This is a Task Assignment Notification Form and associated proposal from the Florida Department of Environmental Protection (FDEP) for construction administration services related to the Torreya State Park Campground Paving Project. The contract is between FDEP and Halff Associates, Inc., a consulting firm, with FDEP Contract Number CN213 and Task Assignment Number TA27. The project is located at Torreya State Park in Florida, with FDEP Project Number 61469C. Key personnel include Bryant King, P.E., as the Consultant Representative for Halff Associates, and Ralph Perkins as the FDEP Contract Manager.

Halff Associates will provide limited construction administration services for the paving project, which involves paving the existing entrance road, campground loop, and dump station pull-off at Torreya State Park. The scope of work is divided into four subtasks: Shop Drawings and RFIs ($2,800.00), Pre-Construction Meeting ($1,452.50), Site Visit ($1,452.50), and Substantial Completion and Closeout Documentation ($2,240.00), for a total fixed-price contract amount of $7,945.00. The services are to be provided on a fixed-price basis with no cost reimbursement component. The task start date is Upon Execution with a completion date of March 3, 2025. No reimbursable expenses are included in the contract. The work is funded through FDEP's budget allocation and is classified under multiple accounting codes for tracking purposes.

View the file

Other files

File Type Posted
CN-370000-CN213-CMC1.pdf PDF
CN-370000-CN213-T16CO2.pdf PDF
CN-370000-CN213-T16CO3.pdf PDF
CN-370000-CN213-T1CO3.pdf PDF
CN-370000-CN213-T2.pdf PDF
CN-370000-CN213-T20.pdf PDF
CN-370000-CN213-T20CO1.pdf PDF
CN-370000-CN213-T21.pdf PDF
CN-370000-CN213-T4CO2.pdf PDF
CN-370000-CN213-T9.pdf PDF
CN-370000-CN213-CO1.pdf PDF
CN-370000-CN213-T1.pdf PDF
CN-370000-CN213-T10CO1.pdf PDF
CN-370000-CN213-T12.pdf PDF
CN-370000-CN213-T13.pdf PDF
CN-370000-CN213-T19.pdf PDF
CN-370000-CN213-T1CO1.pdf PDF
CN-370000-CN213-T24.pdf PDF
CN-370000-CN213-T25.pdf PDF
CN-370000-CN213-T2CO1.pdf PDF
CN-370000-CN213-T2CO2.pdf PDF
CN-370000-CN213-T4CO1.pdf PDF
CN-370000-CN213-T7.pdf PDF
CN-370000-CN213-TA3.pdf PDF
CN-370000-CN213.pdf PDF
CN-370000-CN213-CMC3.pdf PDF
CN-370000-CN213-CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN213-T10.pdf PDF
CN-370000-CN213-T10CO2.pdf PDF
CN-370000-CN213-T14.pdf PDF
CN-370000-CN213-T15.pdf PDF
CN-370000-CN213-T16.pdf PDF
CN-370000-CN213-T17.pdf PDF
CN-370000-CN213-T1CO2.pdf PDF
CN-370000-CN213-T22.pdf PDF
CN-370000-CN213-T22CO1.pdf PDF
CN-370000-CN213-T26.pdf PDF
CN-370000-CN213-T26CO1.pdf PDF
CN-370000-CN213-T27CO1.pdf PDF
CN-370000-CN213-T4CO3.pdf PDF
CN-370000-CN213-T5.pdf PDF
CN-370000-CN213-T5CO1.pdf PDF
CN-370000-CN213-T5CO2.pdf PDF
CN-370000-CN213-TA4.pdf PDF
CN-370000-CN213-A1.pdf PDF
CN-370000-CN213-CMC2.pdf PDF
CN-370000-CN213-T16CO1.pdf PDF
CN-370000-CN213-T18.pdf PDF
CN-370000-CN213-T22CO2.pdf PDF
CN-370000-CN213-T6.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN213 TA27 FDEP 61469C

Pave Campground Road

Halff Associates, Inc.

Bryant King, P.E. (850) 848-9436 bking@halff.com

Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

This proposal provides construction administration services for the paving project at Torreya State Park. See attached proposal dated 10/17/2024.

Don Finkbeiner or successor

Upon Execution $ 7,945.00 Contract End Date: 03/03/2025 $ 0.00

$ 7,945.00

Tamika Bass

Donald J. Finkbeiner

Ralph Perkins

Bryant King, P.E.

Michael W. Foster Jr., P.E.

61469C 37501000077 080039/23 423001 U3200 131500 QK $ 7,945.00

$ 7,945.00

October 17, 2024

Don Finkbeiner Construction Project Consultant II Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: Torreya State Park Campground Paving Project Construction Services

Dear Mr. Finkbeiner, For your review and processing, we are providing a proposal summary and man-hour documentation for the services identified herein.

We look forward to working with you.

Sincerely, Halff

Bryant King, P.E.

Vice President

PROPOSAL SUMMARY

Torreya State Park Campground Paving Project

FDEP Project #61469C

CN213 TA27

The Bureau of Design and Construction (BDC) desires improvements to the Torreya State Park Campground. Specifically, these improvements are to pave the existing entrance road, campground loop, and dump station pull off and tie-in to the main entrance road. Currently, the roadway is compacted gravel and dirt, requiring regular maintenance to prevent washouts, erosions, and potholes. In addition to paving the roadway, other activities include clearing and erosion control and incidental stormwater needed to comply with permit requirements if needed.

No signing, striping, campground improvements, or utilities are included in the proposed work.

The Consultant, Halff Associates, Inc. and their subconsultants (Halff) will provide professional services to complete the Construction Services and closeout of the project.

Subtask 1 – Limited Construction Services

Description: This task shall include those efforts necessary to assist the BDC during the construction phase of work. The following tasks will be supported during the Construction Phase:

Subtask 1A: Shop Drawings and RFI’s

Receive copies of the shop drawing documentation for review and approval as needed.

Assist with responses to Requests for Information (RFI’s) from Contractor and provide clarifications, observations, directions, and reports as required as they relate to the plans and technical specifications.

Subtask 1B: Pre-Construction Meeting

Attend the pre-construction conference to be held onsite to review the construction contract, schedule and roles and responsibilities of each participating party (DEP, Halff, and Contractor).

Subtask 1C: Site Visit (if authorized by BDC)

Attend one (1) site visit to the site to observe site conditions and assess the work in progress as it compares to the plans and specifications. A site visit will be conducted only upon documented request by the BDC. Prepare notes documenting the visit with supporting information such as sketches, markups, and/or photographs.

Subtask 1D: Substantial Completion and Closeout Documentation

Attend the inspection for substantial completion when requested by the Contractor and prepare a punch list of those items not completed, do not meet the intent of the plans and technical specifications or need minor adjustment. Halff shall sign the FDEP certification of substantial completion setting forth the date of substantial completion for the project (only if required by permit). The Contractor will also prepare any completion notices required to be submitted to regulatory agencies as a condition of the permit. Review the as-built survey as provided by the contractor for accuracy and for compliance with the contract documents.

NOTE: Consultant shall not be required to make on-site inspections to check the quality or quantity of work. Consultant shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected by Contractor(s) or the safety precautions and programs incident to the work of Contractor(s). Consultant’s efforts will be directed toward providing the items identified in the scope of services above and shall not be responsible for failure of Contractor(s) to perform the construction work in accordance with the contract documents. At the Client’s request, Consultant can provide construction observation and documentation on an hourly rate basis.

Deliverables: Halff will provide to the BDC the following:

Subtask 1A: Digital copies of responses to RFI’s or Shop Drawings stamped by Halff in pdf format.

Subtask 1B: Documentation of Halff’s notes from the Pre-Construction Meeting in pdf format.

Subtask 1C: Documentation of Halff’s notes from the Site Visit in pdf format.

Subtask 1D: Punch list, Signed Certifications in pdf format.

Performance Measures: The BDC will review the deliverables prepared by Halff to verify satisfactory completion of the services rendered. BDC will notify Halff of any deficiencies in the deliverable(s) and will give Halff reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Fixed Price Cost: Subtask 1 – Limited Construction Services

Project Schedule:

An estimated project schedule is noted below.

Summary of Fees:

The project fees are summarized below:

File details come from the government source that posted it. Updated .