CN-370000-HW550-BF4D.pdf

PDF 436 KB Posted

Attached to
Master Agreement FL|HW550|85d144626a85584193b4b253697535d5
Contract number
HW550
Issued by
Florida

About this file

The provided document is a PDF portfolio cover page that does not contain substantive contract information. The image shows only a title page with the Adobe Acrobat logo and instructions to open the document in Acrobat X or Adobe Reader X or later versions. No contract details, parties, jurisdictions, agencies, or companies are identified on this page.

Without access to the actual contract content within the portfolio, a comprehensive summary of contract terms, goods, services, pricing, set-asides, renewal periods, or financial amounts cannot be provided. To complete an analysis of this indefinite delivery vehicle contract, the full contents of the PDF portfolio must be reviewed.

View the file

Other files

File Type Posted
CN-370000-HW550-DC39BCO4.pdf PDF
CN-370000-HW550-SL04LCO1.pdf PDF
CN-370000-HW550-BF02BCO1.pdf PDF
CN-370000-HW550-SW23CO4.pdf PDF
CN-370000-HW550-SL04WCO1.pdf PDF
CN-370000-HW550-SIS07B.pdf PDF
CN-370000-HW550-DC38CCO1.pdf PDF
CN-370000-HW550-BF3A.pdf PDF
CN-370000-HW550-HW028A.pdf PDF
CN-370000-HW550-DC30CCO2.pdf PDF
CN-370000-HW550-DC18C.pdf PDF
CN-370000-HW550-HW020G.pdf PDF
CN-370000-HW550-SIS9BCO1.pdf PDF
CN-370000-HW550-HW020B.pdf PDF
CN-370000-HW550-SA117.pdf PDF
CN-370000-HW550-DC03N.pdf PDF
CN-370000-HW550-A11.pdf PDF
CN-370000-HW550-BF504A.pdf PDF
CN-370000-HW550-SL13CCO1.pdf PDF
CN-370000-HW550-DC15ICO1.pdf PDF
CN-370000-HW550-DC37A.pdf PDF
CN-370000-HW550-FIL8.pdf PDF
CN-370000-HW550-FIL18.pdf PDF
CN-370000-HW550-DC17FCO1.pdf PDF
CN-370000-HW550-SA138.pdf PDF
CN-370000-HW550-DC21C.pdf PDF
CN-370000-HW550-SL10ACO1.pdf PDF
CN-370000-HW550-SIS9CCO1.pdf PDF
CN-370000-HW550-DC10ACO1.pdf PDF
CN-370000-HW550-DC27GCO3.pdf PDF
CN-370000-HW550-SIS13A.pdf PDF
CN-370000-HW550-DC026i.pdf PDF
CN-370000-HW550-HW15J.pdf PDF
CN-370000-HW550-HW15ICO2.pdf PDF
CN-370000-HW550-HW09ECO3.pdf PDF
CN-370000-HW550-DC28B.pdf PDF
CN-370000-HW550-DC039D.pdf PDF
CN-370000-HW550-DC01H.pdf PDF
CN-370000-HW550-SLA60CO1.pdf PDF
CN-370000-HW550-HW20A.pdf PDF
CN-370000-HW550-DC025D.pdf PDF
CN-370000-HW550-SL004Y.pdf PDF
CN-370000-HW550-SA125.pdf PDF
CN-370000-HW550-SL13B.pdf PDF
CN-370000-HW550-SL04YCO1.pdf PDF
CN-370000-HW550-SLA92.pdf PDF
CN-370000-HW550-SIA063.pdf PDF
CN-370000-HW550-0A010CO1.pdf PDF
CN-370000-HW550-BF54B.pdf PDF
CN-370000-HW550-SA133.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

WCP TAFORM 04-2017

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS93)

Section Representative _____

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

COST PLUS FIXED FEE

TASK ASSIGNMENT NOTIFICATION FORM

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Task Assignment Notification

BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf

Deliverable & Invoice Schedule

Module: SRPPM

Grant: SRP13

Phone: 850-245-8765

Final Deliverable Due Date: 12-30-2018

RETAINAGE: 0

Facility ID #: ERIC_5554 & COM_350825

Site Name: Bob Lee's Auto Repair

Contractor: Geosyntec

Activity Phase: Limited Source Removal (LSR) & Post-Active Remedial Monitoring (PARM)

Address (Street, City, County): 812 Park Street, Clearwater, FL

Task Description: LSR and PARM activities including: an underground utility locate; soil sample collection between SB-3 and SB-10, & SB-20 to define plume/excavation limit; contaminated soil excavation & removal/disposal; installation of (4) monitoring wells, soil & GW analysis --includes 4 quarters of PARM GW sampling; mobilizations; and reporting will be conducted under this TA as per the approved LSR Work Plan dated August 24, 2017 & LOE CE dated September 15, 2017, and the revised LOE & LOE Cover Letter dated 9-25-17.

Final Deliverables: PARM Annual Report

Date 1: March 31, 2019

FIXED PRICE: 43831.37

FEE SCHEDULE:

COST REIMBURSEMENT:

FIXED FEE:

DEP Contract Manager: Carrie Kruchell

Contractor Representative: Mike Lodato Phone #: 813-558-0990

Total Cost: 43831.37

TOTAL COST: 43831.37

Deliverable Description 1: REVISED HASP, FIELD PACKAGE-LSR (photos, field notes, manifests)

Deliverable Description 2: FIELD PACKAGE-MW INSTALL (photos, GW sampling logs, MW construction logs)

Deliverable Description 3: PARM QTR 1 REPORT (letter report including figures, tables, labs)

Deliverable Description 4: PARM QTR 2 REPORT (letter report including figures, tables, labs)

Deliverable Description 5: PARM QTR 3 REPORT (letter report including figures, tables, labs)

Deliverable Description 6: PARM ANNUAL REPORT (annual report including figures, tables, labs)

Invoice Submittal Requirement 1: Rev. HASP & LSR (photos, field notes, manifests)

Invoice Submittal Requirement 3: PARM QTR 1 REPORT (letter report including figures, tables, labs)

Invoice Submittal Requirement 4: PARM QTR 2 REPORT (letter report including figures, tables, labs)

Invoice Submittal Requirement 6: PARM ANNUAL REPORT (annual report including figures, tables, labs)

Invoice Submittal Requirement 5: PARM QTR 3 REPORT (letter report including figures, tables, labs)

Invoice Submittal Requirement 2: MW INSTALL (photos, GW sampling logs, MW construction logs)

Deliverable Due Date 1: 10-30-2017

Deliverable Due Date 2: 11-30-2017

Deliverable Due Date 3: 3-30-2018

Deliverable Due Date 4: 06-30-2018

Deliverable Due Date 6: 12-30-2018

Deliverable Due Date 5: 09-30-2018

Invoice Amount 2: 16353.74

Invoice Amount 1: 17535.03

Invoice Amount 3: 2485.65

Invoice Amount 4: 2485.65

Invoice Amount 5: 2485.65

Invoice Amount 6: 2485.65

CONTRACT #: HW550

TA #: BF04D

2017-09-26T14:56:31-0400

Carrie Kruchell

2017-09-26T14:56:38-0400

Carrie Kruchell

2017-09-27T09:02:05-0400

Teresa Booeshaghi

2017-09-27T12:30:45-0400

Michael Lodato

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 9-25-17 Revised

Task #: SubTask 1 Project Management SubTask 6

Site: Bob Lee's Auto Repair, Clearwate SubTask 2 Pre-excavation Activities SubTask 7

Activity/Phase: Limited Source Removal/ PARM SubTask 3 Limited Source Removal SubTask 8

Project Manager: Ryan Tuttle SubTask 4 Post Active Remediation Monitoring SubTask 9

SubTask 5 Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Geosyntec Consultants $34.13 Project Manager Tuttle 29 28.9

$1.00 Principal 0 0 0 0 0 0 0 0 0 0 $65.38 Principal Lodato 5 1 0 0 4 0 0 0 0 0 $50.72 Senior Professional Brey 22 2 2 8 10 0 0 0 0 0 $53.12 Senior Professional Kafka 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Professional 0 0 0 0 0 0 0 0 0 0

$34.13 Professional Tuttle 86 22 32 22 10 0 0 0 0 0 $1.00 Project Professional 0 0 0 0 0 0 0 0 0 0

$1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$30.53 Senior Staff Professional Cain 88 0 0 48 40 0 0 0 0 0 $1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $1.00 Clerical 0 0 0 0 0 0 0 0 0 0 $1.00 Clerical 0 0 0 0 0 0 0 0 0 0

$30.53 Admin Asst Strickland 0 0 0 0 0 0 0 0 0 0 $1.00 SR Drafter/SR CADD 0 0 0 0 0 0 0 0 0 0

$34.13 Designer Hensley 24 0 4 0 20 0 0 0 0 0 $0.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $1.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $1.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0 $1.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0

Total Hours 254 29 25 38 78 84 0 0 0 0 0

Direct Labor $8,869.14 $985.46 $917.68 $1,330.12 $2,622.06 $3,013.82 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $15,317.01 $1,701.89 $1,584.83 $2,297.12 $4,528.30 $5,204.87 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $24,186.15 $2,687.35 $2,502.51 $3,627.24 $7,150.36 $8,218.69 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $443.45 $49.27 $45.88 $66.51 $131.10 $150.69 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 1

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 9-25-17 Revised

Task #: SubTask 1 Project Management SubTask 6

Site: Bob Lee's Auto Repair, Clearwate SubTask 2 Pre-excavation Activities SubTask 7

Activity/Phase: Limited Source Removal/ PARM SubTask 3 Limited Source Removal SubTask 8

Project Manager: Ryan Tuttle SubTask 4 Post Active Remediation Monitoring SubTask 9

SubTask 5 Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $776.00 $97.00 $194.00 $485.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $776.00 $97.00 $194.00 $485.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $3,010.00 $0.00 $0.00 $3,010.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$6,182.50 $500.00 $5,682.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $9,192.50 $500.00 $5,682.50 $3,010.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $919.25 $50.00 $568.25 $301.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $10,111.75 $550.00 $6,250.75 $3,311.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,810.00 $750.00 $660.00 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,810.00 $750.00 $660.00 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $224.00 $28.00 $56.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $359.00 $215.00 $144.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $949.20 $0.00 $0.00 $949.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $158.20 $0.00 $0.00 $158.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $362.50 $100.00 $100.00 $162.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,085.40 $375.50 $300.00 $1,409.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $41,412.75 $2,736.62 $4,320.89 $11,098.50 $14,887.36 $8,369.38 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,418.62 $268.74 $250.25 $362.72 $715.04 $821.87 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $43,831.37 $3,005.36 $4,571.14 $11,461.22 $15,602.40 $9,191.25 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_GEO.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)

SITE : Bob Lee's Auto Repair, Clearwater SUBTASK: Pre-excavation Activities DATE: 9-25-17 Revised

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

(M. Lodato) 1

Senior Professional (A. Brey) 2

(T. Kafka)

Professional Geologist (R. Tuttle)

Designer (M. Hensley)

GIS

Admin Strickland

TOTAL LABOR 25

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck $410.00 week 0 $0.00 Truck $97.00 day 1 $97.00 Car $68.00 day $0.00 subtotal $97.00 Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00 Air Fare $1.00 Round Trip 0 $0.00

Per diem ($35/75)

$35.00 days 0 $0.00 $100.00 days 0 $0.00

TOTAL TRAVEL $97.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Other Utility Survey $500.00 Lump Sum 1 $500.00 subtotal $500.00

TOTAL SUBCONTRACTOR (SERVICES) $500.00

Senior level HASP Review (1 hrs)

Review of HASP (2 hrs)

Procure subcontractors (6 hrs), revise HASP (6 hrs), conduct soil sampling (10 hours)

Copy of BLAR_LSR_LOE Draft, Rev 9-25-17.xlsx 10/15/2017 Page 3 of 9 Subtask 2

SUBTASK: Pre-excavation Activities

LABORATORY COSTS

Rate # SAMPLES #QA/QC TOTALS

Method - Matrix

EPA 8260B - GW $66.00 0 0 $0.00

EPA 8260B - Soil $66.00 4 1 $330.00

EPA 8270C - GW $0.00 0 0 $0.00

EPA 8270 SIM - Soil $100.00 0 0 $0.00

TRPH - GW $84.00 0 0 $0.00

TRPH - Soil $84.00 4 1 $420.00

8 RCRA - GW $0.00 0 0 $0.00

8 RCRA - Soil $0.00 0 0 $0.00 subtotal $750.00

TOTAL LABORATORY $750.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Personal Protection Level D PPE $28.00 day 1 $28.00 subtotal $28.00 Drilling Related Soil Sampling Kit (through concrete) $215.00 day 1 $215.00 subtotal $215.00 Expendables $32.50 day 1 $32.50

Survey Equipment $100.00 day 1 $100.00 subtotal $100.00

TOTAL FIELD EXPENSES $375.50

10/15/2017 Page 4 of 9 Subtask 2

SUBTASK: Limited Source Removal

Principal (Lodato)

(A. Brey) 2

Professional (R. Tuttle) Field prep and limited source removal contractor oversight (18 hrs), Limited Source Removal Report (16 hours) 32

Sr. Staff Professional (Morrison)

Staff Professional

Project Professional

Designer (Hensley)

TOTAL LABOR 38

Truck $97.00 day 2 $194.00 subtotal $194.00

TOTAL TRAVEL $194.00

Excavation (Action Environmental) $5,682.50 Lump Sum 1 $5,682.50 subtotal $5,682.50

TOTAL SUBCONTRACTOR (SERVICES) $5,682.50

Figures for Limited Source Removal Report (4 hours)

Field support for limited source removal (2 hours)

10/15/2017 Page 5 of 9 Subtask 3

SUBTASK: Limited Source Removal

EPA 8260 - Soil (24 hour TAT) $132.00 5 0 $660.00 subtotal $660.00

TOTAL LABORATORY $660.00

Level D PPE $28.00 day 2 $56.00 subtotal $56.00 Drilling Related Soil Assessment Kit $144.00 day 1 $144.00 Survey Equipment $100.00 day 1 $100.00 subtotal $100.00

TOTAL FIELD EXPENSES $300.00

10/15/2017 Page 6 of 9 Subtask 3

SITE : Geosyntec Consultants SUBTASK: Post Active Remediation Monitoring

Senior Scientist (Brey)

Engineer

Sr. Engineer

Geologist (Tuttle)

Sr. Staff Hydrogeologist (Cain) 48

Admin

TOTAL LABOR 78

Truck $410.00 week 0 $0.00 Truck $97.00 day 5 $485.00 Car $68.00 day 0 $0.00 subtotal $485.00 Mileage Costs 0.585 mile 0 $0.00

Air Fare $1.00 Round Trip 0 $0.00

$75.00 days 0 $0.00

TOTAL TRAVEL $485.00

Drilling (Conventional) Preferred Drilling Solutions (11747 87th St, Largo, FL 33773) $3,010.00 Lump Sum 1 $3,010.00

$0.00 Lump Sum 0 $0.00 subtotal $3,010.00

Drilling (Non-Conventional)

Mobile Laboratory

Surveying

IDW

Utilities $0.00 Month 0 $0.00 $0.00 Month 0 $0.00

None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00

Field prep for and conducting monitoring well installation and quarterly (4 events) groundwater sampling (48 hours)

Field prep (4 hours) for and monitoring well installation oversight (12 hours) and field support for quarterly PARM groundwater sampling and review of field data (6 hrs)

Field support and senior level review of reporting (8 hours)

10/15/2017 Page 7 of 9 Subtask 4

SUBTASK: Post Active Remediation Monitoring

TOTAL SUBCONTRACTOR (SERVICES) $3,010.00

EPA 8260 - GW $66.00 16 0 $1,056.00

FL-PRO $84.00 16 0 $1,344.00

Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 subtotal $2,400.00 Fast Turnaround Charges Percent

0% $0.00 0 $0.00

Shipping

Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 0 $0.00

TOTAL LABORATORY $2,400.00

Level D PPE $28.00 day 5 $140.00 subtotal $140.00 Analytical Related Groundwater Sampling Kit $208.55 day 4 $834.20 Tubing (silicone) $2.00 ft 20 $40.00 Tubing (polyethylene) $0.25 ft 300 $75.00 subtotal $949.20 IDW Related Drum $58.20 drum 1 $58.20 GW Drum Disposal (non-haz) $100.00 drum 1 $100.00 subtotal $158.20

Expendables $32.50 day 5 $162.50 subtotal $162.50

TOTAL FIELD EXPENSES $1,409.90

10/15/2017 Page 8 of 9 Subtask 4

SUBTASK: Reporting

Associate

Senior Scientist

Engineer

Sr. Engineer

Geologist (Tuttle)

Sr. Staff Hydrogeologist (Cain) 40

Designer

(Hensley) 20

TOTAL LABOR 84

Generation of GIS figures for PARM annual report including groundwater analytical (quarterly data) and groundwater contours (quarterly data) (20 hrs)

PARM Quarterly and Annual Reports (Text, figures, tables, appendices) (40 hours)

Senior review of Limited Source Removal and PARM annual report (4 hrs)

Review of PARM Quarterly and PARM Annual Reports (10 hrs)

PARM Annual Reports (Text, figures, tables, appendices) (30 hours)

10/15/2017 Page 9 of 9 Subtask 5

Cost Estimate

Subtask 2

Subtask 3

Subtask 4

Subtask 5

50. S. Belcher Road, Suite 116 Clearwater, Florida 33765

PH 813.792.4820

www.geosyntec.com

25 September 2017

Carrie L. Kruchell, P.G.

Environmental Manager Brownfields and CERCLA Administration Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4535 Room 310-D Tallahassee, Florida 32399-2400

Subject: Revised Level of Effort Cost Estimate Limited Source Removal Implementation Bob Lee’s Automotive Repair 812 Park Street Clearwater, Pinellas County, Florida

Dear Ms. Kruchell:

Please find the Geosyntec’s revised proposed cost estimate and level of effort (LOE) and Limited Source Removal Subcontractor Evaluation (originally sent in an e-mail on 14 September 2017) for the subject property located at 812 Park Street in Clearwater, Florida. The revisions to the LOE were based upon Florida Department of Environmental Protection (FDEP) comments received on 25 September 2017. The scope of work and associated costs provided in the LOE are based on activities described in the Limited Source Removal Work Plan (LSRWP) submitted to FDEP on 23 August 2017 and subsequently approved by FDEP on 24 August 2017.

The proposed scope of work to initiate LSRWP activities includes the following subtasks:

Subtask 1 – Project Management

This subtask will include such activities as scheduling, resource coordination, contractor management, status updates, access notification, budget review and invoicing.

Subtask 2 – Pre-Excavation Activities

One Geosyntec professional will prepare for implementation of LSRWP activities. The scope of work for this subtask will include the following elements:

Revision of Health and Safety Plan to address excavation activities;

Four soil samples for TRPH between boring locations SB-3 and SB-10 to refine the horizontal extent of contaminated soil. The additional soil samples will help to refine the limits of the engineering control (EC) of contaminated soil;

Four soil samples will be collected from the SB-20 excavation area to define the excavation limits. Soil volatile organic compound (VOC) field screening will be conducted with a flame ionization detector (FID). The soil VOC field screening will be conducted in each direction from the SB-20 soil sample location to four feet bgs until soil VOC field screening results are less than 100 parts per million (ppm), subsequently a soil sample will be collected for laboratory analysis. The soil samples will be analyzed for the following VOCs:

1,2,4-trimethylbenzene, 1,3,5-trimethylbenzene, total xylenes, and methylene chloride by EPA Method 8260.

Site Excavation Area and Underground Utility Location Survey for intrusive activities.

For cost estimating purposes, we have assumed that a Geosyntec Professional will prepare and mobilize for the LSR implementation and the timeframe for implementation will not exceed 3 days (total of 22 hours). Review of the Health and Safety plan by senior Geosyntec practitioners is also assumed.

Subtask 3 – Limited Source Removal

Based on the contractor bids, it is assumed that excavation activities will take 1.5 days. Confirmation soil sampling will be conducted to determine excavation activities have removed soils above SCTLs. Confirmation soil samples will be analyzed on an expedited (24 hour) turn around time. It is assumed one Geosyntec professional will provide oversight of contractors for implementation of the LSR work plan for one full day (12 hours) and one half day (6 hours) for a total of 18 hours. It is assumed a senior Geosyntec practitioner will provide field support, as needed. A Limited Source Removal Report will be prepared by a Geosyntec Professional (14 hours). A Geosyntec Designer will provide detailed drawings of the excavation area (4 hours). Contractor costs are included in the LOE.

Subtask 4 - Post Active Remediation Monitoring

Following completion of limited source removal activities, post active remediation monitoring (PARM) activities will begin. One Geosyntec professional will provide oversight of monitoring well installation for four monitoring wells. It is assumed well installations will be completed in one day (12 hours) with associated field preparation and wrap up (4 hours). One Geosyntec Senior Staff personnel will complete four (4) groundwater sampling events with sample collection at 4 monitoring well locations for each event (16 samples total) with associated field prep and wrap

up. It is assumed duplicate groundwater samples will not collected for the PARM monitoring events. It is assumed each event will take one day to complete at 12 hours per day (48 hours total). A Geosyntec Professional will provide field support for the quarterly monitoring and review the field data (6 hours). Contractor costs are included in the LOE.

Subtask 5 – Reporting

Quarterly PARM reporting is assumed (a total of 4 reports); the first quarterly PARM report will be submitted within 60 days of sample collection and include boring/monitoring well construction logs and groundwater sampling logs along with laboratory analytical data. Subsequent quarterly PARM reports will be submitted within 60 days of sample collection and will include groundwater sampling logs and laboratory analytical data. The PARM reports will contain information necessary to evaluate the progress of PARM for each quarterly sampling event.

Following the fourth quarterly monitoring event, Geosyntec will submit an annual PARM report to the FDEP. The annual PARM report will provide a more substantial degree of evaluation of the progress of the PARM program and will include a conclusions and recommendations section.

PARM reports will be signed and sealed by a registered professional geologist (P.G.) or registered professional engineer (P.E.). It is assumed that a Geosyntec Professional (30 hours) and Senior Staff Level (40 hours) will work in conjunction on PARM annual and quarterly report preparation. A Geosyntec Designer (20 hours) will prepare figures for the PARM annual report including contamination iso-contours and groundwater flow maps for each quarter. PARM quarterly and annual reports will be reviewed by a Senior Geosyntec practitioner (10 hours).

Invoice and Deliverable Schedule:

Subtask Deliverable Deliverable Due Date Invoice Amount

25% of 1, 2 Submittal of Revised HASP 30 September 2017 $5,322.48

25% of 1, 3 Submittal of Field Package (photos, field notes, waste manifests) 30 October 2017 $12,212.55

25% of 1, 4 Submittal of Field Package (photos, groundwater sampling/boring/well construction logs)

15 November 2017 $16,353.74

25% of 1, 25% of 5 for each quarterly report

PARM quarterly reports (lab reports, calibration and groundwater sampling logs)

PARM Annual Report

60 days post receipt of laboratory analytical reports

$2,485.65 each quarter ($9,942.60

Total)

Period of Performance January 2019

Total: $43,831.37

Closing

As always, feel free to contact the undersigned at 727.330.9959 with any questions.

Sincerely, Geosyntec Consultants

Ryan Tuttle, P.G. (FL)

Geologist

Andrew Brey, P.G (FL) Senior Geologist

File details come from the government source that posted it. Updated .