BAA RVKD-2014-0001 CALL 0005 BARD Q&A 07 Jun 2017

View the file

Other files

File Type Posted
Questions_and_Answers_26_Jul.docx DOCX document
SIFT_QA_20180723.pdf PDF
Attch_5_-_SIFT_Section_K_Reps_Certs.pdf PDF
Attch_2_-_SIFT_Supp_Req_20180629.pdf PDF
BAA-RVKD-2014-0001_Call_0007_SIFT.pdf PDF
Attch_4_-_SIFT_Draft_DD_254_20171117.pdf PDF
Attch_3_-_SIFT_Draft_CDRLs_A001-A006.pdf PDF
Attch_1_-_SIFT_SOO_20180629.pdf PDF
Attch_6_-_Cost_Proposal_Inst_20161019.pdf PDF
FLARE_CALL-0006_Q&As.pdf PDF
BAA-RVKD-2014-0001_Call_0006_FLARE__w_6_Attachments_20180319.pdf PDF
COSMO_QA_20171115.pdf PDF
Attachment_4_-_BARD_DD_Form_254.pdf PDF
Attachment_5_-_BARD_Section_K.pdf PDF
Attachment_1_-_BARD_SOO.pdf PDF
BAA_RVKD-2014-0001_Call_0004_BARD.pdf PDF
Attachment_2_-_BARD_SOW_Supplement.pdf PDF
Attachment_3_-_BARD_DD_Form_1423__CDRLS.pdf PDF
Attachment_6_-_BARD_Cost_Proposal_Instructions.pdf PDF
Guide_to_Preparing_CSOW.pdf PDF
LSAR_BAA_Amend_02_06_Mar_2017.pdf PDF
q&a.docx DOCX document
SOO_-_Phased_Array__25Aug2016.docx DOCX document
1_-_Statement_of_Objectives.pdf PDF
3_-_Contract_Data_Requirements_List_(Draft).pdf PDF
BAA-RVKD-2014-0001_Call_0003_(Final).pdf PDF
6_-_Cost_Proposal_Instructions.pdf PDF
5_-_Proposal_Adequacy_Checklist.pdf PDF
4_-_Contract_Security_Classification_Specification_(Draft).pdf PDF
2_-_Supplemental_Requirements.pdf PDF
7_-_Representations_and_Certifications.pdf PDF
1_-_Statement_of_Objectives.pdf PDF
BAA-RVKD-2014-0001_CALL_0002_(ALMS)_Q A_(06_Jun_2016).pdf PDF
BAA-RVKD-2014-0001_Call_0002_Amend_1_(24_May_2016).pdf PDF
BAA-RVKD-2014-0001_CALL_0002_(ALMS)_Q A_(23_May_2016).pdf PDF
Attch_4_-_ALMS_Draft_DoD_Security_Classification_Specification_DD_Form_254.pdf PDF
Attch_1_-_ALMS_SOO_(05_May_2016).pdf PDF
BAA-RVKD-2014-0001_Call_0002_(05_May_2016).pdf PDF
Attch_2_-_ALMS_SOW_Supplemental_Requirements_(05_May_2016).pdf PDF
Attch_3_-_ALMS_Draft_CDRL_DD_Form_1423_A001-A007.pdf PDF
Attch_5_-_Proposal_Adequacy_Checklist_(Jan_2014).pdf PDF
Attch_7_-_Representations_and_Certifications_(Section_K).pdf PDF
Attch_6_-_Cost_Proposal_Instructions_(06_Nov_2015).pdf PDF
Contract_awards.docx DOCX document
CALL_0001_-_LEAMER_v1_(17_Apr_15)(Amendment_3).docx DOCX document
Call_0001 _Summary_of_Changes_(Amendment_3).docx DOCX document
Q A_for_Call_0001_(version_6).docx DOCX document
Call_0001 _Summary_of_Changes_(Amendment_2).docx DOCX document
CALL_0001_-_LEAMER_v1_(11_Dec_14)(Amendment_2).docx DOCX document
LSAR_BAA_29_Sep.docx DOCX document
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Beam Control and Aero-Effects Research and Development (BARD) BAA RVKD-2014-0001 Call 0004

Questions and Answers (Q&A)

07 June 2017

Q.1. Technical Area 7 in the “Laser Simulation, Analysis and Research (LSAR)” Broad Agency Announcement (BAA), BAA RVKDL-2014-0001, includes “…computational tools and sensing techniques (hardware and software)…” to perform several tasks. Is the Government asking for a new standalone optical tracking system to be developed, or does the Government already have a system that the contractor is expected to use?

A.1. The Government is not seeking a new standalone optical tracking system to be developed under the BARD effort. For the tracking aspects of BARD, the majority of the effort will occur in the Tactical Beam Control Lab as described in the BARD Statement of Objectives (SOO). Field tests and measurements will be performed on systems/platforms provided by the Government.

While there may be some hardware development required to integrate with the system, development of standalone systems is beyond the scope of BARD.

Q.2. Which test facilities and ranges are most likely to be used for this program?

A.2. For the wind tunnel portion of the effort, the Aero Effects Laboratory (AEL) is a supersonic, blow down wind tunnel with an approximately 8'' test section. For beam control testing, while the majority of the effort will be in the Tactical Beam Control Lab, we also plan on using the Environmental Laser Test Facility. There is also the potential of testing at WSMR (NOP, HELSTF, ACR being the most likely sites). There also may be opportunity to collaborate with airborne testing on the AAOL-T at Notre Dame.

Q.3. Does the Government have a ballpark ODC budget that they are expecting? Are there any large purchases (test equipment, etc.) that should be included?

A.3. The Government does expect the need for some ODC items, but the exact costs and items are unknown at this time.