This document is a Task Assignment Notification Change Order Form for contract HW550 administered by the Florida Department of Environmental Protection (FDEP). The contractor is Geosyntec Consultants, represented by Teresa Fischer, with DEP Contract Manager Kelly Crain overseeing the work. The task assignment (SIS-013A) pertains to investigation-derived waste (IDW) disposal services at the Bayou Texar site in Pensacola, Escambia County, Florida.

The contract involves coordination of the removal, transport, and disposal of ten 55-gallon polyethylene drums containing IDW with radium 226/228 exceedances requiring management as Low-Level Radioactive Waste (LLRW). The scope encompasses four primary subtasks: LOE Preparation, Waste Profile Development, IDW Disposal Activities, and Reporting. The original task amount was $9,458.81, with Change Order #2 adding $35,108.02 for LLRW disposal costs, bringing the total task amount with all change orders to $44,566.83. The final deliverable is waste manifests with a due date of November 30, 2017. The contract operates on a fixed-price basis with no additional fee schedules. Change Order #1 extended the completion date from October 20, 2017 to December 29, 2017 (a two-month extension), and Change Order #2 further extended it to January 31, 2018 (a one-month extension).

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
CN-370000-HW550-DC21H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12/20/2017

From: Teresa Fischer To: Crain, Kelly Subject: RE: Northeast Florida Aquatic Preserve Office Investigative Derived Waste Disposal Date: Tuesday, December 19, 2017 10:31:25 PM Attachments: LLW IDW Profiling and Disposal_LOE_Task Assignment SIS-013A Change Oder #1 12192017.xlsx

Hi Kelly:

Attached please find the Task Assignment Change Order for Bayou Texar. Additional funds are requested to cover the costs associated with Low-Level Radioactive Waste Disposal.

Please contact me with any questions.

Warmest Regards and Season’s Greetings!

Teresa

From: Teresa Fischer Sent: Monday, August 28, 2017 5:34 PM To: Crain, Kelly (Kelly.Crain@dep.state.fl.us) <Kelly.Crain@dep.state.fl.us> Subject: Northeast Florida Aquatic Preserve Office Investigative Derived Waste Disposal

Hi Kelly:

Please find attached Geosyntec’s proposed level of effort (LOE) to coordinate the disposal of Investigation Derived Waste (IDW) at the Florida Department of Environmental Protection (FDEP) - Northwest Florida Aquatic Preserves Office located at 3000 Environmental Place in Pensacola, Escambia County, Florida.

On August 18, 2017, FDEP requested Geosyntec coordinate the disposal of ten, 55-gallon polyethylene drums containing IDW stored at an FDEP facility located at 3000 Environmental Place, Pensacola, Florida. The IDW contains water with exceedances of radium 226/228 and therefore needs to be managed as Low Level Radioactive Waste (LLW). Geosyntec’s proposed work plan is described below. PermaFix of Florida, Inc. has been selected to remove the treat the IDW.

The required tasks for the disposal work are described below:

Subtask 1: LOE Preparation

Subtask 2: Waste Profile Development – Geosyntec will work with the waste disposal facility (PermaFix) to develop a waste profile for the IDW based on the waste characterization laboratory analytical reports provided by FDEP.

Subtask 3: IDW Disposal Activities – Using the PermaFix-approved waste profile, Geosyntec will coordinate with an approved LLW waste transporter and LLW waste disposal facility to properly transport and dispose of the IDW.

mailto:Kelly.Crain@dep.state.fl.us

Original LOE

Contractor: Geosyntec Consultants (HW550)

Date: 8/28/17

Task #: SIS-013A SubTask 1 Project Management SubTask 6

Site: Northwest Florida Aquatic Preserves Office SubTask 2 LOE Preparation SubTask 7

Activity/Phase: IDW Disposal SubTask 3 Waste Profile Development SubTask 8

Project Manager: T. Fischer SubTask 4 IDW Disposal Activities SubTask 9

SubTask 5 Reporting SubTask 10

2 3 4 5 6 7 8 9 10

Labor Rate

Geosyntec Consultants

$0.00 Project Manager 0 0.0

$0.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0

$0.00 Principal 0 0 0 0 0 0 0 0 0 0

$49.27 Senior Scientist TF 6 1 2 2 1 0 0 0 0 0

$0.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0

$36.54 Hydrogeologist CT 0 0 0 0 0 0 0 0 0 0

$0.00 Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Scientist/GIS 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0

$26.75 Senior Staff Scientist CP 2 2 0 0 0 0 0 0 0 0

$0.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Clerical 0 0 0 0 0 0 0 0 0 0

$0.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0

$0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0

$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0

$0.00 Field Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 8 0 3 2 2 1 0 0 0 0 0

Direct Labor $392.76 $43.64 $102.77 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $678.30 $75.37 $177.48 $170.18 $170.18 $85.09 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $1,071.06 $119.01 $280.25 $268.72 $268.72 $134.36 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs 5% $19.64 $2.18 $5.14 $4.93 $4.93 $2.46 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $7,510.00 $0.00 $0.00 $7,510.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $7,510.00 $0.00 $0.00 $7,510.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $751.00 $0.00 $0.00 $751.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $8,261.00 $0.00 $0.00 $8,261.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $9,351.70 $121.19 $285.39 $273.65 $8,534.65 $136.82 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee 10% $107.11 $11.90 $28.03 $26.87 $26.87 $13.44 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $9,458.81 $133.09 $313.42 $300.52 $8,561.52 $150.26 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

CO#1

Contractor: Geosyntec Consultants (HW550)

Date: 12/19/17

Task #: SIS-013A SubTask 1 Project Management SubTask 6

Site: Bayou Texar SubTask 2 LOE Preparation SubTask 7

Activity/Phase: IDW Disposal SubTask 3 Waste Profile Development SubTask 8

Project Manager: T. Fischer SubTask 4 IDW Disposal Activities SubTask 9

SubTask 5 Reporting SubTask 10

2 3 4 5 6 7 8 9 10

Labor Rate

Geosyntec Consultants

$0.00 Project Manager 0 0.0

$0.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0

$0.00 Principal 0 0 0 0 0 0 0 0 0 0

$49.27 Senior Scientist TF 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0

$36.54 Hydrogeologist CT 0 0 0 0 0 0 0 0 0 0

$0.00 Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Scientist/GIS 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0

$26.75 Senior Staff Scientist CP 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Clerical 0 0 0 0 0 0 0 0 0 0

$0.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0

$0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0

$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0

$0.00 Field Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 0 0 0 0 0 0 0 0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs 5% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $35,108.02 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $35,108.02 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $35,108.02 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $35,108.02 $0.00 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee 10% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $35,108.02 $0.00 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

Final

Contractor: Geosyntec Consultants (HW550)

Date: 12/19/17

Task #: SIS-013A SubTask 1 Project Management SubTask 6

Site: Northwest Florida Aquatic Preserves Office SubTask 2 LOE Preparation SubTask 7

Activity/Phase: IDW Disposal SubTask 3 Waste Profile Development SubTask 8

Project Manager: T. Fischer SubTask 4 IDW Disposal Activities SubTask 9

SubTask 5 Reporting SubTask 10

2 3 4 5 6 7 8 9 10

Labor Rate

Geosyntec Consultants

$0.00 Project Manager 0 0.0

$0.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0

$0.00 Principal 0 0 0 0 0 0 0 0 0 0

$49.27 Senior Scientist TF 6 1 2 2 1 0 0 0 0 0

$0.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0

$36.54 Hydrogeologist CT 0 0 0 0 0 0 0 0 0 0

$0.00 Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Scientist/GIS 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0

$26.75 Senior Staff Scientist CP 2 2 0 0 0 0 0 0 0 0

$0.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0

$0.00 Clerical 0 0 0 0 0 0 0 0 0 0

$0.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0

$0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0

$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0

$0.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0

$0.00 Field Manager 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 8 0 3 2 2 1 0 0 0 0 0

Direct Labor $392.76 $43.64 $102.77 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $678.30 $75.37 $177.48 $170.18 $170.18 $85.09 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $1,071.06 $119.01 $280.25 $268.72 $268.72 $134.36 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs 5% $19.64 $2.18 $5.14 $4.93 $4.93 $2.46 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $42,618.02 $0.00 $0.00 $42,618.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $42,618.02 $0.00 $0.00 $42,618.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $751.00 $0.00 $0.00 $751.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $43,369.02 $0.00 $0.00 $43,369.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $44,459.72 $121.19 $285.39 $273.65 $43,642.67 $136.82 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee 10% $107.11 $11.90 $28.03 $26.87 $26.87 $13.44 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $44,566.83 $133.09 $313.42 $300.52 $43,669.54 $150.26 $0.00 $0.00 $0.00 $0.00 $0.00

Original - $9,458.81

TACO - $35,108.02

Final - $44,566.83

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

Subtask 2

SITE : Northwest Florida Aquatic Preserves Office

SUBTASK 2: LOE Preparation

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Principal

Principal

Senior Scientist Review LOE (1hr)

Fischer 1

Project Geologist

Senior Staff Scientist Develop LOE (2 hr)

Pracheil 2

Staff Engineer

Drafter/CAD

Admin

TOTAL LABOR 3

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem

Two People, One Day $35.00 days 0 $0.00

Hotel $110.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $39.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&F &D Page &P of &N &A

Subtask 3

SITE : Northwest Florida Aquatic Preserves Office

SUBTASK 3: Waste Profile Development

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Principal

Principal

Lodato

Senior Scientist Develop waste profile based on waste characterization laboratory analytical reports; coordinate waste profile approval (2 hrs)

Fischer 2

Project Geologist

Senior Staff Scientist

Senior Staff Engineer

Scientist/GIS

Admin

TOTAL LABOR 2

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per Diem $35.00 days 0 $0.00

Hotel $130.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Per Drum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

EPA 6020 $15.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $2.25 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $0.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $140.00 day 0 $0.00

GPS subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 4

SITE : Northwest Florida Aquatic Preserves Office

SUBTASK 4: IDW Disposal Activities

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Principal

Principal

Senior Scientist Coordinate IDW pickp and schedule with advance notification

Fischer 2

Project Geologist

Hydrogeologist

Senior Staff Scientist

Scientist/GIS

Admin

TOTAL LABOR 2

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per Diem $35.00 days 0 $0.00

Hotel $130.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

PermaFix - 10 Drums of Nonhazardous IDW $7,510.00 Lump Sum 1 $7,510.00

Lump Sum 0 $0.00 subtotal $7,510.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $7,510.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

EPA 6020 $15.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $2.25 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $0.00

Analytical Related

Shallow Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Other $0.00 0 $0.00

Other $0.00 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

GPS $140.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 4_CO#1

SITE : Bayou Texar

SUBTASK 4: IDW Disposal Activities

DATE: 12/19/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Principal

Principal

Senior Scientist Coordinate IDW pickp and schedule with advance notification

Fischer

Project Geologist

Hydrogeologist

Senior Staff Scientist

Scientist/GIS

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per Diem $35.00 days 0 $0.00

Hotel $130.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

PermaFix - 10 Drums of LLRW IDW $35,108.02 Lump Sum 1 $35,108.02

Lump Sum 0 $0.00 subtotal $35,108.02

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $35,108.02

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

EPA 6020 $15.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $2.25 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $0.00

Analytical Related

Shallow Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Other $0.00 0 $0.00

Other $0.00 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

GPS $140.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 4 _Final

SITE : Northwest Florida Aquatic Preserves Office

SUBTASK 4: IDW Disposal Activities

DATE: 12/19/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Principal

Principal

Senior Scientist Coordinate IDW pickp and schedule with advance notification

Fischer 2

Project Geologist

Hydrogeologist

Senior Staff Scientist

Scientist/GIS

Admin

TOTAL LABOR 2

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per Diem $35.00 days 0 $0.00

Hotel $130.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

PermaFix - 10 Drums of Nonhazardous IDW $42,618.02 Lump Sum 1 $42,618.02

Lump Sum 0 $0.00 subtotal $42,618.02

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $42,618.02

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

EPA 6020 $15.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $2.25 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $0.00

Analytical Related

Shallow Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Other $0.00 0 $0.00

Other $0.00 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

GPS $140.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 5

SITE : Northwest Florida Aquatic Preserves Office

SUBTASK 5: Reporting

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Principal

Senior Scientist Field package review and submittal (1 hr)

Fischer 1

Project Geologist

Senior Staff Engineer

Site Manager

Scientist/GIS

Admin

TOTAL LABOR 1

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

Permafix disposal of 55-gallon soil/water drum $125.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $125.00 drum 0 $0.00

GW Drum Disposal (non-haz) $125.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 6

SITE : Geosyntec Consultants (HW550)

SUBTASK 6: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Lodato

Senior Scientist

Project Geologist

Senior Staff Engineer

Senior Staff Geologist

Scientist/GIS

Drafter/CAD

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 7

SITE : Geosyntec Consultants (HW550)

SUBTASK 7: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $30.00 0 0 $0.00

TRPH- FL Pro -Water $40.00 0 0 $0.00

8-RCRA Metals - Water $65.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $30.00 0 $0.00

3 days 50% $20.00 0 $0.00

1 week 15% $9.75 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $215.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 8

SITE : Geosyntec Consultants (HW550)

SUBTASK 8: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 9

SITE : Geosyntec Consultants (HW550)

SUBTASK 9: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 10

SITE : Geosyntec Consultants (HW550)

SUBTASK 10: 0

DATE: 8/28/17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Car $68.00 days 0 $0.00

Truck $97.00 days 0 $0.00

Van $97.00 days 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$0.00 days 0 $0.00

$0.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Water $66.00 0 0 $0.00

EPA 8260 - Soil $66.00 0 0 $0.00

TO-15 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

24 hours 100% $66.00 0 $0.00

3 days 50% $33.00 0 $0.00

1 week 15% $30.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Groundwater Sampling Kit $215.00 day 0 $0.00

Other $0.00 day 0 $0.00

Other $0.00 day 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00

GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Geosyntec Labor Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$49.27 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$53.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars -Geosyntec $0.00 $102.77 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Equipment Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Services Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .