B08_Attachment_3_ORPI_Wage_Determination.pdf

PDF 2 MB Posted

Attached to
ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
Solicitation number
140P2025R0080
Issued by
Department of the Interior National Park Service National Office

About this file

This is a General Decision from the U.S. Department of Labor establishing prevailing wage rates for construction projects in Pima County, Arizona, effective June 20, 2025. The decision (AZ2025059) supersedes a previous general decision (AZ2024059) and covers heavy construction work subject to the Davis-Bacon Act.

The document provides detailed wage rates and fringe benefits for various construction classifications including electricians ($33.00-$59.69/hour), power equipment operators ($32.29-$37.67/hour), laborers ($27.41-$30.88/hour), truck drivers ($30.88/hour), carpenters ($31.98/hour), and other specialized roles. Most positions include fringe benefits ranging from $9.26 to $21.33 per hour. The wage determination includes Executive Order compliance requirements, with different minimum wage rates depending on contract award dates - $17.75/hour for contracts entered after January 30, 2022, or $13.30/hour for earlier contracts. Additional provisions include Executive Order 13706 requirements for paid sick leave and Executive Order 13766 establishing paid sick leave for federal contractors. The document includes classification codes, effective dates for various wage rates, and a detailed appeals process for wage determination matters through the Department of Labor's Wage and Hour Division.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
432250_-_Flowmeters_0010.doc DOC document
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
Sol_140P2025R0080_Amd_0009.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Design_Report_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .