Attch_3_-_SIFT_Draft_CDRLs_A001-A006.pdf
PDF 480 KB Posted
- Attached to
- Laser Simulation, Analysis and Research (LSAR) Federal contract opportunity
- Solicitation number
- BAA-RVKD-2014-0001
About this file
Attch 3 - SIFT Draft CDRLs A001-A006
View the file
Other files for this federal contract opportunity
Show all 50
Laser Simulation, Analysis and Research (LSAR) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: CLIN ____
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: System Integration & Field Testing (SIFT) E. CONTRACT/PR NO.: BAA RVKD-2014-0001 Call 0007
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A001
2. TITLE OF DATA ITEM............: Status Report
3. SUBTITLE..................................: Technical and Cost Status Report
4. AUTHORITY.............................: DI-MGMT-80368A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See SOO Para 6.0
6. REQUIRING OFFICE..............: AFRL/RDLA
7. DD250 REQ................................: LT
8. APP CODE.................................:
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION……: See Blk 16
13. DATE OF SUBSEQUENT SUBM…...: See Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLA (PM) 0 1
AFRL/RDLB 0 1
AFRL DET 8/RVKDL 0 Ltr ACO 0 Ltr
15. TOTAL: 0 2
16. REMARKS
Blk 4: Tailoring of DID Requirements. The contractor shall report all activities at the WBS level III (work package level). Technical and cost status information shall be included in this report. In addition, the contractor shall prepare labor reports at the Work Unit level and provide a line item report of all commitments, obligations, and expenditures within each project. Approval of contractor format is required on initial submission. Submissions shall be compatible with Microsoft Office 2010 or later.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings as shown below:
“Distribution authorized to U.S. Government Agencies and their contractors; Critical Technology and Export Controlled, [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RDLA, 3550 Aberdeen Avenue SE, Kirtland AFB, NM 87117-5773.” (ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE
REPORT)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 10-13: The contractor shall deliver the first Status Report within 15 calendar days after completion of the first full contractor accounting month. Subsequent status reports shall be delivered within 15 calendar days after the end of each subsequent accounting period (monthly) thereafter through technical completion. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure e-mail is not permitted.
Blk 14: The contractor shall distribute the Status Report in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: John McCord I. APPROVED BY: Mark Cruz H. DATE: 16 Nov 17 J. DATE: 13 Dec 17
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 6 Pages
BAA-RVKD-2014-0001 Call 0007 Attachment 3 http://quicksearch.dla.mil/
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: CLIN ____
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: System Integration & Field Testing (SIFT) E. CONTRACT/PR NO.: BAA RVKD-2014-0001 Call 0007
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A002
2. TITLE OF DATA ITEM............: Presentation Material
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-ADMN-81373 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See SOO Para 6.0
6. REQUIRING OFFICE..............: AFRL/RDLA
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED....: See Blk 16
10. FREQUENCY.....................................: See Blk 16
11. AS OF DATE.......................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLA (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL DET 8/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Block 4: Tailoring of DID Requirements. The contractor shall provide project status updates for incorporation into Program Management Reviews/Technical Interchange Meetings (PMRs/TIMs). This update shall include providing the manpower, skills and resources required to plan, organize, coordinate, direct, accomplish, and document technical efforts and track funding requirements, use an effective cost, schedule, and technical performance control systems, and implement an efficient organizational structure flexible to the changing requirement and workloads. The contractor shall provide the status of deliverables against schedule, track expenditures against both the budget and approved activities, and report technical progress on ongoing activities. The presentation shall include notes to explain each page/slide. The format shall be in Microsoft Office PowerPoint unless otherwise determined by the government. Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings as shown below:
“Distribution authorized to U.S. Government Agencies and their contractors; Critical Technology and Export Controlled, [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RDLA, 3550 Aberdeen Avenue SE, Kirtland AFB, NM 87117-5773.” (ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE
REPORT)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blocks 8, 10 - 13:
- For technical presentation, the submission is due the day of the presentation. If the Government requires revisions or corrections to the presentation, the contractor shall submit the revised version within 5 business days after the date of the presentation.
- For programmatic inputs to PMRs/TMRs, the presentation shall be submitted as required based on the scheduling of reviews and meetings. Where feasible, the Government will provide 30 calendar days’ notice with presentations due 10 business days later. If revisions or corrections are required, the contractor shall have 5 business days to submit a revised copy.
Blk 14: The contractor shall distribute the Presentation Materials in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: John McCord I. APPROVED BY: Mark Cruz
H. DATE: 16 Nov 17 J. DATE: 13 Dec 17
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 6 Pages
BAA-RVKD-2014-0001 Call 0007 Attachment 3
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: CLIN ____
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: System Integration & Field Testing (SIFT) E. CONTRACT/PR NO.: BAA RVKD-2014-0001 Call 0007
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A003
2. TITLE OF DATA ITEM............: Technical Report--Study/Services
3. SUBTITLE..................................: Scientific & Technical Reports
4. AUTHORITY.............................: DI-MISC-80508B (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See SOO Para 6.0
6. REQUIRING OFFICE..............: AFRL/RDLA
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLA (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL DET 8/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Block 4: Tailoring of DID Requirements. Contractor format is authorized. This report shall document interim studies/services as requested by Government Program Manager. Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings as shown below:
“Distribution authorized to U.S. Government Agencies and their contractors; Critical Technology and Export Controlled, [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RDLA, 3550 Aberdeen Avenue SE, Kirtland AFB, NM 87117-5773.” (ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE
REPORT)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blocks 8, 10, 11, 12 & 13: Draft due 30 calendar days after an analysis is completed. Final report due 10 business days after Government review.
Block 14: The contractor shall distribute the Technical Report – Study/Services in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: John McCord I. APPROVED BY: Mark Cruz
H. DATE: 16 Nov 17 J. DATE: 13 Dec 17
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 6 Pages BAA-RVKD-2014-0001 Call 0007
Attachment 3
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: CLIN ____
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: System Integration & Field Testing (SIFT) E. CONTRACT/PR NO.: BAA RVKD-2014-0001 Call 0007
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A004
2. TITLE OF DATA ITEM............: Test Plan
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-NDTI-80566A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See SOO Para 6.0
6. REQUIRING OFFICE..............: AFRL/RDLA
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED...: See Blk 16
10. FREQUENCY...................................: See Blk 16
11. AS OF DATE.....................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLA (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL DET 8/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Block 4: Tailoring of DID Requirements. A test plan shall be delivered for each test measurement series and coordinated with the Government Program Manager (see Block 8). Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings as shown below:
“Distribution authorized to U.S. Government Agencies and their contractors; Critical Technology and Export Controlled, [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RDLA, 3550 Aberdeen Avenue SE, Kirtland AFB, NM 87117-5773.” (ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE
REPORT)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blocks 8, 10, 11, 12 &13: The draft should be completed within 30 calendar days of the Test Readiness Review (TRR). Final due 15 calendar days prior to TRR.
Blk 14: The contractor shall distribute the Test Plan in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: John McCord I. APPROVED BY: Mark Cruz
H. DATE: 16 Nov 17 J. DATE: 13 Dec 17
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 6 Page BAA-RVKD-2014-0001 Call 0007
Attachment 3
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: CLIN ____
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: System Integration & Field Testing (SIFT) E. CONTRACT/PR NO.: BAA RVKD-2014-0001 Call 0007
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A005
2. TITLE OF DATA ITEM............: Scientific and Technical Report
3. SUBTITLE..................................: Final Report
4. AUTHORITY.............................: DI-MISC-80711A(http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See SOO Para 6.0
6. REQUIRING OFFICE..............: AFRL/RDLA
7. DD250 REQ................................: DD
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
FINAL CRC
AFRL/RDLA (PM) 1 1
AFRL/RDLB Ltr 1 AFRL DET 8/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 2
16. REMARKS
THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit any version of the report to DTIC.
Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current AFRL ANSI/NISO Standard Z39.18-2005, or other most current report preparation guidance. The contractor shall complete the most current SF 298 Report Documentation Page, and submit it with the report.
The contractor shall complete the following blocks of the SF 298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), and 14-16c. Incomplete reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor. NOTE: The report preparation guidance and SF 298 are available at: http://www.afrlnewmexico.com/stinfo-1.
The contractor shall deliver two editable electronic copies of the report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A CD- ROM (CD-R) is the acceptable media for submittal (CD-RWs are not acceptable). Electronic media shall be marked I.A.W. the AFRL ANSI/NISO Standard Z39.18-2005 guidelines, or other most current report preparation guidance. Submission via unencrypted or unsecure email is not permitted.
Blk 7: UPON NOTIFICATION OF ACCEPTANCE OF THE SCIENTIFIC AND TECHNICAL REPORT FROM THE PROGRAM OFFICE, the contractor shall submit the final Receiving Report (DD Form 250) in WAWF. In preparing the final DD Form 250, code the shipment number with a “Z.” Do not upload the Scientific and Technical Report into WAWF or DTIC. NOTE: SUBMITTAL OF THE DD FORM 250Z PRIOR TO ACCEPTANCE NOTIFICATION WILL RESULT IN REJECTION OF THE DD FORM 250Z
FINAL RECEIVING REPORT.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings as shown below:
“Distribution authorized to U.S. Government Agencies and their contractors; Critical Technology and Export Controlled, [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RDLA, 3550 Aberdeen Avenue SE, Kirtland AFB, NM 87117-5773.” (ADD THIS ENTIRE DISTRIBUTION
STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE REPORT)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blks 10 - 13: The contractor shall deliver the draft Scientific and Technical Report no later than 30 calendar days after the end of the technical effort. The Government will review and, if necessary, return the report with comments no later than 30 days after receipt of contractor submission. If the report is returned to the contractor with comments, the contractor shall deliver the final version of the report no later than 30 calendar days after receipt of the Government’s comments. If the draft Scientific and Technical report is accepted as-is, no further submission will be required.
Blk 14: The contractor shall distribute the Scientific and Technical Report (final/CRC version(s)) in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: John McCord I. APPROVED BY: Mark Cruz
H. DATE: 16 Nov 17 J. DATE: 13 Dec 17
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 6 Page BAA-RVKD-2014-0001 Call 0007
Attachment 3 http://www.afrlnewmexico.com/stinfo-1
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: CLIN ____
B. EXHIBIT....................................: A
C. CATEGORY..............................: Other
D. SYSTEM/ITEM........: System Integration & Field Testing (SIFT) E. CONTRACT/PR NO.: BAA RVKD-2014-0001 Call 0007
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A006
2. TITLE OF DATA ITEM............: Contractor Acquired Property (CAP) Inventory
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-MGMT-80259 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: FAR 52.245-1 and PGI 245-402-71
6. REQUIRING OFFICE..............: AFRL/RDLA
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: C
10. FREQUENCY......................................: Annually
11. AS OF DATE........................................: N/A
12. DATE OF FIRST SUBMISSION: N/A
13. DATE OF SUBSEQUENT SUBM.: Annually
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
Draft Final
AFRL/RDLA (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL DET 8/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Blk 4: During performance of this contract the contractor may purchase material or equipment using Government funds as specified in the contract. The contractor shall annual perform, record, and disclose physical inventory results of all CAP material/equipment. Ninety (90) days prior to contract expiration the contractor shall submit a final CAP List suitable for close-out purposes containing use/disposition recommendations. Approval is required by the Government Program Manager and/or DCMA Property Administrator.
The CAP List shall include:
-List of CAP by nomenclature -National Stock Number of each equipment- CAP meeting IUID criteria of DFARS 211.274-2 -Serial number of each equipment -Quantity of each equipment -Condition of each equipment, in accordance with the equipment condition status listed:
--Service Usable without qualification. New, used, repaired, or reconditioned.
--Service Usable with qualification. New, used, repaired or reconditioned equipment which is serviceable and useable for its intended purposes but which is restricted for issue to specific units, activities, or geographical areas by reason of its limited usefulness or short service life expectancy.
--Serviceable Test/Modifications. Serviceable equipment which requires test, alteration, modification, conversion or disassembly.
-Status of the CAP -Solutions of problems relating to the above -Request assistance for repair of CAP, as necessary.
The CAP List shall be delivered in a spreadsheet using Microsoft Office Excel. Abbreviations are not allowed.
Block 9: The CAP List shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings as shown below:
"Distribution authorized to US government agencies and their contractors; Critical Technology and Export Controlled; (contractor fill in date of report dd mmm yy). Other requests for this document shall be referred to Air Force Research Laboratory/RDLA, 3550 Aberdeen Ave SE, Kirtland AFB, NM 87117-5776. (ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EACH PAGE OF THE REPORT.)
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25." (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE REPORT.)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blks 8, 10-13: Initial submission due 15 calendar days after first year of contract award, and therefore annually through technical period performance.
Block 14: The contractor shall distribute the Contractor Acquired Property (CAP) Inventory in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: John McCord I. APPROVED BY: Mark Cruz H. DATE: 16 Nov 17 J. DATE: 13 Dec 17
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 6 Page
BAA-RVKD-2014-0001 Call 0007 Attachment 3 http://quicksearch.dla.mil/
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
| A. ADDRESSEES |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
| A. ADDRESSEES |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
| A. ADDRESSEES |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
| A. ADDRESSEES |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
| A. ADDRESSEES |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 |
A. ADDRESSEES