Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN213. The document modifies Task Assignment No. 20 between FDEP and HALFF Associates, Inc., a consulting firm. The project involves the Ravine Gardens State Park Stormwater Solution, with David Hutcheson, P.E. serving as the consultant representative and Ralph Perkins as the FDEP Contract Manager. All required approvals were digitally signed between November 16 and November 21, 2023.
The change order extends the task execution period by 365 days, with the new task end date of December 30, 2024, to provide limited construction administration services as detailed in a proposal dated August 14, 2023. The extension was necessitated by project rebidding. The fixed fee for this change order is $15,260.00, with no reimbursable expenses. The original task had no previous change orders, and the total task amount with all change orders remains $15,260.00. The original task execution date was September 1, 2022, with an initial end date of December 31, 2023.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN213 20 1 61377C
Ravine Gardens State Park Stormwater Solution
HALFF Associates, Inc.
David Hutcheson, P.E. 850-848-9414 dHutcheson@Halff.com
Ralph Perkins or successor 850-245-2460 Ralph.Perkins@FloridaDEP.gov
365 Days time only change order to provide limited Construction Administration services per attached proposal dated 8/14/23.
$ 0.00 $ 15,260.00 $ 15,260.00 $ 0.00 $ 15,260.00 $ 15,260.00 $ 0.00 $ 0.00 $ 0.00
9-01-2022
12-31-2023
12-31-2023
12-30-2024
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.11.16 09:21:18 -05'00'
Richard Rowe on behalf of Uyles W, Keen Jr Richard J. Rowe Digitally signed by Richard J.
Rowe Date: 2023.11.16 16:17:13 -05'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.11.17 09:16:36 -05'00'
David Hutcheson, P.E.
Digitally signed by David W Hutcheson DN: cn=David W Hutcheson, c=US, o=Florida , email=DHUTCHESON@HALFF.COM Date: 2023.11.20 10:08:09 -05'00'
David W Hutcheson
Michael W. Foster Jr,.P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.11.21 11:12:09 -05'00'
61377C
$ 0.00
$ 0.00 $15,260.00 $15,260.00
From: Hutcheson, David W.
To: Keen, Uyles (JR); Gebhardt, Jasper Cc: King, Bryant; Horn, Tina Subject: CN213 CO20 Ravine Gardens State Park - Stormwater Solution Date: Monday, August 14, 2023 12:32:38 PM Attachments: CN213 TA20 Ravine Gardens Stormwater Solution CA-signed.pdf
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
JR and Jasper, Please extend the time on TA 20 and additional 365 days due to rebidding the project.
Regards, David W. Hutcheson, PE, PSM Senior Vice President o (850) 848-9414 c (850) 545-6071 e dHutcheson@Halff.com
We improve lives and communities by turning ideas into reality.
mailto:dHutcheson@Halff.com mailto:Uyles.Keen@dep.state.fl.us mailto:Jasper.Gebhardt@FloridaDEP.gov mailto:bKing@halff.com mailto:tHorn@Halff.com https://secure-web.cisco.com/1o6AARiFgx2jWg0asML2C4rXpfSYDj-4aA0AxJ9F-_Wp66ncZ8yl0FmsRvmVmuUtzYlS4NieFGw1FDQJCfO5genX58Fy_9_yyQ60kLBZI_cpW06oDXTrCyc-gtlGx6mvXyfnaP_9jXCFYDZJEdio9rcDwbZ6Kv8walexCewJYshquqdiqUzdHJI9KQUfhJXPysMKcLh4FE_CyyheBP2onDm5HTKxasn9N6MwhuH8xf-zw2J7Hq88iL0LdT7-SAfMF59k1fFWX10xIZ8jJunCbVE2GGAMZ56NqfIz_MfMEnLnkKJ-JuRNePDFF8iEd8ASw/https%3A%2F%2Fwww.halff.com https://secure-web.cisco.com/15KiTYQ-NsjdtMwu1STWeUpmwOuYlKSF9zCM0J8YliUpOKn9fiPvdtiPQEXZIHOYEtq6V35NrWGO_Kpr0BJKzUzrU7-flds2XkgCqGU-C0qs50mo3n5u_hnnum1Xrm7aGI1omFB1Q5rRaKb4Tuf5xSbQZdwqzzO-kl_GgvLpwWmozUyned-kUic_mE7CKztwy8HM3ArLCeFoOP1xTYSYY4PDNNw-veSBraPLpDECFlavH2chMAM1HUhiu2qmU0D66NE-qmhyDRVAQcFPayPb7PUddti55HPov46BD18cGqPn1lLSmYxcGQcR5bTY2BSCR/https%3A%2F%2Fwww.facebook.com%2FHalffAssociates https://secure-web.cisco.com/1NQEMnTU757yfqCAtxBaFc_k6Z6E0PbzrY2UXiXT7SqqSpufIwpDn0myoXsVxq7PoeKUcymiMNXs1KaLG5EAUw_w7Mk5kxtkblNOnYKO0CXfo5PTYddthTTviAGLkDv7acJPxRBFvr8AXTDzAlAXUQ7jlp2O4DnFiQVNJpoI7puuXeOyLKQEEo7QfCiGHlvcpTWEdZHdoZebgJGn2nKEj8dX2wQ-ZH9xiPIkLanEn8f7ujmRcov5eVE2E05eypLbQcVAis_q15nZI__fq5T_iRoFq88-yIj5BFnLNB6ka0ULmtEaMY6VKNKDYnmA0HL8k/https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fhalff-associates https://secure-web.cisco.com/1H8Seoci8sI1SQYOPUSSyLLYU1kcKK-UYpfcy8F9-uJKvKP9OvZEhch-yGFLcPNt1bsXkgaw1PrAUZ-6kn6eyOAPtLuALLFXr-C4I-UijN3JsLtljLj63YihXVANpVTPxtHKauMCWYmUkbryZhHU11xeucaJCvtU5bGejPGHJTsC28GKeVefpl3Bu_sPbs7E8_6VH_jslAB_28VthqaA3ZaIzBhffrNTuZla_A4QpR_Dh2uhcJokT4tmtAFH-EUkybcL6YWEPBiuIl25LKle2ACJNXLwFZk0VNTB-tIbHoTfMMP34GXTxAUdrMgpakq8u/https%3A%2F%2Ftwitter.com%2Fwearehalff https://secure-web.cisco.com/1MFzaAK0I1I7XwE5pLkI0Y3ox4wMrBKyaY2HTzSTJFLk189qV9v5rKdYIxN8CcOs5M2PvNLS7nHJqTJteLMUQSGzARXaIIZ8YEvJAFSIwvD_vHFtiDvMfJQ8UEHb0MpJZRKVJCB74pclPCKgBM_FeGXjlRbHpUKjZvA_oq1dzzvbBJylmdphMcy4K3yqjI4TxqcRSwX8an0tsRguaZFPuOl9SDW3K4q3F2RAGsveAoY2UdIS-CGNnh0PVjzm6_MOC8_OQyGu89Tup1sWCJET4_gtUk82dVmdisdIHto9mUywxsgbbsUCyGFhGiW5HNp-5/https%3A%2F%2Fwww.youtube.com%2Fuser%2FHalffAssociates https://secure-web.cisco.com/1IedXgCmyAq_dIegVX5KE8oveXzCvlIBHyMReuAINuNrbFhmVrxVbjpnuNIZ15C5G6p8jqaRDtMGZdcMSrlEtaA5yhrieTR0clTUGYCjpan_GaEyDpCyLVzHX1z2hPSpozyvuzqkOnyvnA2odL7RFLUIjoDgv_t_wmraGglA99lQFAUOZLzQsoV3d7AbnT7JaUFJ5Zm7u2d3i_XZU60QaQ662thDPpusyxGSxt8ynyCNSmEJRZ2Z2Hj_1DmIgZFmc9DeUxGlrQHZWSM_gbaV2rzFhQvtcLfSYaNKGUCcQzu610WMHQCoTWD_dVEK_Ovcz/https%3A%2F%2Fwww.instagram.com%2Fwearehalff
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
HALFF ASSOCIATES, INC.
2507 CALLAWAY ROAD, SUITE 100 TEL (850) 224-4400 WWW.HALFF.COM
TALLAHASSEE, FL 32303 FAX (850) 681-3600
August 29, 2022
Andrew Lippens, Project Manager Florida Department of Environmental Protection, Division of Recreation and Parks Bureau of Design and Construction 3800 Commonwealth Boulevard, 260M, MS 520 Tallahassee, FL 32399
RE: Task Assignment 20 Consultant Contract Number CN213, Task Assignment 20
Ravine Gardens Parking Lot Drainage Improvements, Construction Admin Services FDEP Project Number 61377C
Dear Andrew:
The Florida Department of Environmental Protection (FDEP) selected Halff Associates, Inc. (Consultant) to provide professional services for the Construction Administration Services for parking lot drainage improvements at Ravine Gardens.
Background and Scope of Services
Halff Associates, Inc. (Halff) will provide services to complete the construction administration for the repair and/or replacement of the drainage system located in the parking lot near the entrance to the buildings per the design previously completed by our firm.
For your review, Halff Associates, Inc. has provided a proposal summary and man-hour documentation for the work now being requested.
Please review the attached and let us know if you have questions.
Sincerely, HALFF ASSOCIATES, INC.
Senior Vice President
PROPOSAL SUMMARY
Ravine Gardens State Park Parking Lot Drainage Improvements Services During
Construction FDEP Project #61377C
CN213 TA20
Ravine Gardens State Park is a 59-acre Florida State Park located in Palatka, Florida. It is listed on the National Register of Historic Places in 1999. The park was constructed by the Works Progress Administration, with cypress buildings, rock gardens and fieldstone terraces. Near the park entrance is The Court of States and a 64-foot obelisk dedicated to Franklin D. Roosevelt.
Halff Associates, Inc. (Halff) will provide services to provide services during construction for the drainage system located in the parking lot near the entrance to the buildings.
Subtask 1 – Bidding Assistance
This task shall include those efforts necessary to assist the CLIENT during the competitive bid process to select a qualified Construction Contractor. The following tasks will be supported during the bidding phase:
a) Prepare a summary of work suitable for bid advertisement and a bid schedule with the estimated quantities for each project component and an updated Opinion of Probable Construction Costs.
b) CONSULTANT will attend the pre-bid meeting and will be responsible for providing a brief overview of the construction documents prepared by CONSULTANT including drawings, technical specifications and permits. CONSULTANT will keep notes of questions presented by prospective bidders on the civil engineering plans and provide written commentary on the questions and comments presented during the meeting to the CLIENT. (Note: No verbal comments or answers will be provided to prospective bidders at the pre-bid meeting. CONSULTANT will not receive or respond directly to any questions posed by prospective contractors or anyone else, other than the CLIENT.)
c) CONSULTANT will support the CLIENT during the bidding process in providing responses to prospective contractors’ questions, requests for information (RFI), or clarification and interpretation of the project documents prepared by CONSULTANT.
All responses shall be in writing and provided to the CLIENT. CONSULTANT will review and respond to the CLIENT on bid addenda as they pertain to the documents prepared by CONSULTANT and its subconsultants.
CONSULTANT will provide the “Issued for Bidding” construction drawings and permits. Bid receipt, opening and review of bids received, including legal review and evaluation of contractors’ financial condition, business licenses or authorizations, bonding, and contractual requirements; and providing recommendation of the award for Construction Contractor selection will be by FDEP.
Deliverables: CONSULTANT will provide to the CLIENT the following:
a) Summary of work suitable for bid advertisement
b) Bid schedule with the estimated quantities
c) Responses to questions resulting from the Pre-Bid Meeting
d) Responses to requests for clarification and interpretation of the project documents
e) Written responses to addenda
Performance Measures: The CLIENT will review the deliverables prepared by CONSULTANT to verify satisfactory completion of the services rendered. The CLIENT will notify CONSULTANT of any deficiencies in the deliverable(s) and will give CONSULTANT reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Fixed Price Cost: Subtask 1– Bidding Assistance
Firm Description Unit Cost Hours Total Cost Halff Principal/Officer-Professional
Engineer $180.00 6
$1,080.00
Halff Senior Professional Engineer $120.00 12 $1,440.00 Halff Engineer Intern $ 72.50 10 $ 725.00 Halff Supervisory Technician $105.00 16 $1,680.00 Halff Senior Technician $ 77.50 10 $ 775.00
TOTAL $5,700.00
Subtask 2 - Limited Construction Administration
Description: During the construction of the proposed facilities the Consultant shall assist the FDEP Contract Manager with various construction support tasks as described below. These construction administration services shall begin upon the award of the construction contract and extend through final certification of completion. The Consultant will be directed/authorized by the FDEP Contract Manager as to the dates and times when construction observations should occur.
2A Attend the pre-construction conference to be held onsite to review the construction contract, schedule and roles and responsibility of each participating party (DEP, Halff and Contractor).
2B Receive copies of the shop drawing documentation for review and approval as needed.
Assist with responses to Requests for Information (RFIs) from Contractor and provide clarifications, observations, directions, and reports as required as they relate to the plans and technical specifications.
2C Attend the inspection for substantial completion when requested by the Contractor and prepare a punch list of those items not completed, do not meet the intent of the plans and technical specifications or need minor adjustment. The Consultant shall sign the FDEP certification of substantial completion setting forth the date of substantial completion for the project. The Contractor will also prepare any completion notices required to be submitted to regulatory agencies as a condition of the permit. Review the as-built survey as provided by the contractor for accuracy and for compliance with the contract documents.
NOTE: Consultant shall not be required to make on-site inspections to check the quality or quantity of work. Consultant shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected by Contractor(s) or the safety precautions and programs incident to the work of Contractor(s). Consultant’s efforts will be directed toward providing the items identified in the scope of services above and shall not be responsible for failure of Contractor(s) to perform the construction work in accordance with the contract documents. At the Client’s request, Consultant can provide construction observation and documentation on an hourly rate basis.
Deliverables:
All correspondence will be directed to the FDEP Contract Manager. Responses to RFI’s will be provided within three (3) working days.
Performance Measures: FDEP Contract Manager shall review shop drawings approvals and RFI responses. The Contractor will be notified by the FDEP Contract Manager of any deficiencies in deliverables and shall be given reasonable opportunity to provide revised deliverables.
Fixed Price Cost: Subtask 2A – Pre-Construction
$180.00 8
$1,440.00
Halff Supervisory Technician $105.00 8 $ 840.00
TOTAL $2,280.00
Fixed Price Cost: Subtask 2B – Review Shop Drawings and RFI’s
$180.00 12
$2,160.00
Halff Supervisory Technician $105.00 12 $1,260.00
TOTAL $3,420.00
Fixed Price Cost: Subtask 2C – Substantial Completion and Closeout Documents
$180.00 8
$1,440.00
Halff Senior Professional Engineer $120.00 8 $ 960.00 Halff Supervisory Technician $105.00 8 $ 840.00 Halff Senior Technician $ 77.50 8 $ 620.00
TOTAL $3,860.00
Project Schedule:
Activity Duration (Calendar Days) Subtask 1-Bidding Assistance 28 FDEP Approval 5
Subtask 2- Limited Construction Administration
FDEP Approval 5
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1- Bidding Assistance $5,700.00 Subtask 2A- Pre Construction $2,280.00 Subtask 2B – Review Shop Drawings and RFI’s
$3,420.00
Subtask 2C – Substantial Completion and Closeout Documents
$3,860.00
Total Fees: $15,260.00 Total Reimbursable Costs: $0.00 Overall Total Cost: $15,260.00
Excluded Items:
1. Surveying.
2. Permit Fees except as noted.
3. Testing of workmanship.
4. Routine site visits during construction.
CN213 TA20 Form.pdf
0829202 Ravine Gardens Parking Lot Drainage CA Services Cover.pdf
08292022 Ravine Gardens Parking Lot Drainage Improvements Services During Construction.pdf
FDEP Contract No: CN213
Task Assignment No: 20
Owners Name: FDEP
Project No: 61377C
Project Location: Ravine Gardens State Park
Project Name: Stormwater Solution
Consultant Name: HALFF Associates, Inc.
Consultant Representative: David Hutcheson, P.E.
Phone: 850-848-9414
Email: dHutcheson@Halff.com
FDEP Contract Manager: Ralph Perkins
Phone_2: 850-245-2460
Email_2: Ralph.Perkins@FloridaDEP.gov
Description of Task: Consultant to provide limited Construction Administration services per attached proposal dated 8/29/22.
Project Manager: Andrew Lippens
Start Date: Upon Execution
Fixed Price Cost: 15260
Completion Date: 12/31/2023
Cost Reimbursement not to exceed: 0.00
Total Task Amount: 15260
Budget Representative FDEP: Tamika Bass
2022-08-30T14:51:21-0400
Tamika Bass
Date:
Project Manager FDEP: Andrew Lippens
2022-08-31T11:26:35-0400
Andrew Lippens
Date_2:
Contract Manager FDEP: Ralph Perkins
2022-08-31T11:37:20-0400
Ralph M Perkins
Date_3:
Consultant: David Hutcheson, P.E.
2022-08-31T11:18:20-0500
David W Hutcheson
Date_4:
Contract Authority FDEP: Michael W. Foster Jr., P.E.
2022-09-01T14:36:09-0400
Michael W. Foster Jr., P.E.
Date_5:
Project Row1: 61377C
Grant Row1:
Org CodeRow1: 37503000085
CatYearRow1: 080039/22
FundRow1: 423001
ModuleRow1: U3200
Object CodeRow1: 131500
EORow1: QK
AmountRow1: 15260
Project Row2:
Grant Row2:
Org CodeRow2:
CatYearRow2:
FundRow2:
ModuleRow2:
Object CodeRow2:
EORow2:
AmountRow2:
Project Row3:
Grant Row3:
Org CodeRow3:
CatYearRow3:
FundRow3:
ModuleRow3:
Object CodeRow3:
EORow3:
AmountRow3:
Total: 15260
29 digit code:
| CN213 TA 20 CO1 Time Only.pdf |