Other files for this federal contract opportunity
Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
| File |
Type |
Posted |
| 100kTankPower_0010.pdf |
PDF |
|
| 40_91_19_Instrumentation_0010.docx |
DOCX document |
|
| 432250_-_Flowmeters_0010.doc |
DOC document |
|
| Sol_140P2025R0080_Amd_0010.pdf |
PDF |
|
| 432255_-_Water_Meters_with_Automatic_Read_System_0010.docx |
DOCX document |
|
| Amendment_10_Answers_0010.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0009.pdf |
PDF |
|
| Amendment_08_Q_A_0008.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0008.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0007.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0006.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0005.pdf |
PDF |
|
| Design_Report_0005.pdf |
PDF |
|
| Q_A_Amd_05_0005.pdf |
PDF |
|
| Sign_in_0005.pdf |
PDF |
|
| Project_Experience_Questionnaire_0005.docx |
DOCX document |
|
| Small_Business_Partcipation_0005.pdf |
PDF |
|
| General_References_0005.pdf |
PDF |
|
| B08_Amendment_04_Q_A_Set_01_0004.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0004.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0003.pdf |
PDF |
|
| Sol_140P2025R0080_Amd_0001.pdf |
PDF |
|
| B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf |
PDF |
|
| B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf |
PDF |
|
| B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf |
PDF |
|
| B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf |
PDF |
|
| B08_Attachment_8_Hydrogeologic_Assessment.pdf |
PDF |
|
| B08_Attachment_3_ORPI_Wage_Determination.pdf |
PDF |
|
| B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf |
PDF |
|
| B08_Attachment_6_Construction_Contract_Administration.pdf |
PDF |
|
| B08_Attachment_4C__Key_Personnel_Resume_Form.pdf |
PDF |
|
| B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf |
PDF |
|
| B08_Attachment_5B_SF24-23a.pdf |
PDF |
|
| B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf |
PDF |
|
| B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx |
XLSX spreadsheet |
|
| B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf |
PDF |
|
| B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx |
XLSX spreadsheet |
|
| Sol_140P2025R0080.pdf |
PDF |
|
| B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf |
PDF |
|
| B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf |
PDF |
|
| B08_1442_Clause_Package_P2025R0080_7_31_25.pdf |
PDF |
|
| B08_Attachment_4B_Project_Experience_Questionnaire_.docx |
DOCX document |
|
| B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx |
XLSX spreadsheet |
|
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .