CN-370000-HW550-SLA60CO1.pdf

PDF 796 KB Posted

Attached to
Master Agreement FL|HW550|85d144626a85584193b4b253697535d5
Contract number
HW550
Issued by
Florida

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
CN-370000-HW550-DC21H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/15/2020

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: Site # 92SL-1, ERIC_6494, Florida State Fire College Site File

FROM: David Meyers, Contract Manager

SUBJECT: Negotiation Summary

HW550 SL-0A060

Change Order #1

DATE: January 15, 2020

This Change Order reduces costs for DPT ground water and soil sampling (by two days) and decreases labor hours associated with that work at the Florida State Fire College, as requested in the January 9, 2020 Geosyntec email. This Change Order also reduces IDW costs.

Total cost decrease is $13,901.53. Geosyntec’s time, labor and subcontractor costs for these activities have been reviewed and are appropriate. No revisions or negotiations were required. The level-of-effort and cost estimate of $65,564.47 is reasonable for the scope of services.

From: Boone Abbott To: Meyers, David Cc: Eric Sager; Todd Kafka Subject: FSFC - SOL-0A060 TACO Date: Thursday, January 9, 2020 3:03:55 PM Attachments: FSFC_TACO #1_CEF-LOE_0A060.XLS

Hi Dave, Please find the attached TACO for the November 2019 DPT soil and groundwater sampling event.

This work is under TA SOL-0A060. Please let me know if you have any questions.

Thanks, J. Boone Abbott Staff Professional Geosyntec Consultants, Inc.

12802 Tampa Oaks Blvd, Suite 151 Tampa, FL 33637 Phone: 813-379-4408 Mobile: 205-914-1978 www.geosyntec.com mailto:babbott@Geosyntec.com mailto:David.Meyers@dep.state.fl.us mailto:ESager@Geosyntec.com mailto:TKafka@Geosyntec.com https://clicktime.symantec.com/3FEnrwby8Zv2iwAvGeFSCuq7Vc?u=http%3A%2F%2Fwww.geosyntec.com%2F

Original CEF

Contractor: Geosyntec Consultants

Date: 10/23/19

Task #: SubTask 1 Project Management SubTask 6

Site: Florida State Fire College SubTask 2 Soil and Groundwater Work Plan SubTask 7

Activity/Phase: Investigation SubTask 3 Soil and Groundwater Investigation SubTask 8

Project Manager: Eric Sager SubTask 4 Preparation of Summary Tables and Figures SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$65.38 Project Manager E. Sager 19 19.1

$1.00 Principal 0 0 0 0 0 0 0 0 0 0

$65.38 Principal E. Sager 14 1 8 4 1 0 0 0 0 0

$60.10 Principal T.Kafka 3 1 2 0 0 0 0 0 0 0

$1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$40.38 Project Professional (Scientist/GIS) M. Hensley 40 4 4 32 0 0 0 0 0 0

$34.14 Professional JJ 17 0 17 0 0 0 0 0 0 0

$33.17 Senior Staff Engineer J Mills 48 4 44 0 0 0 0 0 0 0

$1.00 Professional (Engineer) 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$29.81 Senior Staff Professional D Montiel 0 0 0 0 0 0 0 0 0 0

$31.49 Senior Staff Professional O Cain 52 0 52 0 0 0 0 0 0 0

$26.44 Staff Professional A. Batzer 115 0 97 8 10 0 0 0 0 0

$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0

$23.00 Admin Asst A. Acosta 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$27.40 Staff Professional E. Fagre 15 0 15 0 0 0 0 0 0 0

$1.00 Field Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 323.0 19 10 239 44 11 0 0 0 0 0

Direct Labor $11,219.00 $1,246.56 $419.68 $7,457.78 $1,765.20 $329.78 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $19,375.22 $2,152.81 $724.79 $12,879.59 $3,048.50 $569.53 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $30,594.22 $3,399.37 $1,144.47 $20,337.37 $4,813.70 $899.31 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $560.95 $62.33 $20.98 $372.89 $88.26 $16.49 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $1,131.00 $0.00 $1,034.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $2,336.00 $0.00 $2,336.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $3,467.00 $0.00 $3,370.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $28,875.00 $0.00 $28,875.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $2,810.00 $0.00 $2,810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $4,320.00 $0.00 $0.00 $0.00 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $36,005.00 $0.00 $31,685.00 $0.00 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $3,600.50 $0.00 $3,168.50 $0.00 $432.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $39,605.50 $0.00 $34,853.50 $0.00 $4,752.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $390.00 $0.00 $357.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $558.80 $0.00 $558.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) - PDBs $1,133.20 $0.00 $1,133.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $2,179.00 $0.00 $2,146.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $76,406.67 $3,461.70 $1,165.45 $61,080.26 $4,901.96 $5,797.30 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $3,059.43 $339.94 $114.45 $2,033.74 $481.37 $89.93 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $79,466.10 $3,801.64 $1,279.90 $63,114.00 $5,383.33 $5,887.23 $0.00 $0.00 $0.00 $0.00 $0.00

Tasks 1 and 5 $9,688.87

&C&"CG Times,Bold"&16FDEP COST ESTIMATE

&L&"Courier New,Bold"&10REV: 02/03&C&"Courier New,Bold"&10CEF_GEO.XLS&R&"Courier New,Bold"&10Page &P

TACO #1 CEF

Contractor: Geosyntec Consultants

Date: 1/9/20

Task #: SubTask 1 Project Management SubTask 6

Site: Florida State Fire College SubTask 2 Soil and Groundwater Work Plan SubTask 7

Activity/Phase: Investigation SubTask 3 Soil and Groundwater Investigation SubTask 8

Project Manager: Eric Sager SubTask 4 Preparation of Summary Tables and Figures SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$65.38 Project Manager E. Sager -2 -2.3

$1.00 Principal 0 0 0 0 0 0 0 0 0 0

$65.38 Principal E. Sager 1 0 1 0 0 0 0 0 0 0

$60.10 Principal T.Kafka 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$40.38 Project Professional (Scientist/GIS) M. Hensley 0 0 0 0 0 0 0 0 0 0

$34.14 Professional JJ 0 0 0 0 0 0 0 0 0 0

$33.17 Senior Staff Engineer J Mills 0 0 0 0 0 0 0 0 0 0

$1.00 Professional (Engineer) 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0

$27.16 Staff Professional B. Abbott 1 0 1 0 0 0 0 0 0 0

$1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$29.81 Senior Staff Professional D Montiel 0 0 0 0 0 0 0 0 0 0

$31.49 Senior Staff Professional O Cain -19 0 -19 0 0 0 0 0 0 0

$26.44 Staff Professional A. Batzer -27 0 -27 0 0 0 0 0 0 0

$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0

$23.00 Admin Asst A. Acosta 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$27.40 Staff Professional E. Fagre 0 0 0 0 0 0 0 0 0 0

$1.00 Field Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours -46.0 -2 0 -44 0 0 0 0 0 0 0

Direct Labor ($1,372.11) ($152.46) $0.00 ($1,219.65) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% ($2,369.64) ($263.30) $0.00 ($2,106.34) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor ($3,741.75) ($415.76) $0.00 ($3,325.99) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs ($68.60) ($7.62) $0.00 ($60.98) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental ($194.00) $0.00 ($194.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel ($438.00) $0.00 ($438.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel ($632.00) $0.00 ($632.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) ($7,000.00) $0.00 ($7,000.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW ($1,200.00) $0.00 $0.00 $0.00 ($1,200.00) $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($8,200.00) $0.00 ($7,000.00) $0.00 ($1,200.00) $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee ($820.00) $0.00 ($700.00) $0.00 ($120.00) $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost ($9,020.00) $0.00 ($7,700.00) $0.00 ($1,320.00) $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables ($65.00) $0.00 ($65.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) - PDBs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses ($65.00) $0.00 ($65.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($13,527.35) ($423.38) $0.00 ($11,783.97) $0.00 ($1,320.00) $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee ($374.18) ($41.58) $0.00 ($332.60) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($13,901.53) ($464.96) $0.00 ($12,116.57) $0.00 ($1,320.00) $0.00 $0.00 $0.00 $0.00 $0.00

Tasks 1 and 5 ($1,784.96)

Final CEF

Contractor: Geosyntec Consultants

Date: 1/9/20

Task #: SubTask 1 Project Management SubTask 6

Site: Florida State Fire College SubTask 2 Soil and Groundwater Work Plan SubTask 7

Activity/Phase: Investigation SubTask 3 Soil and Groundwater Investigation SubTask 8

Project Manager: Eric Sager SubTask 4 Preparation of Summary Tables and Figures SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$65.38 Project Manager E. Sager 17 16.7

$1.00 Principal 0 0 0 0 0 0 0 0 0 0

$65.38 Principal E. Sager 15 1 9 4 1 0 0 0 0 0

$60.10 Principal T.Kafka 3 1 2 0 0 0 0 0 0 0

$1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$40.38 Project Professional (Scientist/GIS) M. Hensley 40 4 4 32 0 0 0 0 0 0

$34.14 Professional JJ 17 0 17 0 0 0 0 0 0 0

$33.17 Senior Staff Engineer J Mills 48 4 44 0 0 0 0 0 0 0

$1.00 Professional (Engineer) 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0

$27.16 Staff Professional B. Abbott 1 0 1 0 0 0 0 0 0 0

$1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$29.81 Senior Staff Professional D Montiel 0 0 0 0 0 0 0 0 0 0

$31.49 Senior Staff Professional O Cain 33 0 33 0 0 0 0 0 0 0

$26.44 Staff Professional A. Batzer 88 0 70 8 10 0 0 0 0 0

$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0

$23.00 Admin Asst A. Acosta 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$27.40 Staff Professional E. Fagre 15 0 15 0 0 0 0 0 0 0

$1.00 Field Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 277.0 17 10 195 44 11 0 0 0 0 0

Direct Labor $9,846.89 $1,094.10 $419.68 $6,238.13 $1,765.20 $329.78 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $17,005.58 $1,889.51 $724.79 $10,773.25 $3,048.50 $569.53 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $26,852.47 $2,983.61 $1,144.47 $17,011.38 $4,813.70 $899.31 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $492.35 $54.71 $20.98 $311.91 $88.26 $16.49 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $937.00 $0.00 $840.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $1,898.00 $0.00 $1,898.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $2,835.00 $0.00 $2,738.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $21,875.00 $0.00 $21,875.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $2,810.00 $0.00 $2,810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $3,120.00 $0.00 $0.00 $0.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $27,805.00 $0.00 $24,685.00 $0.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $2,780.50 $0.00 $2,468.50 $0.00 $312.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $30,585.50 $0.00 $27,153.50 $0.00 $3,432.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $325.00 $0.00 $292.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $558.80 $0.00 $558.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) - PDBs $1,133.20 $0.00 $1,133.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $2,114.00 $0.00 $2,081.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $62,879.32 $3,038.32 $1,165.45 $49,296.29 $4,901.96 $4,477.30 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $2,685.25 $298.36 $114.45 $1,701.14 $481.37 $89.93 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $65,564.57 $3,336.68 $1,279.90 $50,997.43 $5,383.33 $4,567.23 $0.00 $0.00 $0.00 $0.00 $0.00

Tasks 1 and 5 $7,903.91

Subtask 2

SITE : Florida State Fire College

SUBTASK 2: Soil and Groundwater Work Plan

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Review Soil and Groundwater Investigation Work Plan

(T. Kafka) 1

Principal Review SOW and LOE

(E. Sager) 1

Project Professional Prepare Soil and Groundwater Investigation Work Plan (4 hrs)

(M. Hensley) 4

Professional

(JJ Hollingshead)

Sr. Staff Professional Obtain subcontractor bids, Prepare SOW and LOE

(J. Mills) 4

Sr. Staff Professional

(D. Montiel)

Sr. Staff Professional

(O. Cain)

Staff Professional

(A. Batzer)

Staff Professional

(E. Fagre)

Admin

(A. Acosta)

TOTAL LABOR 10

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($36/110)

$36.00 days 0 $0.00

$110.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

Perma-Fix $0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Lump Sum 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

$0.00 Lump Sum 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 6020 - Arsenic $12.50 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

EPA 1312 - SPLP $48.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Deep Groundwater Sampling Kit $349.20 day 0 $0.00

Diffusion Sampler (Small Diameter - 2" Well) $21.87 each 0 $0.00

Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00

Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00

PBD Shipping - estimated $48.00 lump sum 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other

Archer Mini Storage Rental (May 2018 through May 2019) $44.83 month 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&C&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&L&F &D&CPage &P of &N&R&A

Subtask 3

SITE : Florida State Fire College

SUBTASK 3: Soil and Groundwater Investigation

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Preparing for and conducting field readiness review (1 hr), review Trip Report (1 hr)

(T. Kafka) 2

Principal Technical support prior to and during field investigations (8 hrs), review TACO (1 hr)

(E. Sager) 9

Project Professional Update Work Plan figures and prepare figures/tables for Trip Report (4 hrs)

(M. Hensley) 4

Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)

(JJ Hollingshead) 17

Sr. Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (3 days x 10 hrs = 30 hrs), mobilize/demobilize from hotel (2 days x 1 hr = 2 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)

(J. Mills) 44

Staff Professional Prepare TACO (1 hr)

(B. Abbott) 1

Sr. Staff Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct DPT soil sampling (21 hrs), mobilize/demobilize from hotel (3 days x 1 hr = 3 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hr)

(O. Cain) 33

Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hr), mobilize to site (2 hrs), conduct DPT groundwater sampling (2 days x 10 hrs = 20 hrs), mobilize/demobilize from hotel (1 day x 1 hr = 1 hr), demobilize from site (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (0 hrs), conduct DPT soil sampling (23 hrs), mobilize/demobilize from hotel (4 days x 1 hr = 4 hrs), demobilize from site (2 hrs), finalize and organize field notes (4 hrs), prepare Trip Report (4 hrs)

(A. Batzer) 70

Staff Professional Complete pre-field work and field preparation activities (1 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (1 hrs)

(E. Fagre) 15

Admin

(A. Acosta)

TOTAL LABOR 195

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck DPT sampling and Hand-Augering Soil Sampling (2 Days) $420.00 week 2 $840.00

Truck DPT Sampling $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $840.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($36/110)

JJ (1 day), E. Fagre (1 day), J. Mills (3 days), O. Cain (3 days), A. Batzer (5 days) $36.00 days 13 $468.00

$110.00 days 13 $1,430.00 subtotal $1,898.00

TOTAL TRAVEL $2,738.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

PDS; DPT soil and groundwater sampling $21,875.00 Lump Sum 1 $21,875.00

$0.00 Lump Sum 0 $0.00 subtotal $21,875.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

GeoTek - utility survey $750.00 Lump Sum 1 $750.00

Surv-Tech (TOC survey) $2,060.00 Lump Sum 1 $2,060.00 subtotal $2,810.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Lump Sum 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

$0.00 Lump Sum 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $24,685.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 6020 - Arsenic $12.50 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

EPA 1312 - SPLP $48.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Shallow Groundwater Sampling Kit $208.55 day $0.00

Shallow Groundwater Sampling Kit $834.20 week $0.00

Soil Assessment Kit $558.80 week 1 $558.80 subtotal $558.80

Analytical Related

Water Level Indicator $19.40 day 1 $19.40

Water Level Indicator $77.60 week 1 $77.60

Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00

Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00

PBD Shipping - estimated $48.00 lump sum 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $97.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables Hand-auger soil borings (1 day), DPT soil and groundwater sampling (8 days) $32.50 day 9 $292.50

Other

Total GPS Station $566.60 week 2 $1,133.20 subtotal $1,133.20

TOTAL FIELD EXPENSES $2,081.50

Subtask 3 TACO #1

SITE : Florida State Fire College

SUBTASK 3: Soil and Groundwater Investigation

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Preparing for and conducting field readiness review (1 hr), review Trip Report (1 hr)

(T. Kafka)

Principal Technical support prior to and during field investigations (8 hrs), review TACO (1 hr)

(E. Sager) 1

Project Professional Update Work Plan figures and prepare figures/tables for Trip Report (4 hrs)

(M. Hensley)

Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)

(JJ Hollingshead)

Sr. Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (3 days x 10 hrs = 30 hrs), mobilize/demobilize from hotel (2 days x 1 hr = 2 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)

(J. Mills)

Staff Professional Prepare TACO (1 hr)

(B. Abbott) 1

Sr. Staff Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct DPT soil sampling (-19 hrs), mobilize/demobilize from hotel (3 days x 1 hr = 3 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hr)

(O. Cain) -19

Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hr), mobilize to site (2 hrs), conduct DPT groundwater sampling (2 days x 10 hrs = 20 hrs), mobilize/demobilize from hotel (1 day x 1 hr = 1 hr), demobilize from site (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (-1 day x 10 hrs = -10 hrs), conduct DPT soil sampling (-17 hrs), mobilize/demobilize from hotel (4 days x 1 hr = 4 hrs), demobilize from site (2 hrs), finalize and organize field notes (4 hrs), prepare Trip Report (4 hrs)

(A. Batzer) -27

Staff Professional Complete pre-field work and field preparation activities (1 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (1 hrs)

(E. Fagre)

Admin

(A. Acosta)

TOTAL LABOR -44

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck DPT sampling $420.00 week $0.00

Truck Hand-auger soil sampling (2 days) $97.00 day -2 ($194.00)

Car $68.00 day 0 $0.00 subtotal ($194.00)

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($36/110)

JJ (1 day), E. Fagre (1 day), J. Mills (3 days), O. Cain (-1 days), A. Batzer (-2 days) $36.00 days -3 ($108.00)

$110.00 days -3 ($330.00) subtotal ($438.00)

TOTAL TRAVEL ($632.00)

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

PDS; DPT soil and groundwater sampling $7,000.00 Lump Sum -1 ($7,000.00)

$0.00 Lump Sum 0 $0.00 subtotal ($7,000.00)

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

GeoTek - utility survey $750.00 Lump Sum 0 $0.00

Surv-Tech (TOC survey) $2,060.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Lump Sum 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

$0.00 Lump Sum 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) ($7,000.00)

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 6020 - Arsenic $12.50 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

EPA 1312 - SPLP $48.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Shallow Groundwater Sampling Kit $208.55 day $0.00

Shallow Groundwater Sampling Kit $834.20 week $0.00

Soil Assessment Kit $558.80 week 0 $0.00 subtotal $0.00

Analytical Related

Water Level Indicator $19.40 day 0 $0.00

Water Level Indicator $77.60 week 0 $0.00

Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00

Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00

PBD Shipping - estimated $48.00 lump sum 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables Hand-auger soil borings (1 day), DPT soil and groundwater sampling (-2 days) $32.50 day -2 ($65.00)

Other

Total GPS Station $566.60 week 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES ($65.00)

Subtask 4

SITE : Florida State Fire College

SUBTASK 4: Preparation of Summary Tables and Figures

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

(T. Kafka)

Principal Technical support and review (4 hrs)

(E. Sager) 4

Project Professional Process soil sampling data (electronic data deliverables) and prepare figures/tables summarizing the soil sampling results, DPT groundwater groundwater sampling results, and MW sampling results completed by FDEP (32 hrs)

(M. Hensley) 32

Professional

(JJ Hollingshead)

Sr. Staff Professional

(J. Mills)

Sr. Staff Professional

(D. Montiel)

Sr. Staff Professional

(O. Cain)

Staff Professional Evaluate data, prepare cross sections, review figures/tables (8 hrs)

(A. Batzer) 8

Staff Professional

(E. Fagre)

Admin

(A. Acosta)

TOTAL LABOR 44

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($36/110)

$36.00 days 0 $0.00

JJ (5 days), D. Montiel (5 days) $110.00 days $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

Surv-Tech (TOC survey) $1,000.00 Lump Sum $0.00 subtotal $0.00

IDW

Permafix $0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Lump Sum 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

$0.00 Lump Sum 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 6020 - Arsenic $12.50 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

EPA 1312 - SPLP $48.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Shallow Groundwater Sampling Kit $834.20 week $0.00

Diffusion Sampler (Small Diameter - 2" Well) $21.87 each 0 $0.00

Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00

Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00

PBD Shipping - estimated $48.00 lump sum 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables Groundwater sampling (5 days) $32.50 day $0.00

Other

Lump Sum $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 5

SITE : Florida State Fire College

SUBTASK 5: IDW Management

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

(T. Kafka)

Principal Review Trip Report (1 hr)

(E. Sager) 1

Project Professional

(M. Hensley)

Professional

(JJ Hollingshead)

Sr. Staff Professional

(J. Mills)

Sr. Staff Professional

(D. Montiel)

Sr. Staff Professional

(O. Cain)

Staff Professional Mobilize to site (2 hrs), IDW management (4 hrs), demobilize from site (2 hrs), finalize and organize field notes and prepare Trip Report (2 hrs)

(A. Batzer) 10

Staff Professional

(E. Fagre)

Admin

(A. Acosta)

TOTAL LABOR 11

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 1 $97.00

Car $68.00 day 0 $0.00 subtotal $97.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($36/110)

$36.00 days 0 $0.00

$110.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $97.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

Universal Environmental Solutions, LLC $3,120.00 Lump Sum 1 $3,120.00

$0.00 Lump Sum 0 $0.00 subtotal $3,120.00

Utilities

$0.00 Lump Sum 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

$0.00 Lump Sum 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $3,120.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 6020 - Arsenic $12.50 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

EPA 1312 - SPLP $48.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Deep Groundwater Sampling Kit $349.20 day 0 $0.00

Diffusion Sampler (Small Diameter - 2" Well) $21.87 each 0 $0.00

Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00

Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00

PBD Shipping - estimated $48.00 lump sum 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 1 $32.50

Other

Lump Sum $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $32.50

Subtask 6

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

(E. Sager)

Associate

Project Engineer

Professional (Engineer)

(W. Morrison)

Professional (Scientist/GIS)

(M. Hensley)

Sr. Staff Hydrogeologist

Senior Staff Professional (Engineer)

(A. Johnson)

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $0.00 0 0 $0.00

EPA 8021 - Soil $0.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) ft 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $104.50 drum 0 $0.00

GW Drum Disposal (non-haz) $104.50 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 7

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Staff Engineer

Scientist/GIS

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $66.00 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) ft 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 8

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $66.00 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) ft 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $0.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 9

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $66.00 0 0 $0.00

EPA 8021 - Soil $66.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $184.30 day 0 $0.00

Soil Assessment Kit $139.70 day 0 $0.00

Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) ft 0 $0.00

Tubing (polyethylene) ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 10

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 1/9/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $420.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .