B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
- Solicitation number
- 140P2025R0080
About this file
This is a Contract Price Schedule Template for solicitation 140P2025R0080, issued by the National Park Service Denver Service Center for the Organ Pipe Cactus National Monument water system replacement project. The template establishes pricing structure for both base requirements and optional components, with offerors required to submit pricing for all line items or risk having their proposal deemed unacceptable.
The base contract (CLIN 1) covers installation of a 100,000 gallon potable water tank with associated piping and demolition, replacement of the water distribution system for residential and maintenance areas including mains, laterals, services, hydrants, and truck fill stations, well house piping replacements with new control panels, and SCADA system installation with power and fiber connections. Four options are available: Option 1 (CLIN 2) for a new domestic well and well house, Option 2 (CLIN 3) for a 50,000 gallon tank and distribution system to the campground, Option 3 (CLIN 4) for Twin Peaks Campground water distribution system replacement, and Option 4 (CLIN 5) for campground electrical conduit installation that can only be selected if Option 3 is funded. All pricing uses lump sum quantities with unit prices governing in case of calculation errors, and totals must be rounded to whole dollars.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2025R0080 | ||||
| PARK - PMIS: | ORPI 240821 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Organ Pipe Cactus National Monument | ||||
| Project Title: | Replace Well and Water System Components for Maintenance and Housing | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| CLIN 1 | Base bid – 100K tank, Water system for maintenance and residential areas: • 100,000 gallon potable water tank and associated piping and demolition |
• Replacement of water distribution system for the residential area and maintenance facility including water mains, water laterals, water service, hydrants, truck fill station and associated demolition, trenching, asphalt removal and patching. •Well house piping replacements and control panel replacement including associated demolition and removals.
• SCADA system, power and fiber connections and associated demolition, trenching, asphalt removal and patching. 1 LS
| TOTAL BASE PRICE (Contract Line Item Number 1 & 2) --------------------------------------------------------------------------------- | ||||
| CLIN 2 | Option 1: New well and well house project elements: • Domestic well and associated well pump and supply line to the well house. | 1 | LS | |
| CLIN 3 | Option 2: 50K tank project elements: • 50,000 gallon potable water tank and associated piping and demolition. • Replacement of water distribution system from the 50k tank to the start of the campground water system including water mains, services, hydrants, and associated demolition, trenching, asphalt removal and patching. | |||
| • Power and fiber to 50K tank. | 1 | LS | ||
| CLIN 4 | Option 3: Campground water system: • Replacement of Twin Peaks Campground water distribution system starting at the entrance to the campground including water mains, water laterals, water service, hydrants, truck fill station and associated demolition, trenching, asphalt removal and patching. | 1 | LS | |
| CLIN 5 | Option 4: Campground electrical (to be funded separately from LRF project): (Bid Option 4 will not be selected unless Bid Option 3 is also funded, therefore contractor can assume trenching will be shared between water and electrical conduit- note to be added to Spec 012700) | |||
| • | Install Twin Peaks Campground electrical conduit | |||
| 1 | LS | |||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2-5) ----------------------------------------------------------- | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 5) -------------------------- |
Sheet1