B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx

XLSX spreadsheet 90 KB Posted

Attached to
ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
Solicitation number
140P2025R0080
Issued by
Department of the Interior National Park Service National Office

About this file

This is a template for reporting limitations on subcontracting compliance for small business set-aside contracts. The template is required for small business, 8(a), or other socio-economic set-aside service contracts (including construction) priced at or above $150,000, with a template version date of 7/25/19.

The template requires prime contractors to report their contract number, company name, total contract price, type of set-aside (Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.), and period of performance. It includes three categories of service types with different subcontracting limitations: services (except construction) allowing maximum 50% subcontracting to non-similarly situated subcontractors, general construction allowing maximum 85%, and construction by special trade contractors allowing maximum 75%. The template calculates participation percentages by tracking amounts invoiced by the prime contractor, similarly situated subcontractors (SSS), and non-similarly situated subcontractors (NSS), excluding material costs. If the NSS percentage exceeds the allowable limits under contract clauses 52.219-3, 14, 27, 29, or 30, the prime contractor must provide a written corrective action plan.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
432250_-_Flowmeters_0010.doc DOC document
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
Sol_140P2025R0080_Amd_0009.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Design_Report_0005.pdf PDF
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
B08_Attachment_3_ORPI_Wage_Determination.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template for Contracts and Indi Report on Limitations on Subcontracting [Template Version 7/25/19]

This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000.

Contract Number:[Insert contract #]
Prime Contractor:[Insert prime contractor's company name]
Current Total Contract Price:[Insert the amount of the original contract + all excuted contract modifications]
Type of Set Aside:[Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.]
Period of PerformanceMM/DD/YYYY - MM/DD/YY
Type of Service (Required Participation):[Put an X in the applicable box below per clause 52.219-3, 14, 27,29,30]
1) Services (except construction). 50% maximum may be subcontracted to non-similary situated Subcontractors
2) General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors
3) Construction by special trade contractors. 75% maximum may be subcontracted to non-similary situated Subcontractors
Participartion Calculation as of the Current Invoice
Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.
1) Amount Invoiced by the Prime Contractor:$0
2) Portion of Amount Invoiced for All Similarly Situated Subcontractors (SSS)*$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0Add additional rows if more than 5 SSS
3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS)$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0Add additional rows if more than 5 NSS
4) Prime & SSS Participation %ERROR:#DIV/0!Modify formula if additional rows added above
5) % subcontracted to NSSERROR:#DIV/0!Modify formula if additional rows added above
* Similarly Situated Subcontractor (SSS): is a small business subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the prime contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)
** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS)/ Total amount invoiced by the Prime Contractor)
Corrective Action Plan
If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below:

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .