CN-370000-HW550-DC30CCO2.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW550|85d144626a85584193b4b253697535d5
Contract number
HW550
Issued by
Florida

About this file

Document Summary

This document comprises Task Assignment Change Order (TACO) No. 2 for contract HW550, issued by the Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for supplemental site assessment activities at Vick's Cleaners, Inc., located at 302 Gulf Breeze Parkway in Gulf Breeze, Santa Rosa County, Florida (ERIC ID ERIC_5421). The original task assignment was valued at $84,015.18, with TACO No. 1 increasing the amount to $94,013.94. TACO No. 2 represents an additional $30,019.91 increase, bringing the total task cost to $124,033.85 with a completion date of December 20, 2019.

TACO No. 2 authorizes supplemental site assessment activities including project management, field logistics and permitting, Direct Push Technology (DPT) groundwater sampling at eight locations (DPT013-DPT020) to 60 feet below land surface, monitoring well installation and sampling at four locations (MW009-MW012), investigative derived waste management, supplemental site assessment report preparation, and Modified Active Gas Sampling (MAGS) well installation with soil sampling inside and outside the facility. The cost increase is distributed across subtasks with notable expenditures including $6,460 for DPT drilling services from Singley Construction Company, $3,308 for MAGS drilling, $2,237 for MAGS testing from LMS Manufacturing, and $3,712.50 for investigative derived waste disposal. The contract utilizes fixed-price billing with invoicing contingent upon FDEP receipt and approval of deliverables, scheduled in three phases: April 1, 2019 ($43,858.35), May 1, 2019 ($59,282.78), and July 1, 2019 ($20,892.72), totaling $124,033.85.

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
CN-370000-HW550-DC21H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Change Order No.:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

Site Name:

Site ID / Facility ID::

Description of Change [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Cost Reimbursement Fixed Fee

Original Task Amount

Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00

Original Task Completion Date:

Completion Date Prior to this Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

FIXED PRICE

TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM

ITEM

$0.00

$0.00

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Final Deliverable Due Date:

$0.00

$0.00

CHANGE IN TASK TIME

FEE SCHEDULE

COST PLUS FIXED FEE

TOTAL

WCP TAFORM 01_18

HW550

2DC030C

Geosyntec Consultants

Mike Lodato

850-245-8928Killian Talley

Vicks Cleaners, Inc.

ERIC_5421

This Task Assignment Change Order authorizes costs and labor related to completion of site assessment activities in accordance with the February 20, 2019 scope of work, cost estimate, and bid documentation.

Supplemental Site Assessment Report, IDW, ADaPT/GIS 07/01/2019

$ 84,015.18 $ 0.00 $ 0.00 $ 0.00

$ 94,013.94 $ 0.00 $ 0.00 $ 0.00 $ 94,013.94

$ 30,019.91 $ 0.00 $ 0.00 $ 0.00 $ 30,019.91

$ 124,033.85

07/19/2019

07/19/2019

5 months

12/20/2019

Killian Talley Digitally signed by Killian Talley Date: 2019.03.07 13:30:23 -05'00'

Killian Talley Digitally signed by Killian Talley Date: 2019.03.07 13:30:31 -05'00'

Fletcher Herrald Digitally signed by Fletcher Herrald Date: 2019.03.08 10:14:06 -05'00'

Michael Lodato Digitally signed by Michael Lodato Date: 2019.03.08 11:32:38 -05'00'

$ 124,033.85 $ 0.00 $ 0.00 $ 0.00

$ 84,015.18

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

BWC TAFORM 2/03

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW550

DC030C

$ 124,033.85

Subtask 3: Submittal of field assessment activity field notes including DPT sampling, MAGS, and laboratory analytical data

Subtasks 2,4&7: Submittal of ROW permits, field notes including well installation and groundwater sampling logs, survey data and laboratory analytical data

Subtasks 5&6: Submittal of Supplemental Site Assessment Report, IDW manifest, and ADaPT/GIS update

Subtask 3: FDEP receipt and approval of field assessment activity field notes including DPT sampling, MAGS, and laboratory analytical data

Subtasks1, 5&6: FDEP receipt and approval of Supplemental Site Assessment Report, IDW manifest, and ADaPT/GIS update

Subtasks 2,4&7: FDEP receipt and approval of ROW permits, field notes including well installation and groundwater sampling logs, survey data and laboratory analytical data

04/01/2019

05/01/2019

07/01/2019

$ 59,282.78

$ 43,858.35

$ 20,892.72

11/21/2018

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW550 Contract Negotiation File

Vicks Cleaner, Inc.

Gulf Breeze, Santa Rosa County

ERIC_5421

From: Killian Talley, Project Manager, Date: March 7, 2019 Subject: Negotiation Summary

HW550 DC030C-2

This Task Assignment Change Order authorizes additional labor and costs related to completion of site assessment activities. After conversations with the Department it was decided further on-site assessment would be conducted in addition to off-site assessment.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask. The cost increase related to this subtask is $966.60.

Subtask 2: LOE Preparation & Fieldwork Logistics Change Order authorizes costs and labor related to obtaining permits, site access, and coordination of field work for completion of site assessment activities. The cost increase related to this subtask is $2,755.88.

Subtask 3: Direct Push Technology (DPT) Groundwater Sampling Change order authorizes additional costs and labor related to completion of off-site groundwater sampling. With off-site access obtained DPT will be conducted at five (5) locations down to sixty (60) feet below land surface. DPT21 – DPT24 will be sampled at 10 ft intervals while DPT16 (located by the sanitary sewer going north on Gulf Breeze) will be sampled in 4 ft intervals. All locations are marked on figure 1 of the scope of work from Geosyntec. The cost increase related to this subtask is $9,737.85.

Subtask 4: Monitoring Well Installation and Sampling No changes to subtask.

Subtask 5: Investigative Derived Waste (IDW) and Survey Change order authorizes additional costs related to transport and disposal of IDW. The cost increase related to this subtask is $1,166.15.

Subtask 6: Supplemental Site Assessment Report Preparation Change order authorizes additional labor for reporting efforts related to additional site assessment activities. The cost increase related to this subtask is $5,108.38.

MEMORANDUM

Page Two

Subtask 7: MAGS Installation with Vapor and Soil Sampling Subtask adds cost and labor related to completion of site assessment activities inside the former Vick’s Cleaners. After communications with the Department, it was decided that additional interior investigation would be conducted related to MAGS wells installation and soil sampling as shown in the Gesoyntec scope of work and figures. The cost increase related to this subtask is $13,285.05.

The cost increase related to this change order is $30,019.91.

The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $124,033.85 with 558 labor hours.

Geosyntec Consultants may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.

FDEP COST ESTI MATE

Contractor: Geosyntec Consultants

Date: 9/19/2018

Task #: DC030C SubTask 1 Project Management SubTask 6 Supplemental Site Assessment Report Prep.

Site: Vick's Cleaners, Inc. SubTask 2 LOE Prep and Field Work Logistics SubTask 7 MAGS

Activity/Phase: Supplemental Site Assessment SubTask 3 DPT Groundwater Sampling SubTask 8

Project Manager: Crystal Towns SubTask 4 Monitoring Well Install & Sampling SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Geosyntec Consultants $31.01 Project Manager Towns 60 59.8 $67.31 Principal Lodato 4 4 0 0 0 0 0 0 0 0 $53.85 Principal Johnson 18 4 4 4 2 4 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Professional Dorman 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$34.13 Project Professional Hensley 19 0 2 0 0 17 0 0 0 0 $1.00 Project Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Professional 0 0 0 0 0 0 0 0 0 0

$31.01 Professional Towns 125 46 26 2 12 36 3 0 0 0 $1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$30.29 Senior Staff Professional A. Johnson 28 0 0 0 0 28 0 0 0 0 $25.96 Staff Professional Wilson 172 2 84 86 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$30.29 Staff Professional Taylor 99 12 60 0 0 0 27 0 0 0 $1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$18.00 Clerical Haslam 4 0 0 0 0 4 0 0 0 0 $0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0 $1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0 $1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0 $1.00 Designer 0 0 0 0 0 0 0 0 0 0

$31.59 Site Manager 0 0 0 0 0 0 0 0 0 0 $1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$23.75 Sr Engineering Technician Graves 29 0 0 29 0 0 0 0 0 0 $1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 558 60 68 176 121 14 89 30 0 0 0

Direct Labor $16,690.46 $1,854.50 $2,326.50 $5,087.96 $3,198.73 $479.82 $2,832.09 $910.86 $0.00 $0.00 $0.00

Overhead 172.70% $28,824.44 $3,202.72 $4,017.87 $8,786.91 $5,524.21 $828.65 $4,891.02 $1,573.06 $0.00 $0.00 $0.00 Total Labor $45,514.90 $5,057.22 $6,344.37 $13,874.87 $8,722.94 $1,308.47 $7,723.11 $2,483.92 $0.00 $0.00 $0.00

Other Direct Costs $834.53 $92.73 $116.33 $254.40 $159.94 $23.99 $141.60 $45.54 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 3

FDEP COST ESTI MATEContractor: Geosyntec Consultants

Date: 9/19/2018

Task #: DC030C SubTask 1 Project Management SubTask 6 Supplemental Site Assessment Report Prep.

Site: Vick's Cleaners, Inc. SubTask 2 LOE Prep and Field Work Logistics SubTask 7 MAGS

Activity/Phase: Supplemental Site Assessment SubTask 3 DPT Groundwater Sampling SubTask 8

Project Manager: Crystal Towns SubTask 4 Monitoring Well Install & Sampling SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $2,557.00 $262.00 $1,002.00 $1,099.00 $0.00 $0.00 $194.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $358.00 $0.00 $0.00 $358.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,915.00 $262.00 $1,002.00 $1,457.00 $0.00 $0.00 $194.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $40,548.52 $0.00 $15,980.00 $21,260.52 $0.00 $0.00 $3,308.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $1,045.00 $0.00 $0.00 $1,045.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $3,712.50 $0.00 $0.00 $0.00 $3,712.50 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Locate $900.00 $0.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sewer Inspection $2,237.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,237.00 $0.00 $0.00 $0.00 MAGS Equipment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $48,443.02 $0.00 $16,880.00 $22,305.52 $3,712.50 $0.00 $5,545.00 $0.00 $0.00 $0.00 Handling Fee $4,844.30 $0.00 $1,688.00 $2,230.55 $371.25 $0.00 $554.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $53,287.32 $0.00 $18,568.00 $24,536.07 $4,083.75 $0.00 $6,099.50 $0.00 $0.00 $0.00

Laboratory Analytical Costs $11,650.00 $0.00 $6,072.00 $858.00 $886.00 $0.00 $3,834.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $835.00 $0.00 $356.00 $104.00 $167.00 $0.00 $208.00 $0.00 $0.00 $0.00 Total Laboratory $12,485.00 $0.00 $6,428.00 $962.00 $1,053.00 $0.00 $4,042.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $715.00 $65.00 $325.00 $260.00 $0.00 $0.00 $65.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,028.20 $0.00 $0.00 $921.50 $0.00 $0.00 $106.70 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,502.60 $0.00 $1,876.95 $625.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $0.00 $0.00 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $141.65 $0.00 $141.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $4,445.65 $65.00 $2,343.60 $1,865.35 $0.00 $0.00 $171.70 $0.00 $0.00 $0.00

Subtotal $119,482.40 $5,149.95 $6,787.70 $42,470.87 $37,703.30 $6,469.21 $7,864.71 $13,036.66 $0.00 $0.00 $0.00 Completion Fee $4,551.49 $505.72 $634.44 $1,387.49 $872.29 $130.85 $772.31 $248.39 $0.00 $0.00 $0.00

Total Estimated Cost $124,033.85 $5,655.64 $7,422.14 $43,858.35 $38,575.59 $6,600.05 $8,637.03 $13,285.05 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 4

LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

SITE : Vick's Cleaners, Inc.

SUBTASK: LOE Prep and Field Work Logistics

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson) 4

Principal (Lodato) 4

Project Professional

Professional

Professional (Towns)

Senior Staff Professional (Taylor)

Staff Professional (Wilson) 2

TOTAL LABOR 68

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 0 $0.00 Truck $97.00 day 2 $194.00 Car $68.00 day 1 $68.00 subtotal $262.00

TOTAL TRAVEL $262.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

TOTAL SUBCONTRACTOR (SERVICES) $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Expendables $32.50 day 2 $65.00

TOTAL FIELD EXPENSES $65.00

LOE review (2hr): Review ROW permit and offsite access request.

TACO #2 preparation (4 hr); Communication with property owners for offsite property access (4 hours); Site visit for additional employee to meet with property owner Britton Stamps due to request that meeting take place at personal residence (4 hr)

LOE preparation (4hr); Correspondence with property manager for Gulf Breeze Shopping Center 2hr per event - DPT GW sampling and MW install events (4hr); Site visit to confirm locations for ROW permit (4hr); ROW permit prep and submittal to City of Gulf Breeze for access to Northcliff Drive and Duncan Avenue ROWs (16hr). Site visit to confirm and photograph utility locations for ROW permit (4hr); Site visit to meet with Duncan Ave property owner Britton Stamps (4hr); Access agreement prep and submittal to property owners at 250 Gulf Breeze Pkwy and Duncan Ave (12hr); Site visit (2hr);

Site visit (2hr); SOW development for new offsite locations (1hr); Review TACO #2 (1 hr)

HW550_DC030C-2_CEFLOE.xlsx 3/7/2019 Page 1 of 6 Subtask 2

SUBTASK: DPT Groundwater Sampling

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson) 4

Professional (Towns)

Professional Utility survey As-built GIS figure (2hr) (Hensley)

Staff Professional (Wilson)

Senior Staff Professional (Taylor) 60

Clerical (Haslam)

TOTAL LABOR 176

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 1 $420.00 Truck $97.00 day 6 $582.00 Car $68.00 day 0 $0.00 subtotal $1,002.00

TOTAL TRAVEL $1,002.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) Singley Construction Company $6,520.00 Lump Sum 1 $6,520.00 Singley Construction Company $1,500.00 day 2 $3,000.00 Singley Construction Company $6,460.00 L/S 1 $6,460.00 subtotal $15,980.00 Utilities GPRS $900.00 Lump Sum 1 $900.00

$0.00 Month 0 $0.00 subtotal $900.00

TOTAL SUBCONTRACTOR (SERVICES) $16,880.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8260 - GW $66.00 89 3 $6,072.00

0 0 $0.00 subtotal $6,072.00

Shipping Large cooler (25 to 50 lbs) $104.00 1 $104.00 Small cooler (0 to 25lbs) $63.00 4 $252.00 subtotal $356.00

TOTAL LABORATORY $6,428.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Analytical Related Groundwater Sampling Kit $208.55 day 9 $1,876.95 Tubing (silicone) ft 0 $0.00 Multimeter (Temp, pH, Cond, DO, ORP) $97.00 day 0 $0.00 subtotal $1,876.95

Expendables $32.50 day 10 $325.00

Other Total GPS Station $141.65 day 1 $141.65 subtotal $141.65

TOTAL FIELD EXPENSES $2,343.60

Technical support during field event (1 hr/day=4hr)

Field preparation for DPT (4hr); 4 days of mob/demob to include vehicle loading/unloading (4hr); Onsite for DPT GW sampling-4 days (12hr/4days=48hr);

Coordinate lab sample pick-up (2hr); IDW staging and field management (2hr); 2 days of mob/demob to include vehicle loading/unloading (2hr); Onsite for DPT GW sampling-2

Mob, onsite site field kickoff meeting and boring location identification, Oversee utility survey (12hr); Draft utility survey As-built (2hr); Prepare field maps of DPT GW results (4hr). Technical support during field event (1hr/day=2hr); Technical support during field event (1hr/day=4hr); Prepare field maps for additional DPT sampling locations (2 hr)

3/7/2019 Page 2 of 6 Subtask 3

SUBTASK: Monitoring Well Install & Sampling

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson) 4

Professional (Towns) 2

Staff Professional (Wilson)

Sr. Eng Tech (Graves) 29

Clerical (Haslam)

TOTAL LABOR 121

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 1 $420.00 Truck $97.00 day 7 $679.00 Car $68.00 day 0 $0.00 subtotal $1,099.00 Per diem ($35/75)

$36.00 days 3 $108.00 $125.00 days 2 $250.00 subtotal $358.00

TOTAL TRAVEL $1,457.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) Huss Drilling $21,260.52 Lump Sum 1 $21,260.52

$0.00 Lump Sum 0 $0.00 subtotal $21,260.52

Surveying Fabre Engineering and Survey $1,045.00 Lump Sum 1 $1,045.00 subtotal $1,045.00

TOTAL SUBCONTRACTOR (SERVICES) $22,305.52

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8260 - GW $66.00 12 1 $858.00

subtotal $858.00 Shipping

Large cooler (25 to 50 lbs) $104.00 1 $104.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $104.00

TOTAL LABORATORY $962.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Drilling Related Monitoring Well Installation Kit $184.30 day 5 $921.50 subtotal $921.50 Analytical Related Groundwater Sampling Kit $208.55 day 3 $625.65 subtotal $625.65 IDW Related Drum $58.20 drum 1 $58.20 Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

Expendables $32.50 day 8 $260.00

TOTAL FIELD EXPENSES $1,865.35

Technical support during field event (1 hr/day=4hr)

Mob and onsite site field kickoff meeting (2hr)

Field preparation for MW install (2hr); 5 days of mob/demob to include vehicle loading/unloading (5hr); 5 days of monitoring well installation oversight (50hr); Field preparation for GW sampling (2hr); 3 days of mob/demob (3hr); DTW gauging (2hr);

Sample 12 MWs at 1.5hr/well (18hr), IDW staging and field management (2hr); IDW sampling and lab coordination (2hr)

Field preparation for GW sampling (2hr); mob/demob from Tally (7hr); DTW gauging (2hr); Sample 12 MWs at 1.5hr/well (18hr), 3/7/2019 Page 3 of 6 Subtask 4

SUBTASK: IDW Management

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson) 2

Professional Review of IDW analytical results (2hr); Preparation of IDW profile, manifests and (Towns) disposal coordination (4hr); Review of additional IDW analytical results (2hr); 12

Preparation of IDW profile, manifests and disposal coordination (4 hr)

TOTAL LABOR 14

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

IDW

Drum transport & disposal Permafix $125.00 per drum 27 $3,375.00 Energy recovery (transporation) fee (10%) Permafix $337.50 per trip 1 $337.50

$0.00 subtotal $3,712.50

TOTAL SUBCONTRACTOR (SERVICES) $3,712.50

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8260 - GW $66.00 4 0 $264.00

EPA 8260 - Soil $66.00 5 0 $330.00

EPA 8270 - GW $100.00 1 0 $100.00

EPA 8270 - Soil $100.00 1 0 $100.00 RCRA 4 Metals - GW (4 metals @ $11.50/each) $46.00 1 0 $46.00 RCRA 4 Metals - Soil (4 metals @ $11.50 each) $46.00 1 0 $46.00 subtotal $886.00 Shipping

Large cooler (25 to 50 lbs) $104.00 1 $104.00 Small cooler (0 to 25lbs) $63.00 1 $63.00 subtotal $167.00

TOTAL LABORATORY $1,053.00

Technical review of IDW manifests (2 hr)

3/7/2019 Page 4 of 6 Subtask 5

SITE : Geosyntec Consultants SUBTASK: Supplemental Site Assessment Report Prep.

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Senior review of SSAR (4hr) (Johnson) 4

Professional (Towns) 36

Professional (Hensley)

Senior Staff Professional Generate GIS data tables (2hr); ADaPT and GIS table preparation (A. Johnson) (8 min/pt- 110 pts) (15hrs); Run data checker and submittal of tables (2 hr) 28

Generate GIS data tables (2hr); ADaPT and GIS table preparation Staff Professional (8 min/pt- 38 pts) (5hrs); Run data checker and submittal of tables (2 hr) (Wilson)

Clerical Report production and submittal/upload (4hr) (Haslam) 4

TOTAL LABOR 89

Create site maps (sample location map, DPT GW data results, GW elevation map, MW data results, up to two lithology cross-sections and two analytical data cross-sections) (1.5-hr per map) (12hr) ; Create additional site maps for new sampling plan (DPT GW data results, MAGS results, and soil boring results) (1.5-hr per map) (5hr)

SSAR preparation (28 hr); SSAR preparation to include additional DPT sampling efforts, soil sampling, and MAGS testing (8 hr)

3/7/2019 Page 5 of 6 Subtask 6

SUBTASK: MAGS

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional (Towns) 3

Senior Staff Professional (Taylor)

TOTAL LABOR 30

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 0 $0.00 Truck $97.00 day 2 $194.00 Car $68.00 day 0 $0.00 subtotal $194.00

TOTAL TRAVEL $194.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) Singley Construction Company MAGS Wells Install $3,308.00 Lump Sum 1 $3,308.00

$0.00 Lump Sum 0 $0.00 subtotal $3,308.00

Other LMS $2,237.00 Lump Sum 1 $2,237.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 subtotal $2,237.00

TOTAL SUBCONTRACTOR (SERVICES) $5,545.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8021 - GW $66.00 0 0 $0.00

EPA 8021 - Soil $66.00 49 0 $3,234.00 TO-14 - Gas $200.00 3 0 $600.00 Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 subtotal $3,834.00 Shipping

Large cooler (25 to 50 lbs) $104.00 2 $208.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $208.00

TOTAL LABORATORY $4,042.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Drilling Related Monitoring Well Installation Kit $184.30 day 0 $0.00 OVA/PID $106.70 day 1 $106.70 Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $106.70

Expendables $32.50 day 2 $65.00

TOTAL FIELD EXPENSES $171.70

Prepare field maps of soil and MAGS results (2 hr); Technical support during field event (1 hr/day - 1 hr)

Field preparation for MAGS well installation and soil sampling (2hr); mob/demob to include vehicle loading/unloading (1hr); MAGS well installation and soil sampling oversight (10hr); MAGS oversight (10 hrs); soil sample and summa cannister shipping (2hr); PID data download (2 hr)

3/7/2019 Page 6 of 6 Subtask 7 TACO #2

FDEP COST ESTI MATE

Contractor: Geosyntec Consultants

Date: 2/19/2019

Task #: DC030C #2 SubTask 1 Project Management SubTask 6 Supplemental Site Assessment Report Prep.

Site: Vick's Cleaners, Inc. SubTask 2 LOE Prep and Field Work Logistics SubTask 7 MAGS and Soil Boring

Activity/Phase: Supplemental Site Assessment SubTask 3 DPT Groundwater Sampling SubTask 8

Project Manager: Crystal Towns SubTask 4 Monitoring Well Install & Sampling SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Geosyntec Consultants $31.01 Project Manager Towns 10 10.2 $67.31 Principal Lodato 4 4 0 0 0 0 0 0 0 0 $53.85 Principal Johnson 1 0 0 0 1 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Professional Dorman 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$34.13 Project Professional Hensley 5 0 0 0 0 5 0 0 0 0 $1.00 Project Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Professional 0 0 0 0 0 0 0 0 0 0

$31.01 Professional Towns 29 6 6 0 6 8 3 0 0 0 $30.29 Senior Staff Professional Taylor 99 12 60 0 0 0 27 0 0 0 $30.29 Senior Staff Professional A. Johnson 9 0 0 0 0 9 0 0 0 0 $25.96 Staff Professional Wilson -82 2 -84 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$18.00 Clerical Vassaur 0 0 0 0 0 0 0 0 0 0 $0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0 $1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0 $1.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0 $1.00 Designer 0 0 0 0 0 0 0 0 0 0

$31.59 Site Manager 0 0 0 0 0 0 0 0 0 0 $1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$23.75 Sr Engineering Technician Graves 0 0 0 0 0 0 0 0 0 0 $1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 75 10 24 -18 0 7 22 30 0 0 0

Direct Labor $2,852.58 $316.95 $870.70 ($177.18) $0.00 $239.91 $691.34 $910.86 $0.00 $0.00 $0.00

Overhead 172.70% $4,926.40 $547.37 $1,503.70 ($305.99) $0.00 $414.32 $1,193.94 $1,573.06 $0.00 $0.00 $0.00 Total Labor $7,778.98 $864.32 $2,374.40 ($483.17) $0.00 $654.23 $1,885.28 $2,483.92 $0.00 $0.00 $0.00

Other Direct Costs $142.64 $15.85 $43.54 ($8.86) $0.00 $12.00 $34.57 $45.54 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 1

FDEP COST ESTI MATEContractor: Geosyntec Consultants

Date: 2/19/2019

Task #: DC030C #2 SubTask 1 Project Management SubTask 6 Supplemental Site Assessment Report Prep.

Site: Vick's Cleaners, Inc. SubTask 2 LOE Prep and Field Work Logistics SubTask 7 MAGS and Soil Boring

Activity/Phase: Supplemental Site Assessment SubTask 3 DPT Groundwater Sampling SubTask 8

Project Manager: Crystal Towns SubTask 4 Monitoring Well Install & Sampling SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $650.00 $68.00 $388.00 $0.00 $0.00 $0.00 $194.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $650.00 $68.00 $388.00 $0.00 $0.00 $0.00 $194.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $9,768.00 $0.00 $6,460.00 $0.00 $0.00 $0.00 $3,308.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $275.00 $0.00 $0.00 $0.00 $275.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Locate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

MAGS $2,237.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,237.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $12,280.00 $0.00 $6,460.00 $0.00 $275.00 $0.00 $5,545.00 $0.00 $0.00 $0.00 Handling Fee $1,228.00 $0.00 $646.00 $0.00 $27.50 $0.00 $554.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $13,508.00 $0.00 $7,106.00 $0.00 $302.50 $0.00 $6,099.50 $0.00 $0.00 $0.00

Laboratory Analytical Costs $5,682.00 $0.00 $1,716.00 $0.00 $132.00 $0.00 $3,834.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $312.00 $0.00 $104.00 $0.00 $0.00 $0.00 $208.00 $0.00 $0.00 $0.00 Total Laboratory $5,994.00 $0.00 $1,820.00 $0.00 $132.00 $0.00 $4,042.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $227.50 $32.50 $130.00 $0.00 $0.00 $0.00 $65.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $106.70 $0.00 $0.00 $0.00 $0.00 $0.00 $106.70 $0.00 $0.00 $0.00 Equipment (Analytical related) $834.20 $0.00 $834.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,168.40 $32.50 $964.20 $0.00 $0.00 $0.00 $171.70 $0.00 $0.00 $0.00

Subtotal $29,242.02 $880.17 $2,518.44 $9,786.17 $0.00 $1,100.73 $1,919.85 $13,036.66 $0.00 $0.00 $0.00 Completion Fee $777.89 $86.43 $237.44 ($48.32) $0.00 $65.42 $188.53 $248.39 $0.00 $0.00 $0.00

Total Estimated Cost $30,019.91 $966.60 $2,755.88 $9,737.85 $0.00 $1,166.15 $2,108.38 $13,285.05 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 2

SUBTASK: LOE Prep and Field Work Logistics

DATE: 2/19/19

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson)

Principal (Lodato) 4

Project Professional

Professional (Towns) 6

Senior Staff Professional (Taylor)

Staff Professional (Wilson)

Clerical (Haslam)

TOTAL LABOR 24

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 0 $0.00 Truck $97.00 day 0 $0.00 Car $68.00 day 1 $68.00 subtotal $68.00

TOTAL TRAVEL $68.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

TOTAL SUBCONTRACTOR (SERVICES) $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Expendables $32.50 day 1 $32.50

TOTAL FIELD EXPENSES $32.50

Access agreement package (2 hr)

Site visit (2hr); SOW development for new offsite locations (1hr); Review TACO #2 (1 hr)

Site visit (2hr); ROW and access requests (4 hr)

TACO #2 preparation (4 hr); Communication with property owners for offsite property access (4 hours); Site visit for additional employee to meet with property owner Britton Stamps due to request that meeting take place at personal residence (4 hr)

3/7/2019 Page 1 of 5 Subtask 2 TACO #2

SUBTASK: DPT Groundwater Sampling

DATE: 2/19/19

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson)

Professional (Towns)

Senior Staff Professional (Taylor)

TOTAL LABOR 66

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 0 $0.00 Truck $97.00 day 4 $388.00 Car $68.00 day 0 $0.00 subtotal $388.00

TOTAL TRAVEL $388.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) Singley Construction Company $6,460.00 Lump Sum 1 $6,460.00 Singley Construction Company $1,500.00 day 0 $0.00 subtotal $6,460.00

TOTAL SUBCONTRACTOR (SERVICES) $6,460.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8260 - GW $66.00 26 0 $1,716.00

0 0 $0.00 subtotal $1,716.00

Shipping Large cooler (25 to 50 lbs) $104.00 1 $104.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $104.00

TOTAL LABORATORY $1,820.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Analytical Related Groundwater Sampling Kit $208.55 day 4 $834.20 Tubing (silicone) ft 0 $0.00 Multimeter (Temp, pH, Cond, DO, ORP) $97.00 day 0 $0.00 subtotal $834.20

Expendables $32.50 day 4 $130.00

TOTAL FIELD EXPENSES $964.20

Technical support during field event (1hr/day=4hr); Prepare field maps for additional DPT sampling locations (2 hr)

Field preparation for additional DPT sampling (4hr); 4 days of mob/demob to include vehicle loading/unloading (4hr); Onsite for DPT GW sampling-4 days (12hr/4days = 48 hr); Coordinate lab sample delivery (2hr); IDW staging and field management (2hr)

3/7/2019 Page 2 of 5 Subtask 3 TACO #2

SUBTASK: IDW Management

DATE: 2/19/19

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal (Johnson) 1

Professional Review of additional IDW analytical results (2hr); Preparation of IDW profile, manifests and (Towns) disposal coordination (4hr) 6

TOTAL LABOR 7

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

IDW

Drum transport & disposal Permafix $145.00 per drum 2 $290.00 Energy recovery (transporation) fee (10%) Permafix $29.00 per trip 1 $29.00 subtotal $319.00

TOTAL SUBCONTRACTOR (SERVICES) $319.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8260 - GW $66.00 1 0 $66.00

EPA 8260 - Soil $66.00 1 0 $66.00

EPA 8270 - GW $100.00 0 0 $0.00

EPA 8270 - Soil $100.00 0 0 $0.00 RCRA 4 Metals - GW (4 metals @ $11.50/each) $46.00 0 0 $0.00 RCRA 4 Metals - Soil (4 metals @ $11.50 each) $46.00 0 0 $0.00 subtotal $132.00 Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $132.00

Technical review of additional IDW manifests (1 hr)

3/7/2019 Page 3 of 5 Subtask 5 TACO #2

SUBTASK: Supplemental Site Assessment Report Prep.

DATE: 2/19/19

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Professional

Professional (Towns) 8

Professional (Hensley) 5

Senior Staff Professional Generate GIS data tables (2hr); ADaPT and GIS table preparation (A. Johnson) (8 min/pt- 38 pts) (5hrs); Run data checker and submittal of tables (2 hr) 9

TOTAL LABOR 22

SSAR preparation to include additional DPT sampling efforts, soil sampling, and MAGS testing (8 hr)

Create additional site maps for new sampling plan (DPT GW data results, MAGS results, and soil boring results) (1.5-hr per map) (4.5hr)

3/7/2019 Page 4 of 5 Subtask 6 TACO #2

SUBTASK: MAGS

DATE: 9/19/18

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional (Towns) 3

Senior Staff Professional (Taylor)

TOTAL LABOR 30

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $420.00 week 0 $0.00 Truck $97.00 day 2 $194.00 Car $68.00 day 0 $0.00 subtotal $194.00

TOTAL TRAVEL $194.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) Singley Construction Company MAGS Wells Install $3,308.00 Lump Sum 1 $3,308.00

$0.00 Lump Sum 0 $0.00 subtotal $3,308.00

Other LMS $2,237.00 Lump Sum 1 $2,237.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 subtotal $2,237.00

TOTAL SUBCONTRACTOR (SERVICES) $5,545.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8021 - GW $66.00 0 0 $0.00

EPA 8021 - Soil $66.00 49 0 $3,234.00 TO-14 - Gas $200.00 3 0 $600.00 Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 subtotal $3,834.00 Shipping

Large cooler (25 to 50 lbs) $104.00 2 $208.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $208.00

TOTAL LABORATORY $4,042.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Drilling Related Monitoring Well Installation Kit $184.30 day 0 $0.00 OVA/PID $106.70 day 1 $106.70 Soil Sampling Kit (through concrete) $208.55 day 0 $0.00 subtotal $106.70

Expendables $32.50 day 2 $65.00

TOTAL FIELD EXPENSES $171.70

Prepare field maps of soil and MAGS results (2 hr); Technical support during field event (1 hr/day - 1 hr)

Field preparation for MAGS well installation and soil sampling (2hr); mob/demob to include vehicle loading/unloading (1hr); MAGS well installation and soil sampling oversight (10hr); MAGS oversight (10 hrs); soil sample and summa cannister shipping (2hr); PID data download (2 hr)

3/7/2019 Page 5 of 5 Subtask 7 TACO #2

1120 North 12th Avenue Pensacola, Florida 32501

PH 850.477.6547

www.geosyntec.com

Vicks SSAR LOE DC030C_TACO#2.docx

20 February 2019

Mr. Killian Talley Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: TACO #2: Vick’s Cleaners Inc.

302 Gulf Breeze Parkway, Gulf Breeze, Florida FDEP Eric ID ERIC_5421 FDEP Task Assignment No. DC030C

Dear Mr. Talley:

Please find attached Task Assignment Change Order (TACO) #2 for the level of effort (LOE) previously prepared by Geosyntec Consultants, Inc. (Geosyntec) for supplemental site assessment activities at Vick’s Cleaners, Inc., (the Site) located in Gulf Breeze, Santa Rosa County, Florida.

This proposed CEF/LOE is based on the comments provided by the Florida Department of Environmental Protection (FDEP) and dated 25 April 2018 regarding the Draft Site Assessment Report (SAR) prepared by Geosyntec (January 2018) and based on November 2018 DPT field data and subsequent site visits to re-evaluate previously proposed offsite sampling locations. A detailed explanation of the proposed scope of work and report preparation is provided below. This TACO #2 represents updated costs related to obtaining access agreements, MAGS installation and testing, soil sampling, DPT groundwater sampling, and additional reporting requirements related to increased sampling effort.

SCOPE OF WORK

Subtask 1 – Project Management This subtask covers the general management of the project as specified in Contract No. HW550.

Subtask 2 – LOE Preparation & Fieldwork Logistics Subtask 2 includes costs for LOE preparation, obtaining site access, obtaining right-of-way (ROW) permits from Santa Rosa County to conduct off-site DPT groundwater sampling, and to oversee an underground utility survey of all proposed onsite and off-site drilling and sampling locations.

Time for additional communication with property owners for off-site property access and for two additional sites visits. One site visit was needed to take photos for the City of Gulf Breeze ROW permit application following responses to Sunshine 811 utility locates. One site visit was needed to meet with Mr. Britton Stamps, Duncan Avenue property owner. Costs are included in TACO #2 for an additional Geosyntec staff member to meet with Duncan Avenue property owner, as property owner requested the meeting to take place at his residence due to his limited mobility.

Costs associated with obtaining off-site property access agreements for 60 Northcliffe Drive (Community Bank), 301 and 333 Gulf Breeze Parkway (Bank of America and Flowerama), and right of way permits from the City of Gulf Breeze for Live Oak Street and Hoffman Drive, including figure updates, are included in TACO #2.

Subtask 3 – DPT Groundwater Sampling DPT groundwater sampling will be conducted at up to eight locations (DPT013 through DPT020) as shown on Figure 1 (attached). Groundwater samples will be collected at 4-ft intervals beginning at the top of the groundwater table (16 ft BLS) to 60-ft BLS at DPT013 through DPT015 (11 samples per locations.) DPT013 will be sampled until refusal which maybe deeper than 60 -ft BLS.

Groundwater samples will be collected at 10-ft intervals beginning at the top of the groundwater table (16 ft BLS) to 60-ft BLS at DPT016 through DPT020 (5 samples per locations. Groundwater stabilization parameters will be collected during sampling and samples will be submitted to a fixed-base laboratory for analysis of volatile organic compounds (VOCs) by EPA Method 8260.

DPT groundwater sampling activities are estimated to take four field days to complete.

Singley Construction Company is the suggested subcontractor for DPT groundwater sampling as they provided the low bid for 4 days of DPT sampling. Due to weather delays caused by severe rain and purging difficulties due to lithology (excessive flowing sand drawn into sampling screens and DPT rod fittings), costs are included in TACO #1 for 2 additional days of DPT groundwater sampling needed to complete locations DPT013, DPT014, and DPT015.

Costs are included in TACO #2 for sampling of four supplemental DPT groundwater locations DPT021 through DPT024 (Figure 1). Groundwater samples will be collected at 10-ft intervals beginning at the top of the groundwater table (approximately 16-ft BLS) to 60-ft BLS at DPT021 through DPT024 (5 samples per location). DPT016 will be sampled continuously at 4-ft intervals beginning at the top of the groundwater table (approximately 16-ft BLS) to 60-ft BLS to delineate PCE concentrations observed at DPT015 during the October 2018 sampling event. In TACO #2, costs for six supplemental sample intervals at DPT016 are requested to cover the difference between the new 4-ft proposed intervals rather than the original 10-ft sampling intervals.

Supplemental DPT groundwater sampling activities are estimated to take 4 field days to complete due to mobilization between locations.

Subtask 4 – Monitoring Well Installation and Sampling Four monitoring wells will be installed following completion and evaluation of DPT groundwater sampling activities. Continuous soil borings will be advanced at all proposed monitoring well locations to record site lithology. Proposed monitoring wells MW009 through MW012 will be installed at the locations shown on Figure 1. Monitoring well MW009 will be installed near MW002 into the main producing zone of the Sand and Gravel aquifer (approximately 100-ft BLS) and will be screened from 90 to 100-ft BLS. Monitoring wells MW010 through MW012 will be installed at various offsite locations in the right-of-way of Northcliff Drive and Duncan Avenue.

These wells will be installed to a depth of 50-ft BLS with a screened interval from 40 to 50-ft BLS;

however, the actual depth and screen interval will be based on DPT groundwater sampling data and site lithology. The newly installed monitoring wells will be installed using the sonic drilling method and constructed of 2-in. diameter Schedule-40 polyvinyl chloride (PVC) pipe with 10-ft of 0.010-in. pre-packed standard factory-slotted screen. They will be completed at the surface with a flush-mount manhole, a 2-ft by 2-ft by 4-in. thick concrete pad, and a locking monitoring well cap. The monitoring wells will be developed until the discharge is relatively sediment-free. A groundwater quality meter and turbidity meter will be used for water quality measurements during development. The top-of-casing and horizontal coordinates of the new monitoring well will be surveyed by a licensed Florida surveyor. Monitoring well installation activities are estimated to take five field days to complete.

Huss Drilling is the selected subcontractor for monitoring well installation activities and Fabre Engineering is the selected surveyor.

Geosyntec personnel will gauge the depth to water and collect groundwater samples from monitoring wells MW001 through MW012. Groundwater samples will be collected using conventional low flow purging methods and submitted to a fixed-based laboratory for VOC analysis by EPA Method 8260. Groundwater sampling activities are estimated to take three field days to complete.

Subtask 5 – IDW Management Purge water, drill fluids and cuttings and decontamination water generated during assessment activities will be placed in 55-gallon drums for manifested off-site disposal. Investigation-derived waste (IDW) samples will be collected and submitted to a fixed-base laboratory for VOC and semi-volatile organic compound (SVOC) analysis by EPA Methods 8260 and 8270, and Resource Conservation and Recovery Act (RCRA) 4 metals, as required by the disposal contractor. The analytical results will be used to profile the IDW prior to disposal.

PermaFix is the selected subcontractor for waste disposal. Please note the 10% energy recovery (transportation) fee charged by PermaFix, resulting in a total per drum disposal cost of $159.50.

Vicks SSAR LOE DC030C_TACO#2.docx

Costs are included in TACO #2 for disposal of two additional drums for purge water, drill fluids, and decontamination water that will be generated during supplemental DPT groundwater sampling activities, MAGS sampling, and soil borings proposed in TACO #2 Subtasks 3 and 7.

Subtask 6 – SSAR Preparation Subtask 6 includes costs associated with the preparation of a Supplemental Site Assessment Report (SSAR) which documents the results of the field assessment activities. The DPT and MW groundwater analytical data will be evaluated and summarized using Geographic Information System (GIS) techniques, Iso-concentration maps and cross-sections will be prepared to summarize lithology and analytical results. The SSAR will be signed/sealed by a licensed professional geologist/engineer in the State of Florida. An electronic PDF version of the report will also be uploaded to FDEP’s FTP server for loading to OCULUS. One hard copy of the SAR will be provided to FDEP upon approval of the SAR. In addition, Subtask 6 includes costs for provision of ADaPT files and generation, population, and upload of GIS data tables. Costs are included in TACO #2 for additional reporting efforts related to the supplemental sampling efforts proposed in TACO #2 Subtasks 3 and 7.

Subtask 7 – MAGS Installation with Vapor and Soil Sampling Geosyntec will oversee the installation of three MAGS wells at the locations shown on Figure 1 and Figure 2. The MAGS wells will be installed by Singley and constructed of 2-in. diameter Schedule 40 PVC installed to a depth of 10-ft to 12-ft BLS (or approximately 0.5-ft above the water table) and equipped with 10-ft of 0.010-in. factory-slotted well screen. A 20/40 grade environmental sand filter pack will be placed from the bottom of the well screen to approximately 0.5-ft above the top of the well screen. Proposed MAGS well MAGS012 will be installed inside the current Vick’s Cleaners, and a 6-in. core drill will be used to core through the flooring. Soil samples will be collected during MAGS well installation at MAGS012 and MAGS013 and five additional soil borings will be advanced for sample collected from 0 to 12-ft BLS inside the current Vick’s Cleaners (Figure 2). Singley will core the concrete and hand auger to the appropriate depth and Geosyntec will collected the soil samples for screening and for laboratory analysis. Soil samples from each soil boring will be collected at depth intervals of 0 to 0.5-ft BLS then every 2-ft BLS until the water table for field screening with a PID and laboratory analysis.

Invoice and Deliverable Schedule:

Geosyntec proposes the following deliverable and Period of Performance schedule below.

Subtask Deliverable Deliverable Due Date

Invoice Amount

Field notes (DPT GW sampling activities, MAGS), Laboratory analytical data 1 April 2019 $43,858.35

Vicks SSAR LOE DC030C_TACO#2.docx

2, 4 and 7

ROW permits, Field notes (well installation activities, MAGS and soil sampling data, groundwater sampling activities), Monitoring well survey data, Laboratory analytical data

1 May 2019 $59,282.78

1, 5, and 6 Submittal of IDW manifests, GIS data tables, and SSAR 1 July 2019 $20,892.72

Period of Performance 28 July 2019

Total: $124,033.85

CLOSURE

Geosyntec appreciates the opportunity to continue to assist you with this project. If you have any questions, please feel free to contact either of the undersigned at 850-483-5102 (Crystal) or 813- 379-4388 (Mike).

Sincerely, Geosyntec Consultants

Crystal Towns, P.G.

Professional

Michael N. Lodato, P.G.

Principal

Attachments:

Figure 1 - Proposed Sampling Locations Subcontractor Bids & Evaluation Form

North cliff Drive

G u lf B re e z e P a rk w a y

W in d s o r P la c e

DPT018

DPT021

DPT020

04-3S-29-2780-00000-00C3

DPT023

DPT022

MW012

DPT019

DPT024

DPT017

DPT016

MW011

MW010

MW009

053S290000003000000

MAGS012

MAGS013

MAGS011

Proposed Sampling Locations

Vick's Cleaners, Inc.

Facility ID: 579502224

302 Gulf Breeze Parkway Gulf Breeze, FL 32561

Figure

P a th (T it u sv ill e -0 D A

TA

T:

G

IS

F R V ic k sC le a n e rs M X D s\ S a m p le Lo c s_ .m x d

F e b ru a ry

J R B

Pensacola, FL February 2019

120 0 12060 Feet

³

Legend

&? Proposed DPT Groundwater Sampling Location

!!. Proposed Modified Active Gas Sampling Location

&< Proposed Monitoring Well Location

&< Existing Monitoring Well Location

&? DPT Groundwater Sampling Location

&= Modified Active Gas Sampling Well Location

&= Vacuum Monitoring Point Location

Electric

Sanitary Sewer

Water

Communications

Gas

Fiber Optic

Unknown

Parcel Boundary for Bank of America

Parcel Boundary for Community Bank

Parcel Boundary for Northcliffe Drive

Parcel Boundary for Hoffman Drive Parcel

Parcel Boundary for Live Oak Avenue Parcel

Parcel Boundary for 333 Gulf Breeze Parkway

Parcel Boundary for Property Owned by GBSC III LLC

Former Location of Vick's Cleaners

Duncan Avenue

City of Gulf Breeze Sanitary Sewer Lift Station #7

L iv e O a k

S tre e t

Hoffman Drive

Fairp oint D riv e

-3

S -2

-0

-0

-0 dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Oval dalton_jb Typewritten Text Soil Boring Location dalton_jb Typewritten Text MAGS Location dalton_jb Oval dalton_jb Oval

CTowns Text Box Figure 2 Proposed Soil Boring and MAGS Locations inside Current Vicks Cleaners

ATTACHMENTS

DPT DRILLING QUOTE –

SINGLEY CONSTRUCTION COMPANY

Date: February 14, 2019 Quote # : SERS2843

FDEP Facility ID No.:

Project No.:

Purchase Order No.:

To: Mollie Taylor

Geosyntec Consultants 1120 N 12th Ave.

Pensacola, FL 32501 843-422-4966 Mtaylor@Geosyntec.com

Job Payment Terms

Net 60 Days

Qty Unit Price Line Total

4.00 $1,500 6,000.00$

1.00 $60 60.00$

1.00 $400

Subtotal 6,460.00$ Sales Tax

Total 6,460.00$

6741 Pine Forest Road Pensacola, Florida 32526 Office:850-944-7799 Fax:850-944-0704 Email: pensacola@singleycc.com Thank you for your business!

Note: Cost Estimate is valid for 60 days

Estimated days to complete scope of work 4-Days

55-Gallon Drum Mobilization rig and crew

Salesperson

David Hicks Vick's Dry Cleaners 300 Gulf Breeze Pkwy Gulf Breeze Santa Rosa Co

Description

Quote

Singley Environmental & Remediation Services Singley Construction Company

6741 Pine Forest Road Pensacola, Florida 32526

4-Days of DPT 60' Borings with groundwater samples

Quotation prepared by: David Hicks

This is a quotation on the goods named, subject to the conditions noted below:

(Describe any conditions pertaining to these prices and any additional terms of the agreement.

You may want to include contingencies that will affect the quotation.)

To accept this quotation, sign here and return: _______________________________________________ mailto:Mtaylor@Geosyntec.com