CN-370000-HW550-DC21H.pdf
PDF 655 KB Posted
- Contract number
- HW550
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for DEP Contract No. HW550, a state contract managed by the Florida Department of Environmental Protection (FDEP). The task assignment (DC021H) was issued to Geosyntec Consultants for work at the Jet Cleaners facility located at 1440-21 Dunn Avenue, Jacksonville, Duval County, Florida (FDEP Site ERIC_4564). The contract was executed on April 3, 2020, with task manager and contract manager Killian Talley representing FDEP, and contractor representative Michael N. Lodato representing Geosyntec Consultants.
This task assignment authorizes Geosyntec to conduct annual groundwater monitoring and reporting in accordance with a Natural Attenuation with Monitoring (NAM) plan. The work encompasses three subtasks: (1) Project Management, (2) 2020 Annual Groundwater Monitoring involving collection of samples from seven monitoring wells using passive diffusion bags and analysis via EPA Method 8260 for volatile organic compounds, and (3) preparation of a Natural Attenuation Monitoring Letter Report with GIS data updates. The total task assignment value is $5,505.59, structured as a fixed price with retainage of $0.00. The final deliverable—the Natural Attenuation Monitoring Letter Report and GIS/ADaPT Update—was due November 30, 2020, with a performance period extending through March 5, 2021. Invoicing was contingent upon FDEP receipt and approval of the deliverables, with the full amount due upon completion.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW550
D000 N/ADC021H
Geosyntec Consultants
Mike Lodato
850-245-8928Killian Talley
ERIC_4564
Jet Cleaners
1440-21 Dunn Avenue, Jacksonville, Duval County
Monitoring
This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring in accordance with the April 3, 2020 scope of work and cost estimate.
Natural Attenuation Monitoring Letter Report & GIS/ADaPT Update
11/30/2020
03/05/2021
$ 5,505.59 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Killian Talley Digitally signed by Killian Talley Date: 2020.04.03 16:31:40 -04'00'
Killian Talley Digitally signed by Killian Talley Date: 2020.04.03 16:32:08 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.08 09:13:30 -04'00'
Michael N. Lodato Digitally signed by Michael N. Lodato Date: 2020.04.08 10:46:47 -04'00'
$ 5,505.59
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-3: Submittal of Natural Attenuation Monitoring Letter Report & GIS/ADaPT Update 11/30/2020
Subtasks 1-3: FDEP receipt and approval of Natural Attenuation Monitoring Letter Report & GIS/ADaPT Update $ 5,505.59
$ 5,505.59
HW550
DC021H
Florida Department of Memorandum Environmental Protection
To: HW550 Contract Negotiation File Jet Cleaners Jacksonville, Duval County
ERIC_4564
From: Killian Talley, Project Manager, Date: April 3, 2020 Subject: Negotiation Summary
HW550 DC021H
Task Assignment HW550 DC021H is for Geosyntec to conduct annual groundwater sampling using the annual sampling schedule.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: 2020 Annual Groundwater Monitoring Under this subtask Geosyntec will mobilize to site for collection of groundwater samples from monitoring wells using passive diffusion bags. The PDBs will be replaced in wells for the annual and biennial sampling scheduled for 2021 (includes 7 wells).
Subtask 3: 2020 Annual Natural Attenuation Monitoring Letter Report Under this subtask field activities related to groundwater monitoring will be summarized in a report and GIS data tables uploaded for review.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $5,505.59 with 50 labor hours.
Geosyntec Consultants may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
Printed on recycled paper.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 4/3/2020
Task #: DC021H SubTask 1 Project Management SubTask 6
Site: Jet Cleaners No. 8 SubTask 2 Annual Groundwater Monitoring SubTask 7
Activity/Phase: SubTask 3 Annual Natural Attenuation Monitoring Report SubTask 8
Project Manager: A. Ramsey SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
Geosyntec Consultants $34.13 Project Manager B. Dawson 5 5.2
$1.00 Senior Principal 0 0 0 0 0 0 0 0 0 0 $60.10 Principal T. Kafka 3 1 2 0 0 0 0 0 0 0
$1.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Hydrogeologist 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$40.38 Project Professional M. Hensley 2 0 2 0 0 0 0 0 0 0 $34.13 Professional B. Dawson 2 0 2 0 0 0 0 0 0 0
$1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0 $1.00 Principal 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Staff Scientist 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Staff Engineer 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Hydrogeologist 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0
$28.37 Staff Professional A. Ramsey 32 15 17 0 0 0 0 0 0 0 $28.37 Staff Professional J. Barnhart 6 0 6 0 0 0 0 0 0 0
$1.00 Tech Word Processor 0 0 0 0 0 0 0 0 0 0 $1.00 Admin Asst 0 0 0 0 0 0 0 0 0 0 $1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0 $1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0 $1.00 Designer 0 0 0 0 0 0 0 0 0 0 $1.00 Site Manager/Field Supervisor 0 0 0 0 0 0 0 0 0 0 $1.00 Field Manager 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0 $1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 50.0 5 16 29 0 0 0 0 0 0 0
Direct Labor $1,583.30 $175.92 $485.65 $921.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $2,734.36 $303.81 $838.72 $1,591.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,317.66 $479.73 $1,324.37 $2,513.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $79.17 $8.80 $24.28 $46.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Monitored Natural Attenuation
REV: 02/03 CEF_GEO.XLS Page 1
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 4/3/2020
Task #: DC021H SubTask 1 Project Management SubTask 6
Site: Jet Cleaners No. 8 SubTask 2 Annual Groundwater Monitoring SubTask 7
Activity/Phase: SubTask 3 Annual Natural Attenuation Monitoring Report SubTask 8
Project Manager: A. Ramsey SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Monitored Natural Attenuation
Travel Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $327.00 $327.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $220.49 $220.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) - PDBs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $252.99 $252.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,073.82 $488.53 $2,025.64 $2,559.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $431.77 $47.97 $132.44 $251.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,505.59 $536.50 $2,158.08 $2,811.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF_GEO.XLS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
SITE : Jet Cleaners No. 8 SUBTASK: Annual Groundwater Monitoring
DATE: 4/3/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal (T. Kafka) 1
Staff Professional (A. Ramsey) 15
TOTAL LABOR 16
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck $97.00 day 1 $97.00 subtotal $97.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS Method - Matrix
EPA 8260 - GW $66.00 3 1 $264.00
subtotal $264.00 Shipping
Small cooler (0 to 25lbs) $63.00 1 $63.00 subtotal $63.00
TOTAL LABORATORY $327.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Analytical Related Water Level Meter $19.40 day 1 $19.40 Diffusion Sampler (2" Well) 6 wells + 1 QA/QC $21.87 each 7 $153.09 PBD Shipping - EON estimated $48.00 lump sum 1 $48.00 subtotal $220.49
Expendables $32.50 day 1 $32.50
TOTAL FIELD EXPENSES $252.99
Technical support for field staff during sampling activities (1)
Field preparation (2); Mob/demob 1 day @ 2 hrs/day (2); Collect depths to water (3);
Retrieve PDBs and collect groundwater samples (3); Deploy PDBs for 2021 event (3);
Prepare field package (2)
HW550_DC021H_CEFLOE.xls 4/3/2020 Page 3 of 4 Subtask 2
LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
SITE : Jet Cleaners No. 8 SUBTASK: Annual Natural Attenuation Monitoring Report
DATE: 4/3/20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal (T. Kafka) 2
Professional (B. Dawson)
Staff Professional (A. Ramsey)
Staff Professional (J. Barnhart) 6
Project Professional (M. Hensley) 2
CAD
Admin
TOTAL LABOR 29
TRAVEL
TOTAL TRAVEL $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
TOTAL LABORATORY $0.00
FIELD EXPENSES
TOTAL FIELD EXPENSES $0.00
NAM Report review/PG Certification (2)
NAM Report review and submittal (2)
Data QA/QC (1); Update data tables (3); Update groundwater elevation and plume contours (3); NAM Report preparation (10)
Figure and table QA/QC (2); GIS data tables - 15 points @ 8min/point (2), run data checker and submit (2)
Figure Generation
HW550_DC021H_CEFLOE.xls 4/3/2020 Page 4 of 4 Subtask 3
1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207
PH 904.858.1818
FAX 904.396.1143
www.geosyntec.com
3 April 2020
Mr. Killian Talley Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: 2020 Annual NAM - Scope of Work and Level of Effort Jet Cleaners No. 8 1440-21 Dunn Avenue Jacksonville, Duval County, Florida 32804 FDEP Facility ID ERIC_4564
Dear Mr. Talley, Please find attached Geosyntec’s Scope of Work (SOW) and Cost Effort Form/Level of Effort (CEF/LOE) for annual natural attenuation monitoring and reporting in accordance with the Natural Attenuation with Monitoring (NAM) Plan for Jet Cleaners No. 8 (Site) (Facility ID ERIC_4564) located in Jacksonville, Florida.
Subtask 1 – Project Management
Subtask 2 – 2020 Annual Groundwater Monitoring Subtask 2 includes costs associated with the collection of groundwater samples from the monitoring well network in accordance with the Groundwater Monitoring Plan (annually sampled monitoring wells) below.
Groundwater Monitoring Schedule:
Monitoring Wells Sampling Frequency Analyses
MW002, MW006, MW007 Annual VOCs by EPA Method 8260 MW001, MW003, MW004, MW008 Biennial
Prior to collecting groundwater samples, depth to water measurements will be collected from 10 monitoring wells (MW001 through MW010) to evaluate groundwater flow direction and horizontal and vertical groundwater gradients. Passive diffusion bags (PDBs) deployed following the 2019 groundwater monitoring event will be retrieved from monitoring wells MW002, MW006, and MW007 to collect groundwater samples. One duplicate sample will be collected from MW007 for quality assurance/quality control (QA/QC). Groundwater samples will be analyzed by a fixed-based lab for volatile organic halogens (VOHs) by United States Environmental Protection Agency Method 8260. Excess groundwater remaining in PDBs after sampling will be poured back into the monitoring well. New PDBs will be deployed at the center of the submerged screened interval in monitoring wells MW001, MW002, MW04, MW006, MW007, and MW008 for the 2021 annual groundwater monitoring event (annual and biennial sampled monitoring wells) prior to demobilizing from the Site. A PDB was previously deployed in MW003 during the 2019 sampling event and will be sampled during the 2021 groundwater monitoring event.
Subtask 3 – 2020 Annual Natural Attenuation Monitoring Report Subtask 3 includes costs associated with the preparation of a NAM Report, in general accordance with Chapter 62-780, Florida Administrative Code (FAC), and the preparation of the FDEP GIS Data Tables. The NAM Letter Report will document the results of the 2020 annual groundwater sampling activities and include the laboratory analytical results, chain of custody record, updated water level and analytical data tables, and updated site maps that illustrate the groundwater elevation contours and analytical results. The NAM Report will be signed and sealed by the Florida Licensed Professional Engineer or Geologist in responsible charge of the work. An electronic PDF version of the report will be uploaded to FDEP’s FTP server for loading to OCULUS.
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Date Invoice Amount
2 Groundwater sampling field notes 28 August 2020 $2,158.08
1 & 3 Natural Attenuation Monitoring letter report & GIS data tables 30 November 2020 $3,347.51
Total $5,505.59
Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.
Sincerely, Blaine Dawson, G.I.T.
Professional
Todd K. Kafka, P.G.
Principal
Attachments A – Subcontractor Cost Evaluation and Quotes
PDB QUOTES PACKAGE
December 2019 – December 2020
Item Target PDB Depth Unit Cost ($)* Comments & Options 20 ft 77.25$ 50 ft 78.15$ 100 ft 79.65$ 250 ft 96.70$ Recommended Option for .75 inch wells: add 1 additional weight for wells 50‐100ft, ($20 ea, Not Included). add 1 wgt per add'l 100ft 20 ft 74.37$ 50 ft 75.27$ 100 ft 76.77$ 250 ft 93.82$ Recommended Option for 1 Inch wells: add 1 additional weight ($20 ea, Not Included) for wells 100‐200 ft depth 20 ft 72.00$ 50 ft 72.90$ 100 ft 74.40$ 250 ft 95.95$ Recommended Option for 2 & 4 Inch wells: add 1 additional weight ( $22 ea, Not Included) for wells>200 ft depth 20 ft 73.17$ 50 ft 74.07$ 100 ft 75.57$ 250 ft 97.12$ Recommended Option for 2 & 4 Inch wells: add 1 additional weight (Not Included) for wells>200 ft depth
0.75‐inch well 18.45$ GSD151, .75x 42in Prefilled 1‐inch well 18.45$ GSD151, .75x 42in Prefilled 2‐inch well 21.87$ GSD165, 1.33x24in Prefilled 4‐inch well 21.87$ GSD165, 1.33x24in Prefilled
Miscellaneous Tethers > 150 ft Require a Spool instead of H‐Frame. A spool is included in the 250ft price only. One Reel‐Handle is required separately and can be shared among all Spools. Use FSR109, $9.00ea
<20 lbs/2 Pgs $48 Zip Ties for attaching samplers to tether rings are sold in packages of 25 for $1.25 per pkg <50 lbs/2 Pgs $96 Shipping estimates are for Fedex GROUND Service. 1‐2 day delivery to Jacksonville FL from Atlanta Ga factory.
EON Products December 2019- December 2020 PDB Rates
Shipping Charge
*All unit costs must include applicable service costs
Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 0.75‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)
Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 1‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)
Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 2‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)
Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 4‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)
Cost for additional PDB (<250 mL)
AJohnson Rectangle
Alexis Johnson
From: Alexis Johnson Sent: Tuesday, November 26, 2019 9:24 AM To: 'Brian Bendis'; lynn@eonpro.com; donna.jackson@alsglobal.com Subject: PDB Quotes Attachments: PDB Quotes Package 2018.pdf
Hi All, Could you please send over revised quotes for passive diffusion samplers good for the next year in the format attached?
Thanks, Alexis I. Johnson, E.I.(FL) Senior Staff Engineer
1200 Riverplace Boulevard Suite 710 Jacksonville, FL 32207 Direct: 904-450-4262 Mobile: 609-658-0914 www.Geosyntec.com
This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system.
AJohnson Callout no bid provided by ALS
| ALS PDB Quotes.pdf |
| Sheet1 |
| Pine PDB Quotes.pdf |
| Sheet1 |
| PDB Quotes Package 2018.pdf |
| ALS PDB Quotes.pdf |
| Sheet1 |
| Pine PDB Quotes.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .