FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: Site # 92SL-1, ERIC_6494, Florida State Fire College Site File
FROM: David Meyers, Contract Manager
SUBJECT: Negotiation Summary
HW550 SL-0A060
Change Order #1
DATE: January 15, 2020
This Change Order reduces costs for DPT ground water and soil sampling (by two days) and decreases labor hours associated with that work at the Florida State Fire College, as requested in the January 9, 2020 Geosyntec email. This Change Order also reduces IDW costs.
Total cost decrease is $13,901.53. Geosyntec’s time, labor and subcontractor costs for these activities have been reviewed and are appropriate. No revisions or negotiations were required. The level-of-effort and cost estimate of $65,564.47 is reasonable for the scope of services.
From: Boone Abbott To: Meyers, David Cc: Eric Sager; Todd Kafka Subject: FSFC - SOL-0A060 TACO Date: Thursday, January 9, 2020 3:03:55 PM Attachments: FSFC_TACO #1_CEF-LOE_0A060.XLS
Hi Dave, Please find the attached TACO for the November 2019 DPT soil and groundwater sampling event.
This work is under TA SOL-0A060. Please let me know if you have any questions.
Thanks, J. Boone Abbott Staff Professional Geosyntec Consultants, Inc.
12802 Tampa Oaks Blvd, Suite 151 Tampa, FL 33637 Phone: 813-379-4408 Mobile: 205-914-1978 www.geosyntec.com mailto:babbott@Geosyntec.com mailto:David.Meyers@dep.state.fl.us mailto:ESager@Geosyntec.com mailto:TKafka@Geosyntec.com https://clicktime.symantec.com/3FEnrwby8Zv2iwAvGeFSCuq7Vc?u=http%3A%2F%2Fwww.geosyntec.com%2F
Original CEF
Contractor: Geosyntec Consultants
Date: 10/23/19
Task #: SubTask 1 Project Management SubTask 6
Site: Florida State Fire College SubTask 2 Soil and Groundwater Work Plan SubTask 7
Activity/Phase: Investigation SubTask 3 Soil and Groundwater Investigation SubTask 8
Project Manager: Eric Sager SubTask 4 Preparation of Summary Tables and Figures SubTask 9
SubTask 5 IDW Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
Geosyntec Consultants
$65.38 Project Manager E. Sager 19 19.1
$1.00 Principal 0 0 0 0 0 0 0 0 0 0
$65.38 Principal E. Sager 14 1 8 4 1 0 0 0 0 0
$60.10 Principal T.Kafka 3 1 2 0 0 0 0 0 0 0
$1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$40.38 Project Professional (Scientist/GIS) M. Hensley 40 4 4 32 0 0 0 0 0 0
$34.14 Professional JJ 17 0 17 0 0 0 0 0 0 0
$33.17 Senior Staff Engineer J Mills 48 4 44 0 0 0 0 0 0 0
$1.00 Professional (Engineer) 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0
$1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$29.81 Senior Staff Professional D Montiel 0 0 0 0 0 0 0 0 0 0
$31.49 Senior Staff Professional O Cain 52 0 52 0 0 0 0 0 0 0
$26.44 Staff Professional A. Batzer 115 0 97 8 10 0 0 0 0 0
$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0
$23.00 Admin Asst A. Acosta 0 0 0 0 0 0 0 0 0 0
$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0
$1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0
$1.00 Designer 0 0 0 0 0 0 0 0 0 0
$27.40 Staff Professional E. Fagre 15 0 15 0 0 0 0 0 0 0
$1.00 Field Manager 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0
$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 323.0 19 10 239 44 11 0 0 0 0 0
Direct Labor $11,219.00 $1,246.56 $419.68 $7,457.78 $1,765.20 $329.78 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $19,375.22 $2,152.81 $724.79 $12,879.59 $3,048.50 $569.53 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $30,594.22 $3,399.37 $1,144.47 $20,337.37 $4,813.70 $899.31 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $560.95 $62.33 $20.98 $372.89 $88.26 $16.49 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $1,131.00 $0.00 $1,034.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $2,336.00 $0.00 $2,336.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $3,467.00 $0.00 $3,370.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $28,875.00 $0.00 $28,875.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $2,810.00 $0.00 $2,810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $4,320.00 $0.00 $0.00 $0.00 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $36,005.00 $0.00 $31,685.00 $0.00 $4,320.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $3,600.50 $0.00 $3,168.50 $0.00 $432.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $39,605.50 $0.00 $34,853.50 $0.00 $4,752.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $390.00 $0.00 $357.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $558.80 $0.00 $558.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) - PDBs $1,133.20 $0.00 $1,133.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $2,179.00 $0.00 $2,146.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $76,406.67 $3,461.70 $1,165.45 $61,080.26 $4,901.96 $5,797.30 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $3,059.43 $339.94 $114.45 $2,033.74 $481.37 $89.93 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $79,466.10 $3,801.64 $1,279.90 $63,114.00 $5,383.33 $5,887.23 $0.00 $0.00 $0.00 $0.00 $0.00
Tasks 1 and 5 $9,688.87
&C&"CG Times,Bold"&16FDEP COST ESTIMATE
&L&"Courier New,Bold"&10REV: 02/03&C&"Courier New,Bold"&10CEF_GEO.XLS&R&"Courier New,Bold"&10Page &P
TACO #1 CEF
Contractor: Geosyntec Consultants
Date: 1/9/20
Task #: SubTask 1 Project Management SubTask 6
Site: Florida State Fire College SubTask 2 Soil and Groundwater Work Plan SubTask 7
Activity/Phase: Investigation SubTask 3 Soil and Groundwater Investigation SubTask 8
Project Manager: Eric Sager SubTask 4 Preparation of Summary Tables and Figures SubTask 9
SubTask 5 IDW Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
Geosyntec Consultants
$65.38 Project Manager E. Sager -2 -2.3
$1.00 Principal 0 0 0 0 0 0 0 0 0 0
$65.38 Principal E. Sager 1 0 1 0 0 0 0 0 0 0
$60.10 Principal T.Kafka 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$40.38 Project Professional (Scientist/GIS) M. Hensley 0 0 0 0 0 0 0 0 0 0
$34.14 Professional JJ 0 0 0 0 0 0 0 0 0 0
$33.17 Senior Staff Engineer J Mills 0 0 0 0 0 0 0 0 0 0
$1.00 Professional (Engineer) 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0
$27.16 Staff Professional B. Abbott 1 0 1 0 0 0 0 0 0 0
$1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0
$1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$29.81 Senior Staff Professional D Montiel 0 0 0 0 0 0 0 0 0 0
$31.49 Senior Staff Professional O Cain -19 0 -19 0 0 0 0 0 0 0
$26.44 Staff Professional A. Batzer -27 0 -27 0 0 0 0 0 0 0
$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0
$23.00 Admin Asst A. Acosta 0 0 0 0 0 0 0 0 0 0
$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0
$1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0
$1.00 Designer 0 0 0 0 0 0 0 0 0 0
$27.40 Staff Professional E. Fagre 0 0 0 0 0 0 0 0 0 0
$1.00 Field Manager 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0
$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours -46.0 -2 0 -44 0 0 0 0 0 0 0
Direct Labor ($1,372.11) ($152.46) $0.00 ($1,219.65) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% ($2,369.64) ($263.30) $0.00 ($2,106.34) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor ($3,741.75) ($415.76) $0.00 ($3,325.99) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs ($68.60) ($7.62) $0.00 ($60.98) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental ($194.00) $0.00 ($194.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel ($438.00) $0.00 ($438.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel ($632.00) $0.00 ($632.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) ($7,000.00) $0.00 ($7,000.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW ($1,200.00) $0.00 $0.00 $0.00 ($1,200.00) $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($8,200.00) $0.00 ($7,000.00) $0.00 ($1,200.00) $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee ($820.00) $0.00 ($700.00) $0.00 ($120.00) $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost ($9,020.00) $0.00 ($7,700.00) $0.00 ($1,320.00) $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables ($65.00) $0.00 ($65.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) - PDBs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses ($65.00) $0.00 ($65.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($13,527.35) ($423.38) $0.00 ($11,783.97) $0.00 ($1,320.00) $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee ($374.18) ($41.58) $0.00 ($332.60) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($13,901.53) ($464.96) $0.00 ($12,116.57) $0.00 ($1,320.00) $0.00 $0.00 $0.00 $0.00 $0.00
Tasks 1 and 5 ($1,784.96)
Final CEF
Contractor: Geosyntec Consultants
Date: 1/9/20
Task #: SubTask 1 Project Management SubTask 6
Site: Florida State Fire College SubTask 2 Soil and Groundwater Work Plan SubTask 7
Activity/Phase: Investigation SubTask 3 Soil and Groundwater Investigation SubTask 8
Project Manager: Eric Sager SubTask 4 Preparation of Summary Tables and Figures SubTask 9
SubTask 5 IDW Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
Geosyntec Consultants
$65.38 Project Manager E. Sager 17 16.7
$1.00 Principal 0 0 0 0 0 0 0 0 0 0
$65.38 Principal E. Sager 15 1 9 4 1 0 0 0 0 0
$60.10 Principal T.Kafka 3 1 2 0 0 0 0 0 0 0
$1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$40.38 Project Professional (Scientist/GIS) M. Hensley 40 4 4 32 0 0 0 0 0 0
$34.14 Professional JJ 17 0 17 0 0 0 0 0 0 0
$33.17 Senior Staff Engineer J Mills 48 4 44 0 0 0 0 0 0 0
$1.00 Professional (Engineer) 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0
$27.16 Staff Professional B. Abbott 1 0 1 0 0 0 0 0 0 0
$1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0
$1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$29.81 Senior Staff Professional D Montiel 0 0 0 0 0 0 0 0 0 0
$31.49 Senior Staff Professional O Cain 33 0 33 0 0 0 0 0 0 0
$26.44 Staff Professional A. Batzer 88 0 70 8 10 0 0 0 0 0
$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0
$23.00 Admin Asst A. Acosta 0 0 0 0 0 0 0 0 0 0
$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0
$1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0
$1.00 Designer 0 0 0 0 0 0 0 0 0 0
$27.40 Staff Professional E. Fagre 15 0 15 0 0 0 0 0 0 0
$1.00 Field Manager 0 0 0 0 0 0 0 0 0 0
$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0
$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 277.0 17 10 195 44 11 0 0 0 0 0
Direct Labor $9,846.89 $1,094.10 $419.68 $6,238.13 $1,765.20 $329.78 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $17,005.58 $1,889.51 $724.79 $10,773.25 $3,048.50 $569.53 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $26,852.47 $2,983.61 $1,144.47 $17,011.38 $4,813.70 $899.31 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $492.35 $54.71 $20.98 $311.91 $88.26 $16.49 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $937.00 $0.00 $840.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $1,898.00 $0.00 $1,898.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $2,835.00 $0.00 $2,738.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $21,875.00 $0.00 $21,875.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $2,810.00 $0.00 $2,810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $3,120.00 $0.00 $0.00 $0.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $27,805.00 $0.00 $24,685.00 $0.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $2,780.50 $0.00 $2,468.50 $0.00 $312.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $30,585.50 $0.00 $27,153.50 $0.00 $3,432.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $325.00 $0.00 $292.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $558.80 $0.00 $558.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) - PDBs $1,133.20 $0.00 $1,133.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $2,114.00 $0.00 $2,081.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $62,879.32 $3,038.32 $1,165.45 $49,296.29 $4,901.96 $4,477.30 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $2,685.25 $298.36 $114.45 $1,701.14 $481.37 $89.93 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $65,564.57 $3,336.68 $1,279.90 $50,997.43 $5,383.33 $4,567.23 $0.00 $0.00 $0.00 $0.00 $0.00
Tasks 1 and 5 $7,903.91
Subtask 2
SITE : Florida State Fire College
SUBTASK 2: Soil and Groundwater Work Plan
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Review Soil and Groundwater Investigation Work Plan
(T. Kafka) 1
Principal Review SOW and LOE
(E. Sager) 1
Project Professional Prepare Soil and Groundwater Investigation Work Plan (4 hrs)
(M. Hensley) 4
Professional
(JJ Hollingshead)
Sr. Staff Professional Obtain subcontractor bids, Prepare SOW and LOE
(J. Mills) 4
Sr. Staff Professional
(D. Montiel)
Sr. Staff Professional
(O. Cain)
Staff Professional
(A. Batzer)
Staff Professional
(E. Fagre)
Admin
(A. Acosta)
TOTAL LABOR 10
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($36/110)
$36.00 days 0 $0.00
$110.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
Perma-Fix $0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Lump Sum 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
$0.00 Lump Sum 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 6020 - Arsenic $12.50 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
EPA 1312 - SPLP $48.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Deep Groundwater Sampling Kit $349.20 day 0 $0.00
Diffusion Sampler (Small Diameter - 2" Well) $21.87 each 0 $0.00
Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00
Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00
PBD Shipping - estimated $48.00 lump sum 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other
Archer Mini Storage Rental (May 2018 through May 2019) $44.83 month 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&C&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&L&F &D&CPage &P of &N&R&A
Subtask 3
SITE : Florida State Fire College
SUBTASK 3: Soil and Groundwater Investigation
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Preparing for and conducting field readiness review (1 hr), review Trip Report (1 hr)
(T. Kafka) 2
Principal Technical support prior to and during field investigations (8 hrs), review TACO (1 hr)
(E. Sager) 9
Project Professional Update Work Plan figures and prepare figures/tables for Trip Report (4 hrs)
(M. Hensley) 4
Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)
(JJ Hollingshead) 17
Sr. Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (3 days x 10 hrs = 30 hrs), mobilize/demobilize from hotel (2 days x 1 hr = 2 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)
(J. Mills) 44
Staff Professional Prepare TACO (1 hr)
(B. Abbott) 1
Sr. Staff Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct DPT soil sampling (21 hrs), mobilize/demobilize from hotel (3 days x 1 hr = 3 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hr)
(O. Cain) 33
Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hr), mobilize to site (2 hrs), conduct DPT groundwater sampling (2 days x 10 hrs = 20 hrs), mobilize/demobilize from hotel (1 day x 1 hr = 1 hr), demobilize from site (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (0 hrs), conduct DPT soil sampling (23 hrs), mobilize/demobilize from hotel (4 days x 1 hr = 4 hrs), demobilize from site (2 hrs), finalize and organize field notes (4 hrs), prepare Trip Report (4 hrs)
(A. Batzer) 70
Staff Professional Complete pre-field work and field preparation activities (1 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (1 hrs)
(E. Fagre) 15
Admin
(A. Acosta)
TOTAL LABOR 195
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck DPT sampling and Hand-Augering Soil Sampling (2 Days) $420.00 week 2 $840.00
Truck DPT Sampling $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $840.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($36/110)
JJ (1 day), E. Fagre (1 day), J. Mills (3 days), O. Cain (3 days), A. Batzer (5 days) $36.00 days 13 $468.00
$110.00 days 13 $1,430.00 subtotal $1,898.00
TOTAL TRAVEL $2,738.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
PDS; DPT soil and groundwater sampling $21,875.00 Lump Sum 1 $21,875.00
$0.00 Lump Sum 0 $0.00 subtotal $21,875.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
GeoTek - utility survey $750.00 Lump Sum 1 $750.00
Surv-Tech (TOC survey) $2,060.00 Lump Sum 1 $2,060.00 subtotal $2,810.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Lump Sum 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
$0.00 Lump Sum 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $24,685.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 6020 - Arsenic $12.50 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
EPA 1312 - SPLP $48.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Shallow Groundwater Sampling Kit $208.55 day $0.00
Shallow Groundwater Sampling Kit $834.20 week $0.00
Soil Assessment Kit $558.80 week 1 $558.80 subtotal $558.80
Analytical Related
Water Level Indicator $19.40 day 1 $19.40
Water Level Indicator $77.60 week 1 $77.60
Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00
Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00
PBD Shipping - estimated $48.00 lump sum 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $97.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables Hand-auger soil borings (1 day), DPT soil and groundwater sampling (8 days) $32.50 day 9 $292.50
Other
Total GPS Station $566.60 week 2 $1,133.20 subtotal $1,133.20
TOTAL FIELD EXPENSES $2,081.50
Subtask 3 TACO #1
SITE : Florida State Fire College
SUBTASK 3: Soil and Groundwater Investigation
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Preparing for and conducting field readiness review (1 hr), review Trip Report (1 hr)
(T. Kafka)
Principal Technical support prior to and during field investigations (8 hrs), review TACO (1 hr)
(E. Sager) 1
Project Professional Update Work Plan figures and prepare figures/tables for Trip Report (4 hrs)
(M. Hensley)
Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)
(JJ Hollingshead)
Sr. Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (3 days x 10 hrs = 30 hrs), mobilize/demobilize from hotel (2 days x 1 hr = 2 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hrs)
(J. Mills)
Staff Professional Prepare TACO (1 hr)
(B. Abbott) 1
Sr. Staff Professional Complete pre-field work and field preparation activities (2 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct DPT soil sampling (-19 hrs), mobilize/demobilize from hotel (3 days x 1 hr = 3 hrs), demobilize from site (2 hrs), finalize and organize field notes (2 hr)
(O. Cain) -19
Staff Professional Complete pre-field work and field preparation activities (4 hrs), preparing for and conducting field readiness review (2 hr), mobilize to site (2 hrs), conduct DPT groundwater sampling (2 days x 10 hrs = 20 hrs), mobilize/demobilize from hotel (1 day x 1 hr = 1 hr), demobilize from site (2 hrs), mobilize to site (2 hrs), conduct DPT groundwater sampling (-1 day x 10 hrs = -10 hrs), conduct DPT soil sampling (-17 hrs), mobilize/demobilize from hotel (4 days x 1 hr = 4 hrs), demobilize from site (2 hrs), finalize and organize field notes (4 hrs), prepare Trip Report (4 hrs)
(A. Batzer) -27
Staff Professional Complete pre-field work and field preparation activities (1 hrs), preparing for and conducting field readiness review (1 hr), mobilize to site (2 hrs), conduct hand-auger soil sampling and decontamination (8 borings, = 8 hrs), demobilize from site (2 hrs), finalize and organize field notes (1 hrs)
(E. Fagre)
Admin
(A. Acosta)
TOTAL LABOR -44
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck DPT sampling $420.00 week $0.00
Truck Hand-auger soil sampling (2 days) $97.00 day -2 ($194.00)
Car $68.00 day 0 $0.00 subtotal ($194.00)
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($36/110)
JJ (1 day), E. Fagre (1 day), J. Mills (3 days), O. Cain (-1 days), A. Batzer (-2 days) $36.00 days -3 ($108.00)
$110.00 days -3 ($330.00) subtotal ($438.00)
TOTAL TRAVEL ($632.00)
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
PDS; DPT soil and groundwater sampling $7,000.00 Lump Sum -1 ($7,000.00)
$0.00 Lump Sum 0 $0.00 subtotal ($7,000.00)
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
GeoTek - utility survey $750.00 Lump Sum 0 $0.00
Surv-Tech (TOC survey) $2,060.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Lump Sum 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
$0.00 Lump Sum 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) ($7,000.00)
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 6020 - Arsenic $12.50 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
EPA 1312 - SPLP $48.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Shallow Groundwater Sampling Kit $208.55 day $0.00
Shallow Groundwater Sampling Kit $834.20 week $0.00
Soil Assessment Kit $558.80 week 0 $0.00 subtotal $0.00
Analytical Related
Water Level Indicator $19.40 day 0 $0.00
Water Level Indicator $77.60 week 0 $0.00
Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00
Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00
PBD Shipping - estimated $48.00 lump sum 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables Hand-auger soil borings (1 day), DPT soil and groundwater sampling (-2 days) $32.50 day -2 ($65.00)
Other
Total GPS Station $566.60 week 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES ($65.00)
Subtask 4
SITE : Florida State Fire College
SUBTASK 4: Preparation of Summary Tables and Figures
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
(T. Kafka)
Principal Technical support and review (4 hrs)
(E. Sager) 4
Project Professional Process soil sampling data (electronic data deliverables) and prepare figures/tables summarizing the soil sampling results, DPT groundwater groundwater sampling results, and MW sampling results completed by FDEP (32 hrs)
(M. Hensley) 32
Professional
(JJ Hollingshead)
Sr. Staff Professional
(J. Mills)
Sr. Staff Professional
(D. Montiel)
Sr. Staff Professional
(O. Cain)
Staff Professional Evaluate data, prepare cross sections, review figures/tables (8 hrs)
(A. Batzer) 8
Staff Professional
(E. Fagre)
Admin
(A. Acosta)
TOTAL LABOR 44
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($36/110)
$36.00 days 0 $0.00
JJ (5 days), D. Montiel (5 days) $110.00 days $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
Surv-Tech (TOC survey) $1,000.00 Lump Sum $0.00 subtotal $0.00
IDW
Permafix $0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Lump Sum 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
$0.00 Lump Sum 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 6020 - Arsenic $12.50 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
EPA 1312 - SPLP $48.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Shallow Groundwater Sampling Kit $834.20 week $0.00
Diffusion Sampler (Small Diameter - 2" Well) $21.87 each 0 $0.00
Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00
Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00
PBD Shipping - estimated $48.00 lump sum 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables Groundwater sampling (5 days) $32.50 day $0.00
Other
Lump Sum $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Subtask 5
SITE : Florida State Fire College
SUBTASK 5: IDW Management
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
(T. Kafka)
Principal Review Trip Report (1 hr)
(E. Sager) 1
Project Professional
(M. Hensley)
Professional
(JJ Hollingshead)
Sr. Staff Professional
(J. Mills)
Sr. Staff Professional
(D. Montiel)
Sr. Staff Professional
(O. Cain)
Staff Professional Mobilize to site (2 hrs), IDW management (4 hrs), demobilize from site (2 hrs), finalize and organize field notes and prepare Trip Report (2 hrs)
(A. Batzer) 10
Staff Professional
(E. Fagre)
Admin
(A. Acosta)
TOTAL LABOR 11
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 1 $97.00
Car $68.00 day 0 $0.00 subtotal $97.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($36/110)
$36.00 days 0 $0.00
$110.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
Universal Environmental Solutions, LLC $3,120.00 Lump Sum 1 $3,120.00
$0.00 Lump Sum 0 $0.00 subtotal $3,120.00
Utilities
$0.00 Lump Sum 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
$0.00 Lump Sum 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $3,120.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 6020 - Arsenic $12.50 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
EPA 1312 - SPLP $48.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Deep Groundwater Sampling Kit $349.20 day 0 $0.00
Diffusion Sampler (Small Diameter - 2" Well) $21.87 each 0 $0.00
Diffusion Sample Kit (Weight/Fill Kit/Hanger Assembly) $28.15 each 0 $0.00
Diffusion Sampler Well Cap (2") $12.65 each 0 $0.00
PBD Shipping - estimated $48.00 lump sum 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 1 $32.50
Other
Lump Sum $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $32.50
Subtask 6
SITE : Geosyntec Consultants
SUBTASK: 0
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
(E. Sager)
Associate
Project Engineer
Professional (Engineer)
(W. Morrison)
Professional (Scientist/GIS)
(M. Hensley)
Sr. Staff Hydrogeologist
Senior Staff Professional (Engineer)
(A. Johnson)
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$35.00 days 0 $0.00
$75.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8021 - GW $0.00 0 0 $0.00
EPA 8021 - Soil $0.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Water Level Meter $20.00 day 0 $0.00
Submersible Pump $72.00 day 0 $0.00
Flow Cell $520.00 week 0 $0.00
Groundwater Sampling Kit $208.55 day 0 $0.00
Tubing (silicone) ft 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $104.50 drum 0 $0.00
GW Drum Disposal (non-haz) $104.50 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Subtask 7
SITE : Geosyntec Consultants
SUBTASK: 0
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Staff Engineer
Scientist/GIS
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$35.00 days 0 $0.00
$75.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8021 - GW $66.00 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Water Level Meter $20.00 day 0 $0.00
Submersible Pump $72.00 day 0 $0.00
Flow Cell $520.00 week 0 $0.00
Groundwater Sampling Kit $208.55 day 0 $0.00
Tubing (silicone) ft 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Subtask 8
SITE : Geosyntec Consultants
SUBTASK: 0
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$35.00 days 0 $0.00
$75.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8021 - GW $66.00 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Water Level Meter $20.00 day 0 $0.00
Submersible Pump $72.00 day 0 $0.00
Flow Cell $520.00 week 0 $0.00
Groundwater Sampling Kit $208.55 day 0 $0.00
Tubing (silicone) ft 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $0.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Subtask 9
SITE : Geosyntec Consultants
SUBTASK: 0
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$35.00 days 0 $0.00
$75.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8021 - GW $66.00 0 0 $0.00
EPA 8021 - Soil $66.00 0 0 $0.00
TO-14 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
0% $0.00 0 $0.00
0% $0.00 0 $0.00
0% $0.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $184.30 day 0 $0.00
Soil Assessment Kit $139.70 day 0 $0.00
Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $0.00
Analytical Related
Water Level Meter $20.00 day 0 $0.00
Submersible Pump $72.00 day 0 $0.00
Flow Cell $520.00 week 0 $0.00
Groundwater Sampling Kit $208.55 day 0 $0.00
Tubing (silicone) ft 0 $0.00
Tubing (polyethylene) ft 0 $0.00 subtotal $0.00
IDW Related
Drum $58.20 drum 0 $0.00
Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00
GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Subtask 10
SITE : Geosyntec Consultants
SUBTASK: 0
DATE: 1/9/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Truck $420.00 week 0 $0.00
Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00…