CN-370000-CN213-T10CO1.pdf
PDF 1 MB Posted
- Contract number
- CN213
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN213 with Genesis Group (Genesis/Halff), a consulting firm. The change order, dated June 12, 2019, covers additional professional services for the Ravine Gardens State Park Slope Failure Restoration and Road Repair project located in Palatka, Florida. The project involves the FDEP's Bureau of Design and Construction, the St. Johns River Water Management District (SJRWMD), the City of Palatka, and Putnam County School Board. Genesis-Halff is the prime consultant, with sub-consultants including Surveying and Mapping, LLC (SAM) and Environmental and Geotechnical Specialists, Inc. (EGS).
The change order authorizes seven additional subtasks with a total fixed price cost of $29,886.69 and reimbursable costs of $150.00 (Notice of Intent application fee), bringing the total task amount to $30,036.69. The subtasks include Partial Boundary Survey and Overlay ($6,804.85); General Permit Pre-Application Meeting ($4,650.00); Stormwater Management Analysis and Design Report ($5,700.00); Geotechnical Analysis of Slope Stability ($2,606.84); Wetlands Restoration Plan and Springs Protection Measures ($6,765.00); Notice of Intent Submittal and Follow-up ($1,140.00); and Hazard Mitigation Cost Analysis ($2,220.00). The original task execution date was May 1, 2018, with the original completion date of June 30, 2019. The change order extends the project completion date to December 30, 2019, adding 183 net days. The total project amount with all change orders is $93,085.42.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .