Task Assignment Notification Summary

This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for consultant services related to slope failure restoration and road repair at Ravine Gardens State Park in Palatka, Florida. The selected consultant is GGI, LLC, dba Genesis Group, operating under FDEP Contract Number CN213, Task Assignment Number 10 (Project Number 61303). The project manager is Brian Miller, and the contract manager is Adam Browne. Genesis Group will utilize subcontractors including Nobles Consulting Group, Inc. for survey services and Environmental and Geotechnical Specialists (EGS) for geotechnical work. The contract was executed on April 30, 2018, with a completion date of June 30, 2019.

The scope of work encompasses nine subtasks totaling $63,048.73, consisting of $62,134.38 in fixed price costs and $914.35 in reimbursable expenses. Services include a topographic survey ($9,229.70), temporary stormwater control measures ($2,750.74), geotechnical investigation ($21,004.68), existing conditions drainage analysis ($4,287.87), failed slope repair alternatives analysis ($5,110.00), proposed conditions drainage analysis ($4,600.00), and three stages of drainage and slope repair improvement plans at 60%, 90%, and final design ($9,132.87, $5,240.37, and $1,692.50 respectively). Payment is made upon FDEP approval of deliverables for each subtask. The project schedule spans approximately 208 calendar days, with concurrent activities for survey and geotechnical work, followed by sequential design phases with FDEP review periods of 14 days between each plan submission stage.

View the file

Other files

File Type Posted
CN-370000-CN213-CMC1.pdf PDF
CN-370000-CN213-T16CO2.pdf PDF
CN-370000-CN213-T16CO3.pdf PDF
CN-370000-CN213-T1CO3.pdf PDF
CN-370000-CN213-T2.pdf PDF
CN-370000-CN213-T20.pdf PDF
CN-370000-CN213-T20CO1.pdf PDF
CN-370000-CN213-T21.pdf PDF
CN-370000-CN213-T4CO2.pdf PDF
CN-370000-CN213-T9.pdf PDF
CN-370000-CN213-CO1.pdf PDF
CN-370000-CN213-T1.pdf PDF
CN-370000-CN213-T10CO1.pdf PDF
CN-370000-CN213-T12.pdf PDF
CN-370000-CN213-T13.pdf PDF
CN-370000-CN213-T19.pdf PDF
CN-370000-CN213-T1CO1.pdf PDF
CN-370000-CN213-T24.pdf PDF
CN-370000-CN213-T25.pdf PDF
CN-370000-CN213-T27.pdf PDF
CN-370000-CN213-T2CO1.pdf PDF
CN-370000-CN213-T2CO2.pdf PDF
CN-370000-CN213-T4CO1.pdf PDF
CN-370000-CN213-T7.pdf PDF
CN-370000-CN213-TA3.pdf PDF
CN-370000-CN213.pdf PDF
CN-370000-CN213-CMC3.pdf PDF
CN-370000-CN213-CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN213-T10CO2.pdf PDF
CN-370000-CN213-T14.pdf PDF
CN-370000-CN213-T15.pdf PDF
CN-370000-CN213-T16.pdf PDF
CN-370000-CN213-T17.pdf PDF
CN-370000-CN213-T1CO2.pdf PDF
CN-370000-CN213-T22.pdf PDF
CN-370000-CN213-T22CO1.pdf PDF
CN-370000-CN213-T26.pdf PDF
CN-370000-CN213-T26CO1.pdf PDF
CN-370000-CN213-T27CO1.pdf PDF
CN-370000-CN213-T4CO3.pdf PDF
CN-370000-CN213-T5.pdf PDF
CN-370000-CN213-T5CO1.pdf PDF
CN-370000-CN213-T5CO2.pdf PDF
CN-370000-CN213-TA4.pdf PDF
CN-370000-CN213-A1.pdf PDF
CN-370000-CN213-CMC2.pdf PDF
CN-370000-CN213-T16CO1.pdf PDF
CN-370000-CN213-T18.pdf PDF
CN-370000-CN213-T22CO2.pdf PDF
CN-370000-CN213-T6.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 9, 2018

Brian D. Miller Engineering Specialist Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: Consultant Contract Number CN213, Task Assignment 10

Ravine Gardens State Park – Slope Failure Area Storm Sewer System and Slope Restoration Preliminary Design

Dear Brian:

The Florida Department of Environmental Protection (FDEP) has selected GGI, LLC, dba Genesis (Consultant and/or Genesis) to provide professional services for the Ravine Gardens State Park Slope Failure Area Preliminary Design Project(“Project”) located on 1600 Twigg Street, Palatka, Florida. Consultant plans to use the following sub-contractors to complete some of the project tasks:

• Nobles Consulting Group, Inc. – Survey Services

• Environmental and Geotechnical Specialists (EGS) – Geotechnical

Background and Scope of Services The Ravine Gardens State Park experienced severe damage during Hurricane Irma including a major slope failure which required the closure of the Ravine Road. This scope of services will provide a detailed Topographic Survey, Geotechnical Investigation, Preliminary Slope Repair Alternatives, and Stormwater Management Plans. The scope of work also includes an analysis of the existing stormwater conveyance system as required to upgrade the system and prevent future overtopping of the roadway edges. The following provides a detailed task break down of the scope of services, schedule and fee for the project.

Reporting Requirements The Consultant will submit monthly progress reports which indicate the work to be performed during the corresponding reporting period, work scheduled for the next reporting period, problems encountered and resolutions of the problems, and any schedule updates. The report will be provided with each monthly invoice submitted by the Consultant at no additional cost to the FDEP.

Additional Services The Consultant may be requested to provide other professional services related to the Project, as deemed necessary by the FDEP, based on the availability of Project funding. Based on the FDEP’s ability to negotiate a satisfactory price, the FDEP reserves the right to amend the Task Assignment, issued under FDEP Bureau of Design and Construction

(BDC) Contract No. CN213 (Contract), to include additional services related to the Project as may become necessary.

This project should be considered as maintenance and is expected to only require a Verification of Exemption from the St. Johns River Water Management District; therefore, project permitting with any other city, county, regional, state or federal agency is not included in this scope of work. In addition, wetland or floodplain impact mitigation or Environmental Scientist/Biologist services related to floodplain encroachment or wetland impact mitigation are not included in this scope of work. Permitting may be required if a retaining wall system is selected as the permanent solution. Permitting of the retaining wall will be an additional service.

For your review, Genesis has provided a proposal summary and man-hour documentation for the services tasks identified below:

• Subtask 1: Topographic Survey

• Subtask 2: Temporary Stormwater Control Measures

• Subtask 3: Geotechnical Investigation

• Subtask 4: Existing Conditions Drainage Analysis (Slope Failure Area)

• Subtask 5: Failed Slope Repair Alternatives Analysis

• Subtask 6: Proposed Conditions Drainage Analysis

• Subtask 7: Preliminary Drainage and Slope Repair Improvement Plans (60% Plans)

• Subtask 8: Preliminary Drainage and Slope Repair Improvement Plans (90% Plans)

• Subtask 9: Preliminary Drainage and Slope Repair Improvement Plans (Final Plans)

Please review the attached Proposal Summary and deliverables.

Sincerely, GENESIS

Mark T. Llewellyn Sr, PE

CEO

Slope Failure Area – Storm Sewer System and Slope Restoration Preliminary Design Ravine Gardens State Park

Contract Number CN213, Task Assignment Number 10

Subtask 1: Topographic Survey

Description: The Consultant will complete a Specific Purpose Topographic Survey of the slope failure existing land features at a vertical accuracy necessary to provide one (1) foot contours.

• The survey will extend East from the exercise area approximately 500 feet along the north Loop Road.

• Survey Data will be referenced to:

o State Plane Coordinates, Florida East Zone, NAD 83 (2011) o North American Vertical Datum of 1988 (NAVD 88)

• The survey will include the flowing features or items:

o Vicinity Map o Baseline of Survey along roadway o Minimum of two site bench marks o FEMA Flood Zone designation o Existing elevations on a fifty-foot (50') grid, plus any intermediate or abrupt grade o changes (elevation and location of top and toe of slopes) o Contours at one-foot intervals with spot elevations to depict existing conditions o Significant trees, 8" DBH and larger.

o Limits of azalea plantings o Location of public utilities: (above ground, visible, or as identified via Sunshine 811 utility location)

- Sanitary Sewer, including diameter, flow and inverts

- Storm sewer, including diameter, flow and inverts

- Gas lines

- Water lines, including diameter

- Electric

- Phone

- Cable

• Location of all the above listed surface improvements on the subject property and directly adjacent storm water facility outfall structure, including but not limited to:

o Pavement o Retaining walls o Curbs, sidewalks and gutters, elevations, location of curb cuts o Trails and overlooks o Springs and spring run o Fencing o Driveway locations and widths o Utility poles and guy wires o Fire hydrants o Buildings o Billboards o Signs o Existing construction (locations and description) o Existing or abandoned wells

• Legend of ALL symbols, line types and abbreviations are shown

• Two (2) signed and sealed hard copies of the survey may be requested at no additional cost.

Surveys shall be performed under the direct supervision of a Licensed Florida Land Surveyor. Surveys shall meet or exceed the Standards of Practice per the Florida State Board of Surveyors.

Deliverable: The Consultant will provide to the FDEP PM Topographic DTM Survey Map of the subject area with contours and gravity conveyance system(s) table in PDF and CAD format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Nobles Consulting Group, Inc. 3 Person Crew $150.25 40 $6,010.00 Nobles Consulting Group, Inc. Survey Technician $60.40 29 $1,751.60 Nobles Consulting Group, Inc. Surveyor &

Mapper/Principal $184.13 0.75 $138.10

Genesis Engineering Dept. Manager $142.50 4 $570.00 Genesis Project Engineer $95.00 8 $760.00

$9,229.70 Total for Subtask 1: $9,229.70

Subtask 2: Temporary Stormwater Control Measures

Description: The Consultant will meet onsite with Department Staff to observe slope failure conditions and to discuss temporary stormwater control measures to mitigate overland flow from continuing to erode the slope. Based on the onsite meeting, the Consultant will prepare a graphic illustration of the existing conditions along the loop road and propose temporary sandbag installation to direct overland flow to the existing inlets and to minimize the stormwater flowing over the slope failure edge.

Deliverable: The Consultant will provide to the FDEP PM one (1) temporary stormwater control schematic updated based on survey data, electronic copy in 11 x 17 PDF format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and

Subtask 2 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Director $225.00 1 $225.00 Genesis Sr. Professional Landscape Architect $110.00 20 $2,200.00

$2,425.00

Reimbursable Cost:

Mileage (@ $0.445 per mile) Two trips x 366 miles round trip x $0.445/mile = $325.74 Reimbursable Total Cost $325.74

Total for Subtask 2: $2,750.74

Subtask 3: Geotechnical Investigation

Description: The Consultant will provide Geotechnical Services to complete the preliminary and final design as follows:

• Mobilize all-terrain rotary drilling equipment on site to the “severe” slope failure as requested;

• Install two (2) 50 feet deep Standard Penetration Test (SPT) soil borings at the top of the failing slope and two (2), 20 feet deep SPT soil borings at the bottom of the slope;

• Collect “zip-level” measurements of the existing slope to determine existing slope geometry;

• Perform two (2) Unconfined Compression tests on clayey subsoils (if encountered – FDEP will only be charged for this test if it is preformed);

• Perform routine Laboratory Classification Testing (i.e. Grain-Size Testing, Atterberg Testing, and Organic

Testing of select soil samples collected from the Soil Borings.

• Provide a Summary Report, containing:

o Summary of the field and laboratory results of the Soil Borings;

o Results of a preliminary slope stability analysis performed for both the existing slope geometry as-is and at the proposed reconstructed slope or wall geometry;

o Conclusions outlining the most likely cause of the slope failure;

o Geotechnical design recommendations and soil parameters for repair of the slope;

o SPT field log with date drilled;

o X Y Z position and elevation of each boring;

o Notation of beginning and end depths of each drilled interval or intervals where sample was removed for testing

The attached Scope of Services and Cost Estimate is Limit Not-To-Exceed (NTE) based on the following understandings:

• Consultant will have access to the soil boring locations and has permission to be on site during daytime hours;

• Utility Locates are to be performed by others prior to performance of Soil Borings;

Note: It is understood that the FDEP will not be locating underground utilities. The surveyor will request utility locations in accordance with statute. Old plans have been provided by FDEP; however, they may not show the accurate location of existing utilities.

• Costs have not been included for design services or survey other than those outlined in the above Scope of Services;

• Costs have not been included for Design of the repair or Plans preparation;

• Costs have not been included for Post-Design Services or for Construction Engineering Inspection (CEI)

Services.

Deliverable: The Consultant will provide to the FDEP PM the Geotechnical Report, electronically signed and sealed by the responsible Licensed Geotechnical Engineer, in PDF format. In addition, the Geotechnical Engineer will provide tube/bag samples from one of the 50' borings and one of the 20' borings for permanent archival with the Florida Geological Survey.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and

Subtask 3 Labor Category Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost EGS Chief Engineer $216.27 1 $216.27 EGS Sr. Engineer $202.31 6 $1,213.86 EGS Geotechnical Engineer $133.37 28 $3,734.36 EGS Engineering Intern $86.23 40 $3,449.20 EGS Sr. Engineering Technician $83.92 16 $1,342.72 EGS Engineering Technician $38.06 10 $380.60 EGS Contract Coordinator $95.91 2 $191.82 Genesis Engineering Dept. Manager $142.50 2 $285.00 Genesis Project Engineer $95.00 4 $380.00

Total Labor $11,193.83

Field Category Firm Name Field Category Cost/Unit No. of

Units Total Fixed Price Cost

EGS Engineering Intern (Field Logging & “Zip Level” Measurements)

$86.23 20 Hrs $1,724.60

EGS Track Rig Mobilization $632.49 1 EA $632.49 EGS SPT-ATV 0-50 Ft $19.92 140 LF $2,788.80 EGS Grout Boreholes-ATV 0-50 Ft $7.60 140 LF $1,064.00 EGS Temp Casing 4”-ATV 0-50 Ft $14.80 60 LF $888.00 EGS Undisturbed Samples – ATV 0-50 Ft $161.28 2 EA $322.56 EGS Clearing $126.39 4 Hrs $505.56

Total Field $7,926.01

Laboratory Category Firm Name Field Category Cost/Unit No. of

Units Total Fixed Price Cost

EGS Grain-Size Analysis $40.48 14 EA $566.72 EGS Organic Content $32.89 7 EA $230.23 EGS Plastic Limit $25.30 7 EA $177.10 EGS Liquid Limit $63.25 7 EA $442.75 EGS Corrosion Series $132.82 2 EA $265.64 EGS Unconfined Compression - Soil $101.20 2 EA $202.40

Total Laboratory $1,884.84

Total for Subtask 3: $21,004.68

Subtask 4: Existing Conditions Drainage Analysis (Slope Failure Area)

Description: The slope failure appears to have been partially caused by stormwater flowing along the roadway, overwhelming the existing storm sewer system and draining over the roadway edge down the slope. A secondary cause appears to involve a degraded corrugated metal storm sewer pipe that is located directly adjacent to the primary slope failure. The purpose of this task is to evaluate the existing conditions and to recommend a drainage solution. The recommended solution will need to compliment the proposed slope reconstruction.

• Meet with City of Palatka Public Works director to obtain plans for adjacent projects and other information that may be available to determine the character of storm sewer systems and drainage basins.

• Determine the extent of the slope failure area drainage basin based on most recently available LiDAR topographic information and review the completed topographic survey to determine the existing storm sewer configuration.

• Conduct a site visit to confirm the drainage basin and existing storm sewer system.

Note: Based on the recently conducted site scope meeting, the existing storm sewer system appears to be in a deteriorating condition. The exposed sections of corrugated metal piping were severely rusted with large holes or rusted out sections. Based on these observations it is expected that the existing system will need to be replaced and upgraded to reinforced concrete pipe or other appropriate piping material.

• Complete an Existing Conditions Drainage Analysis to determine the capacity of the existing storm sewer system and present results in a report.

• Meet with FDEP representatives to review the results of the Existing Conditions Drainage Analysis and to discuss the existing deficiencies identified.

Deliverable: The Consultant will provide to the FDEP PM with one (1) electronic copy in PDF format of the Existing Conditions Drainage Analysis, electronically signed and sealed by the responsible Licensed Professional Engineer.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and

Subtask 4 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Engineering Dept. Manager $142.50 2 $285.00 Genesis Project Engineer $95.00 32 $3,040.00 Genesis Supervisory Technician $105.00 4 $420.00 Genesis Spatial Analyst $95.00 4 $380.00

$4,125.00 Reimbursable Cost:

Mileage (@ $0.445 per mile) One trip x 366 miles round trip x $0.445/mile = $162.87 Reimbursable Total Cost $162.87

Total for Subtask 4: $4,287.87

Subtask 5: Failed Slope Repair Alternatives Analysis

Description: Repairing the slope failure will require major construction involving structural measures to stabilize the area. Three (3) alternatives will be reviewed and presented to FDEP. The Alternatives will include a modular wall system and gabion basket wall system to create a terraced embankment from the roadway to the stream floodplain, and third alternative to rebuild and stabilize the slope with natural materials. This task does not include final design or structural design of the wall systems. Genesis will coordinate with wall (modular and gabion) vendors to obtain conceptual plans from each vendor. The vendor provided conceptual plans will be included in the Preliminary Drainage and Slope Repair Plans for the FDEP preferred alternative.

• Identify multiple modular wall systems that could be utilized to repair the failed slope. Summarize the alternatives including general costs for each system for presentation to FDEP. FDEP will review the alternatives and direct Genesis to proceed with evaluating two (2) of the alternatives.

• Coordinate with selected modular wall systems vendors for the vendor to prepare preliminary plans to construct a terraced system that would extend from the roadway down to the stream floodplain. As previously described, the vendor provided plans will be included in the Preliminary Drainage and Slope Repair Plans.

• Prepare a conceptual plan for a non-structural solution to reconstructing the slope utilizing GEOWEB® Slope Protection or similar system. This will also include coordination with the vendor to obtain conceptual plans for this alternative.

• Prepare a Preliminary Opinion of Probable Cost for each alternative.

• Prepare a brief report of the Failed Slope Repair Alternatives Analysis including a brief review of each alternative and an outline of next steps required to complete the design of each alternative.

• Meet with FDEP to review the alternatives and to assist with the selection of a preferred alternative that will be included in the Preliminary Drainage and Slope Repair Improvement Plans. This meeting will take place concurrently with the Existing Conditions Drainage Analysis review meeting.

Note: This task does not include structural design or final design of the alternatives.

Deliverable: The Consultant will provide to the FDEP PM with one (1) electronic copy in PDF format of the Failed Slope Repair Alternatives Analysis including the Preliminary Opinion of Probable Cost for the Alternatives, electronically signed and sealed by the responsible Licensed Professional Engineer.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and

Subtask 5 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Engineering Dept. Manager $142.50 4 $570.00 Genesis Project Engineer $95.00 20 $1,900.00 Genesis Sr. Prof. Landscape Architect $110.00 24 $2,640.00

$5,110.00

Total for Subtask 5: $5,110.00

Subtask 6: Proposed Conditions Drainage Analysis

Description: Complete the Proposed Conditions Drainage Analysis based on the results of the Existing Conditions Drainage Analysis and Existing Conditions Topographic Survey.

• Existing Drainage Basins are expected to remain as they currently exist. The proposed storm sewer conveyance system will be designed to accommodate the 25-year critical duration storm event with consideration given to potentially larger event overflows.

• Modify the Existing Conditions Stormwater Model to evaluate appropriate storm sewer upgrades that will provide the required conveyance. This will include storm sewer structures and piping. Provide results in a report.

• Meet with FDEP representatives to review the results of the Proposed Conditions Drainage Analysis and to discuss the required improvements.

Deliverable: The Consultant will provide to the FDEP PM with one (1) electronic copy in PDF format of the Proposed Conditions Drainage Analysis, electronically signed and sealed by the responsible Licensed Professional Engineer.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and

Subtask 6 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Engineering Dept. Manager $142.50 8 $1,140.00 Genesis Project Engineer $95.00 32 $3,040.00 Genesis Supervisory Technician $105.00 4 $420.00

$4,600.00

Total for Subtask 6: $4,600.00

Subtask 7: Drainage and Slope Repair Improvement Plans (60% Plans)

Description: Based on the results of the Existing and Proposed Conditions Drainage Analysis, and the Failed Slope Repair Alternatives Analysis, prepare Drainage and Slope Repair Improvement Plans to identify proposed site modifications. The proposed drainage and roadway improvements may include pavement reconstruction to modify the cross section, the addition of curbing to direct overland flow, storm sewer improvements or other non-structural improvements. The plans will take into consideration the historical context of the brick walls and slopes that exist, along with the use characteristics of the ravine roadway.

• Utilizing the Existing Conditions Survey, prepare 60% Drainage and Slope Repair Improvement Plans. The plans will include the following:

o Title Page o Existing Conditions Topographic Survey o Proposed Grading and Drainage Plan – this plan will identify the proposed roadway and storm sewer system improvements.

o Slope Repair Alternatives Plan – this plan will include the FDEP preferred slope repair alternative vendor provided plans.

Note: A supplemental may be required for structural engineering design depending on the selected slope repair approach. This scope of work does not include structural design.

o Preliminary Landscape Plan – this plan will be prepared to address the restoration of landscaping along the slope and other areas disturbed by construction. Genesis Landscape Architects will meet with FDEP to develop an appropriate plant palette.

o Preliminary Details

• Prepare a Preliminary Opinion of Probable Costs for the proposed improvements.

• Prepare a Verification of Exemption application in accordance with SJRWMD requirements for the project. The permit application will be reviewed by the FDEP PM or others and approved for submittal.

The submittal will include the 60% Construction Plans and brief project narrative.

Deliverable: Plans will be submitted to the FDEP PM at 60% complete. The Consultant will provide to the FDEP PM with one (1) electronic copy in PDF format of the 60% Drainage and Slope Repair Improvement Plans and Preliminary Opinion of Probable Costs for review.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and

Subtask 7 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Engineering Dept. Manager $142.50 4 $570.00 Genesis Project Engineer $95.00 20 $1,900.00 Genesis Supervisory Technician $105.00 40 $4,200.00 Genesis Sr. Prof. Landscape Architect $110.00 20 $2,200.00

$8,870.00

Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)

Reimbursable Total Cost $162.87 SJRWMD Verification of Exemption Fee

$100.00

Total for Subtask 7: $9,132.87

Subtask 8: Drainage and Slope Repair Improvement 90% Plans

Description: Based on the review of the 60% Construction Plans by FDEP, prepare 90% and Slope Repair Improvement Plans to identify proposed site modifications. The proposed drainage and roadway improvements may include pavement reconstruction to modify the cross section, the addition of curbing to direct overland flow, storm sewer improvements or other non-structural improvements. The plans will take into consideration the historical context of the brick walls and slopes that exist, along with the use characteristics of the ravine roadway.

• The 90% plans will be a refinement of the 60% plans and will include the following:

o Title Page o Existing Conditions Topographic Survey o Proposed Grading and Drainage Plan – this plan will identify the proposed roadway and storm sewer system improvements.

o Slope Repair Plan – this plan will include the FDEP preferred slope repair alternative vendor provided plans.

Note: A supplemental may be required for structural engineering design depending on the selected slope repair approach. This scope of work does not include structural design.

o Preliminary Landscape Plan – this plan will be prepared to address the restoration of landscaping along the slope and other areas disturbed by construction. Genesis Landscape Architects will meet with FDEP to develop an appropriate plant palette.

o Preliminary Details

• Prepare a Preliminary Opinion of Probable Costs for the proposed improvements.

Deliverable:

• The Consultant will provide to the FDEP PM one (1) electronic copy in PDF format of the 90% Drainage and Slope Repair Improvement Plans and Updated Preliminary Opinion of Probable Costs for review.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 8 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Engineering Dept. Manager $142.50 3 $427.50 Genesis Project Engineer $95.00 15 $1,425.00 Genesis Supervisory Technician $105.00 15 $1,575.00 Genesis Sr. Prof. Landscape Architect $110.00 15 $1,650.00

$5,077.50

Reimbursable Cost:

Reimbursable Total Cost $162.87

Total for Subtask 8: $5,240.37

Subtask 9: Drainage and Slope Repair Improvement Final Plans

Description: Based on the review of the 90% Construction Plans by FDEP, prepare Final Drainage and Slope Repair Improvement Plans to identify proposed site modifications. The proposed drainage and roadway improvements may include pavement reconstruction to modify the cross section, the addition of curbing to direct overland flow, storm sewer improvements or other non-structural improvements. The plans will take into consideration the historical context of the brick walls and slopes that exist, along with the use characteristics of the ravine roadway.

• The Final plans will be a refinement of the 90% plans and will include the following:

o Title Page o Existing Conditions Topographic Survey o Proposed Grading and Drainage Plan – this plan will identify the proposed roadway and storm sewer system improvements.

o Slope Repair Plan – this plan will include the FDEP preferred slope repair alternative vendor provided plans.

Note: A supplemental may be required for structural engineering design depending on the selected slope repair approach. This scope of work does not include structural design.

o Preliminary Landscape Plan – this plan will be prepared to address the restoration of landscaping along the slope and other areas disturbed by construction. Genesis Landscape Architects will meet with FDEP to develop an appropriate plant palette.

o Preliminary Details

• Prepare a Preliminary Opinion of Probable Costs for the proposed improvements.

Deliverable:

• Consultant will provide to the FDEP PM with one (1) electronic copy in PDF and CAD format of the Final Drainage and Slope Repair Improvement Plans and Final Opinion of Probable Costs, both electronically signed and sealed by the responsible Licensed Professional Engineer.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 9 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Genesis Engineering Dept. Manager $142.50 1 $142.50 Genesis Project Engineer $95.00 5 $475.00 Genesis Supervisory Technician $105.00 5 $525.00 Genesis Sr. Prof. Landscape Architect $110.00 5 $550.00

$1,692.50

Total for Subtask 9: $1,692.50

Project Schedule:

Activity Duration (Calendar Days) Subtask 1: Topographic Survey Twenty (20) Subtask 2: Temporary Stormwater Control Measures Ten (10) Subtask 3: Geotechnical Investigation Twenty (20) Concurrent with Survey Subtask 4: Existing Conditions Drainage Analysis

Thirty (30) Concurrent Subtask 5: Failed Slope Repair Alternatives Analysis FDEP Alternatives Analysis Review Fourteen (14) Subtask 6: Proposed Conditions Drainage Analysis

Sixty (60) Concurrent Subtask 7: 60% Drainage and Slope Repair Improvement Plans FDEP 60% Plans Review Fourteen (14) Subtask 8: 90% Drainage and Slope Repair Improvement Plans Thirty (30) FDEP 90% Plans Review Fourteen (14) Subtask 9: Final Drainage and Slope Repair Improvement Plans Fourteen (14)

Summary of Fees:

Subtask Subtask Fixed

Price Cost Subtask

Reimbursable Subtask 1: Topographic Survey $9,229.70

Subtask 2: Temporary Stormwater Control Measures $2,425.00 $325.74 Subtask 3: Geotechnical Investigation $21,004.68

Subtask 4: Existing Conditions Drainage Analysis $4,125.00 $162.87 Subtask 5: Failed Slope Repair Alternatives Analysis $5,110.00

Subtask 6: Proposed Conditions Drainage Analysis $4,600.00

Subtask 7: Drainage and Slope Repair Improvement Plans $8,870.00 $262.87 Subtask 8: 90% Drainage and Slope Repair Improvement Plans

$5,240.37 $162.87

Subtask 9: Final Drainage and Slope Repair Improvement Plans

$1,692.50

Total Fixed Price Cost: $62,134.38 Total Reimbursable Cost: $914.35

Overall Total Cost: $63,048.73

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

CN213 TA10 fully executed
CN213 TA10 Proposal
Background and Scope of Services
Reporting Requirements
Additional Services
Slope Failure Area – Storm Sewer System and Slope Restoration Preliminary Design Ravine Gardens State Park
Fixed Price Cost:
Fixed Price Cost:
Fixed Price Cost:
Fixed Price Cost:
Fixed Price Cost:
Fixed Price Cost:
Fixed Price Cost:
Total for Subtask 7: $9,132.87