The document is a Field Observation Report prepared by Shear Structural, LLC for the Kennesaw State University (KSU) Clendenin Building project, located at 275 Kennesaw State University Road in Kennesaw, Georgia. The report documents structural repair observations made on October 15, 2024, following previous site visits that identified multiple structural deficiencies. The report focuses on a limited area of structural repairs at the south end of the east building elevation between the third floor and roof, specifically examining the implementation of repair details outlined in Structural Drawing S-200 issued by the Epsten Group on September 12, 2024.
The field observations reveal several critical discrepancies between the specified structural repair details and the actual implementation, including incomplete welding of brick support angles, insufficient welding of relief angles and support lintels, and potential issues with vertical movement accommodation. Key observations include brick support angles cut flush instead of being extended, welds not completed as specified on HSS columns and embed plates, and the need to replace cold-formed steel infill walls. The report also notes that required Structural Steel Shop Drawings were not submitted to the Structural Engineer of Record prior to fabrication and erection, which could potentially impact the structural integrity and compliance of the repairs.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEAR STRUCTURAL, LLC
931 Monroe Drive
Suite A102-491
Atlanta, GA 30308 shearstructural.com
Field Observation Report
Project: KSU Clendenin Building
275 Kennesaw State University Road
Kennesaw, Georgia 30144
Client: Epsten Group
Observation By: Bethany Jones, PE
Report No: 1
Report Date: 10.28.2024
Observation Date: 10.15.2024
Multiple structural deficiencies were observed during a previous site visit, performed on August 2, 2024.
Structural Drawing S-200, Issued by the Epsten Group with Bulletin #1 dated September 12, 2024, provided structural repair details for the previously noted deficiencies at the south end of the east building elevation between the third floor and roof elevations of the KSU Clendenin Building. The structural repairs in this limited area were completed prior to this site visit performed on October 15, 2024. The purpose of this Field Observation Report is to document the existing conditions of the completed structural repairs. These observations are limited in scope to the visible structural repairs and are not a comprehensive building inspection. Shear Structural assumes no responsibility for structural items hidden from view. Compliance with any code or standard is not within the scope of this inspection.
KSU has contracted with NOVA Engineering and Environmental to provide Special Inspection
Services for this project. This Field Observation Report is supplemental to the NOVA Inspection and Report.
Field Observations:
1. Partial Structural Elevation 1/S-200 shows that the brick support angle horizonal legs should be extended beyond the south end of the wall to be field spliced to the brick support angles on the south wall (at a later stage of construction). The brick support angles were stalled flush to the south end of the existing east wall. Therefore, the new brick support angles to be installed at a later stage of construction will require fabrication to correct this condition. Reference Photographs 1 and 2.
2. Structural Detail 5/S-200 specifies that the brick support angles are to field fillet welded all around to the new HSS columns. Observed welds are not installed all around. Reference Photograph 3.
3. Structural Detail 4/S-200 specifies that the brick relief angles are to be field fillet welded at both the top and bottom to the existing structural steel embed plates. Observed welds were installed only at the top of the new angles. Reference Photographs 4 and 5.
4. Structural Detail 2/S-200 specifies that the brick support lintel above the ribbon window is to be fillet stitch welded at the top and bottom of the new horizontal HSS beams. Observed stitch welds were installed only at the top of the new angles. Reference Photographs 6 and 7.
Suite A102-491
5. Structural Detail 5/S-200 specifies that vertical slotted holes were to be provided in the connection angles to the bottom of the existing building concrete roof beam. The purpose of these vertical slotted holes is to provide for differential movement of the new structural steel in respect to the existing concrete structure. Vertical slotted holes could not be field verified because washers and tack welds had been installed. Washers and tack welds need to be removed from these connections to allow for differential vertical movement. Reference Photograph 8.
6. Existing cold-formed steel infill stud walls were removed to allow for the installation of the new horizontal HSS members supporting the brick lintel over the window. These infill walls need to be replaced prior to the reinstallation of brick. Reference Photograph 9.
7. Structural Steel Shop Drawings, required by the Structural General Notes (6/S-200), were not submitted to the SEO prior to the fabrication and erection of the new structural steel.
8. Structural Drawing S-200, Issued by the Epsten Group with Bulletin #1 dated September 12, 2024, is included with this report for additional information.
End of Report
Field Observation Photographs:
Photograph 1: New Brick Support Angle Cut Flush to South Face of East Wall
Photograph 2: New Brick Support Angles Cut Flush to South Face on East Elevation
Suite A102-491
Photograph 3: Brick Support Angles were not Welded All Around to New HSS Column
Photograph 4: Brick Relief Angled Welded Only at Top to Existing Embed
Photograph 5: Brick Relief Angled Welded Only at Top to Existing Embed
Suite A102-491
Photograph 6: Brick Support Lintel Stitch Welded Only at Top to New Horizontal HSS
Photograph 7: Brick Support Lintel Stitch Welded Only at Top to New Horizontal HSS
Photograph 8: Top of New HSS Column Connection does not Provide for
Differential Vertical Movement
Suite A102-491
Photograph 9: Infill CFS Wall to be Replaced Prior to Reinstallation of Brick
BRICK FACE ON SOUTH ELEVATION
OUTLINE OF RIBBON WINDOW
NEW CONTINUOUS LINTEL AND/OR SHELF
ANGLE ABOVE WINDOW FOR BRICK
SUPPORT, SEE 2/S-200 FOR DETAILS
NEW CONTINUOUS SHELF ANGLE
AT 3RD FLOOR LEVEL FOR BRICK
SUPPORT, SEE 4/S-200 FOR DETAILS
NEW SHELF ANGLE FOR WINDOW
SUPPORT, SEE 3/S-200 FOR DETAILS
NEW HSS6x4x
POST FOR LINTEL AND
SHELF ANGLE SUPPORT, SEE 5/S-200
FOR DETAILS
E X
I S
T I N
G
C
O N
C R
E T
E
C
O L U
M N
NOTE: SEE ARCHITECTURAL FOR
ADDITIONAL INFORMATION,
ALL DIMENSIONS TO BE FIELD
VERIFIED (FV).
BACKUP WALL FACE ON SOUTH
ELEVATION
EXISTING CONCRETE ROOF BEAM
EXISTING CONCRETE 3RD FLOOR BEAM
"x5"x0'-7" (LLH)
BENT PLATE
HSS6x6x
"x5"x0'-7" (LLH)
BENT PLATE
CONT L6x6x
CONT BENT PLATE
"x6"x0'-7" (LLH)
E X
I S
T I N
G
C
O N
C R
E T
E
C
O L U
M N
"x5"x0'-7" (LLH)
BENT PLATE
"x5"x0'-7" (LLH)
BENT PLATE
HSS6x6x
"x5"x0'-7" (LLH)
BENT PLATE
HSS6x6x
"x5"x0'-7" (LLH)
BENT PLATE
"x5"x0'-7" (LLH)
BENT PLATE
HSS6x6x
"x5"x0'-7" (LLH)
BENT PLATE
PROJECT
DRAWN BY
CHECKED BY
SHEET TITLE:
OWNER:
PROJECT:
ARCHITECT:
101 MARIETTA STREET NW
SUITE 2600
ATLANTA, GA 30303
404-577-0370 (O)
All reproduction & intellectual property rights reserved © 2024 The Epsten Group, Inc., A Salas O'Brien Company
DO NOT SCALE DIMENSIONS FROM
DRAWINGS SITE VERIFY ALL DIMENSIONS
PRIOR TO CONSTRUCTION REPORT ALL
DISCREPANCIES TO ARCHITECT IMMEDIATELY
THIS DRAWING IS TO BE READ IN
CONJUNCTION WITH ALL RELEVANT
DOCUMENTS AND DRAWINGS.
KENNESAW STATE
UNIVERSITY
KENNESAW STATE
UNIVERSITY CLENDENIN
BUILDING, BUILDING
ENCLOSURE REPAIRS
275 KENNESAW STATE
UNIVERSITY RD,
KENNESAW, GA 30144
KSUCLB2 2024-01462-00
B U
L L E
T I N
ISSUANCE SCHEDULE
REV. # DATE DESCRIPTION
EPSTEN GROUP, A SALAS O'BRIEN COMPANY
SHEET NUMBER:
KEY PLAN
PLAN
NORTH
TRUE
NORTH
BBJ
HCJ
BULLETIN #0109/05/2024
S-200
PARTIAL
STRUCTURAL
ELEVATION,
DETAILS AND
NOTES
STRUCTURAL ENGINER:
3411 PIERCE DRIVE
CHAMBLEE, GA 30341
678.664.8051 (O)
SHEAR STRUCTURAL
BULLETIN #0109/12/2024
09.12.2024
File details come from the government source that posted it. Updated .