Document Summary

This is a Task Assignment Notification Change Order Form (Change Order No. 1) for DEP Contract No. HW550, Task Assignment SIS-009B, executed between the State of Florida Department of Environmental Protection (DEP) and Geosyntec Consultants. The contract involves site investigation work at Tri-Tech of Florida, Inc. (Site No. 734-1, also identified as the Maller Property). Teresa Fischer serves as the Contractor Representative, with David Phillips as the DEP Contract Manager. The change order was granted verbally by the DEP project manager to address unforeseen difficulties encountered during site assessment activities.

The change order authorizes additional work to clear a heavily wooded area required for DPT (Deployment/Drilling) investigation activities. The scope additions include mechanical land clearing operations and Geosyntec professional oversight. The original task amount was $41,760.93, and Change Order No. 1 increases the total contract amount by $4,563.88, resulting in a final task amount of $46,324.81. The net increase consists of $2,800.00 for subcontracted land clearing services, $280.00 handling fee, $97.00 vehicle rental, $32.50 field expendables, and $354.38 in labor and overhead costs. The single deliverable is a field data package due by 6/9/2016, with invoicing triggered upon approval of the deliverable. All work is to be completed by 6/10/2016 with no extension to the original task completion date.

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
CN-370000-HW550-DC21H.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Teresa Fischer To: Phillips, Dave M.

Subject: Tri Tech of Florida, Inc. SIS Study Work Plan - DEP Site #734-1 SIS-009A Change Order No. 1 Date: Friday, May 27, 2016 3:44:58 PM Attachments: Tri-Tech_Site Investigation_LOE CEF SIS-009A CO#1 05272016.xlsx

Hi Dave:

Attached please find the Level of Effort/Cost Estimate Form for Change Order No. 1 at the subject site.

Geosyntec’s work plan, designed to conduct field investigation activities within a wooded area of the Maller Property, required mechanical clearing and will be completed underGeosyntec’s supervision as we discussed on May 19, 2016.

I have added Task 3 to the attached Change Order to cover the costs of the subcontractor and Geosyntec professional time.

Please contact me with any questions or comments. As always, Geosyntec appreciates the opportunity to work with you and the FDEP.

Regards, Teresa

Teresa A. Fischer Senior Geologist Geosyntec Consultants The Terraces 180A Market Place Boulevard Knoxville, TN 37922 Phone: (865) 330-0037 Direct: (865) 291-4709 Mobile: (904) 608-8833 www.Geosyntec.com

This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system.

Please consider the environment before printing this e-mail.

mailto:TFischer@Geosyntec.com mailto:Dave.M.Phillips@dep.state.fl.us http://www.geosyntec.com/

Original LOE CEF

Contractor: Geosyntec Consultants

Date: 3/1/2016 (Revised 4/7/2016)

Task #: SIS-009A SubTask 1 Project Management SubTask 6

Site: Tri-Tech of Florida, Inc. SubTask 2 HASP/Field Activities SubTask 7

Activity/Phase: Site Investigation SubTask 3 SubTask 8

Project Manager: Teresa Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$47.35 Project Manager 11 10.5

$1.00 Principal 0 0 0 0 0 0 0 0 0 0

$62.50 Associate 6 6 0 0 0 0 0 0 0 0

$47.35 Senior Professional 8 8 0 0 0 0 0 0 0 0

$49.52 Senior Professional 20 20 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$25.67 Senior Staff Professional 87 87 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Admin Asst 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 132 11 121 0 0 0 0 0 0 0 0

Direct Labor $4,474.68 $497.19 $3,977.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $7,727.78 $858.65 $6,869.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $12,202.46 $1,355.84 $10,846.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $223.73 $24.86 $198.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $798.00 $798.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $798.00 $798.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $11,800.00 $11,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $10,500.00 $10,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $1,410.00 $1,410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $23,710.00 $23,710.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $2,371.00 $2,371.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $26,081.00 $26,081.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $227.50 $227.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $1,008.00 $1,008.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,235.50 $1,235.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $40,540.69 $1,380.70 $39,159.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $1,220.24 $135.58 $1,084.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $41,760.93 $1,516.28 $40,244.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

CO#1 LOE CEF

Contractor: Geosyntec Consultants

Date: 5/27/16

Task #: SIS-009A SubTask 1 Project Management SubTask 6

Site: Tri-Tech of Florida, Inc. SubTask 2 HASP/Field Activities SubTask 7

Activity/Phase: Site Investigation SubTask 3 Land Clearing SubTask 8

Project Manager: Teresa Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$47.35 Project Manager 1 1.0

$1.00 Principal 0 0 0 0 0 0 0 0 0 0

$62.50 Associate 0 0 0 0 0 0 0 0 0 0

$47.35 Senior Professional 4 0 4 0 0 0 0 0 0 0

$49.52 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$25.67 Senior Staff Professional 8 0 8 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Admin Asst 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 13 1 0 12 0 0 0 0 0 0 0

Direct Labor $444.11 $49.35 $0.00 $394.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $766.98 $85.23 $0.00 $681.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $1,211.09 $134.58 $0.00 $1,076.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $22.21 $2.47 $0.00 $19.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$2,800.00 $0.00 $2,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $2,800.00 $0.00 $2,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $280.00 $0.00 $280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $3,080.00 $0.00 $3,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $32.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $32.50 $0.00 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,442.80 $137.05 $0.00 $4,305.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $121.08 $13.43 $0.00 $107.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,563.88 $150.48 $0.00 $4,413.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

Final LOE CEF

Contractor: Geosyntec Consultants

Date: 5/27/16

Task #: SIS-009A SubTask 1 Project Management SubTask 6

Site: Tri-Tech of Florida, Inc. SubTask 2 HASP/Field Activities SubTask 7

Activity/Phase: Site Investigation SubTask 3 Land Clearing SubTask 8

Project Manager: Teresa Fischer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

Geosyntec Consultants

$47.35 Project Manager 12 11.5

$1.00 Principal 0 0 0 0 0 0 0 0 0 0

$62.50 Associate 6 6 0 0 0 0 0 0 0 0

$47.35 Senior Professional 12 8 4 0 0 0 0 0 0 0

$49.52 Senior Professional 20 20 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$25.67 Senior Staff Professional 95 87 8 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$1.00 Admin Asst 0 0 0 0 0 0 0 0 0 0

$1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Designer 0 0 0 0 0 0 0 0 0 0

$0.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Site Manager 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0

$1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 145 12 121 12 0 0 0 0 0 0 0

Direct Labor $4,918.78 $546.53 $3,977.49 $394.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $8,494.74 $943.86 $6,869.13 $681.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $13,413.52 $1,490.39 $10,846.62 $1,076.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $245.94 $27.33 $198.87 $19.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $895.00 $798.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $895.00 $798.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $11,800.00 $11,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $10,500.00 $10,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $1,410.00 $1,410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$2,800.00 $0.00 $2,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $26,510.00 $23,710.00 $2,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $2,651.00 $2,371.00 $280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $29,161.00 $26,081.00 $3,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $260.00 $227.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $1,008.00 $1,008.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,268.00 $1,235.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $44,983.46 $1,517.72 $39,159.99 $4,305.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $1,341.35 $149.04 $1,084.66 $107.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $46,324.81 $1,666.76 $40,244.65 $4,413.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Original LOE $41,760.93

CO#1 LOE $4,563.88

Final LOE $46,324.81

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF_GEO.XLS &"Courier New,Bold"&10Page &P

Subtask 2

SITE : Tri-Tech of Florida, Inc.

SUBTASK: HASP/Field Activities

DATE: 1/8/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate Field activity kick-off onsite (4 hrs) and technical oversight (2 hrs)

(M. Lodato) 6

Senior Professional Review HASP (1 hr); Field activity coordination (2 hrs) and technical oversight of field acitivities (1 hr/day x 7 days =7 hrs)

(T. Fischer) 8

Senior Professional Mobilization (1 hr/day x 4 days = 4 hrs); Brush clearing and soil boring location (4 hrs); Soil boring advancement, field screening, lithology evaluation assitance, and technical oversight (3 hrs/day x 4 days = 12 hrs)

(T. Kafka) 20

Sr. Staff Engineer Develop HASP (4 hrs); Mobilization (1 hr/day x 7 days = 7 hrs); Field Preparation (2 hrs); Brush clearing and soil boring location (4 hrs); Soil boring advancement, soil and groundwater sampling (10 hrs/day x 7 days = 70 hrs)

(J. Raven) 87

Sr. Staff Engineer

GIS

Admin

TOTAL LABOR 121

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 1 $410.00

Truck $97.00 day 4 $388.00

Car $68.00 day 0 $0.00 subtotal $798.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$100.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $798.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

Preferred Drilling Services $11,800.00 Lump Sum 1 $11,800.00

$0.00 Lump Sum 0 $0.00 subtotal $11,800.00

Mobile Laboratory

ALF $10,500.00 Lump Sum 1 $10,500.00 subtotal $10,500.00

Surveying

SurvTech Solutions, Inc. $1,410.00 Lump Sum 1 $1,410.00 subtotal $1,410.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $23,710.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260B - GW $0.00 0 0 $0.00

EPA 8260B - Soil $0.00 0 0 $0.00

EPA 8270C - GW $0.00 0 0 $0.00

EPA 8270C - Soil $0.00 0 0 $0.00

TRPH - GW $0.00 0 0 $0.00

TRPH - Soil $0.00 0 0 $0.00

8 RCRA - GW $0.00 0 0 $0.00

8 RCRA - Soil $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 7 $1,008.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $1,008.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $208.55 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (HDPE polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $58.20 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 7 $227.50

Survey Equipment $100.00 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $1,235.50

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&F &D Page &P of &N &A

Subtask 3

SITE : Tri-Tech of Florida, Inc.

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Professional

Professional

Sr. Staff Professional

Staff Professional

Project Professional

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 3 CO#1

SITE : Tri-Tech of Florida, Inc.

SUBTASK: Land Clearing

DATE: 5/27/16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Professional Review Quotes and Develop CO (2 hrs); Field activity coordination with Property Owner (1 hr) and technical oversight of field acitivities (1 hrs)

T. Fischer 4

Professional

Sr. Staff Professional Contact Land Clearing Contractors and Obtain Quotes (1 hr); Mobilization (1 hr); Oversee Land Clearing (6 hrs)

J. Raven 8

Staff Professional

Project Professional

Admin

TOTAL LABOR 12

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 1 $97.00

Car $68.00 day 0 $0.00 subtotal $97.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $97.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

Land Clearing $2,800.00 Lump Sum 1 $2,800.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $2,800.00

TOTAL SUBCONTRACTOR (SERVICES) $2,800.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 1 $32.50

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $32.50

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 4

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 5

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 6

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 7

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 8

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 9

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Subtask 10

SITE : Geosyntec Consultants

SUBTASK: 0

DATE: 3/1/2016 (Revised 4/7/2016)

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist

Sr. Staff Hydrogeologist

Admin

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental

Truck $410.00 week 0 $0.00

Truck $97.00 day 0 $0.00

Car $68.00 day 0 $0.00 subtotal $0.00

Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00

Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00

Per diem ($35/75)

$35.00 days 0 $0.00

$75.00 days 0 $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

None $0.00 Lump sum 0 $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Drilling (Non-Conventional)

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Mobile Laboratory

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Surveying

$0.00 Lump Sum 0 $0.00 subtotal $0.00

IDW

$0.00 Lump Sum 0 $0.00

$0.00 Lump Sum 0 $0.00 subtotal $0.00

Utilities

$0.00 Month 0 $0.00

$0.00 Month 0 $0.00 subtotal $0.00

Other

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8021 - GW $64.00 0 0 $0.00

EPA 8021 - Soil $64.00 0 0 $0.00

TO-14 - Gas $200.00 0 0 $0.00

Other $0.00 0 0 $0.00

Other $0.00 0 0 $0.00 subtotal $0.00

Fast Turnaround Charges Percent

0% $0.00 0 $0.00

0% $0.00 0 $0.00

0% $0.00 0 $0.00 subtotal $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00

Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection

Level D PPE $28.00 day 0 $0.00 subtotal $0.00

Drilling Related

Monitoring Well Installation Kit $190.00 day 0 $0.00

Soil Assessment Kit $144.00 day 0 $0.00

Soil Sampling Kit (through concrete) $215.00 day 0 $0.00 subtotal $0.00

Analytical Related

Water Level Meter $20.00 day 0 $0.00

Submersible Pump $72.00 day 0 $0.00

Flow Cell $520.00 week 0 $0.00

Groundwater Sampling Kit $215.00 day 0 $0.00

Tubing (silicone) $2.00 ft 0 $0.00

Tubing (polyethylene) $0.25 ft 0 $0.00 subtotal $0.00

IDW Related

Drum $60.00 drum 0 $0.00

Soil Drum Disposal (non-haz) $85.00 drum 0 $0.00

GW Drum Disposal (non-haz) $85.00 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00

Expendables $32.50 day 0 $0.00

Other $0.00 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

&"Times New Roman,Bold"&12LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

&D Page &P of &N &A

Formula Sheet Original

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Geosyntec Labor Costs $497.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$375.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$378.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$990.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$2,233.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars -Geosyntec $497.18 $3,977.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Equipment Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Services Procurement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $1,180.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $1,050.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $141.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $2,371.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $3,977.49 = sum of Direct Labor Costs from Subtasks 2 through 10

$497.19 =12.5% of Direct Labor Costs (Project Management)

10.500 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Formula Sheet CO#1

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Geosyntec Labor Costs $47.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $189.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .