Task Assignment Notification Form Summary

This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract HW550, establishing a task order between the FDEP and Geosyntec Consultants for environmental remediation services at Paynes Prairie Preserve State Park (Site ID 60SL) in Alachua County, Florida. The task assignment was executed in September 2017, with Teresa Fischer designated as the Geosyntec contractor representative and Kelly Crain as the DEP Contract Manager.

The contract requires Geosyntec to conduct a "virtual remediation" analysis to calculate a 95% Upper Confidence Limit (UCL) for arsenic concentrations at Area of Concern 2 (AOC 2), enabling site closure under Risk Management Option III with institutional controls. The work comprises three subtasks: Project Management, Level of Effort (LOE) Preparation based on Florida Administrative Code Chapter 62-780 and 62-777 guidance, and 95% UCL Calculation and Reporting. Geosyntec will assume virtual removal and backfill of contaminated soil locations with clean material below 2.1 mg/kg arsenic concentration, using median method detection limits as surrogate values, and iteratively perform the analysis to achieve unit-wide arsenic concentrations below the recreational A-SCTL of 5.5 mg/kg. The total task assignment value is fixed at $7,355.15, with a single deliverable—the 95% UCL Report—due November 30, 2017, and the performance period extending through January 12, 2018. The contract specifies a fixed-price fee schedule structure with no retainage, and payment is contingent upon submission of the Work Plan, Level of Effort, and 95% UCL Report.

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
CN-370000-HW550-DC21H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ASSIGNMENT NOTIFICATION FORM

DEPGONTRACTNO. HW55O

SL.OO4Y

Geosyntec

Module #: NA Grant #: NA

Teresa Fischer

Task Assignment #:

Contractor Name:

Contractor Representative:

DEP Contract Manager:

DEP Site #:

Site Name:

Address(Slreet, City, County):

Phase:

Kellv Crain

60SL

Phone #: 850-245-8953

Paynes Prairie Preserve State Park

100 Savannah Micanoov. Alachua

AOC 2 95% UCL

Task Description [use additional pages if necessaryJ:

Conduct activites as ined in 8128117 orooosal at AOC 2 will perform "virtual remediation" to calculale a 95% UCL so that site closure ieved under RMO lll. Costs include 95% UCL calculalion and reporlinq.

The Deliverable and lnvoice Schedule is attached.

95% UCL ReoortFinal Deliverables:

Final Deliverable Due Date

Period of Performance:

11t30/2017

Execution of Task Assignment through:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

RETAINAGE:

TOÏAL TASK ASSIGNMENT VALUE: $7,355.15

1112t2018

Ðate:

Date:

Ðate:

Date:

ól* t/ralr;

f5 t+q

FIXED PRICE FEE SCHEDULE COST PLUS FIXËD FEE

COST REIMBURSEMENT FIXED FEE

$7,355.15

CC: Procurement Section (MS 93)

BWC TAFORM 03/03

Task Assignment Notification/Change Order Deliverables and lnvolce Schedule Attachment

Contract Number:

Task Assignment #:

HW 550

SL.OO4Y

Deliverables

Deliverable Deliverable Due Date

95"/b ULrL Keport i0-Nov-17 lnvoice Schedule:

irements for lnvoice Submittal Amount to be lnvoiced

$7,355.15Submiual of Work Plan a¡d LOÊ and |ío/"VCL Report (Subtask l, 2, and 3)

$7,355.15TOTAL COST

BWC TAFORM 2/03

From: Teresa Fischer To: Crain, Kelly Subject: Paynes Prairie Preserve State Park Area of Concern 2 Work Plan and LOE, dated 08282017 Date: Monday, August 28, 2017 6:15:37 PM Attachments: CEF_LOE_HW550 PPPSP AOC 2 08282017.xls

Deliverable and Invoice Schedule - PPPSP AOC 2 08282017.xls

Hi Kelly:

Please find attached Geosyntec’s revised proposed level of effort (LOE) to calculate a 95% Upper Confidence Limit (UCL) for Paynes Prairie Preserve State Park (PPPSP, Site ID No. 60SL-1) Area of Concern (AOC) 2 located in Alachua County, Florida. Geosyntec’s revised proposed work plan is described below and omits the development of a AOC 2 specific alternative soil cleanup target level and associated field activities. A deliverable schedule is also attached for grouped subtasks for invoicing.

Subtask 1: Project Management

Subtask 2: LOE Preparation – The LOE was developed based on guidance contained in Chapter 62- 780, Florida Administrative Code (FAC) and Chapter 62-777, FAC for conducting closure activities, including performing 95% UCL analyses.

Subtask 3: 95% UCL Calculation and Reporting – Geosyntec will perform “virtual remediation” to calculate an exposure unit-wide, 95% UCL of the arithmetic mean for arsenic so that site closure can be achieved under risk management option (RMO) III using institutional controls (on land use). The 95% UCL will be calculated in accordance with Chapter 62-780.680(3)(b)1 FAC and pursuant to Appendix D in Chapter 62-777, FAC.

For the virtual remediation scenario, it will be assumed that locations “virtually removed” will be back-filled with soil verified to have an arsenic concentration below 2.1 milligrams per kilogram (mg/kg). The median method detection limit for arsenic will be used in the 95% UCL calculation as a surrogate concentration for locations assumed to have clean back-fill. The virtual remediation process will be performed iteratively to achieve unit-wide arsenic concentrations (95% UCL values) below the recreational A-SCTL previously established by the FDEP of 5.5 mg/kg. Soil sampling results and 95% UCL calculations will be provided in a letter report and submitted to FDEP. The letter report will include recommendations and a plan for closure of PPPSP AOC 2.

Geosyntec sincerely appreciates the opportunity to assist the FDEP with the closure of PPPSP AOC 2.

Please contact me with any questions.

Warmest Regards, Teresa

Teresa A. Fischer, BCES Senior Geologist mailto:Kelly.Crain@dep.state.fl.us

Original LOE

Contractor: Geosyntec Consultants (HW550)

Date: 8/28/17

Task #: SubTask 1 Project Management SubTask 6

Site: PPPSP AOC 2 SubTask 2 LOE Preparation SubTask 7

Activity/Phase: 95 % UCL SubTask 3 95% UCL SubTask 8

Project Manager: T. Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

2 3 4 5 6 7 8 9 10

Labor Rate

Geosyntec Consultants

$49.27 Project Manager 5 5.4

$83.65 Principal KT 8 0 8 0 0 0 0 0 0 0

$65.38 Principal ML 1 1 0 0 0 0 0 0 0 0

$49.27 Senior Professional TF 5 2 3 0 0 0 0 0 0 0

$0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$34.13 Professional NP 28 0 28 0 0 0 0 0 0 0

$0.00 Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Professional 0 0 0 0 0 0 0 0 0 0

$36.54 Professional MH 4 0 4 0 0 0 0 0 0 0

$0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$26.75 Senior Staff Professional BD 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$26.44 Staff Professional AJ 0 0 0 0 0 0 0 0 0 0

$0.00 Clerical 0 0 0 0 0 0 0 0 0 0

$0.00 Clerical 0 0 0 0 0 0 0 0 0 0

$30.53 Admin Asst VS 2 0 2 0 0 0 0 0 0 0

$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 53 5 3 45 0 0 0 0 0 0 0

Direct Labor $2,411.76 $267.97 $163.92 $1,979.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $4,165.11 $462.78 $283.09 $3,419.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $6,576.87 $730.75 $447.01 $5,399.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs 5% $120.59 $13.40 $8.20 $98.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $97.00 $0.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $70.00 $0.00 $0.00 $70.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $167.00 $0.00 $0.00 $167.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $165.00 $0.00 $0.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $104.00 $0.00 $0.00 $104.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $269.00 $0.00 $0.00 $269.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $32.50 $0.00 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $144.00 $0.00 $0.00 $144.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $176.50 $0.00 $0.00 $176.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,309.96 $744.15 $455.21 $5,498.10 $612.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee 10% $657.69 $73.08 $44.70 $539.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,967.65 $817.23 $499.91 $6,038.01 $612.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&C&"CG Times,Bold"&16FDEP COST ESTIMATE

&L&"Courier New,Bold"&10REV: 02/03&C&"Courier New,Bold"&10CEF_GEO.XLS&R&"Courier New,Bold"&10Page &P

Subtask 2

SITE : PPPSP AOC 2

SUBTASK 2: LOE Preparation

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Principal Senior review of LOE

Lodato 1

Senior Professional Work plan development and LOE review

Fischer 2

Project Professional

Professional

Staff Professional

Drafter/CAD

Admin

TOTAL LABOR 3

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem

Two People, One Day $35.00 days 0 $0.00

Hotel $110.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $39.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&C&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&L&F &D&CPage &P of &N&R&A

Subtask 3

SITE : PPPSP AOC 2

SUBTASK 3: 95% UCL

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Direct and provide senior review of the 95% UCL

Tolson 8

Principal

Senior Professional Review the letter report for the 95% UCL and provide recommendations

Fischer 3

Professional Calculate the 95% UCL and prepare a letter report

Pinochet 28

Senior Staff Professional

Staff Professional

Professional/GIS Prepare figures for the letter report

Hensley 4

Admin

Strickland 2

TOTAL LABOR 45

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per Diem $35.00 days 0 $0.00

Hotel days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 6010B - Water $0.00 0 0 $0.00

EPA 6010B - Soil $15.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $0.00 0 $0.00

3 days 50% $7.50 0 $0.00

1 week 15% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 4

SITE : PPPSP AOC 2

SUBTASK 4: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Principal

Senior Professional

Fischer

Project Professional

Senior Staff Professional

Dawson

Staff Professional

Johnson

Drafter/CAD

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 1 $97.00

Van $97.00 days 0 $0.00 subtotal $97.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/85)

Based on GSA FY 2013 $35.00 days 2 $70.00 days 0 $0.00 subtotal $70.00

TOTAL TRAVEL $167.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

Lump Sum 0 $0.00

Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

TRPH FLPRO - soil $0.00 0 0 $0.00

TRPH FLPRO - water $0.00 0 0 $0.00

Arsenic - soil $15.00 10 1 $165.00

8-RCRA Metals soil/water $0.00 0 0 $0.00

VOCs 8260B soil/water $0.00 0 0 $0.00 subtotal $165.00

Fast Turnaround Charges Percent

24 hours 100% $0.00 0 $0.00

3 days 50% $0.00 0 $0.00

1 week 15% $2.25 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 1 $104.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $104.00

TOTAL LABORATORY $269.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 1 $144.00

Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $144.00

Analytical Related

Shallow Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 0 $0.00

GW Drum Disposal (non-haz) $0.00 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 1 $32.50

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $176.50

Subtask 5

SITE : PPPSP AOC 2

SUBTASK 5: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Tolson

Principal

Senior Professional

Fischer

Project Professional

Professional

Pinochet

Staff Professional

Professional/GIS

Hensley

Admin

Stricland

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $125.00 drum 0 $0.00

GW Drum Disposal (non-haz) $125.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 6

SITE : Geosyntec Consultants (HW550)

SUBTASK 6: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Tolson

Associate

Lodato

Senior Scientist

Fischer

Project Geologist

Getchell

Senior Staff Scientist

Brandon

Senior Staff Geologist

Stapley

Scientist/GIS

Barface

Drafter/CAD

Admin

Strickland

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 7

SITE : Geosyntec Consultants (HW550)

SUBTASK 7: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 8

SITE : Geosyntec Consultants (HW550)

SUBTASK 8: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 9

SITE : Geosyntec Consultants (HW550)

SUBTASK 9: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Subtask 10

SITE : Geosyntec Consultants (HW550)

SUBTASK 10: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Geosyntec Labor Costs $266.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $669.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$65.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$98.54 $147.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $955.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $146.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $61.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars -Geosyntec $266.06 $163.92 $1,979.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Equipment Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Services Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $2,143.79 = sum of Direct Labor Costs from Subtasks 2 through 10

$267.97 =12.5% of Direct Labor Costs (Project Management)

5.439 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

&A

Page &P

Task Assignment Notification

DEP Contract Number: HW504 Task Assignment #: SL 13 B Module #:

Contractor Name: GeoSyntec Consultants

Contractor Representative: Mr. Mike Lodato

DEP Contract Manager: Ms. Gwen F. Beatty Phone #: (850) 245-8927

DEP Site #: #047 SL

Site Name: Bald Point State Park

Address(Street, City, County): 146 Box Cut Road, Alligator Point, Franklin County, FL

Phase: Site Reconnaissance & Work Plan Preparation

Task Description [use additional pages if necessary]:

Conduct limited site assessment activities and source removal at AOC 1 (CDV) and limited soil sampling at AOC 2 (Turpentine Shanty )as outlined in the proposal dated June 21, 2010.

Final Deliverable: Site Assessment/Limited Source Removal Report Final Deliverable Due Date: 31-Dec-2010

Period of Performance: Execution of Task Assignment through 31-Dec-2010

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED PRICE FEE SCHEDULE COST PLUS FIXED FEE

Fixed Price : $21,472.74 $1,295.56 Cost Reimbursement: $0.00

Fixed Fee: $0.00

Total Task Assignment Value: $22,768.30

DEP Project Manager: Date: 1-Jul-2010

DEP Contract Manager: Date: 1-Jul-2010

Cost Center Administrator: Date: 1-Jul-2010

Contractor Representative: Date:

CC: Gwenn Godfrey, Contracts Office (MS 93)

Bureau of Finance & Accounting (MS 78) - 2 Copies

HWCS Representative ________

&C&"Times New Roman,Bold"&14Task Assignment Notification Form

&R&8BWC TAFORM 03/03

Deliverable & Invoice Schedule

Contract Number: HW550

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

95% UCL Report 30-Nov-17

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

Submittal of Work Plan and LOE and 95%UCL Report (Subtask 1, 2, and 3) $7,967.65

TOTAL COST $7,967.65

&C&"Times New Roman,Bold"&14Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

&R&"Times New Roman,Regular"&9BWC TAFORM 2/03

Geosyntec Consultants The Terraces 180A Market Place Boulevard Knoxville, TN 37922 Phone: (865) 330-0037 Direct: (865) 291-4709 Mobile: (904) 608-8833 www.Geosyntec.com

This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system.

Please consider the environment before printing this e-mail.

http://www.geosyntec.com/

FDEP COST ESTIMATEContractor: Geosyntec Consultants (HW550)

Date: 8/28/2017

Task #: SubTask 1 Project Management SubTask 6

Site: PPPSP AOC 2 SubTask 2 LOE Preparation SubTask 7

Activity/Phase: 95 % UCL SubTask 3 95% UCL SubTask 8

Project Manager: T. Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

2 3 4 5 6 7 8 9 10 Labor Rate

Geosyntec Consultants $49.27 Project Manager 5 5.4 $83.65 Principal KT 8 0 8 0 0 0 0 0 0 0 $65.38 Principal ML 1 1 0 0 0 0 0 0 0 0 $49.27 Senior Professional TF 5 2 3 0 0 0 0 0 0 0

$0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$34.13 Professional NP 28 0 28 0 0 0 0 0 0 0 $0.00 Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Professional 0 0 0 0 0 0 0 0 0 0

$36.54 Professional MH 4 0 4 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$26.75 Senior Staff Professional BD 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$26.44 Staff Professional AJ 0 0 0 0 0 0 0 0 0 0 $0.00 Clerical 0 0 0 0 0 0 0 0 0 0 $0.00 Clerical 0 0 0 0 0 0 0 0 0 0

$30.53 Admin Asst VS 2 0 2 0 0 0 0 0 0 0 $0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0 $0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0 $0.00 Designer 0 0 0 0 0 0 0 0 0 0 $0.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 53 5 3 45 0 0 0 0 0 0 0

Direct Labor $2,411.76 $267.97 $163.92 $1,979.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $4,165.11 $462.78 $283.09 $3,419.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,576.87 $730.75 $447.01 $5,399.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs 5% $120.59 $13.40 $8.20 $98.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 1

FDEP COST ESTIMATEContractor: Geosyntec Consultants (HW550)

Date: 8/28/2017

Task #: SubTask 1 Project Management SubTask 6

Site: PPPSP AOC 2 SubTask 2 LOE Preparation SubTask 7

Activity/Phase: 95 % UCL SubTask 3 95% UCL SubTask 8

Project Manager: T. Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,697.46 $744.15 $455.21 $5,498.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee 10% $657.69 $73.08 $44.70 $539.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,355.15 $817.23 $499.91 $6,038.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

SITE : PPPSP AOC 2

SUBTASK 2: LOE Preparation

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Principal Lodato 1

Senior Professional Fischer 2

Project Professional

Professional

Staff Professional

Drafter/CAD

Admin

TOTAL LABOR 3

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Car $68.00 days 0 $0.00 Truck $97.00 days 0 $0.00 Van $97.00 days 0 $0.00 subtotal $0.00 Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00 Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00 Per diem Two People, One Day $35.00 days 0 $0.00 Hotel $110.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00 Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00 Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying $0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities $0.00 Month 0 $0.00 $0.00 Month 0 $0.00 subtotal $0.00

Other None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

Senior review of LOE

Work plan development and LOE review

CEF_LOE_HW550 PPPSP AOC 2 08282017 (002)

9/13/2017 Page 3 of 6 Subtask 2

SUBTASK 2: LOE Preparation

DATE: 8/28/17

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix EPA 8260 - Water $66.00 0 0 $0.00 EPA 8260 - Soil $66.00 0 0 $0.00 TO-15 - Gas $200.00 0 0 $0.00 Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 subtotal $0.00 Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00 3 days 50% $33.00 0 $0.00 1 week 15% $30.00 0 $0.00 subtotal $0.00 Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection Level D PPE $28.00 day 0 $0.00 subtotal $0.00 Drilling Related Monitoring Well Installation Kit $190.00 day 0 $0.00 Soil Assessment Kit $144.00 day 0 $0.00 Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00 Analytical Related Groundwater Sampling Kit $215.00 day 0 $0.00 Other $0.00 day 0 $0.00 Other $0.00 day 0 $0.00 subtotal $0.00 IDW Related Drum $60.00 drum 0 $0.00 Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00 GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $39.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

9/13/2017 Page 4 of 6 Subtask 2

SUBTASK 3: 95% UCL

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Tolson 8

Principal

Senior Professional Fischer 3

Professional Pinochet 28

Senior Staff Professional

Staff Professional

Professional/GIS Hensley 4

Admin Strickland 2

TOTAL LABOR 45

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Car $68.00 days 0 $0.00 Truck $97.00 days 0 $0.00 Van $97.00 days 0 $0.00 subtotal $0.00 Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00 Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per Diem $35.00 days 0 $0.00 Hotel days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00 Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00 Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities $0.00 Month 0 $0.00 $0.00 Month 0 $0.00 subtotal $0.00

Other None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

Prepare figures for the letter report

Direct and provide senior review of the 95% UCL

Review the letter report for the 95% UCL and provide recommendations

Calculate the 95% UCL and prepare a letter report

9/13/2017 Page 5 of 6 Subtask 3

SUBTASK 3: 95% UCL

DATE: 8/28/17

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix EPA 6010B - Water $0.00 0 0 $0.00 EPA 6010B - Soil $15.00 0 0 $0.00 Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 subtotal $0.00 Fast Turnaround Charges Percent

24 hours 100% $0.00 0 $0.00 3 days 50% $7.50 0 $0.00 1 week 15% $0.00 0 $0.00 subtotal $0.00 Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection Level D PPE $28.00 day 0 $0.00 subtotal $0.00 Drilling Related Monitoring Well Installation Kit $190.00 day 0 $0.00 Soil Assessment Kit $144.00 day 0 $0.00 Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00 Analytical Related Groundwater Sampling Kit $215.00 day 0 $0.00 Other $0.00 day 0 $0.00 Other $0.00 day 0 $0.00 subtotal $0.00 IDW Related Drum $60.00 drum 0 $0.00 Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00 GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00