This document is a Change Order No. 1 issued by the Florida Department of Environmental Protection (FDEP) to amend Task Assignment No. 2 under Contract No. CN213 with GGI, LLC (dba Genesis Group), with sub-contractors Nobles Consulting Group and Nova Engineering and Environmental, LLC. The change order pertains to professional services for the Deepwater Horizon Phase III Early Restoration Project – Indian Creek Boat Ramp Improvements located in Franklin County, Florida. The project involves the design and construction of improvements to the boat ramp facility, including approximately 200 feet of sheet piling replacement and a new access dock.
The change order reflects two modifications to the original task assignment: Task 5.1 (Kiosk and Sign Design) is removed with a cost decrease of $5,362.50, while Task 8 (Kiosk and Sign Design) is added with a cost increase of $3,920.00, resulting in a net change of $(1,442.50). The fixed-price contract includes detailed labor costs for professional engineers, technicians, and support staff across multiple phases including topographic/bathymetric surveys, geotechnical investigations, civil construction documents, permitting, bid support, construction support services, and sign design. The total not-to-exceed cost for all tasks is $46,273.44, with encumbrance information indicating funding from NRDA (Natural Resources Damage Assessment) sources. The project period spans 437 days from December 18, 2015, through February 28, 2017, with final completion scheduled for February 28, 2017.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .