This document is a Task Assignment Notification Form under DEP Contract No. HW550, issued by the Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants, Inc. for environmental assessment services at the Polk County Fertilizer site in Haines City, Polk County, Florida. The task assignment was executed in April 2020 and involves coordination between FDEP's Brownfields and CERCLA Site Screening Section and the contractor's project management team led by Joe Applegate, P.G.
The scope of work comprises three subtasks: (1) Project Management at a cost of $604.69, (2) Document Review and Site Reconnaissance at $1,380.55, and (3) Workplan Preparation at $3,554.00, for a total fixed-price contract value of $5,539.24. The deliverables include Site Reconnaissance Field Notes, a Site Inspection Workplan/Quality Assurance Project Plan (QAPP), and a Health and Safety Plan (HASP), with a final delivery date of July 3, 2020, and project completion through July 24, 2020. The cost proposal was initially submitted at $7,997.70 but was negotiated downward through a reduction in total labor hours from 61 to 46 hours. Geosyntec's scope includes historical document review, site reconnaissance evaluation, preparation of a HASP, identification of potential contaminant areas of concern (including former above-ground storage tanks, fertilizer piles, and loading areas), and development of a work plan for proposed soil and groundwater sampling under the CERCLA site investigation framework.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW550
CERSI CER19CSS-27A
Geosyntec Consultants, Inc.
Joe Applegate, P.G.
8502458953Kelly Crain
COM_65273
Polk County Fertilizer
0 Citrus Ave, Haines City, Polk County, FL
Site Recon and Site Inspection (SI) Workplan Development
This Task Assignment (TA) is issued in accordance with the Cost Proposal submitted by Geosyntec Consultants, Inc.
on April 3, 2020, revised April 7, 2020. This TA includes Project Management, Document Review and Site Reconnaissance, and Workplan Development. The final deliverable is the Site Inspection Work Plan/Quality Assurance Project Plan and Health and Safety Plan (HASP), along with field notes of the Site Recon.
Site Inspection Workplan/QAPP, HASP, Field Notes
07/03/2020
07/24/2020
$ 5,539.24 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Ginger Shirah Digitally signed by Ginger Shirah Date: 2020.04.21 20:11:28 -04'00'
Kelly Crain Digitally signed by Kelly Crain Date: 2020.04.22 10:08:45 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.22 18:00:22 -04'00'
Michael N. Lodato Digitally signed by Michael N. Lodato Date: 2020.04.23 09:37:37 -04'00'
$ 5,539.24
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Reconnaisance Field Notes,Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) 07/03/2020
Site Reconnaisance Field Notes, Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) (Subtasks 1, 2 & 3) $ 5,539.24
$ 5,539.24
HW550
CSS-27A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
TO:
FROM:
DATE:
SUBJECT:
Geosyntec Consultants, Inc., HW550 Contract File - CERCLA Site Screening
Kelly Crain, Contract Manager
April 21, 2020
Negotiation Summary – Task Assignment (TA) CSS-27A Polk County Fertilizer, COM_65273, Haines City, Polk County Site Reconnaissance and Site Inspection (SI) Workplan/QAPP Development
The Scope of Work (SOW) for this TA as agreed by both FDEP and Geosyntec Consultants, Inc., is to perform Site Inspection (SI) activities at the above referenced site, in accordance with the U.S. EPA Superfund State Political Subdivision and Indian Tribe Site Specific Cooperative Agreement (No. 00D95619), administered by FDEP.
Subtask 1: Project Management This subtask is for project management and includes a percentage of the overall project fees and has been negotiated as a contract rate. The agreed upon cost of this subtask is $604.69.
Subtask 2: Document Review and Site Reconnaissance This subtask includes a file review of historical/background documents, an evaluation of current and historical site features and land use, completion of a Health and Safety Plan (HASP) for a site reconnaissance, and the site reconnaissance itself. The agreed upon cost of this subtask is $1,380.55.
Subtask 3: Workplan Preparation This subtask includes labor hours associated with a teleconference with the FDEP CERCLA Site Screening Section and the preparation of a Workplan/Quality Assurance Project Plan for a Site Inspection to include soil and groundwater sampling at the subject site. The deliverable for this subtask will be the only deliverable of this task assignment and shall include the HASP, field notes, and a Workplan/QAPP for the future Site Inspection. The agreed upon cost of this subtask is $3,554.00.
www.floridadep.gov
Summary The FDEP Contract Manager and the Geosyntec Consultants, Inc. Contract Manager agree to the SOW and final cost. The final cost associated with this Task Assignment is $5,539.24, per the Cost Proposal and LOE received on April 3, 2020, revised on April 7, 2020.
http://www.floridadep.gov/ www.floridadep.gov
Negotiation Summary – Task Assignment (TA) CSS-27A Polk County Fertilizer, COM_65273, Haines City, Polk County Site Recon and SI Workplan/QAPP Development April 21, 2020
The cost associated with the initial Cost Proposal received on April 3, 2020 was $7,997.70.
Negotiations between FDEP and Geosyntec Consultants, Inc. concluded with the following modifications:
o a reduction in total labor hours from 61 to 46.
Due to these changes, the agreed upon final cost of this task assignment is $5,539.24.
2039 Centre Point Blvd. Suite 103 Tallahassee, Florida 32308
PH 850-556-8419
www.geosyntec.com
7 April 2020
Ms. Kelly Crane, Environmental Manager Brownfields and CERCLA Site Screening Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399
Subject: Proposal to Conduct Site Reconnaissance and Develop a CERCLA Site Investigation Work Plan for the former Polk County Fertilizer Plant, Haines City, Polk County, Florida
Dear Ms. Crane:
Geosyntec has prepared this statement of work (SOW) and proposed level of effort (LOE) to review key documents associated with the former Polk County Fertilizer Plant (PCFP, “the Site”), conduct a site reconnaissance, and prepare a Work Plan to conduct a CERLA Site Investigation. We have conducted an initial review of pertinent historical and more recent documents and FDEP correspondence. Our review will focus on issues identified and summarized in key documents including:
• Preliminary Screening Assessment Report (PSAR) dated April 25, 2018, prepared by
FDEP
• FDEP’s correspondence regarding periodic sampling and analyses of existing monitoring wells at the facility in which the FDEP ultimately gave the site owner a no further action regarding nitrate exceedances in groundwater; and
• Preliminary Contamination Assessment Report, Polk County Fertilizer Company Industrial Facility, Polk County, Florida, prepared in February 1996, prepared by Andreyev Engineering.
Background
Based on review of Sanborn Maps, the FDEP reported in their PSAR dated April 25, 2018, that the Site was originally operated as an ice factory in the 1920s and that the Polk County Fertilizer Company (PCFC) began operations in 1936, where fertilizer was manufactured from raw materials that were shipped to the site by truck and rail. The facility also reportedly sold other farm http://www.geosyntec.com/
Polk County Fertilizer Company CERCLA Screening Site Assessment Proposal chemicals and nutritional sprays, but no further information was available. There were also reports of above ground storage tanks that originally contained pesticides and petroleum products that operated dating back to 1984.
On May 10, 1989, a trailer loaded with 20 tons of mixed fertilizer started to smolder on Site. The trailer was moved off-site to the west to an adjacent empty field and dumped on the ground and continued to smolder. The Haines City Fire Department responded and extinguished the fire with water. In August 1989, the PCFC sold the adjacent property to two individuals; that property is now owned by a church.
Water and Earth Sciences, Inc. conducted a Preliminary Contamination Assessment in August 1994 on behalf of PCFC and collected soil samples from 10 to 50 feet below land surface (at 10-foot intervals, no surface samples were collected). A monitoring well was installed adjacent to where the smoldering fertilizer pile was located on the property to the west and was screened 40 to 50 ft bls. Soil and groundwater were analyzed for nitrate, sulfate, and various metals. The analytical result reported no soil cleanup target (CTLs) exceedances; however, elevated concentrations of nitrate and cadmium above FDEP groundwater cleanup target levels (GCTLs) were detected in groundwater.
Based on a Polk County Health Department Storage Tank Facility Closure Site Inspection Report dated April 2007, the following tanks, along with piping, fittings and valves were removed from the Site:
• Two, 10,000-gallon AST containing petroleum products;
• One, 10,000-gallon tank and an18,000-gallon tank, both containing pesticides; and
• Polk County reports also indicate that one additional 10,000-gallon tank containing pesticides was removed in 1994.
The Polk County inspection report noted staining on the ground around the former tank locations and requested a formal tank closure report, but apparently one was never completed. The date of the AST tank removals (except for the 10,000 gallon tank in 1994) was not reported and/or was unknown.
In February 1996, a PCAR was submitted to the FDEP prepared by Andreyev Engineering, which was conducted in accordance with an FDEP approved PCAP. The report documented the installation of 2 additional lithologic borings to 60 feet and the installation of 3 additional monitoring wells. Groundwater was sampled and analyzed for VOCs using EPA Method 601 and 602, 610, RCRA metals, and nitrate. All analytical results with the exception of nitrates were below FDEP GCTLs. Nitrate concentrations in all 4 monitoring wells were above the 10 mg/l FDEP GCTL and the report concluded that groundwater exceeding the GCTLs was likely migrating off-site. As a part of the PCAR, a potable private and public well inventory was completed and it was determined that all properties within a 1-mile radius were provided public water service. The PCAR recommended that the Site initiate semi-annual groundwater monitoring for nitrate using the 4 existing on-site monitoring wells.
Subsequently, based on FDEP District correspondence and a provided timeline, the Site went into a long-term groundwater monitoring program for nitrate from August 1996 through January of 2006. Quarterly groundwater monitoring from 2005 indicated that nitrate concentrations were below GCTLs and on February 2, 2006, the FDEP issued a No Further Action for the site. A well abandonment report was submitted on September of 2007.
Scope of Work
Subtask 1 – Project Management
Subtask 2 - Document Review and Site Reconnaissance
Since Polk County historical compliance reports included the storage and usage of pesticides and petroleum products in the 10,000-gallon and 18,000-gallon ASTs, additional soil and groundwater sampling and analysis will be proposed in CERCA Site Investigation Work Plan that will based on additional review of background documents and a site reconnaissance.
Geosyntec’s review will focus on the three main documents outlined above as well as regulatory correspondence. Geosyntec will conduct a site reconnaissance to evaluate historical site features as well as current land use. We will prepare a site health and safety plan prior to conducting the site reconnaissance.
Based on our initial review and the site reconnaissance, Geosyntec will propose sampling locations for each of the areas of concern with particular attention to identifying other potential chemicals of concern that were not tested for in previous assessments. These areas of concern include, but are not limited to:
• Former AST areas (2);
• Former smoldering fertilizer location;
• Loading/unloading area fertilizer area (bulk unloader areas); and
• Retention Pond located on the southern part of the property.
Subtask 3 – Work Plan Preparation
Based on the historical document review and site reconnaissance, Geosyntec will prepare a Work Plan to collect additional data to support the preparation of a CERCLA site investigation. Specific soil sampling locations and depth recommendations will be provided in the Work Plan. In addition, Geosyntec will propose groundwater sampling locations in the areas of concern, including the former AST locations. The FDEP will provide Geosyntec with the nomenclature and numbering of the soil and groundwater samples (as prescribed by Scribe) proposed in the Work Plan. A Quality Assurance Project Plan (QAPP) will be prepared using the USEPA guidelines for CERCLA sites.
Geosyntec will conduct one teleconference with the FDEP and it will be to discuss the results of the historical document review, site reconnaissance and proposed scope of work for soil and groundwater sampling.
Schedule
Geosyntec proposes the following schedule for the above described scope of work (if a TA is received by 15 April 2020):
• Conduct Site Recon the week of April 27st
• Prepare Draft Work Plan by May 22th;
• Participate in two conference calls with FDEP.
• Prepare Final Work Plan by June 19th.
Invoice and Deliverable Schedule:
Subtask Deliverables Deliverable Due Date
Invoice Amount
1,2,3 Field notes, HASP, QAPP, Work Plan 19 June 2019 $ 5,539.24
Total: 5,539.24
We appreciate this opportunity; please call Joe Applegate at (850) 556-8419 or Brooks Baldwin at
(850) 528-2268 if you have any questions regarding this proposal.
Sincerely, Geosyntec Consultants, Inc.
Joe Applegate, P.G. (FL) Sr. Principal Hydrogeologist
Brooks Baldwin, P.G. (FL) Sr. Geologist
FDEP COST ESTIMATE
Contractor: Geosyntec Consultants
Date: 4/7/2020
Task #: HW550
Site: Polk County Fertilizer SI WP
Activity/Phase: Site Recon & Work Plan
Project Manager: Applegate
SubTask 1 Project Management
SubTask 2 Document Review/Site Reconnaissance SubTask 3 Work Plan Preparation
SubTask 4
SubTask 5
Totals 1 2 3 4
Labor Rate Category
Geosyntec Consultants
$82.69 Project Manager Applegate 2 2.4
$82.69 Principal Applegate 3 1 2 0
$45.19 Senior Professional Baldwin 10 2 8 0
$27.16 Staff Professional Abbott 22 8 14 0
$30.53 Admin Asst Gallagher 3 1 2 0
$32.86 SR Drafter/SR CADD Musie 6 0 6 0
$23.75 Sr. Engineering Tech (Gr 0 0 0 0
Total Hours 46 2 12 32 0
Direct Labor $1,784.52 $198.28 $420.88 $1,165.36 $0.00
Overhead 172.70% $3,081.87 $342.43 $726.86 $2,012.58 $0.00
Total Labor $4,866.39 $540.71 $1,147.74 $3,177.94 $0.00
Other Direct Costs $89.22 $9.91 $21.04 $58.27 $0.00
Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00
Total Travel $97.00 $97.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00
Subtotal $5,052.61 $550.62 $1,265.78 $3,236.21 $0.00
Completion Fee $486.63 $54.07 $114.77 $317.79 $0.00
Total Estimated Cost $5,539.24 $604.69 $1,380.55 $3,554.00 $0.00
REV: 02/03 CEF_GEO.XLS Page 1
SITE :
SUBTASK 2: Document Review and Site Reconnaissance
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal (Applegate) HASP/Document Review (1) 1
Senior Professional (Baldwin) HASP/Historical Review (2) 2
Staff Professional (Abbott) 8
Senior Drafter
Admin (Gallagher) Project team coordination (1) 1
TOTAL LABOR 12
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Car $68.00 days $0.00 Truck $97.00 days 1 $97.00 Van $97.00 days 0 $0.00 subtotal $97.00 Mileage Costs $0.00 subtotal $0.00 Air Fare $365.00 each 0 $0.00 subtotal $0.00 Hotel - Hampton Inn $113.00 day 0 $0.00 Per Diem $36.00 day 0 $0.00 subtotal $0.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional) $0.00 0 $0.00 subtotal $0.00 Drilling (Non-Conventional) $0.00 subtotal $0.00 Utility Locate $0.00 0 $0.00 subtotal $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
LABORATORY COSTS
# SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - GW VOHs $66.00 0 0 $0.00
EPA 8260 - GW VOHs & VOAs $135.00 0 0 $0.00
EPA 8270 GW $100.00 0 0 $0.00
TCLP - CVOCs (ext $45 + VOCs TCLP by 8260) $235.00 0 0 $0.00
$0.00
Shipping RATE UNIT USAGE TOTALS Large Cooler $104.00 each 0 $0.00 Small Cooler $63.00 each 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection Level D PPE $28.00 0 0 $0.00 subtotal $0.00 Drilling Related subtotal $0.00 IDW Related
Drums $58.20 each 0 $0.00 subtotal $0.00
Analytical Related Shallow Groundwater Sampling Kit - $208.55/day $208.55 day 0 $0.00
$0.00 Other Expendables $32.50 day 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Polk County Fertilizer Plant
HASP Preparation (2) and Site Recon(6)
SITE :
SUBTASK 3: Workplan Preparation
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal (Applegate) Senior review of workplan (1) & Technical support (1) 2
Senior Professional (Baldwin) Work Plan development (5 hrs), QAPP, Scribe reviews (3) 8
Staff Professional (Abbott) 14
Senior Drafter Site Figures and Tables for Work Plan (6) 6
Admin (Gallagher) Document editing and production (2) 2
TOTAL LABOR 32
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Car $68.00 days $0.00 Truck $97.00 days 0 $0.00 Van $97.00 days 0 $0.00 subtotal $0.00 Mileage Costs $0.00 subtotal $0.00 Air Fare $365.00 each 0 $0.00 subtotal $0.00 Hotel - Hampton Inn $113.00 day 0 $0.00 Per Diem $36.00 day 0 $0.00 subtotal $0.00
TOTAL TRAVEL $0.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional) $0.00 0 $0.00 subtotal $0.00 Drilling (Non-Conventional) $0.00 subtotal $0.00 Utility Locate $0.00 0 $0.00 subtotal $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
LABORATORY COSTS
# SAMPLES #QA/QC TOTALS
Method - Matrix
EPA 8260 - GW VOHs $66.00 0 0 $0.00
EPA 8260 - GW VOHs & VOAs $135.00 0 0 $0.00
EPA 8270 GW $100.00 0 0 $0.00
TCLP - CVOCs (ext $45 + VOCs TCLP by 8260) $235.00 0 0 $0.00
$0.00
Shipping RATE UNIT USAGE TOTALS Large Cooler $104.00 each 0 $0.00 Small Cooler $63.00 each 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection Level D PPE $28.00 0 0 $0.00 subtotal $0.00 Drilling Related subtotal $0.00 IDW Related
Drums $58.20 each 0 $0.00 subtotal $0.00
Analytical Related Shallow Groundwater Sampling Kit - $208.55/day $208.55 day 0 $0.00
$0.00 Other Expendables $32.50 day 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $0.00
Polk County Fertilizer Plant
Work Plan development (8) and QAPP
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |