This document is a submittal cover sheet for an aluminum termination bar product by F.H. Paschen for the Kennesaw State University (KSU) Clendenin Building Envelope Repairs project. The submittal is specifically for a T2 Aluminum Termination Bar manufactured by Hohmann & Barnard Inc., dated 9/27/24, and involves a technical product submission for architectural review. The submittal was reviewed and approved by Olu Oshinubi from the Epsten Group on 09/30/24, with authorization for fabrication and installation.
The technical specifications indicate the termination bar is made of AA 6063-T6 Aluminum (Grade TB-75), measuring 14 ga. x 1" x 8' long, with a 1/4" flange on top for caulking and 1/4" holes spaced 8" on center. An optional Foam-Tite Seal version is available to help inhibit moisture infiltration and seal small voids between the bar and irregular substrate surfaces. The product is compatible with surface-mount membrane and copper-laminate flashings, and is recommended to be fastened every 8 inches (or 16 inches for metal stud backup). The submittal is part of the larger KSU Clendenin Building Envelope Repairs project, with F.H. Paschen serving as the contractor and Justice Hill as the project manager.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC
1344 La France Street, NE Suite 2, Atlanta, GA 30307
p. 404.942.1307 f. 404.228.4050 | www.fhpaschen.com
SUBMITTAL COVER SHEET
Fill out items 1 through 4 below and submit product data sheet, sample, shop drawing, or other items submitted to the Owner/Architect/Engineer. Each submittal line item shall have its own Submittal Cover Sheet.
Project Name: KSU Clendenin Building Envelope Repairs Contractor: FH Paschen
Project Manager: Justice Hill
Address:
739 Trabert Ave NW Atlanta, GA 30318
Phone: 770-584-4267
Architect/Engineer: Olu Oshinubi – Epsten Group Owner: Kennesaw State University
Owner Project Manager:
Emmanuel Bertrand - KSU
1. Date: ______9/27/24 _____
2. Submitted Item: ________Aluminum Termination Bar
3. Manufacturer: ____Hohmann & Barnard Inc.___
4. Notes: _____
Contractor’s Stamp Owner/ Engineer/ Architect Stamp
No exception taken.
Revise as noted. Do not resubmit. See Notes above.
Revise as noted. Resubmit. See Notes above.
Rejected. See Notes above.
Checking of submittals is only for general conformance with the design concept of the Project and general compliance with the information given in Contract Documents. Any action shown is subject to the requirements of the Drawings and Specifications. Contractor is responsible for dimensions to be confirmed and correlated at the job site, quantities, information that pertains solely to the fabrication processes or to techniques of construction, coordination of the work of all trades, and the satisfactory performance of his work.
By: Date: 09/26/24Olu Oshinubi, VP / Arch
APPROVED
APPROVED AS CORRECTED
REVISE AND RESUBMIT
REJECTED
Fabrication / Installation may be undertaken. Approval does not authorize changes to the Contract Sum or Contract Time.
Fabrication and/or Installation MAY NOT be undertaken. In resubmitting, limit corrections to items marked.
NO PRIOR APPROVAL STAMP
BY CONTRACTOR
NOT A REQUIRED SUBMITTAL
ACTION AS NOTED BELOW
Review / approval neither extends nor alters contractual obligations of the Architect or Contractor.
The Epsten Group, Inc.
DATE REVIEWER
X
Olu Oshinubi, VP / Arch09/30/24
SIDE VIEW
DRAWINGS FOR ILLUSTRATIVE PURPOSES ONLY
T2 - Aluminum Termination Bar AA 6063-T6 Aluminum (GRADE TB-75) termination bar for use at top of flashing to mechanically secure it to the backup.
Compatible with all H&B Surface-Mount membrane and copper-laminate flashings.
NOTE: Available with optional Foam-Tite Seal™ to aid in inhibiting moisture infiltration. A factory-installed foam strip helps to seal small voids occurring between the termination bar and irregular substrate surfaces, while offering protection against water penetration due to sealant deterioration.
T2 - Aluminum Termination Bar
Product:
T2 Aluminum OPTIONAL: T2 Aluminum-FTS (Foam-Tite Seal™)
Dimensions:
• 14 ga. x 1” x 8’ long
• Has a 1/4” flange on top for easy caulking
• 1/4” holes spaced 8” o.c.
45°
3/4”
14 ga.
Flashing and Reglets
HOHMANN & BARNARD, Inc.
30 Rasons Court | Hauppauge, NY 11788
CORPORATE HEADQUARTERS
T: 800.645.0616 F: 631.234.0683 www.h-b.com
Branch/Subsidiary Locations:
ALABAMA - ARIZONA - ILLINOIS
MARYLAND - NEW YORK
PENNSYLVANIA - TEXAS - UTAH
CANADA
© 2013-2016 MiTek®
IMPORTANT: Since each construction project is unique, the appropriate selection and use of any product contained herein must be determined by competent architects, engineers and other appropriate professionals who are familiar with the specific requirements of the project in question.
This drawing and/or data sheet is the confidential and proprietary information of Hohmann & Barnard, Inc. and is not to be reproduced, copied or disclosed, in whole or in part, without the prior written consent of H&B.
NOTE: H&B recommends termination bars be fastened 8" o.c.
(Metal term bars can be fastened 16” o.c. for metal stud backup)
| Termination Bar Cover Sheet |
| SUBMITTAL+T2+Aluminum+Termination+Bar |
| PRODUCT: T2 |
| Print Form: |
| Reset Form: |
| SAVE FORM: |
| SAVE FORM HIDE: |
File details come from the government source that posted it. Updated .