B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf
PDF 3 MB Posted
- Attached to
- ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
- Solicitation number
- 140P2025R0080
About this file
This file contains detailed technical specifications for a water distribution system replacement project at Organ Pipe Cactus National Monument in Arizona. The specifications cover selective demolition, concrete work, water storage tank construction and coating, electrical systems, telecommunications infrastructure, site clearing, earthmoving, and erosion control measures required to replace an existing water system that was constructed using asbestos-cement pipe.
Key components include construction of two welded steel water storage tanks (50,000-gallon and 100,000-gallon capacities) manufactured according to AWWA D100 standards, complete with NSF-certified coating systems suitable for potable water storage. The electrical work encompasses low-voltage power conductors, grounding systems, raceways, telecommunications pathways, and surge protection equipment. Site work involves selective demolition with special handling requirements for asbestos-cement pipe materials, concrete forming and placement, and comprehensive erosion control measures. The telecommunications specifications detail backbone and horizontal cabling systems, equipment racks, and pathway infrastructure. All work must comply with federal environmental regulations and coordinate with the National Park Service, with special provisions for protecting existing cacti and minimizing impact on the Twin Peaks Campground during construction activities.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORPI-240821 02 41 19 - 1
SELECTIVE DEMOLITION
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Removal and disposal, removal and reinstallation, and abandonment of selected site elements and utilities.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
B. Dispose: Legally dispose of off-site.
C. Abandon: Existing items of construction that will be taken out of service but do not have to be completely removed and may remain in place as specified in this Section.
D. Abandoned: Existing items of construction that are not in service but have been left in place.
E. Remove and Replace: Remove existing items and install new items.
F. Remove and Reinstall: Carefully remove from existing construction, in a manner to prevent damage, and store during construction. Reinstall after work in area is complete.
G. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, or removed and reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
ORPI-240821 02 41 19 - 2
1.4 FIELD CONDITIONS
A. Buildings immediately adjacent to water line construction work will be occupied. Conduct demolition so operations of occupied buildings will not be disrupted.
1. For work outside of buildings, maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from Contracting Officer.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
C. Hazardous Materials:
1. It is believed that some of the existing water main is asbestos cement pipe.
2. With the exception of some asbestos cement pipe, it is not expected that hazardous materials will be encountered in the Work.
3. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Contracting Officer.
D. Utility Service:
1. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operation.
2. Coordinate utility outages with Contracting Officer.
3. Coordinate maintenance of fire-protection facilities in service during selective demolition operations with Contracting Officer.
E. Notify Contracting Office of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
ORPI-240821 02 41 19 - 3
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Division 31 Section "Earth Moving."
2.2 FLOWABLE FILL
A. Description: Low-strength-concrete, flowable-slurry mix
1. Cement: ASTM C 150, Type 1, Portland
2. Density: 115- to 145-lb/cu. Ft.
3. Aggregates: ASTM C 33, natural sand, fine and crushed gravel or stone, coarse.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. If services/systems are required to be continued during work provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
D. When unanticipated water, sewer, mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly notify Contracting Officer.
1. Before selective demolition or removal of existing site elements that will be reinstalled in final Work, make permanent record of measurements, materials, and construction details required to reinstall. Walk through site with Contracting Officer for field verification of site accessories to be removed and reinstalled.
3.2 PREPARATION
ORPI-240821 02 41 19 - 4
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
B. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Existing Utilities:
1. Locate existing utilities where Project is located before site clearing and demolition.
2. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
3. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Government and authorities having jurisdiction.
ORPI-240821 02 41 19 - 5
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people.
1. Provide protection to ensure safe passage of people around selective demolition area.
B. Remove temporary barricades and protections where hazards no longer exist.
C. Open Excavations: As specified in Division Section 312000 "Earth Moving."
3.4 SELECTIVE DEMOLITION
A. General:
1. Remove existing construction only to the extent required by new construction and as indicated.
2. Remove or abandon indicated utilities.
3. Use methods required to complete the Work within limitations of governing regulations.
4. Do not use cutting torches until work area is cleared of flammable materials.
5. Maintain adequate ventilation when using cutting torches.
6. Prevent the spread of dust and debris to occupied portions of a building or on pavements and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water for dust control if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris that may result from construction operations.
7. Where pedestrian and or driver safety is endangered in the area of demolition work, provide temporary traffic control in accordance with MUTCD.
8. Protect existing survey monuments. Any damaged monuments shall be replaced by a Professional Land Surveyor licensed in the State of Arizona.
9. Protect existing work that is to remain in place, be reused, or remain the property of the Government. At no additional expense to the Government, repair all items that are damaged during performance of the work to their original condition, or replace with new.
Do not overload pavements that will remain.
10. Preserve existing trees to the greatest extent possible. The Contractor shall tag trees to be saved with plastic or vinyl tape tied to the tree caliper. The Contractor shall protect existing trees by fencing planting areas to remain from compaction and any other damage with a barrier of metal poles a maximum 8 feet (2.4 meter) on center with plastic netting to
ORPI-240821 02 41 19 - 6
a minimum of 10 feet (3.0 meter) radius from outside of the tree’s trunk. Where tree drip lines are greater than 10 feet (3.0 meter) from the tree's trunk, locate barrier fencing at the drip line of the tree. The Contractor shall not allow debris from tree or stump removal operations to fall on or otherwise damage plants that are not scheduled for removal. Plastic tape and barrier fencing shall not be removed until planting operations are ready to begin and or instructed by the Contracting Officer.
B. Explosives: Use of explosives is not permitted.
C. Utility lines and appurtenances
1. Utility Lines to be Removed: Completely remove and dispose of existing lines if they are indicated to be removed, interfere with installation of new lines, or if existing lines are within two feet of new lines. Beyond these limits, existing lines may be abandoned in place, as specified below.
2. Utility Lines to be Abandoned: Drain lines. Portions of abandoned lines within two feet of existing grade shall be removed, the rest of the line may remain in place. Plug ends of lines left in place with flowable fill.
3. Appurtenances such as valves, valve boxes, valve vaults, hydrants and cleanouts to be Abandoned: All portions of appurtenances which extend within two feet of finished grade must be completely removed and disposed of. The rest of the appurtenance may remain in place.
D. Asphalt Pavement, Concrete Sidewalk, Curb and Gutter
1. Completely remove existing bituminous asphalt or concrete pavement, concrete curb and gutter or other pavement surface to extents required for utility installation, within limits of disturbance and as indicated for full depth of pavement. Contractor has the option of salvaging the existing pavement for use as aggregate base or legally disposing of materials.
Recycled material must meet specifications of aggregate base specified in Division 312000 Section "Earth Moving."
2. Saw cut pavement adjacent to new construction.
3. The Contractor has the option to choose the method of asphalt pavement removal from the following:
a. Asphalt milling
b. Pulverization and/or scarification
c. Other methods as approved by the Contracting Officer.
4. If pavement is to be salvaged, clean existing pavement surface of loose and deleterious material immediately before pavement removal.
5. Remove existing base material as needed to establish elevation of subgrade of new pavement section. Existing base material may be reused as common fill as specified in Section 312000 “Earth Moving,” for subgrade of new pavement section or other locations, but shall not be reused as aggregate base material in new pavement sections.
6. Replace pavement with materials in kind and as specified in Section 321216 “Asphalt Paving” and Section 033000 “Cast-In-Place Concrete.”
ORPI-240821 02 41 19 - 7
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Government's property, remove demolished materials from Project site and legally dispose of them.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage or contamination on adjacent surfaces and areas within and beyond park boundaries.
B. Burning: Do not burn demolished materials.
3.6 RESTORATION
A. Below-Grade Areas: Completely fill below-grade areas and voids resulting from demolition operations with satisfactory soil materials meeting the requirements of final backfill as defined in Section 312000 "Earth Moving." Compact backfill as specified in Section 312000 “Earth Moving”.
B. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.
3.7 HAZARDOUS WASTE REMEDIATION
A. In the event of a spill or release of hazardous substances, pollutant, contaminant or oil, notify the Contracting Officer immediately. Containment actions shall be taken immediately to minimize the effect of any spill or leak. Clean up shall be performed at the Contractor's expense in accordance with the ESR and the approved spill work plan as described in NPS Standards and Specification Section, Temporary Environmental Controls.
B. All waste materials shall become the property of the Contractor and shall be transported, disposed of in accordance with the criteria listed in the ESR and the approved disposal plan as described in Specification Section, Temporary Environmental Controls.
C. Demolition and/or removal of asbestos cement (AC) pipe shall be in compliance with the most current and most stringent regulations of the applicable OSHA, EPA, and State of Arizona requirements. This includes, but is not limited to:
1. Federal OSHA Asbestos Regulations (Construction Standard) (29CFR 1926.110)
2. EPA AHERA Asbestos Regulations (40 CFR Part 763).
3. Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP)
ORPI-240821 02 41 19 - 8
D. The project requires working around and potentially disturbing asbestos cement (AC) pipe. It is anticipated the majority of the existing water main is AC pipe. The intent of the design is to minimize disturbance of AC pipe and leave the pipe intact and in-place for possible future use.
E. As long as the AC pipe remains in its non-friable state, as defined by NESHAPS, it can be disposed as a conventional construction waste. EPA defines friable as material, when dry, which may be crumbled, pulverized or reduced to power by hand pressures.
F. Contractor shall submit a Demolition Plan that documents how the material will be kept non-friable prior to commencing work. A safety plan that documents efforts to protect employees/public from respiratory hazards and dust generation should also be provided by Contractor.
G. If the Contractor accidentally crushes or disturbs AC pipe, and it is rendered friable, the Contractor is considered the Generator of the hazardous material and is responsible for notifications, permitting, proper handling, transportation and disposal of the material at no additional expense to the Government.
END OF SECTION 024119
ORPI 031000- 1
CONCRETE FORMING AND ACCESSORIES
SECTION 031000 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Form-facing material for cast-in-place concrete.
Bracing, and anchoring.
PREINSTALLATION MEETINGS
B. Preinstallation Conference: Conduct conference at Project site.
1.2 ACTION SUBMITTALS
A. Product Data: For each of the following:
1. Concealed surface form-facing material.
2. Form ties.
3. Form-release agent.
B. Sustainable Design Submittals: See Sustainability Checklists
C. Shop Drawings: Prepared by, and signed and sealed by, a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.
1. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301 (ACI 301M).
a. Location of construction joints is subject to approval of the Contracting Officer
1.3 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.
B. Minutes of preinstallation conference.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, brace, and maintain formwork, in accordance with ACI 301 (ACI 301M), to support vertical, lateral, static, and dynamic loads, and construction
ORPI 031000- 2
loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
1. Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."
2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.
2.2 FORM-FACING MATERIALS
A. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.
1. Provide lumber dressed on at least two edges and one side for tight fit.
2.3 RELATED MATERIALS
A. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2. Form release agent for form liners shall be acceptable to form liner manufacturer.
B. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that leave no corrodible metal closer than 1 inch (25 mm) to the plane of exposed concrete surface.
2. Furnish ties that, when removed, leave holes no larger than 1 inch (25 mm) in diameter in concrete surface.
PART 3 - EXECUTION
3.1 INSTALLATION OF FORMWORK
A. Comply with ACI 301 (ACI 301M).
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 (ACI 117M) and to comply with the Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finishes.
C. Limit concrete surface irregularities as follows:
1.
2. Surface Finish-3.0: ACI 117 Class A, 1/8 inch (3.0 mm).
ORPI 031000- 3
D. Construct forms tight enough to prevent loss of concrete mortar.
1. Minimize joints.
2. Exposed Concrete: Symmetrically align joints in forms.
E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.
1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.
2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
3. Install keyways, , recesses, and other accessories, for easy removal.
F. Do not use rust-stained, steel, form-facing material.
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.
1. Provide and secure units to support screed strips.
2. Use strike-off templates or compacting-type screeds.
H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.
1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.
2. Locate temporary openings in forms at inconspicuous locations.
I. At construction joints, overlap forms onto previously placed concrete not less than 12 inches (305 mm).
J. Form openings, chases, offsets, sinkages, keyways, blocking, screeds, and bulkheads required in the Work.
1. Determine sizes and locations from trades providing such items.
2. Obtain written approval of Contracting Officerprior to forming openings not indicated on
Drawings.
K. Construction and Movement Joints:
1. Construct joints true to line with faces perpendicular to surface plane of concrete.
2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Contracting Officer.
3. Place joints perpendicular to main reinforcement.
L. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection.
1. Locate ports and openings in bottom of vertical forms, in inconspicuous location, to allow flushing water to drain.
2. Close temporary ports and openings with tight-fitting panels, flush with inside face of form, and neatly fitted, so joints will not be apparent in exposed concrete surfaces.
ORPI 031000- 4
M. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
N. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
O. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
3. Clean embedded items immediately prior to concrete placement.
3.3 FIELD QUALITY CONTROL
A. Special Inspections: Contractor will engage a special inspector and qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
C. Inspections:
1. Inspect formwork for shape, location, and dimensions of the concrete member being formed.
END OF SECTION 031000
ORPI 032000- 1
CONCRETE REINFORCING
SECTION 032000 - CONCRETE REINFORCING
1.1 SUMMARY
A. Section Includes:
1. Steel reinforcement bars.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Each type of steel reinforcement.
2. Bar supports.
B. Sustainable Design Submittals: See Sustainability Checklist
C. Shop Drawings: Comply with ACI SP-066:
1. Include placing drawings that detail fabrication, bending, and placement.
2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.
D. Construction Joint Layout: Indicate proposed construction joints required to build the structure.
1. Location of construction joints is subject to approval of the Contracting Officer.
1.4 INFORMATIONAL SUBMITTALS
A. Material Test Reports: For the following, from a qualified testing agency:
1. Steel Reinforcement:
a. For reinforcement to be welded, mill test analysis for chemical composition and carbon equivalent of the steel in accordance with ASTM A706/A706M.
2. Mechanical splice couplers.
B. Field quality-control reports.
C. Minutes of preinstallation conference.
ORPI 032000- 2
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A615/A615M, Grade 60 (Grade 420), deformed.
2.2 REINFORCEMENT ACCESSORIES
A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.
1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.
B. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch (1.2908 mm) in diameter.
1. Finish: Galvanized.
2.3 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
2. Do not tack weld crossing reinforcing bars.
ORPI 032000- 3
C. Preserve clearance between bars of not less than 1 inch (25 mm), not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.
D. Provide concrete coverage in accordance with ACI 318 (ACI 318M).
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Splices: Lap splices as indicated on Drawings.
1. Stagger splices in accordance with ACI 318 (ACI 318M).
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Contracting Officer.
1. Place joints perpendicular to main reinforcement.
2. Continue reinforcement across construction joints unless otherwise indicated.
3. Do not continue reinforcement through sides of strip placements of floors and slabs.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117 (ACI 117M).
3.5 FIELD QUALITY CONTROL
A. Special Inspections: Contractor will engage a special inspector and qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
C. Inspections:
1. Steel-reinforcement placement.
END OF SECTION 032000
ORPI 033000- 1
CAST-IN-PLACE CONCRETE
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.
1.2 SUMMARY
A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 031000 – Concrete Forming and Accessories
2. Section 032000 – Concrete Reinforcing
1.3 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with fly ash,; materials subject to compliance with requirements.
B. W/C Ratio: The ratio by weight of water to cementitious materials.
1.4 PRE-INSTALLATION MEETINGS
A. Pre-installation Conference: Project Site.
1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:
a. Contractor's superintendent.
b. Independent testing agency responsible for concrete design mixtures.
c. Ready-mix concrete manufacturer.
d. Concrete Subcontractor.
e. Special concrete finish Subcontractor.
2. Review special inspection and testing and inspecting agency procedures for field quality control, concrete finishes and finishing, cold- and hot-weather concreting procedures, curing procedures, construction contraction and isolation joints, and joint-filler strips, forms and form removal limitations, steel reinforcement installation, methods for achieving specified floor and slab flatness and levelness
ORPI 033000- 2
floor and slab flatness and levelness measurement, concrete repair procedures, and concrete protection.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1. Indicate amounts of mixing water to be withheld for later addition at Project site.
C. Steel Reinforcement Shop Drawings: Placing Drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.
D. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.
1. Location of construction joints is subject to approval of the Contracting Officer.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Welding certificates.
C. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Form materials and form-release agents.
4. Steel reinforcement and accessories.
5. Curing compounds.
D. Material Test Reports: For the following, from a qualified testing agency:
1. Aggregates: Include service record data indicating absence of deleterious expansion of concrete due to alkali aggregate reactivity.
E. Field quality-control reports.
F. Minutes of pre-installation conference.
ORPI 033000- 3
1.7 QUALITY ASSURANCE
A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete
Production Facilities."
B. Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.
1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.
2. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing
Technician and Concrete Laboratory Testing Technician, Grade I. Testing agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician, Grade II.
1.8 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on concrete mixtures.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
1.10 FIELD CONDITIONS
A. Hot-Weather Placement: Comply with ACI 301 and ACI 305, and as follows:
1. Maintain concrete temperature below 90º F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
ORPI 033000- 4
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:
1. ACI 301.
2. ACI 117.
2.2 FORM-FACING MATERIALS
A. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
B. Form Ties: Factory-fabricated, removable or snap-off glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.
2. Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.
2.3 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.
2.4 REINFORCEMENT ACCESSORIES
A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
1. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use
CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.
2.5 CONCRETE MATERIALS
A. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from single source from single manufacturer.
ORPI 033000- 5
B. Cementitious Materials:
1. Portland Cement: ASTM C 150/C 150M, Type I or II modified.
2. Fly Ash: ASTM C 618, Class F
C. Normal-Weight Aggregates: ASTM C 33/C 33M, Class 3M coarse aggregate or better, graded.
Provide aggregates from a single source with documented service record data of at least 10 years' satisfactory service in similar applications and service conditions using similar aggregates and cementitious materials.
1. Maximum Coarse-Aggregate Size:
a. 1/5 the narrowest dimension of concrete member; or
b. 1/3 the depth of slab; or
c. ¾ the clearance spacing between reinforcement bars; or
d. 1 ½” inches
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
D. Air-Entraining Admixture: ASTM C 260/C 260M.
E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.
1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.
2. Retarding Admixture: ASTM C 494/C 494M, Type B and D.
3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type A.
4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.
5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.
6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.
7. Permeability-Reducing Admixture: ASTM C494/C494M, Type S, hydrophilic, permeability-reducing crystalline admixture, capable of reducing water absorption of concrete exposed to hydrostatic pressure (PRAH).
a. Permeability: No leakage when tested in accordance with CRC C48 at a hydraulic pressure of 200 psi (1.28 MPa) for 14 days.
F. Water: ASTM C 94/C 94M and potable
2.6 CURING MATERIALS
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.
B. Burlap-Polyethylene Sheet: Burlap weighing not less than 10 ounces per linear yard, 40 inches wide impregnated on 1 side with white opaque polyethylene 0.006 inch thick. Sheeting shall conform to
ASTM C171.
C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
ORPI 033000- 6
D. Water: Potable.
E. Liquid Curing Compound: ASTM C309, Type 1-D, Class B clear or translucent with fugitive dye. Do not apply to floor slabs.
2.7 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.
1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash: 25 percent.
C. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.
D. Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use water reducing admixture in concrete, as required, for placement and workability.
2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
3. Use water-reducing admixture in pumped concrete, concrete for heavy-use industrial slabs and parking structure slabs, concrete required to be watertight, and concrete with a w/c ratio below 0.50.
4. Use corrosion-inhibiting admixture in concrete mixtures where indicated.
2.8 CONCRETE MIXTURES
A. Foundation Ring Walls:
1. Minimum Compressive Strength: 4,000 psi at 28 days.
2. Maximum W/C Ratio: 0.45.
3. Slump Limit: 3 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch, 6-inches after, plus or minus 1 inch.
B. Pads and Slabs-on-Grade:
1. Minimum Compressive Strength: 4,500 psi at 28 days for exterior slabs on grade
2. Maximum W/C Ratio: 0.45
3. Minimum Cementitious Materials Content: 564 lb/cu. yd.
4. Slump Limit: 3 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch, 6-inches after, plus or minus 1 inch.
5. Air Content:
a. Do not use an air-entraining admixture or allow total air content to exceed 3 percent for concrete used in trowel-finished floors.
ORPI 033000- 7
2.9 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
2.10 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and furnish batch ticket information.
1. When air temperature is between 85 and 90º F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90º F, reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.1 FORMWORK INSTALLATION
A. Design, erect, , brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.
B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.
C. Limit concrete surface irregularities, designated by ACI 347 as abrupt or gradual, as follows:
1. Class A, 1/8 inch for smooth-formed finished surfaces.
D. Construct forms tight enough to prevent loss of concrete mortar.
E. Construct forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
1. Do not use rust-stained steel form-facing material.
F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.
G. Form openings, chases, offsets, sinkages, keyways,blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items.
H. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
ORPI 033000- 8
I. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
J. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 EMBEDDED ITEM INSTALLATION
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
1. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
2.
3.3 REMOVING AND REUSING FORMS
A. General: Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50º F for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.
B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material are not acceptable for exposed surfaces. Apply new form-release agent.
C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Contracting Officer.
3.4 STEEL REINFORCEMENT INSTALLATION
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.
1. Weld reinforcing bars according to AWS D1.4/D 1.4M, where indicated.
D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
ORPI 033000- 9
E.
3.5 JOINTS
A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.
B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Contracting Officer.
1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs.
2. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.
3. Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible.
4. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
3.6 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections are completed.
B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Contracting Officer.
C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301.
1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation.
1. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.
2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.
3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
ORPI 033000- 10
E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.
1. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.
2. Maintain reinforcement in position on chairs during concrete placement.
3. Screed slab surfaces with a straightedge and strike off to correct elevations.
4. Slope surfaces uniformly to drains where required.
5. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations.
3.7 FINISHING FORMED SURFACES
A. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects.
Remove fins and other projections that exceed specified limits on formed-surface irregularities.
1. Apply to concrete surfaces to receive a rubbed finish.
B. Rubbed Finish: Apply the following to smooth-formed-finished as-cast concrete where indicated:
1. Smooth-Rubbed Finish: Not later than one day after form removal, moisten concrete surfaces and rub with carborundum brick or another abrasive until producing a uniform color and texture. Do not apply cement grout other than that created by the rubbing process.
C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.8 FINISHING SLABS
A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Scratch Finish: While still plastic, texture concrete surface that has been screeded and bull-floated or darbied. Use stiff brushes, brooms, or rakes to produce a profile amplitude of 1/4 inch in one direction.
1. Apply scratch finish to surfaces.
C. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power-driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.
1. Apply float finish to surfaces.
ORPI 033000- 11
D. Trowel Finish: After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.
1. Apply a trowel finish to surfaces.
2. Finish surfaces to the following tolerances, according to ASTM E 1155, for a randomly trafficked floor surface:
a. Specified overall values of flatness, F(F) 25; and of levelness, F(L) 20; with minimum local values of flatness, F(F) 17; and of levelness, F(L) 15.
b. Specified overall values of flatness, F(F) 35; and of levelness, F(L) 25; with minimum local values of flatness, F(F) 24; and of levelness, F(L) 17; for slabs-on-grade.
3. Finish and measure surface, so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.- long straightedge resting on two high spots and placed anywhere on the surface does not exceed 1/4 inch.
E. Trowel and Fine-Broom Finish: Apply a first trowel finish to surfaces. While concrete is still plastic, slightly scarify surface with a fine broom.
1. Comply with flatness and levelness tolerances for trowel-finished floor surfaces.
F. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and elsewhere as indicated.
1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with Contracting Officer before application.
3.9 MISCELLANEOUS CONCRETE ITEM INSTALLATION
A. Filling In: Fill in holes and openings left in concrete structures after work of other trades is in place unless otherwise indicated. Mix, place, and cure concrete, as specified, to blend with in-place construction. Provide other miscellaneous concrete filling indicated or required to complete the Work.
3.10 CONCRETE PROTECTING AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 305.1 for hot-weather protection during curing.
B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations.
Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist
ORPI 033000- 12
cure after loosening forms. If removing forms before end of curing period, continue curing for remainder of curing period.
D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces.
E. Cure concrete according to ACI 308.1, by one or a combination of the following methods:
1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers.
2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than 7 calendar days.
Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
a. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive floor coverings.
b. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive penetrating liquid floor treatments.
c. Cure concrete surfaces to receive floor coverings with either a moisture-retaining cover or a curing compound that the manufacturer certifies does not interfere with bonding of floor covering used on Project.
3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.
3.11 CONCRETE SURFACE REPAIRS
A. Defective Concrete: Repair and patch defective areas when approved by Contracting Officer.
Remove and replace concrete that cannot be repaired and patched to Contracting Officer's approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-1/2 parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension to solid concrete. Limit cut depth to 3/4 inch.
ORPI 033000- 13
Make edges of cuts perpendicular to concrete surface.
This is the start of the file's text. The full file is on GovTribe.