The document is a Field Observation Report prepared by Shear Structural, LLC for the Kennesaw State University (KSU) Clendenin Building project, located at 275 Kennesaw State University Road in Kennesaw, Georgia. The report documents structural repair observations made on October 15, 2024, following previous site visits that identified multiple structural deficiencies. The report focuses on a limited area of structural repairs at the south end of the east building elevation between the third floor and roof, specifically examining the implementation of repair details outlined in Structural Drawing S-200 issued by the Epsten Group on September 12, 2024.

The field observations reveal several critical discrepancies between the specified structural repair details and the actual implementation, including incomplete welding of brick support angles, insufficient welding of relief angles and support lintels, and potential issues with vertical movement accommodation. Key observations include brick support angles cut flush instead of being extended, welds not completed as specified on HSS columns and embed plates, and the need to replace cold-formed steel infill walls. The report also notes that required Structural Steel Shop Drawings were not submitted to the Structural Engineer of Record prior to fabrication and erection, which could potentially impact the structural integrity and compliance of the repairs.

View the file

Other files

File Type Posted
042000_06_00 Anchor Plates Submittal_EGI.pdf PDF
092423_04_00 Corner Bead Submittal_EGI.pdf PDF
092423_02_00 Control Joint Submittal_EGI.pdf PDF
092400_05_00 Mesh Lath Submittal_EGI.pdf PDF
Clendenin _ Structural Assessment Report_EGI.pdf PDF
071300_01_00 Waterproof Membrane _ Barrier Su.pdf PDF
RFQ for Select Bid Process Clendenin Final.doc DOC document
072100_01_00 Basecoat _ Adhesive Submittal_EG.pdf PDF
072726_01_00 Fluid Applied Permeable Membrane.pdf PDF
Clendenin Enclosure Investigative Report_23_0.pdf PDF
Clendenin Building _ Structural Assessment Re.pdf PDF
092423_05_00 Stucco Assembly Submittal_EGI.pdf PDF
Daily Field Report_24_11_05_Shear Review.pdf PDF
042000_01_00 Brick Ties Submittal_EGI.pdf PDF
Sign_in Sheet 04_08_2025.pdf PDF
042000_05_00 Multipurpose Sealant Submittal_E.pdf PDF
STUCCO COLOR PALETTE_IMG_3261.jpeg JPEG file
042000_02_00 Self Adhering Flashing Submittal.pdf PDF
Parex Stucco Systems.pdf PDF
Existing Clendenin Arch_Struc Drawings.pdf PDF
Addendum 002_RFQ_275_25_252_.docx DOCX document
Addendum 001_RFQ_275_25_252.docx DOCX document
Addendum 003_RFQ_275_25_252_Epsten rev KM.pdf PDF
Clendenin Bulletin 2_Combined Set.pdf PDF
092423_03_00 Casing Bead Submittal_EGI (Rev1).pdf PDF
092423_01_00 Preblended Stucco Submittal_EGI.pdf PDF
042000_03 Weep Holes Submittal_EGI.pdf PDF
042000_04_00 Termination Bar Submittal_EGI.pdf PDF
Clendenin _NWS_ Bid Form.doc DOC document
071300_02_00 Weather Resistive Barrier Submit.pdf PDF
Instructions to Bidders_Clendenin NWS.docx DOCX document
076200_01_00 Flashing _ Joint Filler Submitta.pdf PDF
Clendenin NWS _Suppl Cond State Rev 081924.doc DOC document
099113_01_00 Acrylic Finish Submittal_EGI.pdf PDF
RFQ for Select Bid Process Clendenin Final.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEAR STRUCTURAL, LLC

931 Monroe Drive

Suite A102-491

Atlanta, GA 30308 shearstructural.com

Field Observation Report

Project: KSU Clendenin Building

275 Kennesaw State University Road

Kennesaw, Georgia 30144

Client: Epsten Group

Observation By: Bethany Jones, PE

Report No: 1

Report Date: 10.28.2024

Observation Date: 10.15.2024

Multiple structural deficiencies were observed during a previous site visit, performed on August 2, 2024.

Structural Drawing S-200, Issued by the Epsten Group with Bulletin #1 dated September 12, 2024, provided structural repair details for the previously noted deficiencies at the south end of the east building elevation between the third floor and roof elevations of the KSU Clendenin Building. The structural repairs in this limited area were completed prior to this site visit performed on October 15, 2024. The purpose of this Field Observation Report is to document the existing conditions of the completed structural repairs. These observations are limited in scope to the visible structural repairs and are not a comprehensive building inspection. Shear Structural assumes no responsibility for structural items hidden from view. Compliance with any code or standard is not within the scope of this inspection.

KSU has contracted with NOVA Engineering and Environmental to provide Special Inspection

Services for this project. This Field Observation Report is supplemental to the NOVA Inspection and Report.

Field Observations:

1. Partial Structural Elevation 1/S-200 shows that the brick support angle horizonal legs should be extended beyond the south end of the wall to be field spliced to the brick support angles on the south wall (at a later stage of construction). The brick support angles were stalled flush to the south end of the existing east wall. Therefore, the new brick support angles to be installed at a later stage of construction will require fabrication to correct this condition. Reference Photographs 1 and 2.

2. Structural Detail 5/S-200 specifies that the brick support angles are to field fillet welded all around to the new HSS columns. Observed welds are not installed all around. Reference Photograph 3.

3. Structural Detail 4/S-200 specifies that the brick relief angles are to be field fillet welded at both the top and bottom to the existing structural steel embed plates. Observed welds were installed only at the top of the new angles. Reference Photographs 4 and 5.

4. Structural Detail 2/S-200 specifies that the brick support lintel above the ribbon window is to be fillet stitch welded at the top and bottom of the new horizontal HSS beams. Observed stitch welds were installed only at the top of the new angles. Reference Photographs 6 and 7.

Suite A102-491

5. Structural Detail 5/S-200 specifies that vertical slotted holes were to be provided in the connection angles to the bottom of the existing building concrete roof beam. The purpose of these vertical slotted holes is to provide for differential movement of the new structural steel in respect to the existing concrete structure. Vertical slotted holes could not be field verified because washers and tack welds had been installed. Washers and tack welds need to be removed from these connections to allow for differential vertical movement. Reference Photograph 8.

6. Existing cold-formed steel infill stud walls were removed to allow for the installation of the new horizontal HSS members supporting the brick lintel over the window. These infill walls need to be replaced prior to the reinstallation of brick. Reference Photograph 9.

7. Structural Steel Shop Drawings, required by the Structural General Notes (6/S-200), were not submitted to the SEO prior to the fabrication and erection of the new structural steel.

8. Structural Drawing S-200, Issued by the Epsten Group with Bulletin #1 dated September 12, 2024, is included with this report for additional information.

End of Report

Field Observation Photographs:

Photograph 1: New Brick Support Angle Cut Flush to South Face of East Wall

Photograph 2: New Brick Support Angles Cut Flush to South Face on East Elevation

Suite A102-491

Photograph 3: Brick Support Angles were not Welded All Around to New HSS Column

Photograph 4: Brick Relief Angled Welded Only at Top to Existing Embed

Photograph 5: Brick Relief Angled Welded Only at Top to Existing Embed

Suite A102-491

Photograph 6: Brick Support Lintel Stitch Welded Only at Top to New Horizontal HSS

Photograph 7: Brick Support Lintel Stitch Welded Only at Top to New Horizontal HSS

Photograph 8: Top of New HSS Column Connection does not Provide for

Differential Vertical Movement

Suite A102-491

Photograph 9: Infill CFS Wall to be Replaced Prior to Reinstallation of Brick

BRICK FACE ON SOUTH ELEVATION

OUTLINE OF RIBBON WINDOW

NEW CONTINUOUS LINTEL AND/OR SHELF

ANGLE ABOVE WINDOW FOR BRICK

SUPPORT, SEE 2/S-200 FOR DETAILS

NEW CONTINUOUS SHELF ANGLE

AT 3RD FLOOR LEVEL FOR BRICK

SUPPORT, SEE 4/S-200 FOR DETAILS

NEW SHELF ANGLE FOR WINDOW

SUPPORT, SEE 3/S-200 FOR DETAILS

NEW HSS6x4x

POST FOR LINTEL AND

SHELF ANGLE SUPPORT, SEE 5/S-200

FOR DETAILS

E X

I S

T I N

G

C

O N

C R

E T

E

C

O L U

M N

NOTE: SEE ARCHITECTURAL FOR

ADDITIONAL INFORMATION,

ALL DIMENSIONS TO BE FIELD

VERIFIED (FV).

BACKUP WALL FACE ON SOUTH

ELEVATION

EXISTING CONCRETE ROOF BEAM

EXISTING CONCRETE 3RD FLOOR BEAM

"x5"x0'-7" (LLH)

BENT PLATE

HSS6x6x

"x5"x0'-7" (LLH)

BENT PLATE

CONT L6x6x

CONT BENT PLATE

"x6"x0'-7" (LLH)

E X

I S

T I N

G

C

O N

C R

E T

E

C

O L U

M N

"x5"x0'-7" (LLH)

BENT PLATE

"x5"x0'-7" (LLH)

BENT PLATE

HSS6x6x

"x5"x0'-7" (LLH)

BENT PLATE

HSS6x6x

"x5"x0'-7" (LLH)

BENT PLATE

"x5"x0'-7" (LLH)

BENT PLATE

HSS6x6x

"x5"x0'-7" (LLH)

BENT PLATE

PROJECT

DRAWN BY

CHECKED BY

SHEET TITLE:

OWNER:

PROJECT:

ARCHITECT:

101 MARIETTA STREET NW

SUITE 2600

ATLANTA, GA 30303

404-577-0370 (O)

All reproduction & intellectual property rights reserved © 2024 The Epsten Group, Inc., A Salas O'Brien Company

DO NOT SCALE DIMENSIONS FROM

DRAWINGS SITE VERIFY ALL DIMENSIONS

PRIOR TO CONSTRUCTION REPORT ALL

DISCREPANCIES TO ARCHITECT IMMEDIATELY

THIS DRAWING IS TO BE READ IN

CONJUNCTION WITH ALL RELEVANT

DOCUMENTS AND DRAWINGS.

KENNESAW STATE

UNIVERSITY

KENNESAW STATE

UNIVERSITY CLENDENIN

BUILDING, BUILDING

ENCLOSURE REPAIRS

275 KENNESAW STATE

UNIVERSITY RD,

KENNESAW, GA 30144

KSUCLB2 2024-01462-00

B U

L L E

T I N

ISSUANCE SCHEDULE

REV. # DATE DESCRIPTION

EPSTEN GROUP, A SALAS O'BRIEN COMPANY

SHEET NUMBER:

KEY PLAN

PLAN

NORTH

TRUE

NORTH

BBJ

HCJ

BULLETIN #0109/05/2024

S-200

PARTIAL

STRUCTURAL

ELEVATION,

DETAILS AND

NOTES

STRUCTURAL ENGINER:

3411 PIERCE DRIVE

CHAMBLEE, GA 30341

678.664.8051 (O)

SHEAR STRUCTURAL

BULLETIN #0109/12/2024

09.12.2024

File details come from the government source that posted it. Updated .