B08_Attachment_4C__Key_Personnel_Resume_Form.pdf

PDF 144 KB Posted

Attached to
ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
Solicitation number
140P2025R0080
Issued by
Department of the Interior National Park Service National Office

About this file

This is a template form for submitting resumes of key personnel proposed for a federal contract, designated as Attachment 1.

The form requires comprehensive information for each key person including their name, role in the contract, total years of experience and experience with current company, company name and location, education credentials, and other qualifications such as safety training, quality control training, and awards. The template provides space for up to three relevant experience entries per person, with each entry requiring detailed project information including title and location, project dates, brief description of scope/size/cost, specific duties performed, specific role, employer, and phone contact number. The form is structured as a standardized template to collect personnel qualifications and experience data as part of a contract proposal submission process.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
432250_-_Flowmeters_0010.doc DOC document
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
Sol_140P2025R0080_Amd_0009.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Design_Report_0005.pdf PDF
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_3_ORPI_Wage_Determination.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT

COMPLETE ONE FOR EACH KEY PERSON

1. NAME 2. ROLE IN THIS CONTRACT 3. YEARS EXPERIENCE

a. TOTAL b. W ITH CURRENT COMPANY

4. COMPANY NAME AND LOCATION (City and State)

5. EDUCATION (DEGREE AND SPECIALIZATION)

6. OTHER QUALIFICATIONS (SAFETY, QC TRAINING, AW ARDS, ETC.)

7. RELEVANT EXPERIENCE

a.

(1) TITLE AND LOCATION (City and State) (2) DATES OF PROJECT

START DATE END DATE

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc. of the project)

(4) SPECIFIC DUTIES PERFORMED:

(5) SPECIFIC ROLE (6) EMPLOYER (7) PHONE NUMBER

b.

(1) TITLE AND LOCATION (City and State) (2) DATES OF PROJECT

START DATE END DATE

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc. of the project)

(4) SPECIFIC DUTIES PERFORMED:

(5) SPECIFIC ROLE (6) EMPLOYER (7) PHONE NUMBER

c.

(1) TITLE AND LOCATION (City and State) (2) DATES OF PROJECT

START DATE END DATE

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc. of the project)

(4) SPECIFIC DUTIES PERFORMED:

(5) SPECIFIC ROLE (6) EMPLOYER (7) PHONE NUMBER

File details come from the government source that posted it. Updated .