This document package consists of a Task Assignment Notification Change Order Form and supporting deliverables for Contract HW550, managed by the Florida Department of Environmental Protection (DEP). Geosyntec Consultants, represented by Teresa Fischer, serves as the contractor, with Kelly Crain designated as the DEP Contract Manager. The project site is Tri-Tech of Florida (Site 734-1), located at 5151 Park Street North, St. Petersburg, Pinellas County, Florida. The work involves site investigation activities and waste management services at this contaminated property.

The original task assignment (SIS-009C) was valued at $10,106.66 and has been modified by Change Order No. 1 to increase the total contract value to $11,977.67, representing a net increase of $1,871.01. The increase accounts for the disposal of two drums of hazardous investigative derived waste (IDW) rather than the originally assumed single drum, and additional GIS figure development time (10 hours) for the final report. The project comprises three subtasks: Project Management, Investigative Waste Disposal, and Reporting, with a final deliverable of a Site Investigation Report due September 30, 2016. The contract operates on a fixed-price basis with cost reimbursement provisions, and invoicing occurs upon completion of all three subtasks. The completion date remains November 11, 2016, with no net increase in the task period.

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
CN-370000-HW550-DC21H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Teresa Fischer To: Crain, Kelly Subject: RE: Maller Property SIS Study Reporting - DEP Site #734-1, Work Plan and LOE Dated 07212016 Date: Friday, September 30, 2016 3:27:57 PM Attachments: Maller Property_Site Investigation_LOE CO#1 09302016.xlsx

Hi Kelly:

Attached please find a Task Assignment Change order for the subject site. You may recall that we generated two drums of IDW that have been characterized as hazardous waste. The original Task Assignment assumed disposal of only one drum of IDW.

Also, GIS work was originally budgeted at 6 hours. Contaminant cross sections developed as figures for the final report required additional time. This additional time is included in the attached task assignment change order.

Please contact me with any questions you may have. The report is in PG review and should be in your inbox next week.

Thank you, Teresa

Teresa A. Fischer Senior Geologist Geosyntec Consultants Direct Line: 865-291-4709 Cell: 904-608-8833

From: Teresa Fischer Sent: Friday, July 22, 2016 5:16 PM To: Crain, Kelly <Kelly.Crain@dep.state.fl.us> Cc: Phillips, Dave M.(Haz Waste) <Dave.M.Phillips@dep.state.fl.us> Subject: Maller Property SIS Study Reporting - DEP Site #734-1, Work Plan and LOE Dated 07212016

Hi Kelly:

Attached please find Geosyntec’s Cost Estimate Form and proposed Level of Effort (CEF/LOE) for the disposal of investigative derived waste (IDW) and the development of a Site Investigation Report for the Maller Property (a/k/a Tri-Tech of Florida, Inc.), FDEP Site No. COM_328286/Project No. 343172 located in St. Petersburg, Florida. A Deliverable and Invoice Schedule is also include. The scope of work associated with the CEF/LOE includes the following:

Subtask 1 – Project Management

Subtask 2 – Investigative Waste Disposal: This subtask includes costs associated with the collection mailto:TFischer@Geosyntec.com mailto:Kelly.Crain@dep.state.fl.us

Cost Estimate

Contractor: Geosyntec Consultants

Date: 7/21/16

Task #: SubTask 1 Project Management SubTask 6

Site: Maller Property SubTask 2 Investigative Waste Disposal SubTask 7

Activity/Phase: Site Investigation Report SubTask 3 Reporting SubTask 8

Project Manager: Teresa Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$48.07 Project Manager 7 7.1

$1.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0

$64.42 Princiapl 5 1 4 0 0 0 0 0 0 0

$48.07 Senior Professional 15 5 10 0 0 0 0 0 0 0

$51.20 Senior Professional 16 0 16 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$28.24 Senior Staff Professional 22 6 16 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$30.09 Admin Asst 2 0 2 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$34.13 Project Professional 6 0 6 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 73 7 12 54 0 0 0 0 0 0 0

Direct Labor $3,092.16 $343.57 $474.21 $2,274.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $5,340.16 $593.35 $818.96 $3,927.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $8,432.32 $936.92 $1,293.17 $6,202.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $154.61 $17.18 $23.71 $113.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $380.00 $380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $380.00 $380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $38.00 $38.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $418.00 $418.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $66.00 $66.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $129.00 $129.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $9,263.43 $954.10 $1,993.38 $6,315.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $843.23 $93.69 $129.32 $620.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $10,106.66 $1,047.79 $2,122.70 $6,936.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

CO#1 - Cost Estimate

Contractor: Geosyntec Consultants

Date: 9/30/16

Task #: SIS-009C SubTask 1 Project Management SubTask 6

Site: Maller Property SubTask 2 Investigative Waste Disposal SubTask 7

Activity/Phase: Site Investigation Report SubTask 3 Reporting SubTask 8

Project Manager: Teresa Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$48.07 Project Manager 1 1.1

$1.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0

$64.42 Princiapl 0 0 0 0 0 0 0 0 0 0

$48.07 Senior Professional 1 1 0 0 0 0 0 0 0 0

$51.20 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$28.24 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$30.09 Admin Asst 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$34.13 Project Professional 11 0 11 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 13 1 1 11 0 0 0 0 0 0 0

Direct Labor $476.44 $52.94 $48.07 $375.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $822.82 $91.43 $83.02 $648.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $1,299.26 $144.37 $131.09 $1,023.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $23.82 $2.65 $2.40 $18.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $380.00 $380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $380.00 $380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $38.00 $38.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $418.00 $418.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $1,741.08 $147.02 $551.49 $1,042.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $129.93 $14.44 $13.11 $102.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $1,871.01 $161.46 $564.60 $1,144.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

Final Cost Estimate

Contractor: Geosyntec Consultants

Date: 9/30/16

Task #: SIS-009C SubTask 1 Project Management SubTask 6

Site: Maller Property SubTask 2 Investigative Waste Disposal SubTask 7

Activity/Phase: Site Investigation Report SubTask 3 Reporting SubTask 8

Project Manager: Teresa Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$48.07 Project Manager 8 8.2

$1.00 Sr. Principal 0 0 0 0 0 0 0 0 0 0

$64.42 Princiapl 5 1 4 0 0 0 0 0 0 0

$48.07 Senior Professional 16 6 10 0 0 0 0 0 0 0

$51.20 Senior Professional 16 0 16 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$28.24 Senior Staff Professional 22 6 16 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$30.09 Admin Asst 2 0 2 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$34.13 Project Professional 17 0 17 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 86 8 13 65 0 0 0 0 0 0 0

Direct Labor $3,568.60 $396.51 $522.28 $2,649.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $6,162.97 $684.77 $901.98 $4,576.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $9,731.57 $1,081.28 $1,424.26 $7,226.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $178.43 $19.83 $26.11 $132.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $760.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $760.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $76.00 $76.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $836.00 $836.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $66.00 $66.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $129.00 $129.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,004.50 $1,101.11 $2,544.87 $7,358.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $973.17 $108.14 $142.43 $722.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $11,977.67 $1,209.25 $2,687.30 $8,081.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Original Cost Estimate $10,106.66

Change Order $1,871.01

Final Cost Estimate $11,977.67

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

Subtask 2

SITE : Maller Property

SUBTASK: Investigative Waste Disposal

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Principal

Principal Technical Review of Work Plan and LOE (1 hr)

(M. Lodato) 1

Senior Professional Develop Work Plan and LOE (2 hrs). Solicit Investigative dervied waste (IDW) disposal costs; Coordinate disposal with property owner, transporter and disposal company (3 hrs)

(T. Fischer) 5

Senior Professional

Sr. Staff Professional Mobilization to and from Site to collect an IDW sample for waste characterization (3 hrs); Mobilization to and from Site oversee IDW disposal (2 hrs); Deliver signed manifest to transporter, observe 55-gallon IDW drum removal (1 hr)

(J. Raven) 6

Sr. Staff Engineer

GIS

Admin

TOTAL LABOR 12

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 1 $97.00

Car $68.00 day 0 $0.00 subtotal $97.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$100.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $97.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$11,800.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$10,500.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$1,410.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

PermaFix of Florida - Hazardous Waste Disposal $380.00 Lump Sum 1 $380.00

$0.00 Lump Sum 0 $0.00 subtotal $380.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $380.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Waste Chaaracterzation $66.00 1 0 $66.00

EPA 8260B - Soil $0.00 0 0 $0.00

EPA 8270C - GW $0.00 0 0 $0.00

EPA 8270C - Soil $0.00 0 0 $0.00

TRPH - GW $0.00 0 0 $0.00

TRPH - Soil $0.00 0 0 $0.00

8 RCRA - GW $0.00 0 0 $0.00

8 RCRA - Soil $0.00 0 0 $0.00 subtotal $66.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 1 $63.00 subtotal $63.00

TOTAL LABORATORY $129.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (HDPE polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 1 $32.50

Survey Equipment $100.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $32.50

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&F &D Page &P of &N &A

Subtask 2 - CO#1

SITE : Maller Property

SUBTASK: Investigative Waste Disposal

DATE: 9/30/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Principal

Principal

(M. Lodato)

Senior Professional Additional coordination for disposal of 2 drums of hazardous waste versus 1 drum proposed in original TA (1 hr)

(T. Fischer) 1

Senior Professional

Sr. Staff Professional

(J. Raven)

Sr. Staff Engineer

GIS

Admin

TOTAL LABOR 1

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$100.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$11,800.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$10,500.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$1,410.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

PermaFix of Florida - Hazardous Waste Disposal $380.00 Lump Sum 1 $380.00

$0.00 Lump Sum 0 $0.00 subtotal $380.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $380.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260 - Waste Chaaracterzation $66.00 0 0 $0.00

EPA 8260B - Soil $0.00 0 0 $0.00

EPA 8270C - GW $0.00 0 0 $0.00

EPA 8270C - Soil $0.00 0 0 $0.00

TRPH - GW $0.00 0 0 $0.00

TRPH - Soil $0.00 0 0 $0.00

8 RCRA - GW $0.00 0 0 $0.00

8 RCRA - Soil $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (HDPE polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Survey Equipment $100.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 3

SITE : Maller Property

SUBTASK: Reporting

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Principal

Principal Senior review of report; Sign and seal report (4 hrs)

(M. Lodato) 4

Senior Professional Communicate with FDEP (2 hr); report development; technical review of tables, figures, and supporting documentation to be included in the report (8 hrs)

(T. Fischer) 10

Senior Professional Report development (16 hrs)

(T. Kafka) 16

Sr. Staff Professional Develop draft tables and figures; develop field methodologies section of the report (16 hrs)

(J. Raven) 16

Staff Professional

Project Professional Prepare GIS figures for report (6 hrs)

(M. Hensley) 6

Admin Format and finalize report (2 hrs)

(V. Strickland) 2

TOTAL LABOR 54

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 3 - CO#1

SITE : Maller Property

SUBTASK: Reporting

DATE: 9/30/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Principal

Principal

(M. Lodato)

Senior Professional

(T. Fischer)

Senior Professional

(T. Kafka)

Sr. Staff Professional

(J. Raven)

Staff Professional

Project Professional Additional GIS figure preparation for report (10 hrs)

(M. Hensley) 11

Admin

(V. Strickland)

TOTAL LABOR 11

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 4

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 5

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 6

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 7

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 8

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 9

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 10

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 7/21/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Geosyntec Labor Costs $341.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$64.42 $257.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$240.35 $480.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $819.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .