMENTS Section.

Signature Date

Has all damage been documented? If NO, please specify in the comments section.

Systems Integrator Additional Comments

Company Name

DateSignature

Federal Employee Comments/Concerns

Federal Employee Verification As a witness, sign and date this Decommission Checklist to confirm the document was completed on-site.

Confirmed By:

Printed Name

Systems Integrator Contact Information and Verification Sign and date this Decommission Checklist and leave a copy with the unit.

Reviewed By:

Printed Name Email Address Phone Number

File details come from the government source that posted it. Updated .