- Contract number
- HW550
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Change Order Form for contract HW550 administered by the Florida Department of Environmental Protection (FDEP). The contractor is Geosyntec Consultants, represented by Teresa Fischer, with DEP Contract Manager Kelly Crain overseeing the work. The task assignment (SIS-013A) pertains to investigation-derived waste (IDW) disposal services at the Bayou Texar site in Pensacola, Escambia County, Florida.
The contract involves coordination of the removal, transport, and disposal of ten 55-gallon polyethylene drums containing IDW with radium 226/228 exceedances requiring management as Low-Level Radioactive Waste (LLRW). The scope encompasses four primary subtasks: LOE Preparation, Waste Profile Development, IDW Disposal Activities, and Reporting. The original task amount was $9,458.81, with Change Order #2 adding $35,108.02 for LLRW disposal costs, bringing the total task amount with all change orders to $44,566.83. The final deliverable is waste manifests with a due date of November 30, 2017. The contract operates on a fixed-price basis with no additional fee schedules. Change Order #1 extended the completion date from October 20, 2017 to December 29, 2017 (a two-month extension), and Change Order #2 further extended it to January 31, 2018 (a one-month extension).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/20/2017
From: Teresa Fischer To: Crain, Kelly Subject: RE: Northeast Florida Aquatic Preserve Office Investigative Derived Waste Disposal Date: Tuesday, December 19, 2017 10:31:25 PM Attachments: LLW IDW Profiling and Disposal_LOE_Task Assignment SIS-013A Change Oder #1 12192017.xlsx
Hi Kelly:
Attached please find the Task Assignment Change Order for Bayou Texar. Additional funds are requested to cover the costs associated with Low-Level Radioactive Waste Disposal.
Please contact me with any questions.
Warmest Regards and Season’s Greetings!
Teresa
From: Teresa Fischer Sent: Monday, August 28, 2017 5:34 PM To: Crain, Kelly (Kelly.Crain@dep.state.fl.us) <Kelly.Crain@dep.state.fl.us> Subject: Northeast Florida Aquatic Preserve Office Investigative Derived Waste Disposal
Hi Kelly:
Please find attached Geosyntec’s proposed level of effort (LOE) to coordinate the disposal of Investigation Derived Waste (IDW) at the Florida Department of Environmental Protection (FDEP) - Northwest Florida Aquatic Preserves Office located at 3000 Environmental Place in Pensacola, Escambia County, Florida.
On August 18, 2017, FDEP requested Geosyntec coordinate the disposal of ten, 55-gallon polyethylene drums containing IDW stored at an FDEP facility located at 3000 Environmental Place, Pensacola, Florida. The IDW contains water with exceedances of radium 226/228 and therefore needs to be managed as Low Level Radioactive Waste (LLW). Geosyntec’s proposed work plan is described below. PermaFix of Florida, Inc. has been selected to remove the treat the IDW.
The required tasks for the disposal work are described below:
Subtask 1: LOE Preparation
Subtask 2: Waste Profile Development – Geosyntec will work with the waste disposal facility (PermaFix) to develop a waste profile for the IDW based on the waste characterization laboratory analytical reports provided by FDEP.
Subtask 3: IDW Disposal Activities – Using the PermaFix-approved waste profile, Geosyntec will coordinate with an approved LLW waste transporter and LLW waste disposal facility to properly transport and dispose of the IDW.
mailto:Kelly.Crain@dep.state.fl.us
Original LOE
Contractor: Geosyntec Consultants (HW550)
Date: 8/28/17
Task #: SIS-013A SubTask 1 Project Management SubTask 6
Site: Northwest Florida Aquatic Preserves Office SubTask 2 LOE Preparation SubTask 7
Activity/Phase: IDW Disposal SubTask 3 Waste Profile Development SubTask 8
Project Manager: T. Fischer SubTask 4 IDW Disposal Activities SubTask 9
SubTask 5 Reporting SubTask 10
2 3 4 5 6 7 8 9 10
Labor Rate
Geosyntec Consultants
$0.00 Project Manager 0 0.0
$0.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0
$0.00 Principal 0 0 0 0 0 0 0 0 0 0
$49.27 Senior Scientist TF 6 1 2 2 1 0 0 0 0 0
$0.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0
$36.54 Hydrogeologist CT 0 0 0 0 0 0 0 0 0 0
$0.00 Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Scientist/GIS 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0
$26.75 Senior Staff Scientist CP 2 2 0 0 0 0 0 0 0 0
$0.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Clerical 0 0 0 0 0 0 0 0 0 0
$0.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0
$0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0
$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0
$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0
$0.00 Designer 0 0 0 0 0 0 0 0 0 0
$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0
$0.00 Field Manager 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0
$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 8 0 3 2 2 1 0 0 0 0 0
Direct Labor $392.76 $43.64 $102.77 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $678.30 $75.37 $177.48 $170.18 $170.18 $85.09 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $1,071.06 $119.01 $280.25 $268.72 $268.72 $134.36 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs 5% $19.64 $2.18 $5.14 $4.93 $4.93 $2.46 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $7,510.00 $0.00 $0.00 $7,510.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $7,510.00 $0.00 $0.00 $7,510.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $751.00 $0.00 $0.00 $751.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $8,261.00 $0.00 $0.00 $8,261.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,351.70 $121.19 $285.39 $273.65 $8,534.65 $136.82 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee 10% $107.11 $11.90 $28.03 $26.87 $26.87 $13.44 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,458.81 $133.09 $313.42 $300.52 $8,561.52 $150.26 $0.00 $0.00 $0.00 $0.00 $0.00
&"CG Times,Bold"&16FDEP COST ESTIMATE
&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P
CO#1
Contractor: Geosyntec Consultants (HW550)
Date: 12/19/17
Task #: SIS-013A SubTask 1 Project Management SubTask 6
Site: Bayou Texar SubTask 2 LOE Preparation SubTask 7
Activity/Phase: IDW Disposal SubTask 3 Waste Profile Development SubTask 8
Project Manager: T. Fischer SubTask 4 IDW Disposal Activities SubTask 9
SubTask 5 Reporting SubTask 10
2 3 4 5 6 7 8 9 10
Labor Rate
Geosyntec Consultants
$0.00 Project Manager 0 0.0
$0.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0
$0.00 Principal 0 0 0 0 0 0 0 0 0 0
$49.27 Senior Scientist TF 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0
$36.54 Hydrogeologist CT 0 0 0 0 0 0 0 0 0 0
$0.00 Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Scientist/GIS 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0
$26.75 Senior Staff Scientist CP 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Clerical 0 0 0 0 0 0 0 0 0 0
$0.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0
$0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0
$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0
$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0
$0.00 Designer 0 0 0 0 0 0 0 0 0 0
$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0
$0.00 Field Manager 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0
$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 0 0 0 0 0 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs 5% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $35,108.02 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $35,108.02 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $35,108.02 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $35,108.02 $0.00 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee 10% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $35,108.02 $0.00 $0.00 $0.00 $35,108.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
&"CG Times,Bold"&16FDEP COST ESTIMATE
&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P
Final
Contractor: Geosyntec Consultants (HW550)
Date: 12/19/17
Task #: SIS-013A SubTask 1 Project Management SubTask 6
Site: Northwest Florida Aquatic Preserves Office SubTask 2 LOE Preparation SubTask 7
Activity/Phase: IDW Disposal SubTask 3 Waste Profile Development SubTask 8
Project Manager: T. Fischer SubTask 4 IDW Disposal Activities SubTask 9
SubTask 5 Reporting SubTask 10
2 3 4 5 6 7 8 9 10
Labor Rate
Geosyntec Consultants
$0.00 Project Manager 0 0.0
$0.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0
$0.00 Principal 0 0 0 0 0 0 0 0 0 0
$49.27 Senior Scientist TF 6 1 2 2 1 0 0 0 0 0
$0.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0
$36.54 Hydrogeologist CT 0 0 0 0 0 0 0 0 0 0
$0.00 Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Scientist/GIS 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0
$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0
$26.75 Senior Staff Scientist CP 2 2 0 0 0 0 0 0 0 0
$0.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0
$0.00 Clerical 0 0 0 0 0 0 0 0 0 0
$0.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0
$0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0
$0.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0
$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0
$0.00 Designer 0 0 0 0 0 0 0 0 0 0
$0.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0
$0.00 Field Manager 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0
$0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 8 0 3 2 2 1 0 0 0 0 0
Direct Labor $392.76 $43.64 $102.77 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $678.30 $75.37 $177.48 $170.18 $170.18 $85.09 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $1,071.06 $119.01 $280.25 $268.72 $268.72 $134.36 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs 5% $19.64 $2.18 $5.14 $4.93 $4.93 $2.46 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $42,618.02 $0.00 $0.00 $42,618.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $42,618.02 $0.00 $0.00 $42,618.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $751.00 $0.00 $0.00 $751.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $43,369.02 $0.00 $0.00 $43,369.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $44,459.72 $121.19 $285.39 $273.65 $43,642.67 $136.82 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee 10% $107.11 $11.90 $28.03 $26.87 $26.87 $13.44 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $44,566.83 $133.09 $313.42 $300.52 $43,669.54 $150.26 $0.00 $0.00 $0.00 $0.00 $0.00
Original - $9,458.81
TACO - $35,108.02
Final - $44,566.83
&"CG Times,Bold"&16FDEP COST ESTIMATE
&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P
Subtask 2
SITE : Northwest Florida Aquatic Preserves Office
SUBTASK 2: LOE Preparation
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Principal
Principal
Senior Scientist Review LOE (1hr)
Fischer 1
Project Geologist
Senior Staff Scientist Develop LOE (2 hr)
Pracheil 2
Staff Engineer
Drafter/CAD
Admin
TOTAL LABOR 3
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem
Two People, One Day $35.00 days 0 $0.00
Hotel $110.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
TO-15 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $30.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $39.00 day 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&F &D Page &P of &N &A
Subtask 3
SITE : Northwest Florida Aquatic Preserves Office
SUBTASK 3: Waste Profile Development
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Principal
Principal
Lodato
Senior Scientist Develop waste profile based on waste characterization laboratory analytical reports; coordinate waste profile approval (2 hrs)
Fischer 2
Project Geologist
Senior Staff Scientist
Senior Staff Engineer
Scientist/GIS
Admin
TOTAL LABOR 2
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per Diem $35.00 days 0 $0.00
Hotel $130.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Per Drum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
EPA 6020 $15.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $2.25 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $0.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $140.00 day 0 $0.00
GPS subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 4
SITE : Northwest Florida Aquatic Preserves Office
SUBTASK 4: IDW Disposal Activities
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Principal
Principal
Senior Scientist Coordinate IDW pickp and schedule with advance notification
Fischer 2
Project Geologist
Hydrogeologist
Senior Staff Scientist
Scientist/GIS
Admin
TOTAL LABOR 2
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per Diem $35.00 days 0 $0.00
Hotel $130.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
PermaFix - 10 Drums of Nonhazardous IDW $7,510.00 Lump Sum 1 $7,510.00
Lump Sum 0 $0.00 subtotal $7,510.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $7,510.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
EPA 6020 $15.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $2.25 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $0.00
Analytical Related
Shallow Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Other $0.00 0 $0.00
Other $0.00 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
GPS $140.00 day 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 4_CO#1
SITE : Bayou Texar
SUBTASK 4: IDW Disposal Activities
DATE: 12/19/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Principal
Principal
Senior Scientist Coordinate IDW pickp and schedule with advance notification
Fischer
Project Geologist
Hydrogeologist
Senior Staff Scientist
Scientist/GIS
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per Diem $35.00 days 0 $0.00
Hotel $130.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
PermaFix - 10 Drums of LLRW IDW $35,108.02 Lump Sum 1 $35,108.02
Lump Sum 0 $0.00 subtotal $35,108.02
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $35,108.02
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
EPA 6020 $15.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $2.25 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $0.00
Analytical Related
Shallow Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Other $0.00 0 $0.00
Other $0.00 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
GPS $140.00 day 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 4 _Final
SITE : Northwest Florida Aquatic Preserves Office
SUBTASK 4: IDW Disposal Activities
DATE: 12/19/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Principal
Principal
Senior Scientist Coordinate IDW pickp and schedule with advance notification
Fischer 2
Project Geologist
Hydrogeologist
Senior Staff Scientist
Scientist/GIS
Admin
TOTAL LABOR 2
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per Diem $35.00 days 0 $0.00
Hotel $130.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
PermaFix - 10 Drums of Nonhazardous IDW $42,618.02 Lump Sum 1 $42,618.02
Lump Sum 0 $0.00 subtotal $42,618.02
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $42,618.02
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
EPA 6020 $15.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $2.25 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Well Supplies (Atlantic Drilling Supply) $156.38 LS 0 $0.00 subtotal $0.00
Analytical Related
Shallow Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Other $0.00 0 $0.00
Other $0.00 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
GPS $140.00 day 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 5
SITE : Northwest Florida Aquatic Preserves Office
SUBTASK 5: Reporting
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Principal
Senior Scientist Field package review and submittal (1 hr)
Fischer 1
Project Geologist
Senior Staff Engineer
Site Manager
Scientist/GIS
Admin
TOTAL LABOR 1
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$0.00 days 0 $0.00
$0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
Permafix disposal of 55-gallon soil/water drum $125.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
TO-15 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $30.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $125.00 drum 0 $0.00
GW Drum Disposal (non-haz) $125.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 6
SITE : Geosyntec Consultants (HW550)
SUBTASK 6: 0
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Lodato
Senior Scientist
Project Geologist
Senior Staff Engineer
Senior Staff Geologist
Scientist/GIS
Drafter/CAD
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$0.00 days 0 $0.00
$0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
TO-15 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $30.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 7
SITE : Geosyntec Consultants (HW550)
SUBTASK 7: 0
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$0.00 days 0 $0.00
$0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $30.00 0 0 $0.00
TRPH- FL Pro -Water $40.00 0 0 $0.00
8-RCRA Metals - Water $65.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $30.00 0 $0.00
3 days 50% $20.00 0 $0.00
1 week 15% $9.75 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $215.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 8
SITE : Geosyntec Consultants (HW550)
SUBTASK 8: 0
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$0.00 days 0 $0.00
$0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
TO-15 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $30.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 9
SITE : Geosyntec Consultants (HW550)
SUBTASK 9: 0
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$0.00 days 0 $0.00
$0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
TO-15 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $30.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Subtask 10
SITE : Geosyntec Consultants (HW550)
SUBTASK 10: 0
DATE: 8/28/17
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Associate
Senior Scientist
Engineer
Sr. Engineer
Geologist
Sr. Staff Hydrogeologist
Admin
TOTAL LABOR 0
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental
Car $68.00 days 0 $0.00
Truck $97.00 days 0 $0.00
Van $97.00 days 0 $0.00 subtotal $0.00
Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00
Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00
Per diem ($35/75)
$0.00 days 0 $0.00
$0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying
$0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
$0.00 Month 0 $0.00
$0.00 Month 0 $0.00 subtotal $0.00
Other
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00
None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - Water $66.00 0 0 $0.00
EPA 8260 - Soil $66.00 0 0 $0.00
TO-15 - Gas $200.00 0 0 $0.00
Other $0.00 0 0 $0.00
Other $0.00 0 0 $0.00 subtotal $0.00
Fast Turnaround Charges Percent
24 hours 100% $66.00 0 $0.00
3 days 50% $33.00 0 $0.00
1 week 15% $30.00 0 $0.00 subtotal $0.00
Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00
Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection
Level D PPE $28.00 day 0 $0.00 subtotal $0.00
Drilling Related
Monitoring Well Installation Kit $190.00 day 0 $0.00
Soil Assessment Kit $144.00 day 0 $0.00
Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00
Analytical Related
Groundwater Sampling Kit $215.00 day 0 $0.00
Other $0.00 day 0 $0.00
Other $0.00 day 0 $0.00 subtotal $0.00
IDW Related
Drum $60.00 drum 0 $0.00
Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00
GW Drum Disposal (non-haz) $0.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $32.50 day 0 $0.00
Other $0.00 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
&D Page &P of &N &A
Formula Sheet
Project Management
Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10
Geosyntec Labor Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$49.27 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$53.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars -Geosyntec $0.00 $102.77 $98.54 $98.54 $49.27 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Equipment Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Services Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .