This is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract No. HW550, issued on April 3, 2020. The task assignment authorizes Geosyntec Consultants to conduct groundwater monitoring and remedial alternatives evaluation work at the Oak Hill Cleaners site (Facility ID ERIC_4544) located at 7628 103rd Street, Jacksonville, Duval County, Florida. The contract is managed by FDEP Contract Manager Killian Talley, with Geosyntec Consultants represented by Mike Lodato. The work is performed under a fixed-price arrangement with a not-to-exceed amount of $18,216.82.

The task assignment encompasses six subtasks: Project Management, PDB (Passive Diffusion Bag) Deployment, Groundwater Sampling, IDW (Investigative Derived Waste) Management, Groundwater Monitoring Report preparation, and Remedial Alternatives Evaluation. The contract specifies deliverables and invoice milestones tied to FDEP receipt and approval, with invoicing scheduled in three tranches: $7,492.75 upon approval of groundwater sampling field notes (due July 31, 2020), $3,996.56 upon approval of the Groundwater Monitoring Report and GIS updates (due October 2, 2020), and $6,727.51 upon approval of the Remedial Alternatives Evaluation (due November 20, 2020). The performance period extends from April 2020 through March 12, 2021. Geosyntec's cost estimate includes 157 labor hours distributed across professional staff, subcontractor costs for passive diffusion samplers from EON Products, laboratory analytical services for volatile organic halocarbons analysis via EPA Method 8260, and IDW disposal services through Hulls Environmental Services at $150 per drum.

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW550

D000 N/ADC025G

Geosyntec Consultants

Mike Lodato

850-245-8928Killian Talley

ERIC_4544

Oak Hill Cleaners

7628 103rd Street, Jacksonville, Duval County

Assessment

This Task Assignment authorizes Geosyntec Consultants to conduct annual groundwater sampling activities and develop a Remedial Alternatives Evaluation in accordance with the April 2, 2020 scope of work, cost estimate, and bid documentation.

Remedial Alternatives Evaluation

11/20/2020

03/12/2021

$ 18,216.82 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.04.03 12:49:25 -04'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.04.03 12:49:34 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.04.03 15:49:31 -04'00'

Michael N. Lodato Digitally signed by Michael N. Lodato Date: 2020.04.03 16:13:20 -04'00'

$ 18,216.82

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 2-3: Submittal of groundwater sampling field notes 07/31/2020

Subtask 4&5: Submittal of Groundwater Monitoring Report, ADaPT/GIS Update, and Final IDW Manifest 10/02/2020

Subtask 1&6: Submittal of Remedial Alternatives Evaluation 11/20/2020

Subtasks 2-3: FDEP receipt and approval of groundwater sampling field notes $ 7,492.75

Subtask 4&5: FDEP receipt and approval of Groundwater Monitoring Report, ADaPT/GIS Update, and Final IDW Manifest $ 3,996.56

Subtask 1&6: FDEP receipt and approval of Remedial Alternatives Evaluation $ 6,727.51

$ 18,216.82

HW550

DC025G

Florida Department of Memorandum Environmental Protection

To:

From:

Date:

Subject:

HW550 Contract Negotiation File Oak Hill Cleaners Jacksonville, Duval County

ERIC_ 4844

Killian Talley, Project Manager April 3, 2020 Negotiation Summary

HW550 DC025G

This Task Assignment authorizes Geosyntec Consultants to conduct groundwater monitoring and preparation of a Remedial Alternatives Evaluation (RAE).

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: PDB Deployment Subtask authorizes labor and related costs for the mobilization to site for deployment of passive diffusion bags to additional wells for analysis. Following review of previous monitoring event and learning that the drycleaner was no longer operating with PCE the Department requested additional sampling for design purposes.

Subtask 3: Groundwater Sampling This subtask authorizes labor and costs associated with the groundwater sampling event at site. Depth to water measurements will be collected from the monitoring well network to evaluate flow and gradients, 25 samples will be taken for analysis of volatile organic halocarbons via EPA Method 8260. Passive diffusion bags will not be deployed after this event to allow potential adjustments for designs.

Subtask 4: IDW Management This subtask includes cost and labor related to the transport and disposal of investigative derived waste generated during monitoring activities. Hulls Environmental has been selected as the lowest responsive and responsible bidder.

Subtask 5: Groundwater Monitoring Report Subtask authorizes labor and related costs for data evaluation and development of a Groundwater Monitoring Report.

Subtask 6: Remedial Alternatives Evaluation Under this subtask Geosyntec will prepare a RAE for soil and shallow groundwater contamination at the site. The Department and contractor will hold a conference call discussing the document and implementation of remedies discussed in the RAE.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $18,216.82 with 157 labor hours.

Geosyntec Consultants may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

Printed on recycled paper.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 4/2/2020

Task #: DC025F SubTask 1 Project Management SubTask 6 RAE

Site: Oak Hill Cleaners SubTask 2 PDB Deployment SubTask 7

Activity/Phase: Monitored Natural Attenuation SubTask 3 Groundwater Sampling SubTask 8

Project Manager: K. Talley SubTask 4 IDW Management SubTask 9

SubTask 5 Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Geosyntec Consultants $34.13 Project Manager B. Dawson 16 16.1 $60.10 Principal T. Kafka 2 0 0 0 2 0 0 0 0 0 $55.29 Principal R. Klinger 7 0 0 1 0 6 0 0 0 0 $34.13 Professional Geologist B. Dawson 7 1 2 0 2 2 0 0 0 0 $34.13 Professional Engineer A. Johnson 2 0 0 0 0 2 0 0 0 0 $28.37 Senior Staff Professional A. Ramsey 88 9 26 3 16 34 0 0 0 0 $28.37 Staff Professional J. Barnhart 25 0 14 0 11 0 0 0 0 $40.38 SR Drafter/SR CADD M. Hensley 8 0 0 0 4 4 0 0 0 0 $30.53 Admin Asst P. Gallagher 2 0 0 0 0 2 0 0 0 0

Total Hours 157 16 10 42 4 35 50 0 0 0 0

Direct Labor $4,954.85 $550.54 $289.46 $1,203.06 $140.40 $1,115.97 $1,655.42 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $8,557.02 $950.78 $499.90 $2,077.68 $242.47 $1,927.28 $2,858.91 $0.00 $0.00 $0.00 $0.00 Total Labor $13,511.87 $1,501.32 $789.36 $3,280.74 $382.87 $3,043.25 $4,514.33 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $247.74 $27.53 $14.47 $60.15 $7.02 $55.80 $82.77 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 1

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 4/2/2020

Task #: DC025F SubTask 1 Project Management SubTask 6 RAE

Site: Oak Hill Cleaners SubTask 2 PDB Deployment SubTask 7

Activity/Phase: Monitored Natural Attenuation SubTask 3 Groundwater Sampling SubTask 8

Project Manager: K. Talley SubTask 4 IDW Management SubTask 9

SubTask 5 Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $291.00 $97.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $291.00 $97.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $55.35 $55.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$109.35 $109.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $72.90 $72.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $237.60 $237.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $23.77 $23.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $261.37 $261.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $150.00 $0.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Southeastern Surveyors $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $150.00 $0.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $15.00 $0.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $165.00 $0.00 $0.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,782.00 $0.00 $1,782.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $167.00 $0.00 $167.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,949.00 $0.00 $1,949.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $97.50 $32.50 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $283.95 $48.00 $235.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $0.00 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $439.65 $80.50 $359.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $16,865.63 $1,528.85 $1,242.70 $5,843.04 $554.89 $3,099.05 $4,597.10 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,351.19 $150.13 $78.94 $328.07 $38.29 $304.33 $451.43 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $18,216.82 $1,678.98 $1,321.64 $6,171.11 $593.18 $3,403.38 $5,048.53 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

SITE : Oak Hill Cleaners SUBTASK: PDB Deployment

DATE: 4/2/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional B. Dawson 1

Senior Staff Professional A. Ramsey 9

TOTAL LABOR 10

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $97.00 day 1 $97.00

TOTAL TRAVEL $97.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

EON PDB samplers (0.75 inch) $18.45 Per Sampler 3 $55.35 EON PDB Sampler (2 inch) $21.87 Per Sampler 5 $109.35 EON PDB Tether (MW017R) $72.90 Per Tether 1 $72.90

TOTAL SUBCONTRACTOR (EQUIPMENT) $237.60

SUBCONTRACTOR (SERVICES PROCUREMENT)

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

TOTAL LABORATORY $0.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Analytical Related PDB Shipping $48.00 Lump Sum 1 $48.00

Expendables $32.50 day 1 $32.50

TOTAL FIELD EXPENSES $80.50

Technical support (1 hr/day; 1)

Mob/demob @ 1 hr/day (1); PDB deployment (0.5 hr/well; 4)

HW550_DC025G_CEFLOE.xls 4/2/2020 Page 3 of 7 Subtask 2

SITE : Geosyntec Consultants SUBTASK: Groundwater Sampling

DATE: 4/2/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional B. Dawson 2

Senior Staff Professional A. Ramsey 26

Staff Professional J. Barnhart 14

TOTAL LABOR 42

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $97.00 day 2 $194.00

TOTAL TRAVEL $194.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS Method - Matrix

EPA 8021 - GW $66.00 25 1 $1,716.00

EPA 8021 - GW - IDW $66.00 1 0 $66.00

EPA 6020 - GW - IDW $100.00 0 0 $0.00

subtotal $1,782.00 Fast Turnaround Charges Percent

0% $0.00 0 $0.00 0% $0.00 0 $0.00 0% $0.00 0 $0.00 subtotal $0.00 Shipping

Large cooler (25 to 50 lbs) $104.00 1 $104.00 Small cooler (0 to 25lbs) $63.00 1 $63.00 subtotal $167.00

TOTAL LABORATORY $1,949.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection Level D PPE $28.00 day 0 $0.00 subtotal $0.00 Analytical Related Groundwater Sampling Kit $208.55 day 1 $208.55 Water Level Meter $19.40 day 1 $19.40 Tubing (Polyethylene) $0.25 ft 0 $0.00 Tubing (Silicone) $2.00 ft 4 $8.00 subtotal $235.95 IDW Related Drum $58.20 drum 1 $58.20

Expendables $32.50 day 2 $65.00

TOTAL FIELD EXPENSES $359.15

Mob/demob (1 hr/day; 2); Collect depth to groundwater measurements from site-wide MWs (3); Conventionally collect groundwater sample from 6 monitoring wells (1.5 hr/well; 9)

Technical support (1 hr/day; 2)

LOE Preparation (3); Property owner and drycleaning tenant correspondence (1); Field preparation and PDB coordination (3); Mob/demob (1 hr/day; 2); Collect depth to groundwater measurements from site-wide MWs (3), Collect 19 deployed PDB samples for laboratory analysis (0.5 hr/well; 10); Sample management (2); Prepare groundwater sampling field package (2).

4/2/2020 Page 4 of 7 Subtask 3

SUBTASK: IDW Management

DATE: 4/2/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal R. Klinger 1

Senior Staff Professional A. Ramsey 3

TOTAL LABOR 4

TRAVEL

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

IDW

Hulls $150.00 Per Drum 1 $150.00

TOTAL SUBCONTRACTOR (SERVICES) $150.00

LABORATORY COSTS

TOTAL LABORATORY $0.00

FIELD EXPENSES

TOTAL FIELD EXPENSES $0.00

Review IDW profile and sign manifest (1)

Establish IDW profile (2); IDW coordination and manifest preparation (1)

4/2/2020 Page 5 of 7 Subtask 4

SUBTASK: Groundwater Sampling

DATE: 4/2/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Professional B. Dawson 2

Senior Staff Professional A. Ramsey 16

Staff Professional J. Barnhart 11

Project Professional M. Hensley 4

TOTAL LABOR 35

TRAVEL

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

TOTAL LABORATORY $0.00

FIELD EXPENSES

TOTAL FIELD EXPENSES $0.00

Preparation of report figures

GMR review/PG Certification (2)

GMR review and submittal (2)

Preparation of groundwater monirtoring report (12); Data table and figure updates (4)

ADaPT and GIS table preparation (59 points @ 8 min/point) (8); Run data checker and submittal of tables (1); Table and Figure QA/QC (2)

4/2/2020 Page 6 of 7 Subtask 5

SUBTASK: RAE

DATE: 4/2/20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal R. Klinger 6

Professional B. Dawson 2

Professional A. Johnson 2

Senior Staff Professional A. Ramsey 34

Project Professional M. Hensley 4

Admin Asst.

P. Gallagher 2

TOTAL LABOR 50

TRAVEL

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIPMENT PROCUREMENT)

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

TOTAL LABORATORY $0.00

FIELD EXPENSES

TOTAL FIELD EXPENSES $0.00

Document formatting and hardcopy preparation (2)

RAE figure preparation (4)

RAE preparation (2) FDEP meeting (2), PE review of RAE and sign/seal (2)

Engineering QA/QC (2)

Prepare RAE (32hr), FDEP meeting (2 hr)

RAE review (2), FDEP meeting (2)

4/2/2020 Page 7 of 7 Subtask 6

1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207

PH 904.858.1818

FAX 904.396.1143

www.geosyntec.com

2 April 2020

Mr. Killian Talley Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Annual Groundwater Monitoring Scope of Work and Level of Effort Oak Hill Cleaners 7628-1 103rd Street, Jacksonville, Florida 32210 FDEP Facility ID ERIC_4544

Dear Mr. Talley, Geosyntec has prepared this Scope of Work (SOW) and Cost Effort Form/Level of Effort (CEF/LOE) for biennial groundwater monitoring activities at the Oak Hill Cleaners (Site) (Facility ID ERIC_4544) located in Jacksonville, Florida.

Subtask 1 – Project Management

Subtask 2 – PDB Deployment This subtask includes costs associated with deployment of passive diffusion bag (PDB) samplers in 8 monitoring wells (MW005, MW011, MW017R, MW018, MW020R, MW029, MW030, and MW031) which did not receive a new PDB sampler following the July 2019 groundwater sampling event. These newly installed PDBs will be deployed a minimum of 2 weeks to allow sufficient time for equilibration with groundwater prior to sampling activities. Additionally, a new PDB hanger kit will be ordered and installed in monitoring well MW017R, which was traditionally sampled during the 2019 sampling event due to the missing hanger kit.

Subtask 3 – Groundwater Sampling This subtask includes costs associated with the collection of 25 groundwater samples from the current monitoring well network per recommendations in the 2019 Groundwater Monitoring Report and subsequent FDEP correspondence dated 2 March 2020. Prior to sampling, depth to water measurements will be collected from the monitoring well network to evaluate groundwater flow direction including horizontal and vertical groundwater gradients. Nineteen monitoring wells included in the current annual and biennial groundwater sampling plan (MW001, MW002, MW004 through MW006, MW010, MW011, MW014 through MW018, MW020R, MW026 through MW031) will be sampled via PDBs. Monitoring well MW025 is a water table monitoring well located inside the current facility and will be sampled using a peristaltic pump in general accordance with FDEP SOPs. Additionally, per FDEP request, monitoring wells MW008, MW013, MW021 through MW023 will be sampled using a peristaltic pump in general accordance with FDEP SOPs. The 25 groundwater samples and one duplicate sample will be analyzed by a fixed-based lab for volatile organic halocarbons (VOHs) by Environmental Protection Agency (EPA) Method 8260.

Following the 2020 biennial groundwater sampling activities, PDBs will not be redeployed into the select monitoring wells previous set to be sampled as part of the annual sampling plan in 2021 to allow for potential adjustments to the annual and biennial groundwater sampling plans as part of the remedial alternatives evaluation discussed in Subtask 6. Moving forward, PDBs will be deployed and sampled in separate mobilizations at least two weeks prior to the subsequent groundwater sampling activities.

Subtask 4 – IDW Management

Purge water generated during sampling activities will be placed in a 55-gallon drum and manifested for off-site disposal. IDW will be staged in the rear of the facility. To establish a new non-hazardous IDW groundwater profile with our selected IDW waste hauler Hull’s Environmental Services, an IDW groundwater sample will be collected for VOHs via EPA Method 8260 from the purge water drum.

IDW Disposal

Water

(per 55-gal.

drum)

Soil (per 55-gal. drum)

Universal Environmental Solutions $300 $300 Moran Environmental Recovery $500 $500 Hulls Environmental Services $150 $150

Subtask 5 – Groundwater Monitoring Report

This subtask includes costs associated with preparation of a GMR in general accordance with Chapter 62-780, Florida Administrative Code (FAC). The GMR will document the results of the biennial groundwater sampling activities and will be signed and sealed by a licensed professional geologist/engineer. An electronic PDF version of the report will be uploaded to FDEP’s FTP server for loading to OCULUS.

In addition, Subtask 5 includes costs for provision of ADaPT files and generation, population, and upload of GIS data tables.

Subtask 6 – Remedial Alternatives Evaluation

Geosyntec will prepare a RAE to evaluate various remedial technologies for soil and groundwater treatment. The RAE will include but is not limited to an evaluation of technologies based on (i) long and short-term environmental impacts; (ii) implementability; (iii) operation and maintenance; (iv) reliability; (v) feasibility; and (vi) costs. Geosyntec will schedule a teleconference with FDEP to discuss the findings of the RAE prior to completing the document. The goal of the teleconference will be to discuss and select a remedial approach for soil and groundwater remediation. Geosyntec will include copies of pertinent site assessment figures (e.g., site maps with analytical results and concentration isopleths) to facilitate the teleconference. The RAE will include a summary of the conceptual Site model, cleanup criteria, remedial goals and objectives, a summary of evaluated technologies, a RAE table, and one conceptual design for the top selected alternatives for soil and groundwater (two total), and estimated costs.

Invoice and Deliverable Schedule:

Subtask Deliverable Deliverable Due Date* Invoice Amount

2 & 3 Submittal of groundwater sampling field notes 31 July 2020 $7,492.75

4 Submittal of IDW Manifest 25 September 2020 $593.18

Submittal of Groundwater

Monitoring Report, and GIS Data Tables

2 October 2020 $3,403.38

1&6 Submittal of RAE 20 November 2020 $6,727.51

Total $18,216.82

*Assumes TA is approved by 1 May 2020 and there will be no future working restrictions as a result of current pandemic.

As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Blaine Dawson at 904.450.4271 (office).

Sincerely, Blaine Dawson, G.I.T.

Professional

Todd K. Kafka, P.G.

Principal

Attachments A – Subcontractor Cost Evaluation and Quotes

Item Target PDB Depth Unit Cost ($)* Comments & Options 20 ft 77.25$ 50 ft 78.15$ 100 ft 79.65$ 250 ft 96.70$ Recommended Option for .75 inch wells: add 1 additional weight for wells 50‐100ft, ($20 ea, Not Included). add 1 wgt per add'l 100ft 20 ft 74.37$ 50 ft 75.27$ 100 ft 76.77$ 250 ft 93.82$ Recommended Option for 1 Inch wells: add 1 additional weight ($20 ea, Not Included) for wells 100‐200 ft depth 20 ft 72.00$ 50 ft 72.90$ 100 ft 74.40$ 250 ft 95.95$ Recommended Option for 2 & 4 Inch wells: add 1 additional weight ( $22 ea, Not Included) for wells>200 ft depth 20 ft 73.17$ 50 ft 74.07$ 100 ft 75.57$ 250 ft 97.12$ Recommended Option for 2 & 4 Inch wells: add 1 additional weight (Not Included) for wells>200 ft depth

0.75‐inch well 18.45$ GSD151, .75x 42in Prefilled 1‐inch well 18.45$ GSD151, .75x 42in Prefilled 2‐inch well 21.87$ GSD165, 1.33x24in Prefilled 4‐inch well 21.87$ GSD165, 1.33x24in Prefilled

Miscellaneous Tethers > 150 ft Require a Spool instead of H‐Frame. A spool is included in the 250ft price only. One Reel‐Handle is required separately and can be shared among all Spools. Use FSR109, $9.00ea

<20 lbs/2 Pgs $48 Zip Ties for attaching samplers to tether rings are sold in packages of 25 for $1.25 per pkg <50 lbs/2 Pgs $96 Shipping estimates are for Fedex GROUND Service. 1‐2 day delivery to Jacksonville FL from Atlanta Ga factory.

EON Products December 2019- December 2020 PDB Rates

Shipping Charge

*All unit costs must include applicable service costs

Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 0.75‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)

Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 1‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)

Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 2‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)

Prefilled Diffusion Sampler (<250mL) with ASTM Type 1 Deionized Water for 4‐inch well with complete hanger kit (locking cap, stainless steel reusable weight, suspension tether,PDB connection rings, tether holding frame, etc.)

Cost for additional PDB (<250 mL)

AJohnson Rectangle

Alexis Johnson

From: Alexis Johnson Sent: Tuesday, November 26, 2019 9:24 AM To: 'Brian Bendis'; lynn@eonpro.com; donna.jackson@alsglobal.com Subject: PDB Quotes Attachments: PDB Quotes Package 2018.pdf

Hi All, Could you please send over revised quotes for passive diffusion samplers good for the next year in the format attached?

Thanks, Alexis I. Johnson, E.I.(FL) Senior Staff Engineer

1200 Riverplace Boulevard Suite 710 Jacksonville, FL 32207 Direct: 904-450-4262 Mobile: 609-658-0914 www.Geosyntec.com

This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system.

AJohnson Callout no bid provided by ALS

QUOTE

Customer GEOSYNTEC CONSULTANTS

Project Street Address Various Locations

Project State Florida

Project City Jacksonville

Project Zip

Quote Number Q200169JAX

Quote Date Mar 27, 2020 03:55:49 PM

Phone Number 904-450-4271

Email bcdawson@geosyntec.com

Hull's Rep Larry Hall

SCOPE OF WORK

Transportation and disposal of non-hazardous IDW waste drums within 50 mile radius of Hull's Jacksonville location.

Item description Quantity Unit Rate Amount

Transportation and Disposal (IDW waste) 1.00 Drum $ 150.00 $ 150.00

TOTAL $ 150.00

UNIT PRICING

JACKSONVILLE | 251 LEVY ROAD | ATLANTIC BEACH, FL 32233 | TEL. 904-241-2200

CORPORATE OFFICE | 75-D YORK AVENUE | RANDOLPH, MA 02368| TEL. 888-233-5338

CLIENT:

Attn: Ashley Ramsey

Company: Geosyntec Consultants

Street: 1200 Riverplace Blvd Suite 710

City, St, Zip: Jacksonville , FL 32207

Phone: 904-705-4579

Email: Aramsey@geosyntec.com

WORK TO BE PERFORMED AT:

Site: 956 Hubbard st

Company: 956 Hubbard St

Street: 1200 Riverplace Blvd

City, St, Zip: Jacksonville , FL 32207

Site Contact: Ashley Ramsey

Phone: 904-705-4579

BID NAME: 956 Hubbard st DATE: March 12, 2020

BID NO: 20FLJJ0066

Dear Ashley, Moran Environmental Recovery (MER) appreciates this opportunity to be of service. MER is a specialized provider of integrated environmental and industrial services. Below is the scope of work and pricing for the services requested.

SCOPE OF WORK:

• Pick up 1 drum water and haul to WRI for Disposal.

PROJECT PRICING:

• Pick up and disposal 1 drum $500.0000 aramsey Highlight aramsey Highlight

BWC TA 100k.pdf
Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .