This Task Assignment Notification Form (HW550 DC003N) is issued by the Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for groundwater monitoring services at the King of Cleaners site (ERIC_4984) located at 5043 Silver Star Road, Orlando, Orange County, Florida. The contract is executed under FDEP Contract No. HW550, with Crystal Posey serving as the DEP Contract Manager and Todd Kafka as the contractor representative. The task is authorized under the monitoring phase and references the September 24, 2021 scope of work, cost estimate, and bid documentation.
The task assignment authorizes Geosyntec Consultants to conduct two quarters of groundwater sampling and preparation of monitoring reports with a total contract value of $8,355.09 under a fixed-price arrangement with zero retainage. The scope includes Subtask 2 (Quarter 1 Groundwater Monitoring Report and ADaPT/GIS Update) invoiced at $3,875.31 upon FDEP receipt and approval by December 9, 2021, and Subtask 3 (Quarter 2 Groundwater Monitoring Report and ADaPT/GIS Update) invoiced at $4,479.78 upon FDEP receipt and approval by March 31, 2022. The period of performance extends through June 30, 2022. Services include depth-to-water gauging at three monitoring wells, sample collection from two wells, volatile organic hydrocarbon analysis via EPA Method 8260, investigation-derived waste characterization and disposal through Clark Environmental (selected as the lowest-cost provider at $140 per drum), laboratory analysis, report preparation with professional certification, and GIS data updates. No duplicate samples are required due to the minimal number of samples collected.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW550
D000 N/ADC003N
Geosyntec
Todd Kafka
850-245-8851Crystal Posey
ERIC_4984
King of Cleaners
5043 Silver Star Road, Orlando, Orange County
Monitoring
This Task Assignment authorizes Geosyntec Consultants to conduct two quarters of groundwater sampling in accordance with the September 24, 2021 scope of work, cost estimate, and bid documentation.
Quarter 2 Groundwater Monitoring Report and ADaPT/GIS Update
03/31/2022
06/30/2022
$ 8,355.09 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Crystal Posey Digitally signed by Crystal Posey Date: 2021.09.28 21:45:48 -04'00'
Crystal Posey Digitally signed by Crystal Posey Date: 2021.09.28 21:45:57 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.09.29 13:38:06 -04'00'
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2021.09.29 15:08:20 -04'00'
$ 8,355.09
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Quarter 1 Groundwater Monitoring Report and ADaPT/GIS Update 12/09/2021
Subtask 3: Quarter 2 Groundwater Monitoring Report and ADaPT/GIS Update 03/31/2022
FDEP receipt and approval of Quarter 1 Groundwater Monitoring Report and ADaPT/GIS Update - Subtask 2 $ 3,875.31
FDEP receipt and approval of Quarter 2 Groundwater Monitoring Report and ADaPT/GIS Update $ 4,479.78
$ 8,355.09
HW550
DC003N
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW550 Contract File Crystal Posey King of Cleaners
(ERIC_4984)
HW550 DC003N
5043 Silver Star Rd, Orlando Orange County September 28, 2021
Task Assignment HW550 DC003N is for Geosyntec Consultants to conduct two quarters of groundwater sampling in accordance with the September 24, 2021 scope of work and cost estimate form.
Subtask 1: An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Quarter 1 Groundwater Monitoring Costs associated with quarterly groundwater sampling activities and preparation of the Quarter 1 Groundwater Monitoring Report. Geosyntec will collect two groundwater monitoring samples that will be analyzed for VOHs at a fixed-based laboratory. Clark Environmental is the selected subcontractor for IDW transport and disposal because it is the lowest cost provider.
Subtask 3: Quarter 2 Groundwater Monitoring Costs associated with quarterly groundwater sampling activities and preparation of the Quarter 2 Groundwater Monitoring Report. Geosyntec will collect two groundwater monitoring samples that will be analyzed for VOHs at a fixed-based laboratory. Clark Environmental is the selected subcontractor for IDW transport and disposal because it is the lowest cost provider.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment (TA), total task amount is $8,355.09
The final task completion date is June 30, 2022.
FDEP COST ESTI MATEContractor: Geosyntec Consultants
Date: 9/24/2021
Task #: DC003N SubTask 1 Project Management SubTask 6
Site: King of Cleaners SubTask 2 Quarter 1 Groundwater Monitoring SubTask 7
Activity/Phase: GW Monitoring SubTask 3 Quarter 2 Groundwater Monitoring SubTask 8
Project Manager: J. Bartlett SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
Geosyntec Consultants $40.38 Project Manager J. Bartlett 6 5.9 $68.75 Principal T. Kafka 2 1 1 0 0 0 0 0 0 0 $40.38 Project Professional J. Bartlett 9 5 4 0 0 0 0 0 0 0 $40.38 Project Professional M. Hensley 4 2 2 0 0 0 0 0 0 0 $31.25 Senior Staff Professional A. Langteau 4 2 2 0 0 0 0 0 0 0 $29.45 Staff Professional R. Joslyn 36 18 18 0 0 0 0 0 0 0 $30.53 Admin Asst P. Gallagher 2 1 1 0 0 0 0 0 0 0
Total Hours 63 6 29 28 0 0 0 0 0 0 0
Direct Labor $2,147.29 $238.59 $974.54 $934.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 172.70% $3,708.36 $412.04 $1,683.03 $1,613.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,855.65 $650.63 $2,657.57 $2,547.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $107.37 $11.93 $48.73 $46.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF_GEO.XLS Page 1
FDEP COST ESTI MATEContractor: Geosyntec Consultants
Date: 9/24/2021
Task #: DC003N SubTask 1 Project Management SubTask 6
Site: King of Cleaners SubTask 2 Quarter 1 Groundwater Monitoring SubTask 7
Activity/Phase: GW Monitoring SubTask 3 Quarter 2 Groundwater Monitoring SubTask 8
Project Manager: J. Bartlett SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $280.00 $140.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $280.00 $140.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $28.00 $14.00 $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $308.00 $154.00 $154.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $580.00 $290.00 $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $126.00 $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $706.00 $353.00 $353.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $417.10 $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $116.40 $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $598.50 $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $7,769.52 $662.56 $3,609.55 $3,497.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $585.57 $65.06 $265.76 $254.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,355.09 $727.62 $3,875.31 $3,752.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF_GEO.XLS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
SITE : Geosyntec Consultants SUBTASK 2: Quarter 1 Groundwater Monitoring
DATE: 9/24/21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Project Professional J. Bartlett 5
Project Professional M. Hensley 2
Sr. Staff Professional A. Langteau 2
Sr. Staff Professional R. Joslyn
Admin Assistant P. Gallagher 1
TOTAL LABOR 29
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Car $68.00 days 0 $0.00 Truck $97.00 days 1 $97.00 Van $97.00 days 0 $0.00 subtotal $97.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
IDW
Clark Environmental $140.00 Drum 1 $140.00
$0.00 Lump Sum 0 $0.00 subtotal $140.00
TOTAL SUBCONTRACTOR (SERVICES) $140.00
Field prep (1 hr); Mob/Demob (3 hrs), MW sampling (1.5 hrs per well @ 2 MWs = 3 hrs), sample management (1 hr), IDW management (1 hr); Post-field wrap up (1 hr);
Preparation of GWM Report text, tables, draft figures, and revisions (8 hrs).
PDF compilation and assembly (1 hr)
PG certification of GWM Report
LOE Preparation (1 hr); Field preparation (1 hr); IDW manifesting (1 hr); Data evaluation and reporting (2 hrs)
Preparation of figures for the GWM Report (2 hrs)
GIS Data Update (2 samples + 3 WLs @ 8 mins/sample = 1 hr); run data checker and submittal of data tables (1 hr)
Copy of KOC (ERIC_4984) - GWM - LOE_08-2021 9/28/2021 Page 3 of 6 Subtask 2
SUBTASK 2: Quarter 1 Groundwater Monitoring
DATE: 9/24/21
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix EPA 8260 - GW VOHs $66.00 2 0 $132.00 EPA 8260 - Soil VOHs $66.00 0 0 $0.00 TO-15 - Vapor VOCs $200.00 0 0 $0.00 Other - EPA 8260 - GW (IDW Characterization) $66.00 1 0 $66.00 Other - EPA 6010/7470 (8 RCRA Metals) - GW (IDW Characteriza $92.00 1 0 $92.00 subtotal $290.00 Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 1 $63.00 subtotal $63.00
TOTAL LABORATORY $353.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Analytical Related Groundwater Sampling Kit $208.55 day 1 $208.55 Other $0.00 day 0 $0.00 Other $0.00 day 0 $0.00 subtotal $208.55 IDW Related Drum $58.20 drum 1 $58.20 subtotal $58.20
Expendables $32.50 day 1 $32.50
TOTAL FIELD EXPENSES $299.25
9/28/2021 Page 4 of 6 Subtask 2
SUBTASK 3: Quarter 2 Groundwater Monitoring
DATE: 9/24/21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Project Professional J. Bartlett 4
Project Professional M. Hensley 2
Sr. Staff Professional A. Langteau 2
Sr. Staff Professional R. Joslyn
Admin Assistant P. Gallagher 1
TOTAL LABOR 28
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck $420.00 week 0 $0.00 Truck $97.00 days 1 $97.00 Van $97.00 days 0 $0.00 subtotal $97.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
IDW
Clark Environmental $140.00 Drum 1 $140.00
$0.00 Lump Sum 0 $0.00 subtotal $140.00
TOTAL SUBCONTRACTOR (SERVICES) $140.00
PDF compilation and assembly (1 hr)
PG certification of GWM Report
Field preparation (1 hr); IDW manifesting (1 hr); Data evaluation and reporting (2 hrs)
Preparation of figures for the GWM/SRC Report (2 hrs)
GIS Data Update (2 samples + 3 WLs @ 8 mins/sample = 1 hr); run data checker and submittal of data tables (1 hr)
Field prep (1 hr); Mob/Demob (3 hrs), MW sampling (1.5 hrs per well @ 2 MWs = 3 hrs), sample management (1 hr), IDW management (1 hr); Post-field wrap up (1 hr);
Preparation of GWM Report text, tables, draft figures, and revisions (8 hrs).
9/28/2021 Page 5 of 6 Subtask 3
SUBTASK 3: Quarter 2 Groundwater Monitoring
DATE: 9/24/21
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS
Method - Matrix EPA 8260 - GW VOHs $66.00 2 0 $132.00 EPA 8260 - Soil VOHs $66.00 0 0 $0.00 TO-15 - Vapor VOCs $200.00 0 0 $0.00 Other - EPA 8260 - GW (IDW Characterization) $66.00 1 0 $66.00 Other - EPA 6010/7470 (8 RCRA Metals) - GW (IDW Characteriza $92.00 1 0 $92.00 subtotal $290.00 Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 1 $63.00 subtotal $63.00
TOTAL LABORATORY $353.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Analytical Related Groundwater Sampling Kit $208.55 day 1 $208.55
$0.00 day 0 $0.00 $0.00 day 0 $0.00 subtotal $208.55 IDW Related Drum $58.20 drum 1 $58.20 subtotal $58.20
Expendables $32.50 day 1 $32.50 subtotal $32.50
TOTAL FIELD EXPENSES $299.25
9/28/2021 Page 6 of 6 Subtask 3
12802 Tampa Oaks Blvd., #151 Tampa, Florida 33637
PH 813.558.0990
www.geosyntec.com
KOC (ERIC_4984) - GWM - SOW_08-2021
24 September 2021 Ms. Crystal Posey Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Subject: Scope of Work and Level of Effort Groundwater Monitoring Report or Site Rehabilitation Completion Report King of Cleaners (ERIC_4984) 5043 Silver Star Rd, Orlando, Florida Task Assignment DC003N (pending)
Dear Ms. Posey:
Geosyntec Consultants, Inc. (Geosyntec) has prepared this proposed Scope of Work and Level of Effort for two quarterly groundwater monitoring events and preparation of two Groundwater Monitoring Reports (GWMRs) at King of Cleaners (Site) located in Orlando, Orange County, Florida. Groundwater samples were last collected at the Site in September 2020. A detailed explanation of the proposed scope of work is provided below.
SCOPE OF WORK
Subtask 1 – Project Management This subtask covers the general management of the project as specified in Contract No. HW550.
Subtask 2 – Quarter 1 Groundwater Monitoring Subtask 2 includes costs associated with quarterly groundwater sampling activities and preparation of the GWMR. Geosyntec personnel will gauge the depth to water in three shallow monitoring wells (MW006, MW009, and MW013) to evaluate groundwater flow direction and will collect groundwater samples from two monitoring wells (MW006 and MW013; Figure 1). Groundwater samples will be collected using conventional low flow purging methods in accordance with FDEP SOPs. No duplicate groundwater sample will be collected due to the minimal samples collected.
Groundwater samples will be submitted to a fixed-based laboratory for volatile organic hydrocarbon (VOH) analysis by Environmental Protection Agency (EPA) Method 8260.
Groundwater sampling activities are proposed to occur in October/November 2021.
Investigation Derived Waste (IDW) will consist of purge and decontamination water generated during sampling activities and will be placed in one 55-gallon drum for manifested off-site disposal. Necessary IDW characterization samples will be collected from the drum upon completion of the sampling event in order to develop a new waste profile and will include analysis of VOHs (8260B) and 8 RCRA Metals (6010C/7470A). Clark Environmental is the selected subcontractor for IDW transport and disposal. Subcontractor bids and evaluation form are included in Attachment A.
The GWMR will document the field activities and results from the first quarterly monitoring event. The groundwater analytical data will be evaluated and summarized graphically using iso-concentration maps, if applicable. The report will be signed/sealed by a licensed professional geologist/engineer in the State of Florida. An electronic PDF version of the report will also be uploaded to FDEP’s FTP server for loading to OCULUS. In addition, Subtask 2 includes costs for provision of ADaPT files and generation, population, and upload of GIS data tables.
Subtask 3 – Quarter 2 Groundwater Monitoring Subtask 3 includes costs associated with quarterly groundwater sampling activities. Geosyntec personnel will gauge the depth to water in three shallow monitoring wells (MW006, MW009, and MW013) to evaluate groundwater flow direction and will collect a groundwater sample from two monitoring well (MW006 and MW013; Figure 1). Groundwater samples will be collected using conventional low flow purging methods in accordance with FDEP SOPs. No duplicate groundwater sample will be collected due to the minimal samples collected. Groundwater samples will be submitted to a fixed-based laboratory for VOH analysis by EPA Method 8260.
Groundwater sampling activities are proposed to occur in January/February 2022.
IDW will consist of purge and decontamination water generated during sampling activities and will be placed in one 55-gallon drum for manifested off-site disposal. Necessary IDW characterization samples will be collected from the drum upon completion of the sampling event in order to develop a new waste profile and will include analysis of VOHs (8260B) and 8 RCRA Metals (6010C/7470A). Clark Environmental is the selected subcontractor for IDW transport and disposal. Subcontractor bids and evaluation form are included in Attachment A.
The GWMR will document the field activities and results from the second quarterly monitoring event. The groundwater analytical data will be evaluated and summarized graphically using iso-concentration maps, if applicable. The report will be signed/sealed by a licensed professional geologist/engineer in the State of Florida. An electronic PDF version of the report will also be uploaded to FDEP’s FTP server for loading to OCULUS. In addition, Subtask 3 includes costs for provision of ADaPT files and generation, population, and upload of GIS data tables.
Invoice and Deliverable Schedule:
Geosyntec proposes the following deliverable and Period of Performance schedule below.
Subtask Deliverable Deliverable Due Date
Invoice Amount
2 Submittal of GWMR 9 December 2021 $3,875.31 1 & 3 Submittal of GWMR 31 March 2022 $4,479.78
Period of Performance 30 June 2022
Total: $8,355.09
CLOSURE
Geosyntec appreciates the opportunity to continue assist you with this project. If you have any questions, please contact me at 813-379-4388.
Sincerely, Geosyntec Consultants
Joseph K. Bartlett III, P.E. Todd Kafka, P.G.
Project Engineer Senior Principal
Figure 1 – Site Map Attachments A – Subcontractor Bids and Evaluation Form
FIGURE
DPT027
DPT028
DPT020
DPT017
DPT018
DPT019
DPT031
DPT029
MW017 (38-48)
King of
Cleaners
MW016 (34-39)
MW015 (15-20) MW012 (35-40) DPT025
DPT026
DPT024
DPT023
DPT022
MW011 (35-40)
DPT021
DPT010
DPT014
DPT009
DPT013
DPT012
MW013 (50-55) MW008 (15-20)
MW009 (35-40)
MW007 (25-30)
MW010 (35-40)
MW006 (25-30)
DPT011
Morse MW-2 (4-14)
Morse MW-1 (4-14)
DPT008
DPT006
DPT015 DPT016 DPT007
MW005 (25-30)
Marshall MW-3 (4-14)
DPT005
MW003 (25-30)
DPT002
MW004 (45-50)
MW002 (20-25)
DPT004
DPT003
DPT001
MW001 (15-25)
Marshall MW-2 (4-14)
MW014 (6-16)
MW019 (31-41)
MW018 (15-20)
Chevron MW-12 (50-55)
Chevron MW-18 (17-32)
Site Map
King of Cleaners 5043 Silver Star Road
Orlando, Orange County, FL
Figure
P a th
Ti tu sv ill e -0
D a ta
)T
G
IS
F R
K in g
O fC le a n e rs
M X
D s\
S it e
M a p
.m x d
A p r
A L
Notes:
1. TPOC indicates temporary point of compliance.
2. ft BLS indicates feet below land surface.
3. DPT indicates direct push technology.
4. Locations of monitoring Wells MW-12 and MW-18 located on Chevron Food Mart property are approximate.
5. Property boundary obtained from the Orange County Property Appraiser.
6. Source of 2017 Aerial: FDOT, Surveying and Mapping Office. Jacksonville, FL October 2020
100 0 10050 Feet
³
Legend
&? DPT Sample Location
&< Monitoring Well Location (showing screen interval, ft BLS)
&< Presumed Abandoned or Destroyed Monitoring Well Location
Approximate Location of King of Cleaners
Parcel Boundary
Central Florida Regional Transportation Authority (18-22-29-0169-00-021)
Chevron Food Mart (Owner Hze
Enterprises Inc.)
(18-22-29-0000-00-033)
Silver Hill Shopping Center (Owner Lb-Ubs 2007-C6-Silver
Hills Station Inc.)
(18-22-29-0169-00-040)
B e lc o
D ri v e
Silver Star Road
N o rt h
P in e H il ls
R o a d
ATTACHMENT A
Investigation Derived Wastes (non-hazardous)
Transport and Disposal Company Per Drum Clark Environmental $140 X
Universal Environmental Solutions $200 Hepaco $155
Note:
X indicates selected contractor.
King of Cleaners - Orlando, Orange County, Florida Subcontractor Evaluation
ERIC_4984
1/7/2021 Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=18362 1/2
Quote Number: 18362
QUOTE
QUOTED TO: Todd Kafka QUOTE DATE: 1/1/2021
COMPANY NAME: Geosyntec - 2021 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for thirty (30) days from the date listed above except for transportation which is subject to weekly change and is based on upon payment in net 30 days.
Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
Name (print) Title
ALangteau Rectangle
ALangteau Rectangle
ALangteau Text Box Total: $140
1/7/2021 Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=18362 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
BID PROPOSAL FORM
Florida Department of Environmental Protection (FDEP) Drycleaner and Hazardous Waste Sites
Investigation Derived Waste (IDW) Transportation and Disposal
Contractor Company Name: HEPACO, LLC
Contact Name and Phone Number: Linda Basinger (813) 240-8020
Assumptions and Clarifications.
• Unless otherwise specified within this proposal all terms and conditions will be governed by the most recent Master Services Agreement between GEOSYNTEC and HEPACO, LLC. In the event that a current agreement is not in place all terms and conditions will be governed by HEPACO’s standard service agreement.
• All proposed disposal methods and prices are contingent upon profile approval and acceptance into HEPACO’s approved/preferred partner disposal facility.
• The above listed rates apply for less than truck load quantities (LTL). In the event that a higher quantity is needed at one specific location HEPACO can provide additional pricing that will reflect the volume.
• Above rates include a standard energy and insurance fee. If market conditions change dramatically, HEPACO reserves the right to increase or decrease these fees based on the appropriate energy index. In the event that this is required HEPACO will provide a 30 day notice of the anticipated change.
* Excludes Monroe County (Case by case basis determined by volume of IDW)
• Bid costs above should be inclusive of transportation fees, fuel fees, environmental recovery fees, etc.
• No standby time should be included in the above bid costs.
• Assume that the drums are accessible.
• It is assumed that VOH totals results will be provided for profiling. If other analytical results are required, please indicated here:
Region
Non-RCRA/NON-DOT
LIQUIDS, Process Code
STAB01
Non-RCRA/NON-DOT
Solids, Process Code
LF01
RCRA D039/DOT
Class 9 Liquids, Process Code INC09
RCRA D039/DOT Class
9 Sludges/Solids, Process Code INC17
RCRA D004-11/DOT
Class 9 Liquids
Process Code WAT17
RCRA D004-11/DOT
Class 9 Sludges/Solids
STAB02
Northwest 173.88$ 146.28$ 346.28$ 535.44$ 471.96$ 333.96
Northeast 173.88$ 146.28$ 346.38$ 535.44$ 471.96$ 333.96
Central 154.56$ 126.96$ 327.06$ 516.12$ 452.64$ 314.64
Southwest 154.56$ 126.96$ 327.06$ 516.12$ 452.64$ 314.64
Southeast 154.56$ 126.96$ 327.06$ 516.12$ 452.64$ 314.64
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
Untitled
File details come from the government source that posted it. Updated .